You are on page 1of 1

Client /Contractor: Engineering Contractor:

COMMENT RESOLUTION SHEET (CRS)

PROJECT NAME: FEED & DD for Additional


CONTRACT / PROJECT NO.: Date:
Separation facility
DOCUMENT TITLE: Project Design Basis DOCUMENT NO: Revision No: Page 1 of 1

Item Reference
Comments Valdel Response Resolution
No Page / Section

Section 8.1, 8.2 & 8..3 : 20% installed spares shall be maintained after
1 Noted and incorporated
DCS, IPS and FGS implementation of this project

Noted. Different instruments will be used

Separate instruments shall be used for control and for control and safeguarding functions. As
Section 8.4 : Field
2 safeguarding. Instrument used for safeguarding shall SIL study is not part of scope, SIL 1
Instruments
be certified according to relevant SIL. certified instruments will be selected for
safeguarding functions.
Section 8.4.8 :
Heat detectors contacts shall be of normally closed
3 Miscellaneous Noted and incorporated
type
Instruments
Noted. Pair cables (instruments to JB) will
be with overall screens and Multipair
4 Field Cables Individual and overall screen
cables (from JB to Control System) shall be
individual and overall screen.

You might also like