REKAPITULASI HARGA PEKERJAAN

KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI


PEKERJAAN : PENINGKATAN JARINGAN IRIGASI DI CEWOK
LOKASI : DESA ADIWARNO, KEC . BUAYAN
TAHUN ANGGARAN : 2017

NO. URAIAN HARGA

1 GALIAN TANAH BIASA SEDALAM < 1M Rp. 12,794,788.73

2 GALIAN TANAH BERBATU SEDALAM < 1M Rp. 2,489,485.00

3 TIMBUNAN TANAH KEMBALI DIPADATKAN Rp. 82,326.08

4 PASANGAN BATU BELAH 1 : 4 Rp. 274,573,203.98

5 SIARAN 1 : 2 Rp. 13,602,188.49

6 PLESTERAN 1 : 3 Rp. 12,794,408.35

7 ACIAN Rp. 5,968,714.62

8 BETON K-175 Rp. 20,808,171.02

9 PEMBESIAN 1Kg MENGGUNAKAN BESI POLOS / ULIR Rp. 723,255.17

10 PINTU SORONG BAJA b: 0,80, h: 0,70 Rp. 19,800,000.00

A. JUMLAH ( 1 - 2 ) Rp. 363,636,541.44

B. PAJAK PERTAMBAHAN NILAI ( 10% x A ) Rp. 36,363,654.14

C. JUMLAH HARGA ( A + B ) Rp. 400,000,195.59

D. DIBULATKAN Rp. 400,000,000.00

TERBILANG : EMPAT RATUS JUTA RUPIAH

Disetujui
Kasi Sungai Dan Pantai Di buat Oleh
Dinas Pekerjaan Umum Dan Penataan Ruang Konsultan Perencana
Kabupaten Kebumen CV. KOSINDO BANGUN PERSADA

SYAIFUL AMRI, ST
NIP. 19800302 200604 1 007
ARIE SISWANTO, ST
Direktur

Mengetahui Menyetujui
Kepala Dinas Pekerjaan Umum dan penataan Ruang Kepala Bidang Sumber Daya Air
Kabupaten Kebumen Dinas Pekerjaan Umum Dan Penataan Ruang
Kabupaten Kebumen
Mengetahui Menyetujui
Kepala Dinas Pekerjaan Umum dan penataan Ruang Kepala Bidang Sumber Daya Air
Kabupaten Kebumen Dinas Pekerjaan Umum Dan Penataan Ruang
Kabupaten Kebumen

H. SLAMET MUSTOLKHAH, ST. MT Ir. TRIMULYONO


NIP. 19690922 199703 1 005 NIP. 19630322 199603 1 003
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
Jl. Sarbini No. 37 Kebumen Telp. (0287) 382821
KEBUMEN, 54311
RENCANA ANGGARAN BIAYA ( RAB )

KEGIATAN REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI


PEKERJAAN PENINGKATAN JARINGAN IRIGASI DI CEWOK
LOKASI DESA ADIWARNO, KEC . BUAYAN

KABUPATEN : KEBUMEN

HARGA SATUAN BESARNYA BIAYA


NO URAIAN PEKERJAAN VOLUME SAT ANALISA ( Rp.) (Rp.) JUMLAH BIAYA (Rp.)

PEKERJAAN SALURAN
1 Galian Tanah Biasa 1m 320.66 m3 T.06.a.1 39,901.50 12,794,788.73
2 Galian tanah berbatu sedalam < 1 m 26.00 m3 T.07.a.1 95,749.42 2,489,485.00
3 Timbunan tanah kembali dan dipadatkan 3.52 m3 T.14.a.1 23,388.09 82,326.08
4 Pasangan Batu Belah 1:4 318.50 m3 P.01.c.1 862,093.10 274,573,203.98
5 Siaran 1:2 308.12 m2 P.03.a 44,145.75 13,602,188.49
6 Plesteran 1:3 224.40 m2 P.04.e 57,016.08 12,794,408.35
7 Acian 224.40 m2 P.04.g 26,598.55 5,968,714.62
8 Beton K-175 19.50 m3 B.05.b 1,066,866.85 20,808,171.02
9 Pembesian 1 kg dengan besi polos atau ulir 51.67 Kg B.17.a1 13,996.95 723,255.17
10 Pintu Sorong Baja b: 0.8 , h: 0,7 1.00 bh Ls 19,800,000.00 19,800,000.00
363,636,541.44

TERBILANG : JUMLAH : 363,636,541.44

TUJUH RATUS SEMBILAN JUTA ENAM RATUS SEMBILAN PULUH LIMA RIBU RUPIAH DI BULATKAN : 363,636,000.00
PERHITUNGAN VOLUME
Pekerjaan : PENINGKATAN JARINGAN IRIGASI DI CEWOK
D I / DPS : DI CEWOK
Lokasi : DESA ADIWARNO, KEC . BUAYAN
Konsultan Perencana : CV. KOSINDO BANGUN PERSADA
SALURAN

No. PERHITUNGAN VOLUME GAMBAR SKET KETERANGAN

1 GALIAN TANAH BIASA


1.00 X 1.00 X 0.00 = = -
- - m³
3.00 3.00
2 TIMBUNAN
0.70 X 1.50 X 0.00 = = -

- - m³
6.00
3 PAS. BATU
1.00
0.40 X 0.40 X 205.00 X 2.00 = = 65.60
3.00
0.35 X 0.60 X 205.00 X 2.00 = = 86.10
4.00 8.00 4.00
151.70 151.70 m³

4 PLESTERAN = ACIAN
0.40 X 1.00 X 205.00 X 2.00 = = 82.00

82.00 82.00 m²

5 SIARAN
0.50 X 1.00 X 205.00 X 2.00 = = 205.00

205.00 205.00 m²

6 BETON
0.10 X 0.80 X 205.00 = = 16.40

16.40 16.40 m³

PERHITUNGAN VOLUME
Pekerjaan : PENINGKATAN JARINGAN IRIGASI DI CEWOK
D I / DPS : DI CEWOK
Lokasi : DESA ADIWARNO, KEC . BUAYAN
Konsultan Perencana : CV. KOSINDO BANGUN PERSADA
BANGUNAN PENGAMBILAN

