TECHNICAL DATA

LW36A-126/145 Model
OUTDOOR HV SF6 CIRCUITBREAKER
ISO9001 International Quality System Certified Enterprise
China's Well-known Trademark
National Exemption from Inspection Product

ú ú

HUAYI ELECTRIC
GENERAL AND APPLICATION

1. This Manual includes the installation, operation and maintenance of LW36 model SF6 circuit breaker, and also includes
the safety norms that shall be paid attention to and the risk of possible in the above mentioned courses. Any operator shall
carefully read this Manual before installation and operation, and shall not operate the product until he ensures complete
understanding. Please contact with the manufacturer if there are any questions or further information.
2. LW36A-126/145 model H.V. AC SF6 circuit breaker applies to power system of AC 50Hz, 132kV for control and protection,
also can be used as a liaision breaker.
3. The circuit breaker accords with standards of IEC62271-100 and GB/T1984-2003. It takes SF6 gas as insulation &
arc extinguish medium, adopts arc self-extinguish principle and matches with CT30 spring operating mechanism, and has
the advantages of strong breaking capacity, low operating power consumption and high reliability.
4. Service environmental conditions:
Normal service environmental conditions shall meet the stipulations of IEC60694-2002 & GB11022-99:
1) Environmental ambient temperature: -25 +40
2) Altitude above sea level: not exceeding 2500m (126kV); not exceeding 1000m (145kV)
3) Wind speed: 34m/s
4) Daily temperature difference: 25
2
5) Sunshine strength: 0.1w/cm
6) Monthly average relative humidity: 90%
7) Earthquake acceleration: 0.2g (level), 0.1g (vertical)
8) Ice covering thickness: 10mm
9) Air polluted degree: not exceeding degree stipulated in IEC60507 & Gb5582
10) Installation site: outdoor.
If the user has some special environmental requirements, please further consult with the manufacturer.
5. There are two types of tips respectively Attention and Warning in the Manual. Not executing the related
content of Attention may cause inconvenience or minor injuries; Not executing the content of Warning may cause
personal injury or equipment damage. This two types of tips are both shown in boldface.

MAIN TECHNICAL PARAMETERS


1. Main technical parameters of circuit breaker table 1
No Items Unit Data
1 Rated voltage 126 145
Rated P.F. withstand To ground 230 275
2 voltage (1min) Between gaps kV 265 315
Rated lightning impulse To ground 550 650
3
withstand voltage Between gaps 630 750
4 Rated P.F. withstand voltage under SF6 zero gauge pressure(5min.) kV 95
5 Rated frequency Hz 50
6 Rated current A 3150
7 First pole factor 1.5
8 Rated short-circuit breaking current 40 31.5
9 Rated short-circuit making current 100 80
kA
10 Rated short-time withstand current 40 31.5
11 Rated peak withstand current 100 80
12 Rated short circuit duration s 4
13 Rated out of phase breaking current 10
kA
14 Short-line fault breaking current 36 30

1
table 1 continued
No Items Unit Data
15 Rated line charge breaking current A 31.5
16 Rated operating sequence O-0.3s-CO-180s-CO
17 Opening time 30 3
18 Closing time ms 75 8
19 Closing/opening time 60
20 Main circuit resistance u 40
21 Rated SF6 gas pressure (20 gauge pressure) 0.6
Mpa
22 Alarm/locking pressure (20 gauge pressure) 0.55/0.50
23 Annual gas leakage rate of SF6 gas % 1
24 Water content of gas ppm(v) 150
25 Mechanical life time 6000
26 Radio interference level uV 500
To ground 3150 3625
27 Creepage distance mm
Between gaps 3150 3625
28 SF6 gas weight per circuit breaker 10
kg
29 Unit weight of circuit breaker 1300

2. Main technical parameter of operating mechanism table 2


No Items Unit Data
1 Rated auxiliary circuit resistance V DC 220
2 Rated operating voltage of opening/closing coil V DC 220
3 Rated operating current of opening/closing coil A 2
Rated voltage V DC220 / AC 220
4 Energy storage motor Normal working voltage range V 65% - 110%
Power factor W 600
5 Electrical energy storage time s 15
6 Manual energy storage torque N.m 30
7 Rated voltage of heater & lighting circuit V AC 220
8 Rated voltage of auxiliary switch V DC 220
9 Rated current of auxiliary switch A 10
10 Contact number of auxiliary switch 20

