Project Brief

Project A197 A213 A216


Development Private Residential Private Residential Private Office Complex
Location TMTL 422, Tsing Lung Road, KIL 11227, J/O SHEUNG LOK STREET AND Lam Lee Street, Kowloon Bay, NKIL No. 6312, HK
Developer Evermatch (HK) Limited Kerry Project Management (HK) Ltd. Star Wing International Limited
Architect Siu Yin Wai Dennis Lau & Ng Chun Man Dennis Lau & Ng Chun Man
QS RLB Acardis RLB
Scope two 10-storey tower blocks, thirty seven 3-storey The construction of 2 levels basement car park, 9 nos. The Works comprise the construction of 22-storey
houses, one 2-storey car port, one clubhouse and all of residential towers, 2 levels clubhouse; including all office tower on a 3-storey podium
associated pile cap, raft footing and single footing structural (with precast façade works), architectural and 3-storey basement of GFA approximately 51,600
construction, building services and external works for works and building services installation, etc. as shown s.m. and the external works at
the residential development at TMTL 422, Tsing Lung on drawings. Yellow Area, Green Area and external areas within the
Road, Area 58, Siu Lam, Tuen Mun, N.T. The Works lot boundary.

(p.503)
Contract Type Lump sum based on drawing and specifications
Contract Sum HK$ 525,003,629.00 HK$ 3,666,052,480.09 HK$ 1,401,165,897.62
Surety Bond HK$ 36,250,000.00 HK$ 201,538,000.00 HK$ 140,117,000.00
6.90% 5.50% 10.00%
LD/day HK$ 300,000.00 HK$ 1,000,000.00 HK$ 370,000.00
0.057% 0.027% 0.026%
Tender Apr 2010
Award Nov 2010
Possession 1-Dec-10 15-Jan-15 2-Nov-15
Completion 22-Jul-12 28-Oct-16 23-Jul-17
SMM HKSMM3 HKSMM4 HKSMM4
QS Tasks

MC IP Prelim, Bill, Workdone


VO AI/CVI, Addition, incurred cost, abortive works, Omission
DSC IP S&M, Sundry, Door, Stone works, Scaffolding, Fire shutter, Security, Testing
FA Qty & rate checking, terms checking, agreement
VO Site order, Addition, incurred cost, abortive works, Omission
CC Site memo, NOCC, breakdown, admin fee, penalty
NSC CC Site memo, NOCC, breakdown, admin fee, penalty
Subletting Call tender 3 or more, on list
TA del qualifications, apple to apple fair comparison
Award call sc & site team, draft LOA / contract, agreement, terms, bq, spec, dwg
Procurement Measurement correct dwg, notes, excel / on paper, remark, readability
Place Order add wastage (suggested by frontline management)
Site Ans contract quries contract particulars
General Filing latest application & certification (accumulated), every VO & supporting, CW work done