No. PERHITUNGAN VOLUME GAMBAR SKET KETERANGAN

1 GALIAN TANAH BIASA


0.60 X 1.00 X 0.00 = = - A
0.60 X 0.60 X 0.00 = = - C C
- - m³

2 TIMBUNAN
Peninggian Pasangan
0.70 X 1.50 X 0.00 = = -
1.00 X 1.00 X 0.00 = = - 50.00
- - m³ B B

3 PAS. BATU
0.30 X 0.40 X 50.00 = = 6.00
0.30 X 0.40 X 50.00 = = 6.00
12.00 12.00 m³

4 PLESTERAN = ACIAN
0.70 X 1.00 X 100.00 = = 70.00
A
70.00 70.00 m²

5 PINTU SORONG 0.30 0.60 0.600.400.40


0.80 X 0.70 X 1.00 = = 1.00
0.40 0.40
1.00 1.00 Bh 0.60 0.60
0.30
6 RABAT BETON ( Plat Layan ) 0.80
0.10 X 0.60 X 2.00 = = 0.12

0.12 0.12 m²

7 PEMBESIAN D 10
(4,00 + 13,33) X 2.00 X 0.62 = 10.78 0.40
10.78 10.78 Kg 0.60
0.80

PERHITUNGAN VOLUME
Pekerjaan : PENINGKATAN JARINGAN IRIGASI DI CEWOK
D I / DPS : DI CEWOK
Lokasi : DESA ADIWARNO, KEC . BUAYAN
Konsultan Perencana : CV. KOSINDO BANGUN PERSADA
BANGUNAN PEMBUANGAN

No. PERHITUNGAN VOLUME GAMBAR SKET KETERANGAN

1 GALIAN TANAH BIASA


0.40 X 0.40 X 24.00 = = 3.84
1 0.00 1.00 1.0 0 2.30

0.40 X 1.60 X 12.00 = = 7.68


0.30 X 0.80 X 12.00 = = 2.88 B
A A
0.85 X 0.80 X 4.00 = = 2.72
0.40 X 0.30 X 4.00 = = 0.48
B

17.60 17.60 m³

2 TIMBUNAN
0.52 X 1.10 X 0.00 = = -
1.00 X 1.00 X 0.00 = = -
- - m³ 1.00

0.80 0.80

3 PAS. BATU 1.50 1.50

0.40 X 0.40 X 24.00 = = 3.84 0.80

0.35 X 0.80 X 24.00 = = 6.72 7.00

0.30 X 0.80 X 12.00 = = 2.88


0.85 X 0.80 X 4.00 = = 2.72
0.60 X 2.30 X 3.20 = = 4.42
0.75 X 1.50 X 0.80 = = 0.90
21.48 21.48 m³

4 PLESTERAN = ACIAN 0.30 1.00 0.30


1.10 X 1.00 X 24.00 = = 26.40
0.40 X 3.20 X 1.00 = = 1.28
27.68 27.68 m²
0.80
5 SIARAN
2.00 X 1.00 X 0.80 = = 1.60
3.10 X 3.20 X 1.00 = = 9.92 0.30
11.52 11.52 m² 0.10
0.40 0.80 0.40
6 RABAT BETON
0.12 X 1.30 X 1.00 = = 0.16

0.16 0.16 m²
7 PEMBESIAN D 10
(6,667 + 8,667) X 2.00 X 0.62 = 9.54

9.54 9.54 Kg
PERHITUNGAN VOLUME
Pekerjaan : PENINGKATAN JARINGAN IRIGASI DI CEWOK
D I / DPS : DI CEWOK
Lokasi : DESA ADIWARNO, KEC . BUAYAN
Konsultan Perencana : CV. KOSINDO BANGUN PERSADA
BENDUNG

No. PERHITUNGAN VOLUME GAMBAR SKET KETERANGAN

1 GALIAN TANAH BIASA


1.00 X 1.00 X 13.00 X 2.00 = = 26.00 GALIAN BERBATU

1.00 X 1.50 X 14.00 X 1.00 = = 21.00 GALIAN BIASA


1.00 X 0.90 X 12.00 X 1.00 = = 10.80
0.50 X 1.00 X 7.00 X 1.00 = = 3.50 B

0.40 X 1.00 X 7.00 X 1.00 = = 2.80


0.50 X 1.00 X 7.00 X 1.00 = = 3.50
0.75 X 0.60 X 7.00 X 1.00 = = 3.15
0.40 X 2.20 X 7.00 X 1.00 = = 6.16
0.50 X 0.60 X 7.00 X 1.00 = = 2.10
0.40 X 1.50 X 7.00 X 1.00 = = 4.20
0.40

0.50 X 1.00 X 7.00 X 1.00 = = 3.50


0.40

60.71 60.71 m³
0.50
11.50

2 TIMBUNAN 1.50

0.20
0.80

5.00

0.55 X 1.10 X 0.00 = = - 1.00 0.40


1.00 0.40
3.00
A 1.00

1.00 X 1.00 X 0.00 = = - 2.00


0.60

- - m³ 0.60 0.40
2.00

0.40
7.00

2.00 2.00

3 PAS. BATU
B
1.00 X 1.00 X 13.00 X 2.00 = = 26.00
0.70 X 3.00 X 13.00 X 2.00 = = 54.60
0.50 X 1.20 X 7.00 X 1.00 = = 4.20
0.30 X 1.00 X 7.00 X 1.00 = = 2.10
0.50 X 0.90 X 7.00 X 1.00 = = 3.15
0.75 X 0.60 X 7.00 X 1.00 = = 3.15
0.40 X 2.20 X 7.00 X 1.00 = = 6.16
0.20 X 2.10 X 7.00 X 1.00 = = 2.94
1.50 X 0.60 X 7.00 X 1.00 = = 6.30
0.50 X 0.60 X 7.00 X 1.00 = = 2.10
0.30 X 1.50 X 7.00 X 1.00 = = 3.15
0.50 X 0.90 X 7.00 X 1.00 = = 3.15
117.00 117.00 m³

