GENERAL AND APPLICATION
1. This Manual includes the installation, operation and maintenance of LW36 model SF6 circuit breaker, and also includes
the safety norms that shall be paid attention to and the risk of possible in the above mentioned courses. Any operator shall
carefully read this Manual before installation and operation, and shall not operate the product until he ensures complete
understanding. Please contact with the manufacturer if there are any questions or further information.
2. LW36A-126/145 model H.V. AC SF6 circuit breaker applies to power system of AC 50Hz, 132kV for control and protection,
also can be used as a liaision breaker.
3. The circuit breaker accords with standards of IEC62271-100 and GB/T1984-2003. It takes SF6 gas as insulation &
arc extinguish medium, adopts arc self-extinguish principle and matches with CT30 spring operating mechanism, and has
the advantages of strong breaking capacity, low operating power consumption and high reliability.
4. Service environmental conditions:
Normal service environmental conditions shall meet the stipulations of IEC60694-2002 & GB11022-99:
1) Environmental ambient temperature: -25 +40
2) Altitude above sea level: not exceeding 2500m (126kV); not exceeding 1000m (145kV)
3) Wind speed: 34m/s
4) Daily temperature difference: 25
2
5) Sunshine strength: 0.1w/cm
6) Monthly average relative humidity: 90%
7) Earthquake acceleration: 0.2g (level), 0.1g (vertical)
8) Ice covering thickness: 10mm
9) Air polluted degree: not exceeding degree stipulated in IEC60507 & Gb5582
10) Installation site: outdoor.
If the user has some special environmental requirements, please further consult with the manufacturer.
5. There are two types of tips respectively Attention and Warning in the Manual. Not executing the related
content of Attention may cause inconvenience or minor injuries; Not executing the content of Warning may cause
personal injury or equipment damage. This two types of tips are both shown in boldface.
1
table 1 continued
No Items Unit Data
15 Rated line charge breaking current A 31.5
16 Rated operating sequence O-0.3s-CO-180s-CO
17 Opening time 30 3
18 Closing time ms 75 8
19 Closing/opening time 60
20 Main circuit resistance u 40
21 Rated SF6 gas pressure (20 gauge pressure) 0.6
Mpa
22 Alarm/locking pressure (20 gauge pressure) 0.55/0.50
23 Annual gas leakage rate of SF6 gas % 1
24 Water content of gas ppm(v) 150
25 Mechanical life time 6000
26 Radio interference level uV 500
To ground 3150 3625
27 Creepage distance mm
Between gaps 3150 3625
28 SF6 gas weight per circuit breaker 10
kg
29 Unit weight of circuit breaker 1300
PRODUCT STRUCTURE
The circuit breaker adopts three-phase porcelain pillar-type structure and outdoor design. Three phases commonly match
with a spring operating mechanism, centre location, three-phase linkage, so the appearance is novel and exquisite. The
circuit breaker takes SF6 gas as insulation & arc extinguish medium, SF6 gas of three phase will connect during operation
and the gas pressure and density are monitored by a pointer-type density controller. The arc self-extinguish principle and
optimum design of movement system effectively improve the mechanical efficiency and furthest reduce the operating power
consumption.
As shown in Fig.1, three phase poles are installed at the common base, the control box is hoisted under the centre of
base, and the spring operating mechanism and control unit are inside, the output shaft of mechanism connects with the
crutch arm of central pole.
1. Base
The base is used for supporting three poles and connecting with the control box, is bent of steel plate and can meet IP4X
protection degree. The pressure gauge, name plate and three mounting holes can be viewed from the front of base. Three
2
phase SF6 gas inflatable pipeline and pointer type density controller are installed in the base. When un-connecting with the
inflatable valve of pole, the gas in the inflatable pipeline is in a sealed state, and the value displayed on the pressure gauge
is the pressure in the pipeline. There is a T-junctor under the pressure gauge, the vacant joint of which is the inflatable one
of circuit breaker.
The pointer type SF6 density controller (with a pressure gauge) is use for monitoring the density of SF6 gas in the
equipment and sending out control signal, and has the function of temperature compensation. When the SF6 gas pressure
changes due to the variation of environmental temperature, the controller will not act. Only when the gas pressure changes
due to SF6 gas leakage, the controller will send out alarm & locking signal.
The control box is connected to the base by six M20 bolts, and there are moisture-proof & waterproof devices at both the
joint between output shaft of mechanism and B-phase crutch arm and the exits of secondary circuits.