PRODUCT STRUCTURE

The circuit breaker adopts three-phase porcelain pillar-type structure and outdoor design. Three phases commonly match
with a spring operating mechanism, centre location, three-phase linkage, so the appearance is novel and exquisite. The
circuit breaker takes SF6 gas as insulation & arc extinguish medium, SF6 gas of three phase will connect during operation
and the gas pressure and density are monitored by a pointer-type density controller. The arc self-extinguish principle and
optimum design of movement system effectively improve the mechanical efficiency and furthest reduce the operating power
consumption.
As shown in Fig.1, three phase poles are installed at the common base, the control box is hoisted under the centre of
base, and the spring operating mechanism and control unit are inside, the output shaft of mechanism connects with the
crutch arm of central pole.
1. Base
The base is used for supporting three poles and connecting with the control box, is bent of steel plate and can meet IP4X
protection degree. The pressure gauge, name plate and three mounting holes can be viewed from the front of base. Three

2
phase SF6 gas inflatable pipeline and pointer type density controller are installed in the base. When un-connecting with the
inflatable valve of pole, the gas in the inflatable pipeline is in a sealed state, and the value displayed on the pressure gauge
is the pressure in the pipeline. There is a T-junctor under the pressure gauge, the vacant joint of which is the inflatable one
of circuit breaker.
The pointer type SF6 density controller (with a pressure gauge) is use for monitoring the density of SF6 gas in the
equipment and sending out control signal, and has the function of temperature compensation. When the SF6 gas pressure
changes due to the variation of environmental temperature, the controller will not act. Only when the gas pressure changes
due to SF6 gas leakage, the controller will send out alarm & locking signal.
The control box is connected to the base by six M20 bolts, and there are moisture-proof & waterproof devices at both the
joint between output shaft of mechanism and B-phase crutch arm and the exits of secondary circuits.
Attention:
1) When un-connecting with the pole, the value displayed on the pressure gauge is the pressure in the pipeline.
2) The value displayed on the pressure gauge is the pressure under 20 .

1700 1700

1350(1450)
1- Pole
1140(1280)
4685(4925)

2- Base

400

685 1005
980

1800
2195

310
Name plate-5 3- Pointer type density controller 650
4- control box
800

2530
3890

Fig.1 Overall Structure of Circuit Breaker from the front

2. Pole
Each pole is a hermetic unit. The components of pole from top to bottom respectively are upper outlet plate, interrupter,
lower outlet plate, supporting bushing, insulation drawbar, crutch arm box, operating mechanism, etc. (see Fig. 2).
2.1 Upper/lower outlet plate
Upper/lower outlet plates are used for primary connection, there are outlet wires at both sides of lower one (The front is
the side that opening/closing indicators on control box or a pressure gauge on the base), and the outlet wires of upper one
shall be at the front unless the user has special requirements. The size of wiring holes off outlet plates refers to connection
modes of 3150A and 1250A (see Fig. 3), and the size standard refers to GB5273 standard.
2.2 Interrupter

3
The interrupter is the core part whole installed in the porcelain bushing. It mainly consists of porcelain bushing, fixed
contact base, fixed main contact, fixed arc contact, vent, pneumatic cylinder, movable arc contact, middle contact, lower
supporting base, drawbar and so on (see Fig. 4). Of which, the adsorbent is placed on the top of fixed contact base, the
drawbar connects to the insulation drawbar in supporting bushing and finally connects to outer crutch arm of crutch arm
box. The porcelain bushing of interrupter is made of high-strength porcelain with high strength and good air tightness.
Long-term current carrier loop consist of upper connection plate, fixed contact base, fixed main contact, pneumatic cylinder,
middle contact, lower supporting base and lower connection plate. As breaking current, arc loop flows via fixed arc contact
and movable arc contact, so as to guide the arc. A one-way valve is installed at the bottom of pneumatic cylinder's thermal
expansion room, and a back valve and a pressure release device are installed at the bottom of pressure chamber.
2.3 Supporting porcelain bushing
Supporting porcelain bushing is used for supporting the interrupter and insulation to ground. The insulation drawbar inside
the bushing is used for insulation to ground and mechanical transmission. Supporting porcelain bushing is made of high-
strength porcelain with high strength and good air tightness.
2.4 Crutch arm box
The function of crutch arm box is that transmit the operating mechanism's output action to the insulation drawbar and
finally transmit to the moving part unit of interrupter, so as to fulfil opening/closing operation. The valve installed on the
crutch arm box is used for connecting with the inflatable pipeline in the base. If the inflatable pipeline is not connected,
the whole pole is in a sealed state. The enclosure of crutch arm box is made of aluminium alloy with high strength and
good-airtightness, on which, there are positioning holes for expediently fixing the pole in opening position.
3. Spring operating mechanism
This Manual only simply introduces the structure of principle of the spring operating mechanism. Please refer to Manual
for CT30 model Spring Operating Mechanism.
The spring operating mechanism is installed in the control box and its working principle refers to Fig. 6.
4. Control box
In the control box, there are spring operating mechanism, terminal block of secondary control loop, mechanical counter,
heater and so on. About the detail secondary principle & wiring diagrams, please refer to Page 23, 24.
On the inner name plate, there are manual opening/closing pushbutton, remote-local change-over switch, energy storage
motor switch (see Fig. 7) and status indicators. The operator can visibly observe the state of circuit breaker at any time.