4 PLESTERAN = ACIAN
0.50 X 2.00 X 7.00 = = 7.00
0.90 X 1.00 X 7.00 = = 6.30
1.00 X 3.30 X 7.00 = = 23.10
36.40 36.40 m²

5 SIARAN
2.90 X 2.00 X 13.00 = = 75.40

75.40 75.40 m²

6 RABAT BETON
0.10 X 3.50 X 7.00 = = 2.45

2.45 2.45 m²

PERHITUNGAN VOLUME
Pekerjaan : PENINGKATAN JARINGAN IRIGASI DI CEWOK
D I / DPS : DI CEWOK
Lokasi : DESA ADIWARNO, KEC . BUAYAN
Konsultan Perencana : CV. KOSINDO BANGUN PERSADA
BENDUNG

No. PERHITUNGAN VOLUME GAMBAR SKET KETERANGAN

1 GALIAN TANAH BIASA


1.60 X 3.00 X 5.40 X 1.00 = = 25.92
0.50 X 0.50 X 5.40 X 2.00 = = 2.70
0.30 X 0.60 X 5.40 X 1.00 = = 0.97 0.40 0.60 3.00

1.40 X 0.60 X 5.00 X 1.00 = = 4.20 1.00 0.40

0.40 X 0.40 X 5.00 X 2.00 = = 1.60 3.00


0.80
0.30
0.30

0.30 X 0.60 X 5.00 X 1.00 = = 0.90 0.80 0.50 0.50 0.60


0.30
0.40
1.00
5.00

36.29 36.29 m³ 1.00 7.00 1.00

2 TIMBUNAN
2.20 X 1.00 X 1.60 = = 3.52
1.00 X 1.00 X 0.00 = = -
9.00 2.00
3.52 3.52 m³ 0.60

3 PAS. BATU
3.00
0.50 X 0.50 X 5.40 X 2.00 = = 2.70 1.50
1.00 1.00
0.50
0.40 X 1.50 X 5.40 X 2.00 = = 6.48 0.60 0.60
0.30
0.30 X 0.60 X 5.40 X 1.00 = = 0.97 1.20
0.60
1.00

0.40 X 0.40 X 5.00 X 2.00 = = 1.60 0.50 0.50 0.70 0.50 0.50
1.00 1.00 1.50
0.35 X 0.60 X 5.00 X 2.00 = = 2.10
0.30 X 0.60 X 5.00 X 1.00 = = 0.90
0.40 X 1.00 X 1.60 X 2.00 = = 1.28
0.30 X 0.30 X 1.60 X 2.00 = = 0.29 0.90

0.30 0.30

16.32 16.32 m³ 0.10

4 PLESTERAN = ACIAN 1.50


0.40 X 1.80 X 2.00 = = 1.44
0.40 X 5.00 X 2.00 = = 4.00
0.90 X 1.60 X 2.00 = = 2.88 0.30
0.20
8.32 8.32 m²
0.50 0.60 0.50

5 SIARAN
1.40 X 4.00 X 2.00 = = 11.20
0.50 X 5.00 X 2.00 = = 5.00
16.20 16.20 m²
0.30 0.30
6 RABAT BETON
0.10 X 0.90 X 4.20 = = 0.38
0.60
0.38 0.38 m²
0.30
7 PEMBESIAN D 10 0.10
0.40 0.60 0.40
25.20 + 25.20 X 0.62 = = 31.35

31.35 31.35 Kg

1 GALIAN TANAH BIASA


320.66 m³
2 TIMBUNAN
3.52 m³
3 PAS. BATU
318.50 m³

4 PLESTERAN = ACIAN
224.40 m²

5 SIARAN
308.12 m²

6 RABAT BETON
19.50 m²
7 PEMBESIAN D 10
51.67 Kg
PERHITUNGAN VOLUME
Pekerjaan : PENINGKATAN JARINGAN IRIGASI DI CEWOK
D I / DPS : DI CEWOK
Lokasi : DESA ADIWARNO, KEC . BUAYAN
Konsultan Perencana : CV. KOSINDO BANGUN PERSADA

Luas Rata2
No. SKET PERHITUNGAN / LUASAN ( m² )

A.0+0
Galian
1.04
Timbunan
-

A.0+50
Galian
1.19
Timbunan
-

A.0+100
Galian
0.88
Timbunan
-

A.0+150
Galian
0.90
Timbunan
-

A.0+200
Galian
1.02
Timbunan
-

Jumlah
AN VOLUME

Luas Rata2 Jarak Volume ( m³ )


Keterangan
( m² ) ( m' ) Galian Timbunan

1.12 67.01

60.00
- -
206.06

1.04 62.13

60.00
- -

0.89 55.85

63.00
- -

0.96 21.07

22.00
- -

205.00 206.06 -
#VALUE! #REF! #REF!
-
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
Jl. Sarbini No. 37 Kebumen Telp. (0287) 382821
KEBUMEN, 54311

DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT DIBORONGKAN


KEGIATAN TAHUN ANGGARAN 2017
BIDANG SUMBER DAYA AIR
KABUPATEN KEBUMEN

HARGA
STANDART BUPATI HARGA DISEPAKATI
NO. URAIAN SATUAN KET.
UMK.Th 2017 (Rp.)
(Rp.)
1 2 3 4 5 6

I. UPAH TENAGA
1 Mandor Orang/hari - 70,300.00
2 Kepala Tukang Orang/hari - 67,700.00
3 Tukang Orang/hari - 62,300.00
4 Operator Terlatih Orang/hari - 62,300.00
5 Operator Alat Berat Orang/hari - 165,000.00
6 Pekerja Orang/hari 57,400.00 57,400.00
7 Pekerja swakelola Orang/hari 57,400.00 57,400.00

