Contractor ASJ
Related Drawing(s)
Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
Ensure all test results are achieved satisfactory result and approved by
2
consultant
Remarks:
Accompanying document :
For Contractor
For Supervision Consulatnt (Engineer)
Quality Inspector Quality Engineer
Name
Designation
Date
IFO
Remarks
Contractor ASJ
Related Drawing(s)
Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
Ensure approved Sub main line shop drawings are followed and latest
1
revision.
2 Ensure excavation for sub main line at the required and approved levels.
3 Ensure approved material are used for installation sub main line.
Remarks:
Accompanying document :
For Contractor
For Supervision Consulatnt (Engineer)
Quality Inspector Quality Engineer
Name
Designation
Date
IFO
Remarks
Contractor ASJ
Related Drawing(s)
Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
Ensure the excavation for lateral line (drip line,) at approved and required
3
levels.
4 Ensure approved material are used for the installation of the lateral line.
Remarks:
Accompanying document :
For Contractor
For Supervision Consulatnt (Engineer)
Quality Inspector Quality Engineer
Name
Designation
Date
IFO
Remarks
Contractor ASJ
Related Drawing(s)
Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
Remarks:
Accompanying document :
For Contractor
For Supervision Consulatnt (Engineer)
Quality Inspector Quality Engineer
Name
Designation
Date
IFO
Remarks
Contractor ASJ
Related Drawing(s)
Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
1 Ensure clean area which has been construction for Irrigation works.
Remarks:
Accompanying document :
For Contractor
For Supervision Consulatnt (Engineer)
Quality Inspector Quality Engineer
Name
Designation
Date
IFO
Remarks
Contractor ASJ
Related Drawing(s)
Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
All safety measures shall be observed and must be supervised by
1
authorized H&S officer.
Remarks:
Accompanying document :
For Contractor
For Supervision Consulatnt (Engineer)
Quality Inspector Quality Engineer
Name
Designation
Date
IFO
Remarks