4.4 Beam
4.4.1 Tie beam 2 186.843 0.75 1 280.26
4.4.2 toe wall 1 12.33 0.75 0.75 6.94
4.4.3 First Floor beam 1 203.679 0.75 1 152.759
4.4.4 Second Foor beam 1 203.679 0.75 1 152.759
4.4.5 Top floor beam 1 178.756 0.75 1 134.067
Total beam Concreting 726.785
4.5 Staircase
4.5.1 Ground floor to First floor
Landing 2 12.118 0.42 10.18
Inclined 1 16.249 3.5 0.42 23.89
Steps 16 0.8333 3.5 0.5833 27.22
61.29
4.5.2 First Floor to Second floor
Landing 2 12.118 0.42 10.18
Inclined 1 16.249 3.5 0.42 23.89
Steps 16 0.833 3.5 0.5833 27.22
61.29
Total stair case concreting 122.57
Total Rcc work 2829.315
Deductions
Door MD -1 3.5 0.75 7 -18.38
Door D1 -7 3 0.75 7 -110.25
Door D2 -5 2.5 0.75 7 -65.63
Door/Window -1 10.25 0.75 8.16 -62.73
Door/Window -2 9 0.75 8.16 -110.16
Window W -1 6 0.75 24 -108
Window W1 -1 10 0.75 8.16 -61.2
Window W2 -1 8 0.75 4.5 -27
Window W3 -5 6 0.75 4.5 -101.25
Window W4 -1 4 0.75 4.5 -13.5
Window W5 -1 3 0.75 4.5 -10.13
Window W6 -3 1 0.75 8.16 -18.36
Window W7 -3 1 0.75 5 -4.95
Ventilation V1 -1 7.5 0.75 2 -11.25
Ventilation V2 -1 6.75 0.75 2 -10.13
Ventilation V3 -1 6 0.75 2 -9
Ventilation V4 -4 2 0.75 2 -12
-753.9
Total Masonry Work 3932.87
6 Plaster Work
6.1 Exterior Plaster
6.1.1 Ground Floor 1 120.98 9.33 1128.743
Deduction
Door MD -1 3.5 7 -24.5
Window W7 -3 1 5 -15
W2 -1 8 4.5 -36
W3 -3 6 4.5 -81
W4 -1 4 4.5 -18
W -1 6 24 -144
V4 -1 2 2 -4
806.24
ft^3
ft^3 L=16.67+14.17+14.17+13.083+16.75+11.75+15.33
ft^3
ft^3
ft^2
ft^2
ft^2
ft^2
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^3
ft^2
ft^2
ft^2