Attention:
1) When un-connecting with the pole, the value displayed on the pressure gauge is the pressure in the pipeline.
2) The value displayed on the pressure gauge is the pressure under 20 .
1700 1700
1350(1450)
1- Pole
1140(1280)
4685(4925)
2- Base
400
685 1005
980
1800
2195
310
Name plate-5 3- Pointer type density controller 650
4- control box
800
2530
3890
2. Pole
Each pole is a hermetic unit. The components of pole from top to bottom respectively are upper outlet plate, interrupter,
lower outlet plate, supporting bushing, insulation drawbar, crutch arm box, operating mechanism, etc. (see Fig. 2).
2.1 Upper/lower outlet plate
Upper/lower outlet plates are used for primary connection, there are outlet wires at both sides of lower one (The front is
the side that opening/closing indicators on control box or a pressure gauge on the base), and the outlet wires of upper one
shall be at the front unless the user has special requirements. The size of wiring holes off outlet plates refers to connection
modes of 3150A and 1250A (see Fig. 3), and the size standard refers to GB5273 standard.
2.2 Interrupter
3
The interrupter is the core part whole installed in the porcelain bushing. It mainly consists of porcelain bushing, fixed
contact base, fixed main contact, fixed arc contact, vent, pneumatic cylinder, movable arc contact, middle contact, lower
supporting base, drawbar and so on (see Fig. 4). Of which, the adsorbent is placed on the top of fixed contact base, the
drawbar connects to the insulation drawbar in supporting bushing and finally connects to outer crutch arm of crutch arm
box. The porcelain bushing of interrupter is made of high-strength porcelain with high strength and good air tightness.
Long-term current carrier loop consist of upper connection plate, fixed contact base, fixed main contact, pneumatic cylinder,
middle contact, lower supporting base and lower connection plate. As breaking current, arc loop flows via fixed arc contact
and movable arc contact, so as to guide the arc. A one-way valve is installed at the bottom of pneumatic cylinder's thermal
expansion room, and a back valve and a pressure release device are installed at the bottom of pressure chamber.
2.3 Supporting porcelain bushing
Supporting porcelain bushing is used for supporting the interrupter and insulation to ground. The insulation drawbar inside
the bushing is used for insulation to ground and mechanical transmission. Supporting porcelain bushing is made of high-
strength porcelain with high strength and good air tightness.
2.4 Crutch arm box
The function of crutch arm box is that transmit the operating mechanism's output action to the insulation drawbar and
finally transmit to the moving part unit of interrupter, so as to fulfil opening/closing operation. The valve installed on the
crutch arm box is used for connecting with the inflatable pipeline in the base. If the inflatable pipeline is not connected,
the whole pole is in a sealed state. The enclosure of crutch arm box is made of aluminium alloy with high strength and
good-airtightness, on which, there are positioning holes for expediently fixing the pole in opening position.
3. Spring operating mechanism
This Manual only simply introduces the structure of principle of the spring operating mechanism. Please refer to Manual
for CT30 model Spring Operating Mechanism.
The spring operating mechanism is installed in the control box and its working principle refers to Fig. 6.
4. Control box
In the control box, there are spring operating mechanism, terminal block of secondary control loop, mechanical counter,
heater and so on. About the detail secondary principle & wiring diagrams, please refer to Page 23, 24.
On the inner name plate, there are manual opening/closing pushbutton, remote-local change-over switch, energy storage
motor switch (see Fig. 7) and status indicators. The operator can visibly observe the state of circuit breaker at any time.
4
1- Upper outlet plate
2- Interrupter
4- Supporting bushiing
5
50
50
50
50
10 18
50
1- Poceilan bushiing
5- Vent
8- Middle contact
6
WORKING PRINCIPLE
2
3
9
4
5
10 6
A B C D
Closing position Breaking heavy current Breaking low current Opening position
1. Fixed arc contact 2. Main contact finger 3. Vent 4. Movable arc contact 5. Pneumatic cylinder 6. One-way valve
7. Pressure release valve 8. Pressure release spring 9. Pressure room 11.Thermal expansion room
Fig.5 Arc Extinguish Principle
1. Arc-extinguish principle
Once receiving opening command, the rigid moving parts that comprise pneumatic cylinder, movable arc contact, drawbar,
etc. will move downward under the effect of opening spring. During movement process, the fixed main contact finger will
firstly separate from the movable main contact and current will transfer to two closed arc contacts, then the arc contacts
will separate and generate arc.