Fig. 7 Inner Structure of Control Box

4
1- Upper outlet plate

2- Interrupter

3- Lower outlet plate

4- Supporting bushiing

5- Insulation pull rod

6- Crutch arm box

Outer crutch arm-7

Fig. 2 Pole Structure

5
50

50

50
50

10 18

50

Fig.3 Plate of Connection Terminal

1- Poceilan bushiing

2- Fixed contact base

3- Fixed arc contact

4- Fixed main contact

5- Vent

6- Movable main contact

7- Movable arc contact

8- Middle contact

9- Lower supporting base

10- Pull rod

Fig. 4 Interrupter Struction

6
WORKING PRINCIPLE

2
3
9
4
5
10 6

A B C D
Closing position Breaking heavy current Breaking low current Opening position

1. Fixed arc contact 2. Main contact finger 3. Vent 4. Movable arc contact 5. Pneumatic cylinder 6. One-way valve
7. Pressure release valve 8. Pressure release spring 9. Pressure room 11.Thermal expansion room
Fig.5 Arc Extinguish Principle
1. Arc-extinguish principle
Once receiving opening command, the rigid moving parts that comprise pneumatic cylinder, movable arc contact, drawbar,
etc. will move downward under the effect of opening spring. During movement process, the fixed main contact finger will
firstly separate from the movable main contact and current will transfer to two closed arc contacts, then the arc contacts
will separate and generate arc.
As breaking heavy short-circuit current, arc energy between arc contacts is strong, hot airflow of arc zone will flow into
the thermal expansion room, where heat exchange is done and generates low-temperature, high-pressure gas. Then the
one-way valve will close because the pressure in thermal expansion room is higher than that in pressure chamber. When
current exceeds zero, the high pressure gas in thermal expansion room will blow to gaps to extinguish arc. During opening
operation, the gas pressure in pressure chamber will be compressed little by little, however, the spring release valve at bottom
will open when the gas pressure reaches a certain value, and pressing gas and releasing gas will be done at same time to
eliminate more counterforce of pressure gas, so as to greatly decrease operating power (see Fig. 5-B).
As breaking low current (usually lower than few thousands of ampere), it generates low gas pressure in thermal expansion
room due to low arc energy. Here, the pressure in pressure chamber is higher than that in thermal expansion room, the one
-way valve will open and the compressed gas will blow to gaps. When current exceeds zero, the gas will blow to gaps to
extinguish the arc (see Fig. 5-C).
2. Energy storage of closing spring
AC/DC dual-use motor drives the shaft of pawl rotating, transmit torque to the big and small pawls through 90 commutation
to push the ratchet rotating, then make the closing spring compress and start storing energy by drawbar. After passing through
the dead center position, motor will cut off power supply by a micro switch. (motor has over-current protection and 15s forced
power-off function.) The shaft of pawl is given an anti-clockwise rotational torque by the closing spring, and the torque is locked
by the closing holding detent through B-pin.
3. Closing operation
The electrified closing coil will drive the closing detent clockwise rotating to release the closing holding detent, then jack
up B-pin to release the ratchet, and the held closing spring will release energy to drive the cam rotating. The cam strikes the
roller to make the crutch arm clockwise rotate, then drives the drawbar to make the fixed and movable contacts quickly

7
close, consequently, closing operation is completed.
In addition, the opening spring connected with the crutch arm will be simultaneously compressed and store energy
during the closing operation, .
4. Opening operation
After receiving opening command, the opening coil will be electrified, drive the opening detent clockwise rotating and
the opening holding detent will also clockwise rotate to release A-pin. The inner crutch arm will clockwise rotate under effect
of the opening spring, then drive the drawbar to make the fixed and movable contacts quickly separate, consequently,
opening operation is completed.
5. Reclosing operation
When both closing spring and opening spring are in energy storage state, reclosing operation will be completed once
the command of O-0.3s-CO is applied.