II. JENIS BAHAN


1 Pasir Urug M3 106,720.00 106,000.00
2 Pasir Pasang M3 163,250.00 157,000.00
3 Pasir Beton (Muntilan) M3 177,250.00 177,000.00
4 Batu Pecah 2/3 ( Spilt ) manual M3 279,700.00 231,000.00
5 Batu Pecah 2/3 ( Spilt ) mesin M3 338,100.00 248,000.00
6 Batu Belah / Batu Gunung M3 201,000.00 150,000.00
7 Batu belah 15 cm/20 cm m3 210,000.00 210,000.00
8 Batu Merah /Batu Bata Bh 800.00 670.00
9 Semen Abu-abu Kg - 1,350.00
10 Semen (50 Kg) Zak 114,000.00 67,500.00
11 Sirtu (tak diayak) M3 182,900.00 100,000.00
12 Besi Beton Kg - 11,000.00
13 Kawat Beton / Bendrat Kg 26,000.00 16,000.00
14 Paku usuk / reng Kg 39,000.00 12,800.00
15 Mur Baut / Begel Kg 24,400.00 16,300.00
16 Kayu Tahun M3 4,804,000.00 2,900,000.00
17 Kayu Kruwing M3 10,248,700.00 7,000,000.00
18 Kayu Kaso 5/7 (Kruwing) M3 7,686,500.00 6,987,000.00
19 Kayu Kaso 4/6 (Glugu) M3 4,891,400.00 4,430,000.00
20 Kayu Kaso 5/5 (Kayu tahun) M3 3,843,200.00 3,493,000.00
21 Kayu Glugu Tua M3 5,073,000.00 3,500,000.00
22 Kayu Begisting M3 5,124,300.00 2,500,000.00
23 Reng Kayu 2/3 ( bengkirai ) M3 1,250,000.00 1,136,000.00
24 Multiplek 9 mm Lbr - 118,000.00
25 Multiplek 4 mm x 1.2 x 24 Lbr 115,900.00 60,000.00
26 Teakwood 12 mm Uk.(90x210)cm Lbr - 140,000.00
27 Plamur Tembok Kg 32,800.00 27,000.00
28 Plamur Kayu Kg 32,800.00 27,000.00
29 Cat Kayu Emco Kg 1,055,300.00 66,000.00
30 Cat Kayu Avian Kg 78,900.00 57,400.00
31 Cat Tembok Decolit Kg 136,500.00 23,700.00
32 Cat Besi / Bron, Kg 47,900.00 39,500.00
33 Cat Genteng Kapiko Kg 67,300.00 55,000.00
34 Meni Besi Kg - 24,400.00
35 Meni Kayu 5F Kg 65,200.00 40,000.00
36 Minyak Cat 5F Ltr 20,900.00 17,200.00
37 Minyak Pelumas Ltr 63,800.00 28,000.00
HARGA
STANDART BUPATI HARGA DISEPAKATI
NO. URAIAN SATUAN KET.
UMK.Th 2017 (Rp.)
(Rp.)
1 2 3 4 5 6
38 Minyak Bekisting / Residu / Teer Ltr 26,900.00 16,000.00
39 Minyak Tanah Ltr - 7,170.00
40 Bensin / Premium Ltr 6,860.00 6,860.00
41 Minyak Diesel / Solar (Non Subsidi) Ltr 8,763.00 8,763.00
42 Amplas Lbr 5,000.00 3,300.00
43 Lem Kayu Fox Kg - 15,600.00
44 Kawat Bronjong dia 3 mm Kg 35,700.00 17,000.00
45 Kawat Bronjong Pabrikasi dia,2.7 mm Unit 567,800.00 389,400.00
Uk. ( 2.00 x 1.00x 0.50 )m
46 Ijuk Kg 10,800.00 7,800.00
47 Tanah Urug / Timbunan M3 100,100.00 81,000.00
48 Tanah Liat M3 78,100.00 55,000.00
49 Tanah Cadas M3 301,300.00 70,000.00
50 Tinner A Ltr - 15,800.00
51 Tinner Super Ltr - 19,400.00
52 Bambu Ampel dia. 10 cm, L = 150 cm Btg 10,600.00 9,500.00
53 Pipa Galvanis Dia 3/4" Btg 90,500.00 90,500.00
54 Pipa Galvanis Dia 1" Btg 127,920.00 128,000.00
55 Pipa Galvanis Dia 2,5" Btg 691,600.00 306,000.00
56 Pipa Galvanis Dia 3" Btg 768,500.00 480,000.00
57 Pipa PVC Dia 1" Wavin, S.10 Btg 58,500.00 44,000.00
58 Pipa PVC Dia 1 1/4" Wavin, S.10 Btg 139,000.00 105,000.00
59 Pipa PVC Dia 1,5" Wavin, S.12,5 Btg 121,400.00 100,000.00
60 Pipa PVC Dia 2" Wavin, S.12,5 Btg 276,900.00 150,000.00
61 Pipa PVC Dia 3" Wavin, S.12,5 Btg 402,600.00 303,000.00
62 Pipa PVC Dia 4" Wavin, S.12,5 Btg 548,600.00 413,000.00
63 Pipa PVC Dia 6" Wavin, S.12,5 Btg 595,100.00 541,000.00
64 Pipa PVC Dia 8" Wavin, S.12,5 Btg 988,800.00 898,900.00
65 Pipa PVC Dia 10" Wavin, S.12,5 Btg 1,544,400.00 1,404,000.00
66 Pipa PVC Dia 12" Wavin, S.12,5 Btg 2,117,500.00 1,925,000.00
67 Pintu Angkat Baja b = 0.20, h = 0.20 Bh 4,537,500.00 4,125,000.00
68 Pintu Angkat Baja b = 0.25, h = 0.25 Bh 4,900,500.00 4,455,000.00
69 Pintu Angkat Baja b = 0.30, h = 0.30 Bh 5,142,500.00 4,675,000.00
70 Pintu Angkat Baja b = 0.35, h = 0.35 Bh 5,505,500.00 5,005,000.00
71 Pintu Angkat Baja b = 0.40, h = 0.40 Bh 6,352,500.00 5,775,000.00
72 Pintu Angkat Baja b = 0.45, h = 0.45 Bh 6,957,500.00 6,325,000.00
73 Pintu Angkat Baja b = 0.50, h = 0.50 Bh 7,562,500.00 6,875,000.00
74 Pintu Sorong/Geser Baja b = 0.30 h = 0.30 Bh 8,470,000.00 7,700,000.00
75 Pintu Sorong/Geser Baja b = 0.35 h = 0.35 Bh 9,680,000.00 8,800,000.00
