Pull number currently being performed: 1st 2nd 3rd 4th 5th
Length of pull:
Ruling span:
Calculate and indicate your required pulling tension (based on ruling span, pulling sag & conductor weight)
What is the max gauge pressure required on tensioner for this pull?
What will the operator set the initial gauge pressure on the tensioner to begin this pull?
What is the maximum gauge pressure required on this puller for this pull?
Indicate pull line being used for this pull - (rope, existing conductor):
Indicate rope size or conductor size being used and its load rating:
Puller size:
Tensioner size:
List "Red Zone Area" List "Type of Guarding" required for each area
Page 1 of 2
8
Page 2 of 2
9
10
How many workers will be required at the puller for pulling and wire catch off?
How many workers will be required at the tensioner for tensioning and wire catch off?
Will you have radio communication for each "Red Zone" location and puller and tensioner? Yes No
Has a copy of the final "Wire Stringing Risk Assessment" been given to your inspector? Yes No
Has this wire stringing Risk Assessment information been communicated to the crewmembers? Yes No
Is this low risk, medium risk or high risk wire stringing procedure. Low Medium High
▪ "Low Risk" Complete form and review by General Foreman and/or Manager.
▪ "Medium Risk" Complete form and review by General Foreman and /or Manager
▪ "High Risk" Complete form and review by General Foreman and/or Manager.
Knowledgeable and competent safety and or trainer should be present during pulling proced
Keep copy of "Wire Stringing Risk Assessment" Form on Job at all times.