Outer crutch arm Cram Shaft of ratchet


Opening spring
Shaft of pawl
Pawl
Shaft of regulation crank axis Closing spring
Inner regulation crank
B-pin

A-pin Energy storage holding detent


Closing detent

Closing coil
Opening holding detent

Opening coil
Interrupter
Opening detent

Fig. A: Opening operation (Closing position, closing spring store energy)

Fig. B: Closing spring store energy Fig. C Closing operation


(Closing position, closing spring release) (Opening position, closing spring store energy)

Fig. 6 Principle Schematics of Spring Operating Mechanism

PACKAGING, TRANSPORTATION AND STORAGE

1. Packaging
The circuit breaker has 5 packages (see Fig.8). 3 poles are separately packed by wood cases, the control box is packed
and bound by the burlap together with the base, supporting pole and interphase links and they were fixed inside the base.
The packing list and attachment files are in the control box. Besides, there is a accessory box for packing such accessories
as installation and debugging tools, expendables and fasteners.
Attention:
1) Each pole is filled with 0.03 0.05MPa SF6 gas in advance.

8
2) Each pole shall be in opening state and the location pin shall be inserted.
3) Both opening spring and closing spring are in release state and the insurance pin shall be inserted.

Dim.: 3100 780 690; G-300kg/pcs Dim.: 4050 2290 880; G-500kg/pcs Dim.: 650 300 200; G-100kg/pcs
Package for body Package for frames Package for gadget box

Fig.8 Package Unit


2. Transportation
Each package shall be removed by the forklift or lifted by the crane (lifting weight 2 tons). Horizontally move and lightly
put down during transportation. Long-distance carrier may be truck, train or ship, the pavement standard for truck transportation
shall be not lower than 3 grade. During transportation, loading and unloading, the packed circuit breaker shall not be overturned
or inverted, intensive vibration and stroke are prohibited.
Warning:
1) The porcelain cargo is brittle material, non-standard transport will cause damage to the porcelain.
2) Strictly forbid transportation or remove if the filled gas pressure of pole is above 0.1Mpa.
3. Storage
The package shall be stored indoor. If it must be placed outdoor, the package shall be paced at ventilated location and
the wood cases shall be placed on the plank and covered by a paulin for fear of wet ground. For a long-term storage, the
anti-condensation heater of control box shall be used. The longest outdoor storage term shall not be over half a year.
The gadget box shall be stored indoor because the accessories are not designed for outdoor.

INSTALLATION
Before installation, please check and accept each package unit and accessories according to Packing List. If any question,
please contact the manufacturer immediately.
Warning:
1) Incorrect lifting method will cause the tilt/collapse, as a result, the product will be damaged and fatal accident will happen.
2) During installation, improper bolts or incorrect fastening mode will also cause the damage of equipment and fatal
accident as a result of tilt/collapse. The fasteners for installation shall be the spare parts in the gadget box supplied by the
manufacturer, and shall be fastened by the torque spanner.
The bolt strength shall be over 8.8 degree, and the fastening torque shall be M6:8 1Nm, M8:22 2Nm, M10:45 5Nm,
M12:70 7Nm, M16:200 20Nm and M20:400 40Nm.
Attention:
1) During the entire installation process, there shall be skilled and experienced professional people for spot guidance.
2) When installing the poles, please use step ladder or elevator, that the ladder leans against the pole is strictly prohibited.
3) That any tool or lifter strikes the porcelain bushing is strictly forbidden.

1. Preparation of foundation
The requirement of foundation is shown in Fig. 9.
Routine inspection and maintenance shall be done during operation. The height difference between the two foundation
surfaces shall not exceed 2mm, the levelness of each foundation surface shall not exceed 2mm. 8 pieces of anchor bolts
are supplied by the manufacturer.

9
1700 1700

1350(1450)
1140(1280)
4685(4925)

400

685 1005
980
2195

1800

310
650
800

2530
3890

Outline Drawing of Circuit Breaker


100

360
8 M24-6g 360 250 1110
80

Land building
200
250

220
600

800
360

200 200
Land building

600
2530
Installation of Foundation
Cutaway view of installation of anchor bolt

2 Steel pipe L=1100 pcs 1 Galvanized


Dim. of installation holes Installation of
1 Steel channel 10*400 pcs 1 1 Galvanized
of busbar wiring board cable pipe
S.N. Name Spec. Unit Qty. Remarks
(1:6) (1:10)

2 Remarks:
1. The pre-embedded M24 anchor bolts shall be 80mm exposed and
800

match with double nuts, the size deviation is 1mm. The level & L/R
50
Welding
deviations of two foundation surfaces do not exceed 4mm.
1
2. M24 800 anchor bolts are supplied by the manufacturer.
50

50

3. Operating force: pull force upward = 1800kg, level force = 2500kg,


50 50 15 8}
T.W. = 1300kg;
300

4. The earthing of circuit breaker is 50 5 galvanized flat steel.


5. The dimensions in bracket are of 145kV circuit breaker.

10
2. Installation of base & control box
Before install the components of base, please remove the plastic packing and take down both 4 covering plates of lifting
holes and 3 covering plates of handle holes at both sides of base.
Slightly lift the components by means of a crane and remove the pad wooden at the bottom, then lift and carry it to the
foundation, and fix it on the foundation by 8 nuts M24.

