PROPOSAL FOR CARBONATED SOFT DRINK LINE

40 BPM @ 200 ML

Subject: OFFER FOR SUPPLY /ERECTION & COMM. Of CARBONATED SOFT DRINK PLANT

Dear Sir

This refers to the discussion held with our Mr. Prasad S. Naik in regards to the above captioned
subject.

As discussed & as required, please find enclosed herewith our best offer for CARBONATED
SOFT DRINK PLANT with Equipment schedules and process description with configuration as
noted below.

We request you to kindly go through the same and please feel free to call the undersigned in
case of queries if any.

Thanking you
For Aguapuro Equipments Pvt Ltd

Sd/-
Jitendra C. Rane
Director.
PROCESS FLOW for CSD PLANT

Water Treatment Plant

2000 LPH

Water for CIP & Utility 500 Water for CSD


LPH
Line 1500 LPH

Skid Mounted Manual CIP Sugar Syrup


System For CSD
Module for CSD

Beverage Blending

Module for CSD

CHILLER for CSD

CARBONATOR with PHE for


CSD

Counter Pressure Filler For


CSD : 30 BPM @ 500ml

Semi Auto. PET BLOW


MACHINE 1200 BPH
Equipment Schedule & Process Description for SUGAR SYRUP PREPARATION

MODULE for CSD Line. (OPTIONAL for CSD)

Sugar Syrup Making Tank Steam jacketed with Agitator – 500 Liter

Tank totally enclosed type & hygienic SS304 shell with agitator for preparing Sugar syrup and fine
dissolution of sugar with steam heating

Sugar Syrup Making Tank 1 Unit

1 Tank MOC SS 304

2 Make AGUAPURO

3 Tank Volume / Capacity 500 LTRS.

5 Jacketing Dimple Type Steam Jacketing

6 Agitator MOC SS 304

7 Steam Valve 1 No.

8 Relief Valve 1 No.

9 Steam Trap Float Type

10 Pressure gauge 1 No.

11 Temperature Indicator 1 No.

12 Connections 38mmsms

13 Total Connected Power 2 KVA


S.S Transfer Pump

SS Centrifugal pump made of sanitary design to Pump the Syrup to Filter Press with desired velocity
and flow.

SS Transfer Pumps 1 Operating

1 Type Centrifugal

2 Make of Pump Wilo or equivalent

3 MOC SS 316

4 Capacity 10000 LPH @ 5WMC Head

5 Max. Head 12 WMC Head @ 5500 LPH

In line Filter , Filter Press –Sparkler Type, Syrup Cooler (PHE), Hyflow Coating Tank
In line Filter

In Line filter to pre filter the syrup for any suspected suspended solid particles generally
constructed in SS 304, Outlet and inlet connection 51 mm sms

Filter Press -500 Litre

Sparkler type filter press for fine filteration of Sugar syrup generally constructed in SS 304, Outlet
and inlet connection 38 mm sms

Syrup Cooler (PHE) -500 Liter

Plate Type Heat Exchanger for cooling of sugar with plates SS 304 with clipon gasket.

Hyflow Coating Tank – 50 Liter

To clarify the syrup and remove impurities from the syrup, Material of Construction: SS 304 with
inlet and outlet connection ,Adjustable ball feet arrangement

Interconnecting pipes & Valves

All interconnecting piping Valves and joints Material: SS 304

Electric control panel S.S. with on off push button, temperature indicator
Sugar Syrup Holding Tank with Agitator -500 Liter

To hold the ready syrup in the tank for further process, Agitator with motor drive, Manhole ,Outlet
Valve, CIP Spray inlet, Legs with ball feet Installed

Sugar Syrup Holding Tank 1 Unit

1 Tank MOC SS 304

2 Make AGUAPURO

3 Tank Volume / Capacity 500 LTRS.

4 Agitator MOC SS 304

5 Connections 38mmsms

6 Total Connected Power 2 KVA


Final SS Transfer Pump

Final SS 316 Pump of sanitary design to transfer the syrup at required velocity and flow to the
beverage blending section.

