Professional Documents
Culture Documents
I
Inoperation
ti for
f RNP
• Introduction
• Conclusions
• CAAC ’ss PBN Roadmap
– Near term(2009-2012)
30% airports have the ability of PBN operation
– Medium term (2013-2016)
All transport airports have the ability of PBN operation
– long term (2017-2025)
• Present situation
– Total airports 196
– RNAV 23
– RNP APCH 59
– RNP AR 15
Special
p Airports
p
AC & Regulation
g
Track angle<15°Æ600m
Track angle>15°Æ900m
g
45°
45
90m
900m
900m
12.5%
2xRNP
RNP-AR
RNP AR 0
0.3Æ900m
3Æ900m
2xRNP
2xRNP
90m
12.5%
Wind
FTE(AC 95%)
Statistical distribution
model
Basic RNP1 Protection Area
30°
The latest
turning point
0.3NM
The earlist
turning point
0.3NM
Fly-over
Fly over Fly-by
Fly by
Basic RNP 1 Protection Area
• Fly-over
Fl o er waypoint
a point
– The earliest turning point =-ATT
– The
Th llatest turning
i point=
i ATT
ATT+c
• Fly-by waypoint
– The earliest turning point =-ATT+ R*tan(A/2)
– The latest turning point= ATT+c- R*tan(A/2)
• ATT=0.8*XTT
Key
yppoint
Protection width is a constant value for the straight track
P
Protection
i area varied
i d by
b the
h wind
i d factor
f
Wind
ICAO wind: 30kt
Consider the worse wind condition
Reference Doc 9905
Turning Degree
15° 30° 45° 60° 75° 90° 105° 120°
Wind model
ICAO wind 16099 16666 17233 17800 18367 18934 19501 20068
RNP wind 16374 17217 18060 18902 19745 20588 21430 22273
EOSID
DX802
DX801
14
Validation
• Simulator
Sim lator Validation
– Max weight, max temperature
– M weight,
Max i h max temperature, max crosswind.i d
– Min weight, min temperature, max crosswind.
– Min weight, min temperature, max headwind.
– Max weight, min temperature, max tailwind
• Flight Validation
Flight Validation
Conclusions
• No specification or ad
advisory
isor circ
circular
lar abo
aboutt the
basic RNP 1 on EOSID
• New wind model and RNP APCH turning
construction model
• Simulator and flight validation prove the
effectiveness