You are on page 1of 7

PROJECT: ELYSEE SHOP HOUSE (BLOCK 3.5&3.

6)
LOCATION: DIAMOND ISLAND CITY (KOH PICH), PHNOM PENH CAPITAL, CAMBODIA
ITEM: CONCRETE QUANTITIES AT ELYSEE PROJECT BLOCK 3.5&3.6

DIMENSION (m) Thick LEAN CONCRETE


No Item Qty Area(m2) ness Remark
LENGTH WIDTH HEIGHT (m) CYM180 M3 C32/40 CYM400 M3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
1 Footing
PC1 22 1.20 1.20 1.50 4.312 47.5
PC2 2 1.20 3.00 1.50 0.896 10.8
PC4 5 3.00 3.00 1.50 5.120 67.5
PC5 1 3.75 3.75 1.50 1.560 21.1
PC5A 1 3.75 3.75 2.20 1.560 30.9
PC6 4 3.00 4.80 1.50 6.400 86.4
PC6A 1 3.00 4.80 2.60 1.600 35.9 1.496
PC7 1 6.40 3.80 1.80 2.640 43.8
PC7A 1 6.40 3.80 2.60 2.640 61.7 1.496
PC8 1 6.40 3.80 1.80 2.640 43.8
PC9 2 4.80 4.80 1.80 5.000 82.9
PC10 1 6.60 4.80 1.80 3.400 57.0
PC11 4 6.60 4.80 1.80 13.600 228.1
PC18 1 8.50 4.80 2.70 4.350 122.4 15.39
PC20 1 8.70 6.30 2.70 5.785 176.3 23.4
Tie Beam
TB1 44.00 0.50 0.30 3.960 6.6
TB1 55.00 0.50 0.60 4.950 16.5
TB2 111.00 0.50 0.50 9.990 27.8
TB2 44.00 0.50 0.80 3.960 17.6
TB3 11.50 0.80 0.50 1.380 4.6
TB3 10.50 0.80 0.80 1.260 6.7
TB4 8.50 0.40 0.80 0.680 2.7
TB5 7.55 0.30 0.80 0.529 1.8
TB6 26.30 0.80 0.90 3.156 18.9
TB7 39.40 0.50 0.90 3.546 17.7
Slab level -1.35m
Slab 300mm 959.00 0.30 1.00 95.900 287.7 126.8
1 Column -1.35m to -0.05m
C1 9 0.80 0.80 1.00 5.8
DIMENSION (m) Thick LEAN CONCRETE
No Item Qty Area(m2) ness Remark
LENGTH WIDTH HEIGHT (m) CYM180 M3 C32/40 CYM400 M3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
C2 17 1.20 0.80 1.00 16.3
A Water Tank 1 -4.550
Bottom 5.60 5.60 0.30 9.4
Wall 3.2m 22.40 0.30 2.90 19.5
Cover 5.60 5.60 0.30 9.4
B Water Tank 2 -4.550
Bottom 5.60 5.60 0.30 9.4
Wall 3.2m 22.40 0.30 2.90 19.5
Cover 5.60 5.60 0.30 9.4
C Fuel Tank 3 -4.850
Bottom 5.00 7.40 0.30 11.1
Wall 3.5m 29.80 0.30 3.20 28.6
Cover 5.00 7.40 0.30 11.1
D Septic Tank -3.450
Bottom 3.00 9.00 0.30 8.1
Wall 2.1 30.00 0.30 1.80 16.2
Cover 5.00 7.40 0.30 11.1
Total 190.8 1,709.8
(2) Ground Floor +0.00
1 Beam
B5 90.50 0.50 0.50 22.6
W1 200mm 242.50 0.20 1.00 48.5
W3 45.2 0.30 1.90 25.8
Bottom lift 43.2 0.30 1.00 13.0
Slab level -0.5m
Slab 300mm 840.50 0.30 1.00 252.2 126.8
Stair 1.3m 8.50 0.42 1.00 3.6
Stair I 1.04 1.20 1.00 1.2
Stair II 1.04 1.50 1.00 1.6
E Sprinkler Tank
Bottom 3.00 9.00 0.30 8.1
W4 2.1m 30.00 0.30 1.80 16.2
Cover 5.00 7.40 0.30 11.1