Final SS Transfer Pumps 1 Operating

1 Type Centrifugal

2 Make of Pump Wilo or equivalent

3 MOC SS 316

4 Capacity 10000 LPH @ 5WMC Head

5 Max. Head 12 WMC Head @ 5500 LPH


Equipment Schedule & Process Description for

BEVERAGE BLENDING for CSD Line

Beverages Blending Tank : 1 Nos


For blending & final Preparation of the Beverage, Herein the beverage is blended with desired levels
of Concentrate (ready mixture of Flavor, Color, Preservative and Other additives) , Sugar syrup,
Treated Water for Carbonated beverage, While Concentrate (ready mixture of Flavor, Color,
Preservative and Other additives), Sugar syrup, Treated Water and Diluted Fruit Pulp for RTS

Beverage Blending Tank 1 Unit

1 Tank MOC SS 304

Vertical Type Conical dished


2 Tank type end

3 Make AGUAPURO

4 Tank Volume / Capacity 1000 LTRS. With Level tube

5 Tank Height 1000 mm

6 Tank Diameter 0500 mm

7 Agitator MOC SS 304

8 Agitator Speed 60 RPM

9 Connections 38mmsms

10 Total Connected Power 1 KVA

Beverage Transfer Pump


SS centrifugal pump of sanitary design of capacity 1000 LPH to transfer the blended beverage at
regulated flow and pressure to the homogenizer in case of RTS or direct to the Beverage Holding Tank
in case of CSD. A diversion valve is provided to divert the beverage direct to the beverage holding tank
in case of CSD.

Beverage Transfer Pump 1 Operating

1 Type Centrifugal

2 Make of Pump Wilo or equivalent

3 MOC SS 316

4 Capacity 10000 LPH @ 5WMC Head

5 Max. Head 12 WMC Head @ 5500 LPH


Equipment Schedule & Process Description for

CHILLER & CARBONATOR for CSD Line

CHILLER UNIT WITH PHE & GLYCOL CONTROL

The beverage produced in the beverage blending tank for CSD has now to be carbonated for the
sparkling effect. However by general principle gas does not dissolve or mix up in any kind of lesser
viscous liquid even at room temperatures thereby the beverage has to be chilled to a temperature
just above freezing temp (normally from 3 to 5 OC ) to ensure proper dissolution of gas in the
beverage and also to ensure that the Gas level in the beverage is controlled to have uniform
distribution and gas volume in each packed container of the Product.
The Chiller unit comprises of a PHE (Plate Heat Exchanger) which ensures proper chilling of the
beverage to desired temperature before it is sent for carbonization to the carbonator.

Chiller 1 Unit

1 Capacity 10 TR

2 Water Tank SS 304 / 500 Litre storage

3 Compressor Semi Hermetic Reciprocating

4 Compressor Make VOLTAS

5 Water Pump Primary 1 K.W. 3 Phase with Mechanical


Seal for circulating Brine Liquid
Tank to chiller

7 Flow Rate & Pressure 10 LPM & 3 Bar

8 Condenser Water Cooled Shell and Tube


Type.

9 Cooling coil S.S.304 Braze Plate Type with


Expansion Valve duly Insulated.
10 Cooling tower FRP Tower : 7.5TR capacity

11 Pump for Cooling Tower 1 KVA

12 Refrigerant Piping All the piping with suitable


Copper Tubing and Brass
Fittings with Shutoff Valve and
Filter Drier, Liquid Indicator,
etc.

13 Refrigerant Type R - 22

14 Main Structure M S Painted


CARBONATION UNIT

The Carbonator is used to carbonize the beverage to desired gas volume using a commercial Carbon
Dioxide cylinder as source. The carbonator generally increases the surface area of the liquid so as the
liquid is exposed to the gas for even and high value dissolution of gas.

The carbonator works on the film flow principle. A very fine film of liquid is created and allowed to
flow over specially contoured film plates. During these flow, liquid is exposed to carbon-dioxide gas
at carbonation pressure, and when it reaches the bottom level of the carbonation chamber, it is fully
saturated. There is adjustable nozzle provided on top of the tank by which flow rate can be
controlled. A liquid level gauge glass assembly with electronic level control probe is provided. The
control panel is supplied and built on same frame of carbonator The control panel houses, HP and LP
gas regulator with indicator gauges. Electronic pressure transducer controlled Diaphragm valve to
regulate gas flow. Complete electric system along with built in alarm system and pressure controller
for gas and only temperature indicator as one unit.