As breaking heavy short-circuit current, arc energy between arc contacts is strong, hot airflow of arc zone will flow into
the thermal expansion room, where heat exchange is done and generates low-temperature, high-pressure gas. Then the
one-way valve will close because the pressure in thermal expansion room is higher than that in pressure chamber. When
current exceeds zero, the high pressure gas in thermal expansion room will blow to gaps to extinguish arc. During opening
operation, the gas pressure in pressure chamber will be compressed little by little, however, the spring release valve at bottom
will open when the gas pressure reaches a certain value, and pressing gas and releasing gas will be done at same time to
eliminate more counterforce of pressure gas, so as to greatly decrease operating power (see Fig. 5-B).
As breaking low current (usually lower than few thousands of ampere), it generates low gas pressure in thermal expansion
room due to low arc energy. Here, the pressure in pressure chamber is higher than that in thermal expansion room, the one
-way valve will open and the compressed gas will blow to gaps. When current exceeds zero, the gas will blow to gaps to
extinguish the arc (see Fig. 5-C).
2. Energy storage of closing spring
AC/DC dual-use motor drives the shaft of pawl rotating, transmit torque to the big and small pawls through 90 commutation
to push the ratchet rotating, then make the closing spring compress and start storing energy by drawbar. After passing through
the dead center position, motor will cut off power supply by a micro switch. (motor has over-current protection and 15s forced
power-off function.) The shaft of pawl is given an anti-clockwise rotational torque by the closing spring, and the torque is locked
by the closing holding detent through B-pin.
3. Closing operation
The electrified closing coil will drive the closing detent clockwise rotating to release the closing holding detent, then jack
up B-pin to release the ratchet, and the held closing spring will release energy to drive the cam rotating. The cam strikes the
roller to make the crutch arm clockwise rotate, then drives the drawbar to make the fixed and movable contacts quickly
7
close, consequently, closing operation is completed.
In addition, the opening spring connected with the crutch arm will be simultaneously compressed and store energy
during the closing operation, .
4. Opening operation
After receiving opening command, the opening coil will be electrified, drive the opening detent clockwise rotating and
the opening holding detent will also clockwise rotate to release A-pin. The inner crutch arm will clockwise rotate under effect
of the opening spring, then drive the drawbar to make the fixed and movable contacts quickly separate, consequently,
opening operation is completed.
5. Reclosing operation
When both closing spring and opening spring are in energy storage state, reclosing operation will be completed once
the command of O-0.3s-CO is applied.
Closing coil
Opening holding detent
Opening coil
Interrupter
Opening detent
1. Packaging
The circuit breaker has 5 packages (see Fig.8). 3 poles are separately packed by wood cases, the control box is packed
and bound by the burlap together with the base, supporting pole and interphase links and they were fixed inside the base.
The packing list and attachment files are in the control box. Besides, there is a accessory box for packing such accessories
as installation and debugging tools, expendables and fasteners.
Attention:
1) Each pole is filled with 0.03 0.05MPa SF6 gas in advance.
8
2) Each pole shall be in opening state and the location pin shall be inserted.
3) Both opening spring and closing spring are in release state and the insurance pin shall be inserted.
Dim.: 3100 780 690; G-300kg/pcs Dim.: 4050 2290 880; G-500kg/pcs Dim.: 650 300 200; G-100kg/pcs
Package for body Package for frames Package for gadget box
INSTALLATION
Before installation, please check and accept each package unit and accessories according to Packing List. If any question,
please contact the manufacturer immediately.
Warning:
1) Incorrect lifting method will cause the tilt/collapse, as a result, the product will be damaged and fatal accident will happen.
2) During installation, improper bolts or incorrect fastening mode will also cause the damage of equipment and fatal
accident as a result of tilt/collapse. The fasteners for installation shall be the spare parts in the gadget box supplied by the
manufacturer, and shall be fastened by the torque spanner.
The bolt strength shall be over 8.8 degree, and the fastening torque shall be M6:8 1Nm, M8:22 2Nm, M10:45 5Nm,
M12:70 7Nm, M16:200 20Nm and M20:400 40Nm.
Attention:
1) During the entire installation process, there shall be skilled and experienced professional people for spot guidance.
2) When installing the poles, please use step ladder or elevator, that the ladder leans against the pole is strictly prohibited.
3) That any tool or lifter strikes the porcelain bushing is strictly forbidden.