76 Pintu Sorong/Geser Baja b = 0.40 h = 0.40 Bh 12,100,000.00 11,000,000.00
77 Pintu Sorong/Geser Baja b = 0.40 h = 0.50 Bh 12,705,000.00 11,550,000.00
78 Pintu Sorong/Geser Baja b = 0.50 h = 0.50 Bh 13,310,000.00 12,100,000.00
79 Pintu Sorong/Geser Baja b = 0.55 h = 0.55 Bh 14,157,000.00 12,870,000.00
80 Pintu Sorong/Geser Baja b = 0.60 h = 0.60 Bh 15,125,000.00 13,750,000.00
81 Pintu Sorong/Geser Baja b = 0.65 h = 0.65 Bh 16,940,000.00 15,400,000.00
82 Pintu Sorong/Geser Baja b = 0.70 h = 0.70 Bh 19,360,000.00 17,600,000.00
83 Pintu Sorong/Geser Baja b = 0.75 h = 0.75 Bh 20,570,000.00 18,700,000.00
84 Pintu Sorong/Geser Baja b = 0.80 h = 0.70 Bh 21,780,000.00 19,800,000.00
85 Pintu Sorong/Geser Baja b = 0.90 h = 1.00 Bh 22,990,000.00 20,900,000.00
86 Pintu Sorong/Geser Baja b = 1.00 h = 1.00 Bh 25,410,000.00 23,100,000.00
87 Pintu Sorong/Geser Baja b = 1.00 h = 1.20 Bh 27,830,000.00 25,300,000.00
88 Pintu Sorong/Geser Baja b = 1.20 h = 1.20 Bh 30,250,000.00 27,500,000.00
89 Pintu Sorong/Geser Kayu b = 1.30 h = 1.10 Bh 32,670,000.00 29,700,000.00
90 Pintu Sorong/Geser Kayu b = 1.30 h = 1.35 Bh 17,545,000.00 15,950,000.00
91 Pintu Sorong/Geser Kayu b = 1.50 h = 1.50 Bh 19,360,000.00 17,600,000.00
92 Pintu Sorong/Geser Kayu b = 1.60 h = 1.60 Bh 20,570,000.00 18,700,000.00
93 Pintu Sorong/Geser Kayu b = 1.70 h = 1.70 Bh 21,780,000.00 19,800,000.00
94 Pintu Sorong/Geser Kayu b = 1.80 h = 1.80 Bh 22,990,000.00 20,900,000.00
95 Pintu Sorong/Geser Kayu b = 1.85 h = 1.85 Bh 23,595,000.00 21,450,000.00
96 Pintu Sorong/Geser Kayu b = 2.00 h = 2.00 Bh 25,410,000.00 23,100,000.00
97 Pintu Sorong/Geser Kayu b = 2.25 h = 2.25 Bh 31,460,000.00 28,600,000.00
98 Pintu Sorong/Geser Kayu b = 2.50 h = 2.50 Bh 37,510,000.00 34,100,000.00
99 Pintu Sorong/Geser Kayu b = 2.75 h = 2.75 Bh 43,560,000.00 39,600,000.00
HARGA
STANDART BUPATI HARGA DISEPAKATI
NO. URAIAN SATUAN KET.
UMK.Th 2017 (Rp.)
(Rp.)
1 2 3 4 5 6
100 Pintu Sorong/Geser Kayu b = 3.00 h = 3.00 Bh 49,610,000.00 45,100,000.00
101 Pintu Sorong/Geser Kayu b = 3.25 h = 3.00 Bh 52,635,000.00 47,850,000.00
102 Pintu Katrol b =2.50 h =2.00 Bh 53,240,000.00 48,400,000.00
103 Pintu Katrol b =2.50 h =2.25 Bh 59,290,000.00 53,900,000.00
104 Pintu Katrol b =2.50 h =2.50 Bh 65,340,000.00 59,400,000.00
105 Pintu Katrol b =2.50 h =2.75 Bh 51,192,200.00 46,538,300.00
106 Pintu Katrol b =3.75 h =2.00 Bh 55,342,900.00 50,311,700.00
107 Pintu Katrol b =3.75 h =2.25 Bh 57,648,900.00 52,408,000.00
108 Pintu Katrol b =3.75 h =2.50 Bh 59,052,400.00 53,684,000.00
109 Pintu Katrol b =3.75 h =2.75 Bh 62,190,900.00 56,537,100.00
110 Pintu Katrol b =3.75 h =3.00 Bh 63,644,400.00 57,858,500.00
111 Pintu Katrol b =4.00 h =2.00 Bh 66,872,700.00 60,793,300.00
112 Pintu Katrol b =4.00 h =2.25 Bh 68,256,300.00 62,051,000.00
113 Pintu Katrol b =4.00 h =2.50 Bh 79,377,700.00 65,740,636.30
114 Pintu Katrol b =4.00 h =2.75 Bh 72,314,700.00 68,340,000.00
115 Pintu Katrol b =4.00 h =3.00 Bh 75,174,100.00 72,161,500.00
116 Gembolo / Roda Gigi Kuningan Bh 46,119,100.00 41,900,000.00
117 Pintu Klep Fiber Resin(1.00 x1.00) m Bh 23,059,500.00 20,950,000.00
118 Katrol 3 Ton Bh tidak ada 3,000,000.00
119 Katrol 4 Ton Bh tidak ada 3,500,000.00
120 Katrol 5 Ton Bh tidak ada 4,500,000.00
121 Katrol 10 Ton Bh tidak ada 8,500,000.00
122 Seng Gelombang 80 x 108 x 0.05 cm m2 99,400.00 82,000.00
123 Paku Seng (Paku Payung) Kg 48,200.00 23,800.00
124 Kuas 5" bh 12,100.00 10,500.00
125 Gebalan Rumput M2 159,200.00 130,000.00
126 Cangkul Bh 139,700.00 126,900.00
127 Sabit Bh 61,000.00 60,500.00
128 Cakar (tanpa gagang) Bh 80,000.00 77,000.00
129 Karung plastik Lbr 7,300.00 7,150.00
130 Mesin Potong Rumput Gendong (Honda ) Bh 4,573,800.00 4,150,000.00
131 Seal tape Bh 3,500.00
132 Palu Godam Bh 98,050.00 89,000.00
133 Geotextile M2 22,275.00 15,235.00
134 Geomembran HDPE HDS 150 (1,5 mm) terpasan M2 110,838.75 100,760.00
135 Air Ltr 3.18

