DETAILING OF COMBINED FOOTING

3.7500

NOTES:
*ALL DIMENSIONS ARE IN m
13nos 10Dia
10Dia @200mm
15nos 10Dia
*GRADE OF CONCRETE - M30
*GRADE OF STEEL- Fe500
12nos 10Dia 12nos 10Dia
*CLEAR COVER - .075m
*SBS OF SOIL - 200MPa
1.4650 10Dia @200mm 0.8592
12nos 10Dia
*DEPTH OF FOOTING BELOW GROUND LEVEL- .8m
BOTTOM LAYER
DISTRIBUTORS
10mm Dia @ 200mm

COLUMN STRIPS DETAILING OF COMBINED FOOTING


12nos 10mm Dia

MAIN REINFORCEMENT COLUMN STRIPS


Date:09/03/2018
12nos 10mm Dia 12nos 10mm Dia
TOP LAYER
By
DISTRIBUTORS
10mm Dia @ 200mm Abhinav Saketh
MINIMUM REINFORCEMENT
15CE01002
MAIN REINFORCEMENT
13nos 10mm Dia 15nos 10mm Dia