1. Preparation of foundation
The requirement of foundation is shown in Fig. 9.
Routine inspection and maintenance shall be done during operation. The height difference between the two foundation
surfaces shall not exceed 2mm, the levelness of each foundation surface shall not exceed 2mm. 8 pieces of anchor bolts
are supplied by the manufacturer.
9
1700 1700
1350(1450)
1140(1280)
4685(4925)
400
685 1005
980
2195
1800
310
650
800
2530
3890
360
8 M24-6g 360 250 1110
80
Land building
200
250
220
600
800
360
200 200
Land building
600
2530
Installation of Foundation
Cutaway view of installation of anchor bolt
2 Remarks:
1. The pre-embedded M24 anchor bolts shall be 80mm exposed and
800
match with double nuts, the size deviation is 1mm. The level & L/R
50
Welding
deviations of two foundation surfaces do not exceed 4mm.
1
2. M24 800 anchor bolts are supplied by the manufacturer.
50
50
10
2. Installation of base & control box
Before install the components of base, please remove the plastic packing and take down both 4 covering plates of lifting
holes and 3 covering plates of handle holes at both sides of base.
Slightly lift the components by means of a crane and remove the pad wooden at the bottom, then lift and carry it to the
foundation, and fix it on the foundation by 8 nuts M24.
After install and fasten the base and control box, calibrate the level of base less than 2mm by the level gauge.
3. Installation of poles
3.1 Inspection before installation
Lift out three poles from wooden case and horizontally move to the strong ground.
Attention: Pad woodens shall be laid both ends of pole to prevent the porcelains from breaking.
Examine whether each porcelain is damaged or has some cracks due to transportation. If any, please contact with the
manufacture in time.
Warning: If gas charging is done when the porcelain is damaged or has some cracks, the explosion may happen and
endanger personnel safety.
Firstly, check the gas tightness before install the poles. There is a joint of gas valve on the crutch arm box of each pole,
remove the protection nut of valve and slightly open the valve. That the sound of gas deflating can be heard means good
gas tightness, or not, it means that the pole has some leakages or has been damaged during transportation.
Attention: 1) Remove the protection nuts before install the poles.
2) Opening location pins on the crutch arm box keep the transmission crutch arm and crutch arm box are locked
in opening state. Each pole is open before installation, please do not draw out the pin during installation.
3) The contact interface of all bolts, poles and base should be painted with water-proof glue before installation.
3.2 Installation of B pole
B pole shall be installed first. The pole which has double crutch arms and the centre distances between holes of crutch
arms respectively are 125mm and 100mm is B pole. Erect B pole.
Attention: While erecting B pole, lay the rubber plate or wooden plate of over 10mm thickness against the side of crutch
arm box side to protect the crutch arm box from damage when it touches the ground.
Lay the pole at the opening in the middle of base, fasten it with bolt M20*65 (as per Fig. 12) which passes though the
hole from bottom to up and fasten the upper end with nut, check the installation dimensions according to Fig. 12. Connect
2 NOS operating linkages with the crutch arm in opening state (connection mode as per Fig. 13) with 12 pin which shall
be painted with silicon grease. Do not pull out the location pin while connecting. Lock the transmission pin with M16 bolt and
catch plate after finish connection.
Warning: 1) When lay the pole at the opening of base, please gently lift and lay down to prevent the porcelain damaging
due to strong vibration.
11
Fig. 11 Lifting & Transportation of Poles
2) Forbid lifting the pole in gas-charged state (gas charging pressure over 0.1Mpa).
3) The head of bolt M20*65 should be under the through hole, or else the operating linkage will bump against the bolt
during operation. The side installed the linkage is fastened with two special bolts M20*65, the other side is fastened
with two common bolts M20*65.
Pole -1
A B C
Drive pin -2
Base -3
Operating linkage -4
Crutch arm -5
12
C B A
1
5
2
3
3
4 5
1. Crutch arm 2. Operating linkage 3. Operating linkage 4. Drive pin 5. Adjustable washer
2
1. Pole
3 2. Drive pin
3. Base
4. Operating linkage
5. Crutch arm of B-pole
4 6. Output shaft of mechanism
13
for connecting the upper terminal plate will be reserved. Please polish the contact surface with the emery cloth until shinning,
then clean it with the ethanol and evenly paint the surface with a thin layer of conductive gel. Fasten the upper terminal plate
with five bolts M16.