From the Carbonization unit the carbonated beverage is sent to the Counter Pressure Filler for Filling
Carbonator 1 Unit

1 Capacity 500 Litre / Hr.

2 Overall Dimension in Mtrs L: 1.2 X W: 1.2 X H: 1.0

3 Connected Power 3 KVA

4 Air Consumption 60 Psi

5 Water Inlet 2 to 3 C

7 Gas Flow Valve Electronic pressure transducer


controlled Diaphragm valve

8 Pressure controller & gauge 1 No.

9 Temperature Indicator
1 No.
10 Construction Body M S Epoxy coated

11 Gas Type Carbon dioxide Gas


Equipment Schedule & Process Description for

BATCH CODING MACHINE

BATCH CODING MACHINE

Simplicity and value-From the moment you press the start button the A120 delivers great value. The
clever design has reduced consumables usage while maintaining all of the strengths and value that the
market has come to expect from the world’s best selling Continuous Ink Jet (CIJ) printer. Our entry level
A120 is capable of meeting the need for a wide range of common applications where up to 3 lines of
code is required. A diverse range of applications Domino’s A120 is ideal for many coding applications
where up to 3 lines of code is needed
Technical Specification

Operational Capability

Max number of messages 300 Max number of characters per field 256 Max number of fields per
message 40 Logo generation On boards Max number of logos 250 Max number of strokes per logo 2000
Max print format height 25 drops Max number of lines of text 3 Max line speed 148 m/min

Interfaces

QVGA (320x240) with key board Standard 4 Stage 24V beacon Optional 4 Stage alarm (voltage free
contacts) Optional Product detector Standard Shaft encoder Standard

Environment

Weight 23kgs Stainless Steel 304 or equivalent IP Rating (designed to) 55 Operating temperature 5 ºC
to 45ºC Humidity 10% to 90% Power requirement 96-256v 47-63hz Power consumption 56Watts

Print head

Conduit length 3 m ,Bend Radius 45 mm ,Nozzle size 60 μ ,SureStart Standard Heater Standard Positive
air pump Optional

Ink System

Ink Cartridge 825ml, MU cartridge 825ml, Ink Reservoir 1200ml, Reduction (Peltier) Optional
Equipment Schedule & Process Description for

AUTOMATIC COUNTER PRESSURE TYPE FILLING LINE FOR CSD in PET Bottles

AUTOMATIC COUNTER PRESSURE TYPE FILLING MACHINE 40 BPM @ 200 ml FOR CARBONATED
SOFT DRINK

The machine is suitable for 500, 1000, & 2000 cc PET Bottles, with a production capacity of 40 bottles
per minute for 200 ml. Bottle loading and unloading are manual while rinsing, filling and capping
operations are carried out automatically. The Carbonated beverage cannot be filled in normal fillers as
the gas will precipitate the beverage during filling and filling will not take place, thereby special counter
pressure fillers are used in filling CSD to ensure smooth filling of the beverage in PET bottles along with
preventing loss of gas volume in the container.
The machine consists of the following sub-assemblies :-

1. Infeed Conveyor : Air conveyor


MOC : SS 304
Length : 2.4 Meter
2. Outfeed Conveyor : Slat conveyor
MOC : SS 304
Length : 4.0 Meter
3. Cap Feeding : Automatic through Elevator
MOC : SS 304
4. Counter Gas Tank : 1 No.
5. Shrink Tunnel : 1 No.
6. Gear Box Make : Bonfigloli
7. Motor Make : Hindustan Motor
Motor H.P. : 1.5 HP

All Contact Parts: Material of Construction

Rinsing Head : 8 Nos


Filling Head : 8 Nos
Capping Head : 4 Nos
Filling Nozzle MOC : SS 304
Washing Nozzle MOC : SS 304
Arms MOC : SS 304
Neck Holder MOC : SS 304
Washing Tray MOC : SS 304
Capping Head MOC : SS 304 / Brass
Conveyor Guide MOC : UHM
All Electricals Make : Schnider
EQUIPMENT SCHEDULE & TECHNICAL DATA For

BOILER ( RS) 400 Kg /Hr. (Optional for CSD only)

BOILER : 400 Kg/Hr.

