ANALISA STABILITAS DAN STRUKTUR PARAPET

Tinggi Total Parapet H = 3 m

A. DATA DIMENSI

Elevasi Dinding Crest = 106.80 m


Elevasi Crest Bendungan = 105.80 m
H= 3.00 m
a= 1.60 m
b= 0.00 m
c= 0.00 m
d= 0.40 m
e= 0.40 m
f= 0.15 m
g= 0.20 m
h= 0.20 m
i= 2.20 m
j= 0.40 m
k= 0.75 m
l= 0.00 m
m= 2.00 m
B= 2.75 m
o= 1.00 m
El. X = 103.80 m
S= 1.40
n= 8.00 m

B. DATA PROPERTIES BAHAN DAN FAKTOR KEAMANAN

Berat jenis air, γw = 1.00 t/m3


Berat jenis beton bertulang, γc = 2.40 t/m3
Berat jenis material tanggul batu (Zona 2), γr = 2.30 t/m3
Sudut geser dalam tanggul batu, ϕ= 45 °
Kohesi tanah C= 25.0 kN/m2
Koefisien geser antara tanggul batu dengan beton, μ= 0.70
Koefisien gempa, k= 0.12
Beban hidup pada kondisi normal, q= 1.00 T/m2
Beban hidup pada kondisi gempa, q= 0.00

Tegangan yang diijinkan :

Tegangan tarik baja tulangan, σsa = 1850 kg/cm2


Tegangan tekan beton, σca = 75 kg/cm2
Tegangan geser beton, τa = 6.5 kg/cm2
Adhesive stress, τoa = 10 kg/cm2
Modulus Young, n= 21 kg/cm2
Tegangan leleh baja tulangan, σsy = 3000 kg/cm2
Mutu beton, σc = 225 kg/cm2

Angka keamanan terhadap geser

Kondisi normal, SF = μ * (ΣV/ΣH) > 1.5


Kondisi gempa, SF = μ * (ΣV/ΣH) > 1.2

Angka keamanan terhadap guling

Kondisi normal, e = [ (B/2) - (ΣM/ΣV) ] < B/6


Kondisi gempa, e = [ (B/2) - (ΣM/ΣV) ] < B/3

1/8
C. ANALISA STABILITAS

1. Koefisien Tekanan Tanah

b = 0.000 o

a = 0.000 o
(untuk analisis stabilitas)
d = 0.000 o
(untuk analisis stabilitas pada kondisi normal, d = b)
F = 6.843 o
( = Arc tan(Kh) ) Kh = 0.120
f = 45.00 o

a. Koefisien tekanan tanah aktif

Cos2(f -a)
Ka =
Sin(f+d) x Sin(f-b) 2
Cos2a x Cos(a+d) x 1+
Cos(a+d) x Cos(a-b)

(untuk analisis stabilitas)


a = 0.000 o d = 0.000 o

Cos2(f -a) = 0.500 Sin(f+d) = 0.707


Cos a
2
= 1.000 Sin (f-b) = 0.707
Cos(a+d) = 1.000 Cos (a-b) = 1.000
Ka = 0.172 untuk analisis stabilitas

b. Koefisien Tekanan Tanah aktif (gempa)

Cos2(f-F-a)
Kae =
2
Sin(f+d) x Sin(f-b-F)
CosF x Cos2a x Cos(a+d+F) x 1
Cos(a+d+F) x Cos(a-b)

(untuk analisis stabilitas )

a = 0.000 o
d = 15.77 o

tan d = Sin f Sin ( F + D - b )


1 - Sin f Cos ( F + D - b )

sin D= Sin ( F + b )
Sin f

Sin (F+ b ) = 0.119 Sin f = 0.707


Sin D = 0.168 then D = 0.003
Sin(F+D-b) = 0.119 Cos(F+D-b) = 0.993
tan d = 0.282

Cos2(f-F-a) = 0.618 Sin(f+d) = 0.873


CosF = 0.993 Sin(f-b-F) = 0.618
Cos2a = 1.000 Cos(a-b) = 1.000
Cos(a+d+F) = 0.923

Kae = 0.217 (untuk analisis stabilitas)

2/8
2. Kondisi Pembebanan

a. Kondisi Normal

Tekanan Tanah

q : beban merata = 1.00 T/m2


Pq = q*H*ka = 0.3432 Ton
Pa = 0.5*γr*H2*ka = 0.7893 Ton

Tekanan Uplift

Tekanan Uplift tidak dianggap pada perhitungan struktur ini karena elevasi muka air banjir lebih rendah dari
pada elevasi dasar dari struktur parapet.