7. Connection of secondary wires
There are heat-shrink sealing tubes for connecting the secondary wires on the lower cover of control box. The user can
connect the secondary wires according to the connection diagram.
Attention: 1) The secondary wires must be connected in non-electrified state.
2) The secondary wires must be connected after the closing/opening springs of operating mechanism are released.
8. SF6 gas charging
After finish the connection of SF6 gas pipeline, connect the gas charging device, then charge the three poles with SF6
gas thru pressure-reducing valve, gas charging pipe and the joint under pressure gauge of base, details as per Fig. 15.
Before gas charging, first wash pressure-reducing valve and gas charging pipe for 3-5s with SF6 gas so as to expel the air
and water inside the pipeline. Charge the pole with gas one by one. During gas charging, the pressure indication of pressure
-reducing valve shall be below 0.62MPa, keep watch for the values of pressure-reducing valve and pressure gauge, stop
gas charging if the value reaches 0.62MPa. After finish gas charging, remove the joints of gas-charging device and base
and keep them well. .
Attention: 1) The value displayed on the pressure gauge of pointer type density controller is the pressure under 20 .
2) Before gas charging, pack the porcelain with special nylon net to prevent it from exploding due to the damage
during transportation or installation, as a result, endanger personnel safety. (Although its possibility is very small)
3) It is normal that the frost occurs on the gas charging pipe. That adjust the pressure-reducing valve to appropriately
reduce the flow speed can prevent the pipe from frostbiting. Charge the pipe with gas one by one (Namely,
Close its valve once the gas pressure of pole reaches 0.6MPa, then charge another pipe with gas, until three
poles are charged with gas). Please ensure that SF6 gas pressure of three poles reach rated pressure, then
open the Y-shaped connector to ensure the three poles through.
4) The gas charging pressure can be up to 0.62MPa.
1 2 3 4 5
to pole
14
crutch arm box are pulled out, and check whether there are some barriers in the movement direction of
CB or not, specially ensure that the vertical distance between the fixed bolt on the crutch arm and the level
operating linkage is over 20mm (as per Fig. 12).
2) The primary terminal shall not connect with high voltage system.
3) Anyway, SF6 gas pressure must not be lower than 0.3Mpa, or else it may cause CB's mechanical damage.
4) Check whether all pins are tightly locked or not.
5) It is best to adopt electric remote control for try operation. Before operation, all operators should keep 30m
away from CB or stand behind the shield.
6) Anyway, sing-phase or double-phase operation is prohibited.
Do both opening operation and closing operation for five times, and do standard cycle operation for three times.
2. Inspection and test after installation
2.1 Mechanical operating characteristics
Record energy storage time, opening time and closing time during opening/closing operation.
2.2 Resistance of main circuit
Measure and record the resistance of main circuit with main-circuit resistance tester in closing state.
2.3 Insulation resistance
Measure and record the insulation resistance between gaps and to ground in opening and closing state.
2.4 P.F. withstand voltage
If possible, do power frequency withstand voltage test and record the data.
2.5 Inspect the performance of pointer type density controller
Close the valve of crutch arm box, connect the vent joint with the gas charging joint in the base, slightly remove the nut
to make SF6 gas inside the pipe slowly leak. Once SF6 gas pressure falls to the alarming pressure, alarm will arise; When
the pressure falls to the locking value, check whether CB is locked or not, then remove the vent joint and open the valve of
crutch arm box(one phase), monitor whether the pointer-type density controller will reset or not.
After the above mentioned inspection work, open the valves of crutch arm boxes on three poles, if SF6 gas pressure is
below 0.6MPa, charge the pole with gas to rated pressure with gas charging device. After gas charging is completed, remove
the gas charging device and keep it well, meanwhile, put on the protection nut of gas charging joint inside the base.
2.6 Leakage detection
Detect the leak tightness of all sealing surface of CB with the leakage detection, special for the gas charging pipeline
and joints. If any, remove the joint, and check whether there is something on the sealing surface or O-type gasket is damaged.
After the corresponding disposal, detect the leak tightness again. If find that there is any leak on the sealing surface of pole,
please advise the manufacturer to resolve it in time.
2.7 Micro moisture measurement
Connect the pressure-reducing valve, pipeline and micro-moisture tester with the gas charging valve to measure the
moisture content inside the gas room. The measured data shall be compared according to ambient temperature. The moisture
content shall not exceed 150ppm (V/V, 20 ) while check & acceptance, and it shall not exceed 300ppm (V/V, 20 ) during
operation.