Total 403.8
2 1st Floor +4.95 , +5.95
1 Column
C2 6 1.20 0.80 4.65 26.8
C1 9 0.80 0.80 5.65 32.5
C2 11 1.20 0.80 5.65 59.7
DIMENSION (m) Thick LEAN CONCRETE
No Item Qty Area(m2) ness Remark
LENGTH WIDTH HEIGHT (m) CYM180 M3 C32/40 CYM400 M3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
2 RW
W3 45.2 0.30 4.65 63.1
SW1 15.7 0.20 4.65 14.6
W1 30.5 0.20 1.00 6.1
3 Beam
B1 2.1 0.20 0.30 0.1
B2 22.2 0.30 0.30 2.0
B3 18.4 0.40 0.60 4.4
B4 30.4 0.40 0.70 8.5
B5 140.5 0.50 0.60 42.2
B7 173 0.60 0.70 72.7
B8 33.1 0.60 1.10 21.8
B9 27 0.60 1.60 25.9
B10 10 0.30 0.10 0.3
B11 30.5 0.20 0.20 1.2
4 Slab th 200mm
area 200mm 1216.20 0.20 1.00 243.2
area 275mm 344.00 0.08 1.00 25.8
Opening 70.00 0.20 1.00 (14.0)
Stair I 7.20 1.30 1.00 9.4
Stair II 7.20 1.50 1.00 10.8
Total 657.1
3 2nd Floor +10.95 , +11.95
1 Column
C2 6 1.20 0.80 4.65 26.8
C1 9 0.80 0.80 5.65 32.5
C2 11 1.20 0.80 5.65 59.7
2 RW
W3 45.2 0.30 4.65 63.1
SW1 15.7 0.20 4.65 14.6
W1 30.5 0.20 1.00 6.1
3 Beam
B1 2.1 0.20 0.30 0.1
B2 26.2 0.30 0.30 2.4
B3 18.4 0.40 0.60 4.4
B4 30.4 0.40 0.70 8.5
B5 140.5 0.50 0.60 42.2
B7 173 0.60 0.70 72.7
B8 33.1 0.60 1.10 21.8
DIMENSION (m) Thick LEAN CONCRETE
No Item Qty Area(m2) ness Remark
LENGTH WIDTH HEIGHT (m) CYM180 M3 C32/40 CYM400 M3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
B9 27 0.60 1.60 25.9
B10 10 0.30 0.10 0.3
4 Slab th 200mm
area 200mm 1216.20 0.20 1.00 243.2
area 275mm 344.00 0.08 1.00 25.8
Opening 70.00 0.20 1.00 (14.0)
Stair I 7.20 1.30 1.00 9.4
Stair II 7.20 1.50 1.00 10.8
Total 656.2
4 3rd Floor +16.95 , +17.95
1 Column
C2 6 1.20 0.80 4.65 26.8
C1 9 0.80 0.80 5.65 32.5
C2 11 1.20 0.80 5.65 59.7
2 RW
W3 45.2 0.30 4.65 63.1
SW1 15.7 0.20 4.65 14.6
W1 30.5 0.20 1.00 6.1
3 Beam
B1 2.1 0.20 0.30 0.1
B2 26.2 0.30 0.30 2.4
B3 18.4 0.40 0.60 4.4
B4 30.4 0.40 0.70 8.5
B5 140.5 0.50 0.60 42.2
B7 173 0.60 0.70 72.7
B8 33.1 0.60 1.10 21.8
B9 27 0.60 1.60 25.9
B10 10 0.30 0.10 0.3
4 Slab th 200mm
area 200mm 1216.20 0.20 1.00 243.2
area 275mm 344.00 0.08 1.00 25.8
Opening 70.00 0.20 1.00 (14.0)
Stair I 7.20 1.30 1.00 9.4
Stair II 7.20 1.50 1.00 10.8
Total 656.2
5 4th Floor +22.95 , +23.95
1 Column
C2 6 1.20 0.80 4.65 26.8
C1 9 0.80 0.80 5.65 32.5
DIMENSION (m) Thick LEAN CONCRETE
No Item Qty Area(m2) ness Remark
LENGTH WIDTH HEIGHT (m) CYM180 M3 C32/40 CYM400 M3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