ADVANTAGE
Reverse flue three pass combustion system
Combustion air pre-heating outer jacket for enhanced efficiency.
Water tube once through steam boiler design for quick steam output.
Designed for maximum efficiency, ease of operation and maintenance.
Fully automatic burner suitable for pre-heated combustion air
Skid mounted fully assembled & packaged boiler for easy installation.
Use of standardized parts ensures easy availability of spare parts.
TECHNICAL SPECIFICATIONS : MODEL RSB 400RL

Parameter Details

Boiler make ROSS

Boiler type Vertical, once through coil type, reverse


flue three pass steam boiler

Model RSB 400RL

Steam output 400 kg / hr From & At 100 deg C

Design / working pressure 10.5 kg / cm2

Saturated steam temp 183 deg C

Feed water inlet temp 40 deg C maximum

Feed water pump motor 0.75 kW

Total connected electric load (approx) 1.5 kW

Electric power supply 415 V, 3 phase, 50 Hz, 4 wire

Ambient temp & site altitude 5 to 40 deg C. Max 500m above MSL

Pressure part tube grade BS 3059, Part 1, ERW tubes

Heating surface area 6.39 m2

Overall dimensions (approx.) W= 1600, D= 1800, H= 2400 mm

Dry weight of boiler (approx.) 1200 kg

BURNER DETAILS

Burner output control Single stage, On -Off

Burner motor power (approx) 0.75 kW

Burner make, type Dual-bloc light oil burner.

Thermal efficiency on LCV 89 ± 2%

Fuel for combustion HSD, LCV = 10,300 kcal/kg

Rated fuel consumption 24 kgs / hr


Note: Burner motor power given is approximate and depends on the burner selected. Efficiency. Fuel
consumption is based on stated LCV of fuel & boiler thermal efficiency. Thermal efficiency is subject
to clean internal & external heating surfaces. Specifications are subject to reasonable change without
prior notice.

SCOPE OF SUPPLY
Pressure part assembly consisting of MS ERW coil in outer shell.
Standard boiler mountings as per given list.
Combustion air fan with drive motor & fuel pump mounted on drive motor shaft extension and air
damper, all assembled on boiler shell.
Pressure jet oil burner assembly integrally assembled in boiler, with fuel piping fitted from fuel
pump to burner.
Water pump motor assembly with feed water inlet piping to pressure part, non-return valve and
blow-down valve.
Pre-wired control panel with switchgears & boiler controls.
Base frame for the steam boiler, forming a packaged unit.
Instruction Manual and laminated wiring diagram for the steam boiler.

BOILER MOUNTINGS
Safety valve, spring loaded One number

Main steam stop valve One number

Auxiliary steam valve One number

Blow-down valve with limit switch for burner inter-lock One number

Pressure guage with siphon & bib-cock One number

Pressure switch on steam header One number

CONTROL INSTRUMENTS AND SAFETIES


Pressure indicator to indicate fuel pressure.
Flame sensor to supervise flame & initiate alarm on unsafe operation.
Temperature Controller on flue gas side as safety against high stack temperature.
Pressure indicator to indicate steam pressure.
TIC to indicate steam temp & for safety against steam superheat.
Steam safety valve mounted on steam outlet header of boiler.
Pressure switch to regulate steam pressure through burner on-off operation.
BATTERY LIMITS
Boiler feed water Inlet of feed water pump