V H I MV = V * I MH = H * I
(Ton) (Ton) (m) (Tm) (Tm)

Wc1 0.072 0.275 0.020


Wc2 0.036 0.300 0.011
Wc3 2.880 0.550 1.584
Wc4 0.336 0.175 0.059
Wc5 0.000 0.750 0.000
Wc6 0.000 1.417 0.000
Wc7 0.000 0.750 0.000
Wc8 1.920 1.750 3.360
Wq 2.000 1.750 3.500
Ws1 0.000 0.750 0.000
Ws2 7.360 1.750 12.880
Ws3 0.000 0.750 0.000
Ws4 0.000 2.083 0.000
Pq 0.343 1.000 0.3432
Pa 0.789 0.667 0.5262
Total = 14.604 1.133 21.413 0.869

3/8
b. Kondisi Gempa

Tekanan Tanah

Pae = 0.5*γr*H2*kae = 0.9982 Ton

V H I MV = V * I MH = H * I
(Ton) (Ton) (m) (Tm) (Tm)

Wc1 0.072 0.275 0.020


Wc2 0.036 0.300 0.011
Wc3 2.880 0.550 1.584
Wc4 0.336 0.175 0.059
Wc5 0.000 0.750 0.000
Wc6 0.000 1.417 0.000
Wc7 0.000 0.750 0.000
Wc8 1.920 1.750 3.360
Wce1 0.016 2.900 0.045
Wce2 0.008 2.733 0.021
Wce3 0.625 1.500 0.937
Wce4 0.073 0.200 0.015
Wce5 0.000 0.400 0.000
Wce6 0.000 0.400 0.000
Wce7 0.000 0.200 0.000
Wce8 0.417 0.200 0.083
Ws1 0.000 0.750 0.000
Ws2 7.360 1.750 12.880
Ws3 0.000 0.750 0.000
Ws4 0.000 2.083 0.000
Wse1 0.000 1.200 0.000
Wse2 1.597 1.200 1.917
Wse3 0.000 0.400 0.000
Wse4 0.000 0.400 0.000
Pae 0.998 0.667 0.665
Total = 12.604 3.733 17.913 3.684

4/8
3. Kondisi Stabilitas

a. Kondisi Normal

Angka keamanan terhadap geser,

SF = μ * ΣV / ΣH
= 9.03 > 1.5 → OK!!

Angka keamanan terhadap guling,

e = (B/2)-(ΣM/ΣV)
= 0.15 < B/6 = 0.46 → OK!!

Kapasitas penampang pondasi,

6*e/B = 0.329 < 1

q1 = (V/B)*(1+6*e/B) = 7.058 T/m


q2 = (V/B)*(1-6*e/B) = 3.563 T/m

b. Kondisi Gempa

Angka keamanan terhadap geser,

SF = μ * ΣV / ΣH
= 2.36 > 1.5 → OK!!

Angka keamanan terhadap guling,

e = (B/2)-(ΣM/ΣV)
= 0.34 < B/3 = 0.92 → OK!!

Kapasitas penampang pondasi,

6*e/B = 0.7386 < 1

q1 = (V/B)*(1+6*e/B) = 7.969 T/m


q2 = (V/B)*(1-6*e/B) = 1.198 T/m

D. PERHITUNGAN STRUKTUR
a. Kondisi Normal

y= 1.50 m 3.495 2.75


q3 = 6.61 T/m 3.0498 2.40

5/8
Section I - I

V H L MI - I
(Ton) (Ton) (m) (Tm)
Wc1 0.072 0.275 0.020
Wc2 0.036 0.250 0.009
Wc3 1.440 0.000 0.000
Pq1 0.086 0.250 0.021
Pa1 0.049 0.167 0.008
Total = 1.548 0.135 0.058

Section II - II

V H L MII - II
(Ton) (Ton) (m) (Tm)
Wc1 0.072 0.275 0.020
Wc2 0.036 0.250 0.009
Wc3 2.496 0.000 0.000
Pq1 0.275 0.8 0.220
Pa1 0.505 0.533 0.269
Total = 2.604 0.780 0.518

Section III - III

V H L MII - II
(Ton) (Ton) (m) (Tm)
Wc4 0.336 0.175 0.0588
R1 -2.315 0.175 -0.405
R2 -0.078 0.233 -0.018
Total = -2.056 0.000 -0.364

b. Kondisi Gempa

y= 1.50 m 6.771 2.75


q3 = 7.11 T/m 5.9089 2.40

6/8
Section I - I

V H L MI - I
(Ton) (Ton) (m) (Tm)
Wc1 0.072 0.275 0.020
Wc2 0.036 0.250 0.009
Wc3 1.440 0.000 0.000
Wce1 0.016 1.400 0.022
Wce2 0.008 1.233 0.010
Wce3 0.312 0.750 0.234
Pae 0.062 0.167 0.010
Total = 1.548 0.398 0.305

