You are on page 1of 16

May 20, 2015 – Oman Energy and Water Conference

Service Experiences with the World


Record Gas Turbine SGT-8000H
Jens Klingemann

siemens.com/energy
Agenda

 SGT-8000H Introduction

 Fleet Experience / Operational Status

 Service-Friendly Design

 Service Tools

 Summary

Page 2 May 2015 Jens Klingemann


Siemens Large Scale Gas Turbines:
Product Portfolio for 50 Hz and 60 Hz

SGT5-8000H 375 MW
50 Hz SGT5-4000F 295 MW
SGT5-2000E 172 MW
SGT6-8000H 274 MW
60 Hz SGT6-5000F 232 MW
SGT6-2000E 112 MW
SGT-800 50 MW
SGT-750 37 MW
SGT-700 33 MW
SGT-600 25 MW
SGT-500 19 MW
SGT-400 14 MW
SGT-300 8 MW
SGT-200 7 MW
SGT-100 5 MW

Heavy-duty gas turbines Industrial gas turbines

Page 3 May 2015 Jens Klingemann


SGT5/6-8000H engine concept is based on
harmonization and new technology

Siemens V Design Siemens W Design

 Single tie bolt  Turbine cylinder  Front hollow shaft  Turbine features
 Compr. stat. design  Turbine vane carrier  Bearings  Turbine diffuser
 Exit housing  Compressor cylinder

ULN can-annular Secondary Air


Harmonized combustion system System
Compressor

The SGT-8000H concept uses proven features from Siemens


and (former) Westinghouse engines and introduces new technology

Page 4 May 2015 Jens Klingemann


Technical innovation as the basis of power and
efficiency increase

Evolutionary 3D blading Advanced Can Annular


combustion system
4 stages of fast acting variable-
pitch guide vanes (VGV) allowing
for improved part load efficiency
and high load transients > 60% combined
cycle efficiency

Proven rotor design


(Hirth serration, 3D Four stage turbine with
central tie rod, internal advanced materials and
cooling air passages) thermal barrier coating
for world class fast
(cold) start and hot High cycling capability due
restart capability to fully internally air cooled
turbine section

Transient protection of clearances


HCO for reduced for reduced degradation with
clearance losses hydraulic clearance optimization Performance features
(HCO) active clearance control Flexibility features

Designed for >60% efficiency in combined cycle


and best in class operational flexibility

Page 5 May 2015 Jens Klingemann


Global Fleet Overview of SGT-8000H

50 60
Hz Hz

3
15 4
15
2

8
8 1

• Siemens has sold 62 units* worldwide so far


• H-class fleet has achieved more than 2.200 starts & 131.000 EOH*
* 50Hz and 60Hz combined
Page 6 May 2015 Jens Klingemann
SGT-8000H
Service-Friendly Design

Easy-to-service design features


 Defined combustor handling tool
envelope (blue frame)
 Utilize engine symmetry to
optimize maintenance tasks
 Provides multi-task environment
 Does not require cover lift for
Combustion Inspection
 Access under engine for
tooling installation
 One toolkit for burner and
transition assembly

Page 7 May 2015 Jens Klingemann


Simple and efficient service concept
with three types of inspections

Hot Gas Path Inspection


Combustor Inspection
(Rotor in Place)

Major Inspection
(Rotor in Place)

Page 8 May 2015 Jens Klingemann


SGT-8000H Core Engine
Designed for easy and fast maintenance

All rotating blades including compressor are replaceable


without a rotor lift.

Row 1 Turbine Blades/Vanes/Ring Segments & Row 4


Blades can be replaced with or without cover lift.

Roll out/in capability of the turbine vane carrier enables


exchange of stationary turbine hardware without rotor lift.

Roll out/in capability also allows for optional assembled


spare vane carrier exchange concept which further reduces
outage durations.

Page 9 May 2015 Jens Klingemann


Outage Naming and Duration

Duration*
Name Graphic Duration* 50Hz
60Hz

Combustor Inspection 8 days 7 days

Hot Gas Path Inspection 21 days 21 days

Major Inspection / Outage 29 days 29 days

Major Inspection / Outage


35 days 35 days
with Rotor Lift

Rotor Inspection - -

* Estimated outage durations for turnkey inspections depending on several conditions (labor, site, etc.)
* Shift model: 6 days per week / 2 shifts per day / 10 hours per shift
* It’s working days only, counted form turning gear off to turning gear on
Page 10 May 2015 Jens Klingemann
SGT- 8000H
Service-Friendly Combustor Maintenance Concept

Benefits TLC 44 / TLC45 Single Shaft Configuration


 No external crane or other support devices required
 Easy access for Field Service personnel
 Better protection of combustor components against
handling issues
 Pre-assembled burner system for fast installation
 Optimized outage durations due to simultaneous
work flow & packaging

Berlin Factory Test Installation and Container Concept

Similar baskets and similar assembly procedure for transition Combustor components pre-assembled prior to delivery to site!

Page 11 May 2015 Jens Klingemann


Burner and Transition Handling Tool Test

Purpose: Tool 50Hz 60Hz


 Dismantling and assembly of transitions
and burners w/o TLC45 10 d 9d

 Dealing with indoor environment w/ TLC45 8d 7d


 Designed for use of Mobile platform and
support cranes → 20% reduction in Outage duration

Tool Test 10 / 2013 in Berlin, Germany

Page 12 May 2015 Jens Klingemann


SGT- 8000H Plant Platform Concept

3D Plant Design Model Power Plant Concepts with integrated Service Requirements
1. All power plant components included in the design model
2. Simulation of service activities
3. Optimization of overall power plant concept

Page 13 May 2015 Jens Klingemann


SGT- 8000H Serviceability
3D model supports service requirements

Based on the 3D model the best service concept will be developed and customized, e.g.
1. Rotor Inspection can be conducted on site
2. Upending fixture foundation installed during plant construction
3. Lower cost and higher availability as repair possible without factory visit

Destacking Service Option: upending fixture foundation installed during plant construction.
Page 14 May 2015 Jens Klingemann
Summary: SGT-8000H benefits

Arial 16 pt.,
Experience & Quality
Market
Line leadership
spacing 1.1@lines
Siemens quality, proven in >131’000* EOH

Fast Outages
Short outage times with use of innovative service tools and concepts

Serviceability
Easy maintenance on site

Cost
Fast Outages
Cost
Shortreduction programs
outage times due toand cost benefit
innovative for tools
service customer

*status December 2014

Page 15 May 2015 Jens Klingemann


Service Experiences with the World Record Gas Turbine SGT-8000H

Thank you!
Jens Klingemann
Vice President Sales
Siemens Power Generation Services
Middle East & West Asia

siemens.com/energy