Fig. 10 Installation of Base

After install and fasten the base and control box, calibrate the level of base less than 2mm by the level gauge.
3. Installation of poles
3.1 Inspection before installation
Lift out three poles from wooden case and horizontally move to the strong ground.
Attention: Pad woodens shall be laid both ends of pole to prevent the porcelains from breaking.
Examine whether each porcelain is damaged or has some cracks due to transportation. If any, please contact with the
manufacture in time.
Warning: If gas charging is done when the porcelain is damaged or has some cracks, the explosion may happen and
endanger personnel safety.
Firstly, check the gas tightness before install the poles. There is a joint of gas valve on the crutch arm box of each pole,
remove the protection nut of valve and slightly open the valve. That the sound of gas deflating can be heard means good
gas tightness, or not, it means that the pole has some leakages or has been damaged during transportation.
Attention: 1) Remove the protection nuts before install the poles.
2) Opening location pins on the crutch arm box keep the transmission crutch arm and crutch arm box are locked
in opening state. Each pole is open before installation, please do not draw out the pin during installation.
3) The contact interface of all bolts, poles and base should be painted with water-proof glue before installation.
3.2 Installation of B pole
B pole shall be installed first. The pole which has double crutch arms and the centre distances between holes of crutch
arms respectively are 125mm and 100mm is B pole. Erect B pole.
Attention: While erecting B pole, lay the rubber plate or wooden plate of over 10mm thickness against the side of crutch
arm box side to protect the crutch arm box from damage when it touches the ground.
Lay the pole at the opening in the middle of base, fasten it with bolt M20*65 (as per Fig. 12) which passes though the
hole from bottom to up and fasten the upper end with nut, check the installation dimensions according to Fig. 12. Connect
2 NOS operating linkages with the crutch arm in opening state (connection mode as per Fig. 13) with 12 pin which shall
be painted with silicon grease. Do not pull out the location pin while connecting. Lock the transmission pin with M16 bolt and
catch plate after finish connection.
Warning: 1) When lay the pole at the opening of base, please gently lift and lay down to prevent the porcelain damaging
due to strong vibration.

11
Fig. 11 Lifting & Transportation of Poles

2) Forbid lifting the pole in gas-charged state (gas charging pressure over 0.1Mpa).
3) The head of bolt M20*65 should be under the through hole, or else the operating linkage will bump against the bolt
during operation. The side installed the linkage is fastened with two special bolts M20*65, the other side is fastened
with two common bolts M20*65.

Pole -1
A B C

Drive pin -2

Base -3

Operating linkage -4

Crutch arm -5

Output shaft of mechanism -6

Fig. 12 Assembly of Poles

3.3 Installation of A, C poles


Erect A pole and lay it at the A phase opening of base (The left is A phase while face to the circuit breaker.), the side
installed the linkage is fastened with two special bolts M20*65, the other side is fastened with two common bolts M20*65.
Connect the operating linkage with the crutch arm of A phase in opening state with 12 pin which shall be painted with
silicone grease. Do not pull out the location pin while connecting.
The installation of C pole is same as A, B pole.
After the two operating linkages are installed, fasten the three poles with the setting torque .
Attention: 1) While fastening A, C poles at the base, please do not fasten them too much first so that A, C poles can be
moved to adjust the length deviation of connecting the operating linkages.
2) While connecting the operating linkages, the washer shall be laid between the crutch arm and linkage
so as to ensure that the forced direction of linkage keeps same with the movement direction .

12
C B A
1
5
2

3
3

4 5

1. Crutch arm 2. Operating linkage 3. Operating linkage 4. Drive pin 5. Adjustable washer

Fig.13 Location of Linkage

3.4 Connection of operating mechanism


Connect the output shaft of the operating mechanism with B phase crutch arm. Which connecting, slightly poke at the
big crutch arm in mechanism thru the assembly hole to make the joint of output shaft swing from top to bottom, so as to
connect the output shaft with B phase crutch arm easily with 12 pin reference to Fig. 14. After connection, lock the trans
-mission pin with bolt M16 and the catch plate.