III. PERALATAN
1 Excavator 80-140 Hp. Jam 371,184.00 337,400.00
2 Compressor 4000 - 6500 L/M Jam 178,904.00 162,500.00
3 Chainsaw Hari 150,000.00 136,000.00
4 Jack Hammer Jam 19,888.00 18,000.00
5 Molen (0,3 - 0,6 m3) Jam 44,968.00 40,000.00
6 Waterpass Hari 100,000.00 90,800.00
7 Theodolit Hari 150,000.00 136,000.00
8 Stamper Hari 101,816.00 92,500.00
9 Alat Potong rumput Hari 90,000.00 80,000.00
10 Dump Truck Hari 238,568.00 216,000.00
11 Alat Bantu Set 134,300.00 122,000.00

Kebumen, 2017
KEPALA DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN KEBUMEN

H. SLAMET MUSTOLKHAH, ST, MT


Pembina Tk.I
NIP. 19690922 199703 1 005
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
Jl. Sarbini No. 37 Kebumen Telp. (0287) 382821
KEBUMEN, 54311

DAFTAR HARGA SATUAN PEKERJAAN


KEGIATAN TAHUN ANGGARAN 2017
BIDANG SUMBER DAYA AIR
KABUPATEN KEBUMEN

KODE
NO. URAIAN SATUAN HARGA (Rp.)
ANALISA
1 2 3 4 5

I. PEKERJAAN PEMBERSIHAN DAN PENGUPASAN PERMUKAAN TANAH ; RAB


1 Pembersihan dan striping/kosrekan T.01.a M2 4,252.38 ###
Menebas tebang berupa memotong dan membersihkan lokasi dari tanaman/tumbuhan
2 T.01.b M2 5,394.35 ###
diameter < 15 cm
Mencabut 1 tunggul pohon tanaman keras diameter > 15 cm dan membuang sisa tunggul
3 T.01.c POHON 29,134.60 ###
kayu dan akar-akarnya
###
II. PEKERJAAN GALIAN TANAH ###
1 Galian tanah biasa sedalam ≤ 1 m T.06.a.1 M3 39,901.50 ###
2 Galian tanah biasa sedalam s.d. 2 m T.06.a.2 M3 47,839.28 ###
3 Galian tanah berbatu sedalam < 1 m T.07.a.1 M3 95,749.42 ###
4 Galian tanah berbatu sedalam s.d. 2 m T.07.a.2 M3 114,394.50 ###
5 Galian batu sedalam < 1 m T.08.a.1 M3 239,408.99 ###
6 Galian batu sedalam s.d. 2 m T.08.a.2 M3 265,773.75 ###
7 Galian tanah cadas atau tanah keras sedalam < 1 m T.09.a.1 M3 88,591.25 ###
8 Galian tanah cadas atau tanah keras sedalam s.d 2 m T.09.a.2 M3 98,655.22 ###
9 Galian lumpur sedalam < 1 m T.10.a.1 M3 58,824.59 ###
10 Galian lumpur sedalam s.d. 2 m T.10.a.2 M3 70,873.00 ###
11 Galian Tanah di sungai atau drainase dengan excavator AHSP SDA A.11.2 M3 16,487.51 ###
###
III. PEKERJAAN TIMBUNAN DAN PEMADATAN ###
1 Timbunan tanah atau urugan tanah kembali T.14.a.1 M3 23,388.09 ###
2 Timbunan tanah urug T.14.a1' M3 130,308.09 ###
3 Timbunan tanah cadas T.14.a2 M3 120,749.20 ###
4 Pemadatan tanah T.14.b.1 M3 40,524.00 ###
5 Mengangkut 1 m3 hasil galian dengan jarak angkut > 3m s.d. < 5 m T.15.a.1 M3 16,617.61 ###
6 Mengangkut 1 m3 hasil galian dengan jarak angkut 5 m T.15.a.1 M3 16,617.61 ###
7 Mengangkut 1 m3 hasil galian dengan jarak angkut 10 m T.15.a.2 M3 18,225.77 ###
8 Mengangkut 1 m3 hasil galian dengan jarak angkut 30 m T.15.a.3 M3 21,110.91 ###
9 Mengangkut 1 m3 hasil galian dengan jarak angkut 50 m T.15.a.5 M3 28,276.74 ###
10 Mengangkut 1 m3 hasil galian dengan jarak angkut 100 m T.15.a.6 M3 40,203.90
11 Mengangkut 1 m3 hasil galian dengan jarak angkut 200 m T.15.a.7 M3 63,656.18
12 Mengangkut 1 m3 hasil galian dengan jarak angkut 300 m T.15.a.8 M3 87,108.45
13 Mengangkut 1 m3 hasil galian dengan jarak angkut 400 m T.15.a.9 M3 110,560.73
14 Mengangkut 1 m3 hasil galian dengan jarak angkut 500 m T.15.a.10 M3 23,586.29
###
IV PEKERJAAN PASANGAN BATU BELAH ###
1 Pas. batu dengan Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) P.01.c.1 M3 862,093.10 ###
2 Pas. batu tersedia dengan Mortar tipe N (mutu PP tertentu setara dengan camp. 1 PC : 4 PP) P.01.c.2 M3 818,943.40 ###
3 Pas. batu dengan Mortar tipe O (mutu PP tertentu setara dengan campuran 1 PC : 5 PP) P.01.d.1 M3 824,657.90 ###
4 Membongkar pasangan batu dan pembersihan batu (manual) P.01.e.1 M3 100,005.40 ###
5 Membongkar pasangan batu (manual) P.01.e.2 M3 85,635.00 ###
6 Membongkar pasangan batu dengan Jack Hammer P.01.e.3 M3 49,453.80 ###
7 Pembersihan bongkaran pasangan batu untuk pemanfaatan kembali material batu **) P.01.e.4 M3 14,370.40 ###
###
V PEKERJAAN PASANGAN PIPA SULING ###
1 Pasangan pipa suling-suling P.16 1 M 67,023.55###
###
VI PEKERJAAN PASANGAN BATA MERAH ###
1 Pas. bata merah dg Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) P.02.c.1 M3 843,746.20 ###
2 Membongkar pasangan bata merah (manual) P.02.f.1 M3 43,545.73 ###
3 Membongkar pasangan bata merah dengan Jack Hammer P.02.f.2 M3 16,946.60 ###
###
VII PEKERJAAN SIARAN ###
Siaran dengan mortar jenis PC-PP tipe M (untuk mutu PP tertentu setara dengan campuran
1 P.03.a M2 44,145.75 ###
1 PC : 2 PP)