Steam Outlet of steam stop valves

Water & condensate drains Outlet of blow-down valve

Light fuel oil Inlet of fuel oil pump filter

Flue gas Outlet flange of smoke box

Electric power supply Isolator switch of control panel

EXCLUSIONS
All civil/structural work for installation of steam boiler.
Raw water, soft water and fuel storage & service tanks.
Water treatment plant such as softener, chemical dozers, pumps.
All piping to & from tanks/other equipment to steam boiler.
Chimney and flue gas ducting & its approval from local authorities.
Main switch and supply cable up-to control panel.
Steam pressure reducing station etc as per utility requirement.
Erection and commissioning of the unit at site.
Utilities such as water, dozing chemicals, fuel, electric power, cleaning fluids, lubricants for
operation & maintenance of boiler.
Spares for installation, operation and maintenance.
Any other items or services not mentioned in our scope of supply.
Equipment Schedule & Process Description for C.I.P. LINE (For CSD only)

CLEAN IN PLACE (C.I.P.) LINE

CLEAN IN PLACE (C.I.P.) LINE

The CIP Line Extensively built to maintain sanitation and fulfill all hygienic conditions and critical control
points in the assemblies. The CIP Line helps in maintaining trouble free cleaning procedure in the Lines
and must be used during change of product and also during start and stop of the entire processing line
especially the concentrate line assembly. The CIP systems includes of Sanitizing tanks with supply and
return pumps ensuring proper cleaning of the equipments in place. Simplex filters used ensure proper
filteration of the water used during the process. PHE provides Luke warm to hot water wash in the system
to prevent contamination in the process line.
CIP LINE 1 Operating

1 Manual CIP Tanks 500 Litre : 1 Nos

2 CIP Supply Pump 1M3 : 1 No. SS : Wilo

3 CIP Return Pump 1M3 : 1 No. SS : Wilo

4 PHE for Heating 20 degree rise

5 Simplex Filter 1 No.

6 Butterfly Valves 1 No.

7 SS Control Panel & Skid 1 No.


Equipment PRICING & GENERAL TERMS & CONDITIONS

EQUIPMENT Capacity QTY UOM POWER UNIT TOTAL

BASIC BASIC
in H.P. PRICE VALUE

01. WATER TREATMENT PLANT For 2000LPH 1 SET 700000 700000

CSD

SUGAR SYRUP PREPARATION


02. MODULE 8 900000 900000

For CSD

a. Sugar Syrup Jacketted Tank 500 Lit 1 No.

b. Primary SS Transfer Pump 0.5M3/ Hr 1 No.

c. Inline Filter Unit 1 No.

d. Filter Press Unit 0.5M3/ Hr 1 No.

e. PHE Unit for Syrup for Cooling 0.5M3/ Hr 1 Unit

f. Hyflow Coating Tank 50 Lit 1 No.

g. Sugar Holding Tank 500 Lit 1 No.

h. Secondary SS Transfer Pump 0.2M3/ Hr 1 No.

i. Interconnecting Piping & Valves in SS 1 Lot

j. Control Panel with Cabling 1 Set


03. BEVERAGE BLENDING MODULE 2

For CSD

a. 1 Blending Tanks with common Agitator 1000 Lts 1 No. 250000 250000

b. Pump 1.0 M3/hr 1 No. 45000 45000

BEVERAGE HOLDING & TRANSFER


04. PUMP 2

For CSD

a. Holding Tanks with Agitator 1000 Lts 1 No. 250000 250000

b. Pump 1.0M3/hr 1 No. 45000 45000

CARBONATOR & CHILLER MODULE


05. For CSD 10

a. Chiller Unit with glycol tank 10 TR 1 Unit 850000 850000

b. Carbonator Unit with PHE 500 LPH 1 Unit 700000 700000

SEMI AUTO PET BLOW MOULDING


06. M/c 800BPH 1 Unit 40 850000 850000

for CSD
EQUIPMENT Capacity QTY UOM POWER UNIT TOTAL

BASIC BASIC
in H.P. PRICE VALUE

FULLY AUTO.PET Bottle COUNTER


07. PRESSURE FILLER / CAPPER 40 BPM 15

For CSD, Capacity : 40 BPM @ 200 ml.

a. CSD Counter Pressure Type Filler Unit 1 Unit 1800000 1800000

b. Co2 Gas Manifold 4 cylinder with


activated Carbon & Ceramic Filter 1 Unit 85000 85000

c. Shrink Tunnel for labelling 1 Unit 170000 170000

08. SKID MOUNT CIP LINE MANUAL FOR 6 540000 540000

CSD LINE

Manual CIP Tanks 500 Lts 1 No.