2
1. Pole
3 2. Drive pin
3. Base
4. Operating linkage
5. Crutch arm of B-pole
4 6. Output shaft of mechanism

6 Fig. 14 Connection of Operating Mechanism

4. Connection of SF6 gas pipeline


Take away the protection covers of the pipeline joints and the valves, clean the surface of joints and valves with a cloth
or paper dipped with a little absolute ethanol, put on the O-type gaskets and paint with the right amount of sealing glue, then
connect them to the crutch arm boxes.
Respectively connect the pipeline joints with the valves of three poles. Please don't fasten first. Slightly open the valve
and that the sound of gas deflating can be heard means normal, then fasten quickly and fasten the connection screws with
a spanner. The fastening torque shall be 30Nm.
5. Earthing
There are earthing terminals at the base and on the poles, the user can select the earthing according to the actual
requirements. Please polish the contact surface of joints with the emery cloth.
6. Installation of primary connection terminal plates
The outlet wires of lower outlet plate can be at both sides (The front is the side that opening/closing indicators on control
box or a pressure gauge on the base), and the outlet wires of upper plate shall be at the front unless the user has special
requirements. While installing the upper terminal plate, remove the lifting rings on the top of pole first and the 5 screw holes

13
for connecting the upper terminal plate will be reserved. Please polish the contact surface with the emery cloth until shinning,
then clean it with the ethanol and evenly paint the surface with a thin layer of conductive gel. Fasten the upper terminal plate
with five bolts M16.
7. Connection of secondary wires
There are heat-shrink sealing tubes for connecting the secondary wires on the lower cover of control box. The user can
connect the secondary wires according to the connection diagram.
Attention: 1) The secondary wires must be connected in non-electrified state.
2) The secondary wires must be connected after the closing/opening springs of operating mechanism are released.
8. SF6 gas charging
After finish the connection of SF6 gas pipeline, connect the gas charging device, then charge the three poles with SF6
gas thru pressure-reducing valve, gas charging pipe and the joint under pressure gauge of base, details as per Fig. 15.
Before gas charging, first wash pressure-reducing valve and gas charging pipe for 3-5s with SF6 gas so as to expel the air
and water inside the pipeline. Charge the pole with gas one by one. During gas charging, the pressure indication of pressure
-reducing valve shall be below 0.62MPa, keep watch for the values of pressure-reducing valve and pressure gauge, stop
gas charging if the value reaches 0.62MPa. After finish gas charging, remove the joints of gas-charging device and base
and keep them well. .
Attention: 1) The value displayed on the pressure gauge of pointer type density controller is the pressure under 20 .
2) Before gas charging, pack the porcelain with special nylon net to prevent it from exploding due to the damage
during transportation or installation, as a result, endanger personnel safety. (Although its possibility is very small)
3) It is normal that the frost occurs on the gas charging pipe. That adjust the pressure-reducing valve to appropriately
reduce the flow speed can prevent the pipe from frostbiting. Charge the pipe with gas one by one (Namely,
Close its valve once the gas pressure of pole reaches 0.6MPa, then charge another pipe with gas, until three
poles are charged with gas). Please ensure that SF6 gas pressure of three poles reach rated pressure, then
open the Y-shaped connector to ensure the three poles through.
4) The gas charging pressure can be up to 0.62MPa.

1 2 3 4 5

to pole

1. Bottle for SF6 gas 2. Pressure-reducing valve


3. Gas charging pipe 4. Y-shaped connector
5. Pressure gauge

Fig. 15 Connection of SF6 gas charging devices

SITE TEST AFTER INSTALLATION


1. Try operation
After installation ,CB is in opening state and the closing spring is of energy non-stored.
Warning: 1) Before operation, please ensure that the safety pins of operating mechanism and the location pins on the