VIII PEKERJAAN PLESTERAN DAN ACIAN ###


1 Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (untuk mutu PP tertentu setara
dengan campuran 1 PC : 3 PP) P.04.e M2 57,016.08 ###

2 Acian P.04.g M2 26,598.55 ###


KODE
NO. URAIAN SATUAN HARGA (Rp.)
ANALISA
1 2 3 4 5
IX PEKERJAAN PASANGAN BATU BRONJONG KAWAT (SNI 03-0090-1998) ###
1 Pasangan Bronjong Kawat pabrikasi uk. 2 x 1 x 0.5 P.06a.7 M3 660,558.25 ###
2 Pasangan bronjong dari kawat digalvano dia 3 mm G-5a M3 498,893.82 ###
3 Cerucuk bambu diameter 8 cm – 10 cm P.07.b M 19,477.26 ###
4 Pemasangan Geotekstil (1 m2) Tipe-A P.09.a M2 26,054.33 ###
###
X PEKERJAAN LEMPENGAN RUMPUT ###
1 Penanaman Rumput lempengan P.12.a M2 164,387.30 ###
2 Pembabadan rumput P.12.b.2 M2 535.48 ###
###
XI PEKERJAAN BETON ###
1 Beton untuk lantai kerja (bedding) B.01. M3 744,054.30 ###
2 Beton mutu, f’c = 7,4 MPa (K100), slump (12±2) cm, w/c = 0,87 (Menggunakan Molen) B.02.b M3 875,459.85 ###
3 Beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78 (Menggunakan Molen) B.03.b M3 922,616.85 ###
4 Beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 (Menggunakan Molen) B.05.b M3 1,066,866.85 ###
5 Beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58 (Menggunakan Molen) B.07.a M3 1,063,668.65 ###
6 Pembesian 100 kg dengan besi polos atau ulir B.17.a 100 KG 1,399,695.00 ###
7 Pembesian 1 kg dengan besi polos atau ulir B.17.a1 KG 13,996.95 ###
8 Bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm
B.21.b M2 61,851.90 ###
(tanpa perancah)
9 Bekisting untuk lantai permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa
B.21.c M2 87,152.45 ###
perancah)
10 Perancah bekisting Kaso 5/7 tinggi 2 m B.23.f M2 75,009.77 ###
11 Membongkar bekisting secara biasa (dan membereskan puing-puing) B.27.b M2 4,252.38 ###
12 Membongkar beton secara konvensional B.29.a M3 296,700.80 ###
13 Membongkar beton dengan Jack Hammer B.29.b M3 101,272.05 ###
###
XII PEKERJAAN PENGANGKATAN GULMA ###
1 Pengangkatan gulma terapung secara manual LA.09.a M2 2,126.19 ###
2 Pengangkatan gulma padat, ketebalan 25 cm secara manual LA.10.a M2 35,436.50 ###
###
###

Kebumen,

Kebumen, 2017
KEPALA DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN KEBUMEN

H. SLAMET MUSTOLKHAH, ST, MT


Pembina Tk.I
NIP. 19690922 199703 1 005
T.06.a.1 1 m3 Galian tanah biasa sedalam ≤ 1 m
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.563 57,400.00 32,316.20
2 Mandor L.04 OH 0.056 70,300.00 3,957.89
Jumlah Harga Tenaga Kerja 36,274.09
B Bahan
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 36,274.09
E Overhead + Profit 10% x D 3,627.41
F Harga Satuan Pekerjaan per - m3 (D+E) 39,901.50
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
Jl. Sarbini No. 37 Kebumen Telp. (0287) 382821
KEBUMEN 54311

AHSP SDA A.11.2


FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Jenis Pekerjaan : Galian Tanah di sungai atau drainase dengan excavator


Satuan Pembayaran : 1 M3

Perkiraan Harga Jumlah


No. Komponen Satuan Kuantitas Satuan Harga
(Rp.) (Rp.)