CIP Supply Pump 1 M3/hr 1 No.

CIP Return Pump 1 M3/hr 1 No.

20 o C
Plate Heat Exchanger Unit for Heating /rise 1 No.

Simplex Filter 1 No.

Butterfly Valves 1 No.

SS Control Panel 1 No.

SS Skid 1 No.
EQUIPMENT Capacity QTY UOM POWER UNIT TOTAL

BASIC BASIC
/ Make in H.P. PRICE VALUE

10. BATCH CODING MACHINE 1 Unit 1 195000 195000

OTHER PACKAGING & ANCILLARY


11. UNITS

a. Filling Line Inlet & Outlet Conveyors NA Lot 0 0

Extra as per Extra as per


b. All Interconnecting Piping & Valves SS 1 Lot layout layout

c. Boiler : 0.4 Ton (Oil fired) High Pressure 1 Unit 650000 650000

steam generation : 400 Kg/ Hr. with


Chimney 6 Mtr height/ Fuel Tank 200Lit/
softner HS 80/ Water Tank 1 KL
Extra as per
High Pressure Steam Piping with P.R.S Extra Layout

TOTAL BASIC VALUE 80,30,000

TOTAL GROSS VALUE

Add : GST @ 18% 14,45,400


Final VALUE Exclusive of FREIGHT,
Insurance, P & F Etc Rs. 94,75,400

Please Refer Terms & Conditions


GENERAL COMMERCIAL TERMS AND CONDITIONS & SCOPE OF WORK

1. SCOPE OF SUPPLY:
Our scope of work is limited to the items mentioned in our offer. Anything not specifically mentioned on
our quotation to be considered outside scope of our supply.

2. PRICE
Prices quoted are for Design Engineering, Manufacture , Installation and Commissioning, Training etc.
Prices are firm but subject to statutory variations. Unless otherwise stated our offer is Ex-our works and
are Exclusive of packing, forwarding, loading, incidental charges, insurance, freight etc and are extra on
clients account.

3. DELIVERY PERIOD:
a. Within 10 to 12 weeks from date of technically and commercially clear order along with advance as
indicated in the payment terms.
b. A further period of 2 weeks may be required for transportation to the site, erection and
commissioning. The final commissioning of the plant depends on the inlet water connection to our
system provided by you.
c. Delivery period is effective form the date of realization of Advance Cheque / Demand draft.
d. Delivery period quoted is subject to Force Meajure conditions.

4. TERMS OF PAYMENT:
Our payment terms are as follows:
1. 20% as advance along with the Purchase order
2. 40% Second advance intermediate
3. Balance 40% against PROFORMA INVOICE, prior to dispatch (On pro-rata basis)

5. TAXES AND DUTIES


Our offer does not include any Sales tax, Octroi, Excise duty or any other Government levies and these
will be extra to buyers account as applicable on the date of delivery. Excise duties and Sales Tax will be
extra as per Government Rule. For Interstate, If Form ‘C’ is produced tax reduction is applicable as per
Government Rules.
Present Availing Rates of Sales tax is : 13.5% VAT
Present Availing Rates of Excise Duty is : 12.5%
For Exports : Excise and taxes NIL against Forms

6. VALIDITY:
Our offer is valid for 60 days from the date of submission after which is subject to our confirmation.

7. FORCE MEAJURE CLAUSE:


If at any time the execution of this order is affected by war, hostilities invasion, Act of Foreign enemies
Civil War, rebellion, revolution insurrection, riots and civil commotion acts of state and acts of god, such
as earthquakes, floods and other acts of nature which could not have been reasonably foreseen or
reasonably made provision for or insured against, then extension of time for supply as may be
warranted on intimated from us.

8. MANPOWER TRAINING:
Manpower training will be arranged at the time of installation and commissioning of plant and
machineries at the clients site by us.

