Agenda
SGT-8000H Introduction
Service-Friendly Design
Service Tools
Summary
SGT5-8000H 375 MW
50 Hz SGT5-4000F 295 MW
SGT5-2000E 172 MW
SGT6-8000H 274 MW
60 Hz SGT6-5000F 232 MW
SGT6-2000E 112 MW
SGT-800 50 MW
SGT-750 37 MW
SGT-700 33 MW
SGT-600 25 MW
SGT-500 19 MW
SGT-400 14 MW
SGT-300 8 MW
SGT-200 7 MW
SGT-100 5 MW
Single tie bolt Turbine cylinder Front hollow shaft Turbine features
Compr. stat. design Turbine vane carrier Bearings Turbine diffuser
Exit housing Compressor cylinder
50 60
Hz Hz
3
15 4
15
2
8
8 1
Major Inspection
(Rotor in Place)
Duration*
Name Graphic Duration* 50Hz
60Hz
Rotor Inspection - -
* Estimated outage durations for turnkey inspections depending on several conditions (labor, site, etc.)
* Shift model: 6 days per week / 2 shifts per day / 10 hours per shift
* It’s working days only, counted form turning gear off to turning gear on
Page 10 May 2015 Jens Klingemann
SGT- 8000H
Service-Friendly Combustor Maintenance Concept
Similar baskets and similar assembly procedure for transition Combustor components pre-assembled prior to delivery to site!
3D Plant Design Model Power Plant Concepts with integrated Service Requirements
1. All power plant components included in the design model
2. Simulation of service activities
3. Optimization of overall power plant concept
Based on the 3D model the best service concept will be developed and customized, e.g.
1. Rotor Inspection can be conducted on site
2. Upending fixture foundation installed during plant construction
3. Lower cost and higher availability as repair possible without factory visit
Destacking Service Option: upending fixture foundation installed during plant construction.
Page 14 May 2015 Jens Klingemann
Summary: SGT-8000H benefits
Arial 16 pt.,
Experience & Quality
Market
Line leadership
spacing 1.1@lines
Siemens quality, proven in >131’000* EOH
Fast Outages
Short outage times with use of innovative service tools and concepts
Serviceability
Easy maintenance on site
Cost
Fast Outages
Cost
Shortreduction programs
outage times due toand cost benefit
innovative for tools
service customer
Thank you!