14
crutch arm box are pulled out, and check whether there are some barriers in the movement direction of
CB or not, specially ensure that the vertical distance between the fixed bolt on the crutch arm and the level
operating linkage is over 20mm (as per Fig. 12).
2) The primary terminal shall not connect with high voltage system.
3) Anyway, SF6 gas pressure must not be lower than 0.3Mpa, or else it may cause CB's mechanical damage.
4) Check whether all pins are tightly locked or not.
5) It is best to adopt electric remote control for try operation. Before operation, all operators should keep 30m
away from CB or stand behind the shield.
6) Anyway, sing-phase or double-phase operation is prohibited.
Do both opening operation and closing operation for five times, and do standard cycle operation for three times.
2. Inspection and test after installation
2.1 Mechanical operating characteristics
Record energy storage time, opening time and closing time during opening/closing operation.
2.2 Resistance of main circuit
Measure and record the resistance of main circuit with main-circuit resistance tester in closing state.
2.3 Insulation resistance
Measure and record the insulation resistance between gaps and to ground in opening and closing state.
2.4 P.F. withstand voltage
If possible, do power frequency withstand voltage test and record the data.
2.5 Inspect the performance of pointer type density controller
Close the valve of crutch arm box, connect the vent joint with the gas charging joint in the base, slightly remove the nut
to make SF6 gas inside the pipe slowly leak. Once SF6 gas pressure falls to the alarming pressure, alarm will arise; When
the pressure falls to the locking value, check whether CB is locked or not, then remove the vent joint and open the valve of
crutch arm box(one phase), monitor whether the pointer-type density controller will reset or not.
After the above mentioned inspection work, open the valves of crutch arm boxes on three poles, if SF6 gas pressure is
below 0.6MPa, charge the pole with gas to rated pressure with gas charging device. After gas charging is completed, remove
the gas charging device and keep it well, meanwhile, put on the protection nut of gas charging joint inside the base.
2.6 Leakage detection
Detect the leak tightness of all sealing surface of CB with the leakage detection, special for the gas charging pipeline
and joints. If any, remove the joint, and check whether there is something on the sealing surface or O-type gasket is damaged.
After the corresponding disposal, detect the leak tightness again. If find that there is any leak on the sealing surface of pole,
please advise the manufacturer to resolve it in time.
2.7 Micro moisture measurement
Connect the pressure-reducing valve, pipeline and micro-moisture tester with the gas charging valve to measure the
moisture content inside the gas room. The measured data shall be compared according to ambient temperature. The moisture
content shall not exceed 150ppm (V/V, 20 ) while check & acceptance, and it shall not exceed 300ppm (V/V, 20 ) during
operation.
2.8 Check whether the changeover of both temperature & humidity controller and heater are normal.
2.9 Connect the primary busbar and the primary terminals of CB, the connection direction is up to the spot situation.
While connecting, polish the contact surface with the emery cloth until shinning and clean it with a white cloth dipped with a
little absolute ethanol.
2.10 Wash all the porcelains with clear water.
2.11 Before commissioning, check test items again, recheck the test data, and fill in the Installation Inspection & Test
Report in duplicate, the users and manufacturer respectively hold one for reference as original data.
3. Clearance of site
So far the installation of CB was completed, you should put on all the covers and keep all the removed parts in a safe
place for future use.

15
OPERATION AND MAINTENANCE

1. Routine inspection and maintenance during operation


1.1 Visually check whether the porcelains have the defects in operation, such as the crack.
1.2 Observe the gas charging pressure of circuit breaker and record it.
1.3 Observe the opening/closing indicators on the control box and the position of crutch arm on the crutch arm box, to
make sure that the state of circuit breaker is normal.
1.4 Observe the degree of corrosion of the fasteners and frame, and record them.
1.5 Periodically inspect whether the changeover of heater is normal or not.
1.6 Observe whether the connection of primary wires may strike fire or not.

2. maintenance
SF6 circuit breaker is maintenance free circuit breaker, but once maintenance every three years can ensure that the
circuit breaker operates in good state. Maintenance shall be carried out under power cutoff for several hours. The maintenance
items mainly include as follows:
2.1 Inspect and clean the surface of porcelains.
2.2 Inspect the corrosion status. Repair the paints if any corrosion; Replace the fasteners if any rust.
Warning: Please replace the fasteners one by one. That replace them at the same time may cause personal injury or
damage the equipment because the poles are gas-tighness pressure containers.
2.3 Inspect whether the fasteners are loose or not, if yes, fasten it.
2.4 Inspect whether the primary terminal plate is overheated and off-color, if yes, polish the contact surface again and
fasten them.
2.5 Lubricate the moving parts of mechanism.
2.6 Measure the moisture content and record the data.
2.7 Measure the main circuit resistance and record the data.
2.8 Inspect whether the secondary connections are firm or not, whether the electric instruction is reliably conducted.

3.0 Heavy repair


The heavy repair is mainly overhaul for the interrupter. While repairing, the user would better do it under the site instruction
of the professional dispatched by the manufacturer. The circuit breaker will need the overhaul under the following situations:
1) Continuously operate for 20 years;
2) Mechanical operation time is over 2000 times;
3)Full-capacity(40kA) accumulative breaking time is over 20 times.

16
10000

time

3000

2000

1000

100

20

1 10 40 100
kA

ATTACHMENT TECHNICAL FILES

Operation Instruction 1
Packing List 1
Certificate of Conformity 1
Delivery Inspection Report 1
Operation Report 2

ORDER NOTICE

Please specify the following information when ordering:


1. The model and name of circuit breaker;
2. Rated voltage, rated current and breaking current;
3. Voltage of control loop;
4. Rated voltage of motor;
5. The name and quantity of spare parts, special tools and special equipments.