A. TENAGA
1. Operator Alat Berat Jam 0.0414 23,571 976.04
2. Mandor Jam 0.0041 10,043 41.59

JUMLAH HARGA TENAGA 1017.63

B. BAHAN

JUMLAH HARGA BAHAN -

C. PERALATAN

1. Excavator (E10) Jam 0.0414 337,400.00 13,971.01

JUMLAH HARGA PERALATAN 13,971.01

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 14,988.64


E OVERHEAD + PROFIT 10% X D 1,498.86
F HARGA SATUAN PEKERJAAN per M3 (D+E) 16,487.51
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
Jl. Sarbini No. 37 Kebumen Telp. (0287) 382821
KEBUMEN 54311

AHSP SDA A.11.2

Jenis Pekerjaan : Galian Tanah di sungai atau drainase dengan excavator


Satuan Pembayaran : 1 M3
URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sekitar sungai atau drainase
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan tanah Fk 1.20 -

II. URUTAN KERJA


1 Posisi Excavator di darat/di atas tanggul
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menuangkan material hasil galian
di pinggir tanggul

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1 BAHAN
Tidak ada bahan yang diperlukan

2 ALAT
EXCAVATOR (E10)
Kapasitas Bucket V 0.60 M3
Faktor Bucket Fb 0.70 -
Faktor Efisiensi alat Fa 0.69 -

Waktu siklus Ts1 menit


. Menggali, swing / memuat T1 0.35 menit
. Swing kembali dan Lain-lain T2 0.25 menit
Ts1 0.60 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 24.15 M3/jam


Ts1 x Fk

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0414 Jam


No. URAIAN KODE KOEF. SATUAN KETERANGAN
3 TENAGA
a. Membantu pemuatan tanah oleh Excavator
Produksi menentukan : EXCAVATOR Q1 24.15 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 169.05 M3
Kebutuhan Tenaga :
. Operator Alat Berat P 1.00 orang
. Mandor M 0.10 orang

Koefisien tenaga / M3 :
. Operator Alat Berat = (Tk x P) : Qt (L01) 0.0414 Jam
. Mandor = (Tk x M) : Qt (L03) 0.0041 Jam

4 HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5 ANALISA HARGA SATUAN PEKERJAAN


lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Didapat Harga Satuan Pekerjaan :

Rp16,487.51 /M3
ANALISIS BIAYA OPERASI ALAT BERAT UNTUK GALIAN TANA
JENIS ALAT : Excavator, Dump Truck, Buldozer, Roller Vibro dan Water Tanker
SATUAN PEMBAYARAN : Rupiah/jam

No. URAIAN KODE SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan
2. Merk / Tipe -
3. Tenaga Pw HP
4. Kapasitas Cp -
5. Umur Ekonomis A Tahun
6. Jam Operasi dalam 1 Tahun W Jam
7. Harga Alat B Rp

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat C Rp

Faktor Angsuran Modal D -

3. Biaya Pasti per Jam :


a. Biaya Pengembalian Modal E Rp/jam

b. Asuransi, dll. F Rp/jam

Biaya Pasti per Jam G = (E + F) G Rp/jam

C. BIAYA OPERASI PER JAM KERJA


1. Bahan Bakar = (12%-15%) x Pw x Ms H Rp/jam

2. Pelumas = (2.5%-3%) x Pw x Mp I Rp/jam

Biaya bengkel = (6,25% - 8,75%) J Rp/jam

3. Perawatan dan = (12,5%-17,5%) K Rp/jam


perbaikan

4. Operator = (m orang/jam) x U1 M Rp/jam


5. Pembantu operator = (n orang/jam) x U2 L Rp/jam

Biaya Operasi (per Jam) = P Rp/jam


D. BIAYA OPERASI ALAT / JAM = (G + P) S Rp/jam

E. LAIN - LAIN
1. Bahan Bakar Premium Mb Liter
2. Bahan Bakar Solar (non subsidi) Ms Liter
3. Minyak Pelumas Mp Liter
T UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
ller Vibro dan Water Tanker
URAIAN ANALISA HARGA SATU

Perhitungan Biaya Operasi Peralatan KETERANGAN

Excavator
Dump Truck Bulldozer Roller Vibro Water Tanker
(Standard)
80-140 HP 3-4 M3 100-150 HP 5-8 Ton 3000-4500 L
133.0 100.0 150.0 82.0 100.0
0.9 4.0 - 7.1 4,000.0
5.0 5.0 5.0 5.0 5.0
2,000 2,000 2,000 2,000 2,000
934,000,000 360,000,000 900,000,000 918,787,500 105,000,000

93,400,000 36,000,000 90,000,000 91,878,750 10,500,000


Tingkat suku bunga
0.26380 0.26380 0.26380 0.26380 0.26380 i=

110,874.08 42,735.19 106,837.98 109,068.22 12,464.43


Biaya asuransi
934.00 360.00 900.00 918.79 105.00 p=

111,808.08 43,095.19 107,737.98 109,987.01 12,569.43

139,857.48 105,156.00 157,734.00 86,227.92 105,156.00

93,100.00 70,000.00 105,000.00 57,400.00 70,000.00

29,187.50 11,250.00 28,125.00 28,712.11 3,281.25

58,375.00 22,500.00 56,250.00 57,424.22 6,562.50

23,571.43 23,571.43 23,571.43 23,571.43 23,571.43


8,900.00 8,900.00 8,900.00 8,900.00 8,900.00

352,991.41 241,377.43 379,580.43 262,235.68 217,471.18


464,799.49 284,472.62 487,318.41 372,222.69 230,040.61

6,860.00 6,860.00 6,860.00 6,860.00 6,860.00


8,763.00 8,763.00 8,763.00 8,763.00 8,763.00
28,000.00 28,000.00 28,000.00 28,000.00 28,000.00
DATAN

NALISA HARGA SATUAN

KETERANGAN

Tingkat suku bunga


10%

Biaya asuransi
0.2%

12.00%

2.50%

6.25%

12.50%
Tabel II.E.3 Jenis pekerjaan pada komponen konstruksi embung

JENIS PEKERJAAN
No. KOMPONEN
Tanah Pasangan Beton Pancang
1 2 3 4 5 6
I PEKERJAAN POKOK BANGUNAN EMBUNG
Pondasi bangunan embung
I.1 (Galian tanah, tiang pancang, siklop, √ √
dewatering
Tubuh embung
(Galian tanah, batu, pasir, split
I.2 √ √ √
treatment, beton, pasangan, dan
instrumentasi)
Spillway (Galian tanah, timbunan,
√ √ √
beton, pasangan dewatering,)
I.3
a. Peredam energi √
b. Pekerjaan lain-lain
Intake (Galian tanah, timbunan,
I.4 √ √ √ √
beton, pasangan dewatering)
uksi embung

PEKERJAAN
PA+HM Dewatering Lain-lain
7 8 9

√ √

√ √

√ √