C2 11 1.20 0.80 5.65 59.7
2 RW
W3 45.2 0.30 4.65 63.1
SW1 15.7 0.20 4.65 14.6
W1 30.5 0.20 1.00 6.1
3 Beam
B1 2.1 0.20 0.30 0.1
B2 26.2 0.30 0.30 2.4
B3 18.4 0.40 0.60 4.4
B4 30.4 0.40 0.70 8.5
B5 140.5 0.50 0.60 42.2
B7 173 0.60 0.70 72.7
B8 33.1 0.60 1.10 21.8
B9 27 0.60 1.60 25.9
B10 10 0.30 0.10 0.3
4 Slab th 200mm
area 200mm 1216.20 0.20 1.00 243.2
area 275mm 344.00 0.08 1.00 25.8
Opening 70.00 0.20 1.00 (14.0)
Stair I 7.20 1.30 1.00 9.4
Stair II 7.20 1.50 1.00 10.8
Total 656.2
6 5th Floor +28.95 , +29.95
1 Column
C2 6 1.20 0.80 4.65 26.8
C1 9 0.80 0.80 5.65 32.5
C2 11 1.20 0.80 5.65 59.7
2 RW
W3 45.2 0.30 4.65 63.1
SW1 15.7 0.20 4.65 14.6
W1 30.5 0.20 1.00 6.1
3 Beam
B1 2.1 0.20 0.30 0.1
B2 26.2 0.30 0.30 2.4
B3 18.4 0.40 0.60 4.4
B4 30.4 0.40 0.70 8.5
B5 140.5 0.50 0.60 42.2
B7 173 0.60 0.70 72.7
B8 33.1 0.60 1.10 21.8
DIMENSION (m) Thick LEAN CONCRETE
No Item Qty Area(m2) ness Remark
LENGTH WIDTH HEIGHT (m) CYM180 M3 C32/40 CYM400 M3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
B9 27 0.60 1.60 25.9
B10 10 0.30 0.10 0.3
4 Slab th 200mm
area 200mm 1216.20 0.20 1.00 243.2
area 275mm 344.00 0.08 1.00 25.8
Opening 70.00 0.20 1.00 (14.0)
Stair I 7.20 1.30 1.00 9.4
Stair II 7.20 1.50 1.00 10.8
Total 656.2
7 Lower Floor +36.65
1 Column
C1 26 0.80 0.80 5.65 94.0
2 RW
W3 45.2 0.30 4.65 63.1
SW1 15.7 0.20 4.65 14.6
W5 144 0.15 1.45 31.3
3 Beam
B1 2.1 0.20 0.50 0.2
B2 6.2 0.30 0.50 0.9
B3 18.4 0.40 0.80 5.9
B4 30.4 0.40 0.90 10.9
B5 147.3 0.50 0.80 58.9
B7 289.3 0.60 0.90 156.2
4 Slab th 220mm
area 1216.20 0.22 1.00 267.6
Opening 70.00 0.20 1.00 (14.0)
Stair I 7.20 1.30 1.00 9.4
Stair II 7.20 1.50 1.00 10.8
Total 709.8
8 Upper +41.40
1 Column
C1 8 0.80 0.80 5.70 29.2
C1 14 0.80 0.80 7.50 67.2
2 RW
W2 45.2 0.20 4.95 44.7
3 Beam
B3 16.8 0.40 0.80 5.4
B6 6.4 0.50 1.30 4.2
B5 56.7 0.50 0.80 22.7
DIMENSION (m) Thick LEAN CONCRETE
No Item Qty Area(m2) ness Remark
LENGTH WIDTH HEIGHT (m) CYM180 M3 C32/40 CYM400 M3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
4 Slab th 200mm
area 200.00 0.18 1.00 35.0
Total 208.3
9 Top +43.125
2 Beam
B12 369 0.40 0.60 88.6
Total 88.6
6402.343
GRAND TOTAL 190.814
6593.157

Phnom Penh 11th/November/2017


Approved by: Checked by: Prepared by:
Project Manager P. Project Manager QA/QC

KEANG MAP HOK YEK SRUN HOR Chanmakara

You might also like