17
ANNEX-1 FEATURES OF SF6 GAS

SF6 gas was invented in this century, which is widely used in high voltage and extra-high voltage switch equipments
due to its outstanding insulation performance and arc extinguishing performance. Under normal temperature, SF6 gas is
a colorless, odorless, innocuous and transparent inert gas, which has upstanding chemical stability. The atomic weight of
SF6 is 146, namely about 5 times of atmosphere, so the gas leaked in the atmosphere will deposit on the earth's surface.
As same as others gas, the pressure of SF6 gas will change along with temperature. For this circuit breaker, the state
curve of SF6 gas is as follows

Pressure(MPa)

0.8
50
0.7 Pe
Pj
0.6 Ps
Liquefaction line
0.5

Dens(kg/m3)
30
0.4

0.3 20

0.2

0.1 10

-50 -40 -30 -20 -10 0 10 20 30 40 50


Temperature( )

Temperature Pressure Curve of SF6 gas


Pe- Rated pressure of SF6 gas in CB
Pj- Alarming pressure of SF6 gas in CB
Ps- Locking pressure of SF6 gas in CB

18
ANNEX-2 LIST OF INSTALLATION TOOLS & SPARE PARTS

1. Attachment accessories and auxiliary materials

NAME SPECIFICATION QUANTITY REMARKS

Anchor bolt M24 800 8 PCS GB/T799-1988

M24 nut, washer, spring washer 8.8 degree 8 PCS/each 16PCS M24 nut

M20 65 bolt, nut, washer,


Stainless steel 12 PCS/each
spring washer

M6 15 bolt, catch plate 4 PCS/each

12 pin 3 PCS

20 pin 1 PCS

Waterproof glue D05 5 boxes

Vacuum silicone grease 7501 1 box

Anaerobic adhesive 1 PCS

Conductive gel DJG- 1 PCS

O-ring of vavle HX807 3 PCS

SF6 gas 15 kg/set a small steel bottle


Including pressure-reducing
Gas charging tool 1 set valve siphonium joint
Slow opening tools 1 set including ratchet spanner

2. Offered spare parts according to order

NAME SPECIFICATION QUANTITY REMARKS

Opening coil 1 PCS

Closing coil 1 PCS

Motor 1 PCS

Travel switch 1 PCS

SF6 gas 15 kg/set

19
3. Offered special tools according to order

NAME SPECIFICATION QUANTITY REMARKS

Speed measurement tool of CB 1 set

4. Offered special equipments according to order

NAME SPECIFICATION QUANTITY REMARKS

SF6 gas detector 1 set

Micro moisture detector 1 set

Tester of main loop resistance 1 set

Tester for mechanical characteristic 1 set

Oxygen pressure-reducing valve 1 set

Gas-filled tube(both ends with joints) 1 set

Vacuum pump 1 set

20
ANNEX-3 REPORT OF INSTALLATION AND TEST

USER NAME OF SUBSTATION

MODEL OF CB SERIAL NUMBER

INSTALLATION UNIT TIME OF INSTALLATION

NO WORKING CONTENTS REQUIREMENT RESULT REMARKS

Remove the packing and


Accessory box is
1 check the package units:
packed inside base
a. Poles 3PKGS
package.
b. Base and control box 1PKGS

Base package can


Installation of base & control box 8pcs M24 be transported to
2 Installation of foundation the specified site
anchor bolts
Installation of bracket after the signing of
contract.

Installation of poles
4pcs M20 65
B 2of4are specially
3 stainless bolts
A made.
per phase
C

4 Installation of 3 pahse operating linkage 12 pin

5 Connect B phase with operating mechanism 20 pin

6 Connect tube and charge gas 0.60MPa

7 Connect secondary wires

Try operation
5 times of closing operation
8 5 times of opening operation
3 times standard cycle operation

21
TEST & TEST BEFORE OPERATION SPECIFICATION RESULT REMARKS

mechanical characteristic
energy storage time of spring
15s
closing time
opening time 75 8ms
check manual operating device 30 3ms
check anti-jump device

10
Main loop resistance 40

Insulation resistance

P.F. Withstand voltage 230kV

Alarming pressure 0.55MPa

Locking pressure 0.50MPa

Leakage detect 1%

Micro moisture detect 150ppm

11 Record operation time of CB

12 Clear the spot and cover the cover plate


Connect primary wire and
13
prepare for operation.

Inspector of user: Inspector of factory

Director Director

Date Date

The additional test item after consultation:

22
NOTE:
1. The position of aux. switch is the 8. Section of conductors: 2.5mm2
opening position of CB. 9. Color of conductors: Heating circuit is
2. The relay trips in exciterless state white, earth circuit is green, other
3. Gas density relay in pressureless state circuits are black.
4. CB Q1-Q4 in opening state 10. