Construction Assessment Checklist

Checklist No: 01-04 Activity: WELDING CONSUMABLE CONTROL (WELDER)


Revision: 0 Discipline: 01 Structural Fabrication
Site/Location: Report Number:
Contractor: Date:
Subcontractor: Component:

Accepted
Item Action Results
Yes No
Before commencing this surveillance.
SAFETY
check the area is safe.

1 Identify Welder

2 Identify Weld Number

3 Identify WPS being employed

4 Record electrode & type

5 Check quiver condition & operation

6 Check for mixture of electrodes in quiver

7 Check dwell time in quiver since issue

8 Check date/time marking (Vac-Pac)

Check work area at end of shift for non-


9
returned electrodes
Check holding cabinets for returned
10
electrodes
Check returned re-baked electrodes are
11
scrapped

Accepted Completed by: Date:


Rejected Witnessed by: Date:
(Explain below) (Contractor or Subcontractor Representative)
Deficiency Description: (What's wrong and why did it happen?)

Checklist No: 01-04 Activity: WELDING CONSUMABLE CONTROL (WELDER) Page 1 of 1