Section II - II

V H L MII - II
(Ton) (Ton) (m) (Tm)
Wc1 0.072 0.275 0.020
Wc2 0.036 0.250 0.009
Wc3 2.496 0.000 0.000
Wce1 0.016 2.500 0.039
Wce2 0.008 2.333 0.018
Wce3 0.542 1.300 0.704
Pae 0.062 0.533 0.033
Total = 2.604 0.627 0.823

Section III - III

V H L MII - II
(Ton) (Ton) (m) (Tm)
Wc4 0.336 0.175 0.0588
Wce4 0.073 1.200
R1 -2.487 0.175 -0.435
R2 -0.151 0.233 -0.035
Total = -2.302 0.073 -0.412

Perhitungan kebutuhan tulangan dan kontrol tegangan

Potongan I-I Potongan II-II Potongan III-III


Item
Nor. Gem. Nor. Gem. Nor. Gem.
σsa (kg/cm2) 1850 2775 1850 2775 1850 2775
σca (kg/cm2) 75 112.5 75 112.5 75 112.5
Tegangan Ijin

τa (kg/cm2) 6.5 9.75 6.5 9.75 6.5 9.75


τoa (kg/cm2) 10 15 10 15 10 15
k 0.46 0.4599 0.46 0.46 0.4599 0.46
j 0.847 0.847 0.847 0.847 0.847 0.847
n 21 21 21 21 21 21
B (cm) 100 100 100 100 100 100
M (Tm) 0.06 0.31 0.52 0.82 0.36 0.41
N (T) 1.55 1.55 2.60 2.60 0.00 0.07
S (T) 0.14 0.40 0.78 0.63 2.06 2.30
Gaya-gaya yang Bekerja

h (m) 0.40 0.40 0.40 0.40 0.40 0.40


d1 (m) 0.1 0.1 0.1 0.1 0.1 0.1
C1 0.262 0.214 0.262 0.214 0.262 0.214
C2 0.002 0.002 0.002 0.002 0.002 0.002
d (m) 0.30 0.30 0.30 0.30 0.30 0.30
e (m) 0.038 0.1971 0.199 0.316 0.00 5.646
M1 (Tm) 0.213 0.460 0.778 1.084 0.364 0.419
M2 (Tm) 13.14 19.71 13.14 19.71 13.14 19.71
As' (cm2) 0 0 0 0 0 0
As (cm2) -0.38 0.09 0.25 0.60 0.78 0.57
d' (m) 0.012 0.0145 0.023 0.022 0.0158 0.014

7/8
Tulangan Utama
As req (cm2) 0.124 0.4328 1.102 1.168 0.7755 0.584
Dia (mm) 13 13 13 13 13 13
Jarak (mm) 250 250 250 250 250 250
Desain Tulangan

As (cm2) 5.31 5.31 5.31 5.31 5.31 5.31


Kontrol OK!! OK!! OK!! OK!! OK!! OK!!
Tulangan Bagi
As' req (cm2) 0.062 0.22 0.55 0.58 0.39 0.29
Dia (mm) 13 13 13 13 13 13
Jarak (mm) 250 250 250 250 250 250
As (cm2) 5.31 5.31 5.31 5.31 5.31 5.31
Kontrol OK!! OK!! OK!! OK!! OK!! OK!!
U 16.34 16.34 16.34 16.34 16.34 16.34
x 7.14 7.14 7.14 7.14 7.14 7.14
Koefisien

p 0.002 0.002 0.002 0.002 0.002 0.002


k 0.238 0.238 0.238 0.238 0.238 0.238
j 0.921 0.9207 0.921 0.921 0.9207 0.921
σc 0.59 3.09 5.25 8.35 3.70 4.18
σca 75 112.5 75 112.5 75 112.5
Kontrol OK!! OK!! OK!! OK!! OK!! OK!!
Kontrol Tegangan

σs 39.87 208.03 353.1 561.6 248.5 280.7


σsa 1850 2775 1850 2775 1850 2775
Kontrol OK!! OK!! OK!! OK!! OK!! OK!!
τ 0.049 0.1442 0.282 0.227 0.7445 0.834
τa 6.5 9.75 6.5 9.75 6.5 9.75
Kontrol OK!! OK!! OK!! OK!! OK!! OK!!
τo 0.299 0.8827 1.728 1.391 4.5575 5.102
τoa 10 15 10 15 10 15
Kontrol OK!! OK!! OK!! OK!! OK!! OK!!

0.55
0.20

0.20 D13-250

D13-250

D13-250

2.60
2.20 10cm
3.00

D13-250

D13-250

D13-250
10cm

D13-250

0.40 K-225 0.40

0.40 D13-250
0.35 2.00

2.75

Sketsa Penulangan Struktur Parapet

8/8