2.8 Check whether the changeover of both temperature & humidity controller and heater are normal.
2.9 Connect the primary busbar and the primary terminals of CB, the connection direction is up to the spot situation.
While connecting, polish the contact surface with the emery cloth until shinning and clean it with a white cloth dipped with a
little absolute ethanol.
2.10 Wash all the porcelains with clear water.
2.11 Before commissioning, check test items again, recheck the test data, and fill in the Installation Inspection & Test
Report in duplicate, the users and manufacturer respectively hold one for reference as original data.
3. Clearance of site
So far the installation of CB was completed, you should put on all the covers and keep all the removed parts in a safe
place for future use.
15
OPERATION AND MAINTENANCE
2. maintenance
SF6 circuit breaker is maintenance free circuit breaker, but once maintenance every three years can ensure that the
circuit breaker operates in good state. Maintenance shall be carried out under power cutoff for several hours. The maintenance
items mainly include as follows:
2.1 Inspect and clean the surface of porcelains.
2.2 Inspect the corrosion status. Repair the paints if any corrosion; Replace the fasteners if any rust.
Warning: Please replace the fasteners one by one. That replace them at the same time may cause personal injury or
damage the equipment because the poles are gas-tighness pressure containers.
2.3 Inspect whether the fasteners are loose or not, if yes, fasten it.
2.4 Inspect whether the primary terminal plate is overheated and off-color, if yes, polish the contact surface again and
fasten them.
2.5 Lubricate the moving parts of mechanism.
2.6 Measure the moisture content and record the data.
2.7 Measure the main circuit resistance and record the data.
2.8 Inspect whether the secondary connections are firm or not, whether the electric instruction is reliably conducted.
16
10000
time
3000
2000
1000
100
20
1 10 40 100
kA
Operation Instruction 1
Packing List 1
Certificate of Conformity 1
Delivery Inspection Report 1
Operation Report 2
ORDER NOTICE
17
ANNEX-1 FEATURES OF SF6 GAS
SF6 gas was invented in this century, which is widely used in high voltage and extra-high voltage switch equipments
due to its outstanding insulation performance and arc extinguishing performance. Under normal temperature, SF6 gas is
a colorless, odorless, innocuous and transparent inert gas, which has upstanding chemical stability. The atomic weight of
SF6 is 146, namely about 5 times of atmosphere, so the gas leaked in the atmosphere will deposit on the earth's surface.
As same as others gas, the pressure of SF6 gas will change along with temperature. For this circuit breaker, the state
curve of SF6 gas is as follows
Pressure(MPa)
0.8
50
0.7 Pe
Pj
0.6 Ps
Liquefaction line
0.5
Dens(kg/m3)
30
0.4
0.3 20
0.2
0.1 10
18
ANNEX-2 LIST OF INSTALLATION TOOLS & SPARE PARTS
M24 nut, washer, spring washer 8.8 degree 8 PCS/each 16PCS M24 nut
12 pin 3 PCS
20 pin 1 PCS
Motor 1 PCS
19
3. Offered special tools according to order
20
ANNEX-3 REPORT OF INSTALLATION AND TEST
Installation of poles
4pcs M20 65
B 2of4are specially
3 stainless bolts
A made.
per phase
C
Try operation
5 times of closing operation
8 5 times of opening operation
3 times standard cycle operation
21
TEST & TEST BEFORE OPERATION SPECIFICATION RESULT REMARKS
mechanical characteristic
energy storage time of spring
15s
closing time
opening time 75 8ms
check manual operating device 30 3ms
check anti-jump device
10
Main loop resistance 40
Insulation resistance
Leakage detect 1%
Director Director
Date Date
22
NOTE:
1. The position of aux. switch is the 8. Section of conductors: 2.5mm2
opening position of CB. 9. Color of conductors: Heating circuit is
2. The relay trips in exciterless state white, earth circuit is green, other
3. Gas density relay in pressureless state circuits are black.
4. CB Q1-Q4 in opening state 10. Rotation operation
5. State relation between limited switch Button operation
SP and closing spring NO
SP Sate of closing spring NC
23
24
Office Add: No.138 Ningkang W. Road,Yueqing City,
Zhejiang, P.R. China P.C.:325600
Factory Add: Weisi Road, Yueqing Economic Development zone
Yueqing, Zhejiang, P.R. China
Tel 0577-62558769 Fax 0577-27898866 / 62538979
http://www.heag.cn E-mail: sales@heag.com