9. ERECTION AND COMMISSIONING:


A team of our engineers will be deputed to the project site for Erection Installation and Commissioning
of the plant and machinery supplied by us. Client requires to bear To & Fro Air Fare & Local Traveling
Expenses + Lodging and Boarding at site for our engineers deputed. Any delay in commissioning time
before stipulated time frame arising from clients part will be charged @ 100 USD / Day / person extra
10. ESSENCE OF THE CONTRACT:
Delivery schedule and commissioning the project is directly related to customers fulfilling his
obligations in respect of terms of payment. Installation and Commissioning is directly related to
customer’s fulfilling his Building and other requirements to line up the same.

11. INSPECTION :
Customer will be intimated to inspect the items before dispatch as otherwise the item after receipt of
the payment will be dispatched as per dispatch instructions. It is understood that manufactured item
will be inspected by our internal inspection wing before dispatch.

12. INSURANCE:
Transit Insurance by you. However we shall intimate you the dispatch details to effect insurance.

13. GUARANTEE:
The product of our manufacture carries a guarantee against manufacturing defects, for a period of
Twelve months, from the date of dispatch from our factory. Please note that the guarantee is restricted
to mechanical items only and is limited to repair replacement of defective spares and accessories and
does not cover any consequent losses of damages. The guarantee will not cover normal wear and tear of
the parts or defects due to mishandling of the equipment or negligence. As regards bought out items like
Compressor, Pumps, Motors, Instruments, etc., the guarantee offered by the manufacturers of these
items would be passed on to you and it is limited to the guarantee offered by the respective
manufacturers. Warranty on Compressor Limited to 6 months only as offered by the manufacturer.

14. SUBSTITUTION OF MATERIALS:


In the event of non-availability of steel or any other material of a particular section or quality, we will be
using the nearest available alternate section with the approval of the Buyers. Any increase or decrease
on this scope will be to the buyers Account.

15. JURISDICTION:
All disputes will be subject to Mumbai Jurisdiction Only

16. LAYOUTS & PLANT DESIGN :


Detailed Designing of plant and plant layout as per BIS hygienic Standards will be provided by
Aguapuro, the architectural drawing / structural drawing to be prepared by client as per the layout
provided by Aguapuro. Aguapuro representatives will interact with clients appointed architects for the
same. All civil construction and appointment of contractors and architects and their payment in client’s
scope

17. ELECTRICAL DETAILS :


Details regarding Electrical Drawings and load requirement will be provided by Aguapuro, All electrical
connections and arrangement of electricity including documentation to be done by the client as per the
designs & suggestions provided.

18. ANCILLARIES :
All required ancillaries such as Raw water tanks, pipings from bore well to raw water tanks and from
there to the inlet of raw water pump, Air conditioners, Air curtains, fly kits, lightning, exhaust fans etc in
client’s scope. Detailing will be given by Aguapuro

19. ISI DOCUMENTATION : For Indian Packaged Drinking Water Clients Only
Arrangement of Documents such as Gram panchayat NOC, Pollution Control NOC, etc related to
Application of ISI marking in client’s scope, all details regarding the documents required will be
provided by Aguapuro. Aguapuro will assist in getting ISI License for the project through their own
sources however at extra cost payable by the Client.
20. Aguapuro will assist the Client in all maximum possible ways for the project which lies in its
approach.

21. EXCLUSIONS OF OFFER:


Please note out offer does not include the following:
1. All types of civil works including foundations, drains, drain sumps storage tank neutralization pit.
2. Safe storage of tank, chemicals and other accessories at site.
3. All types of electrical wiring and cabling including motors starters MCC control panels etc.
4. Regeneration and dosing chemicals laboratories reagents required for the initial start of the plant and
normal operation of plant.
5. Piping up to the inlet of plant machineries and drain outlets. GI piping’s & fitments for Jar wash room.
6. Watch and Ward.
7. Earthing materials.
8. Covered storage facilities.
9. Lighting and Water supply facilities.
10. Unloading, storage and security of equipment at site.
11. Plant building and its illumination and ventilation.
12. Any other equipments, work and services not specifically mentioned as forming part of our offer.
13. Labour and tools required for erection and commissioning.
14. Hangers / fixtures and supports required for Electrical connections and Pipings.

For AGUAPURO EQUIPMENTS PVT LTD

sd/-
Jitendra C. Rane
Director.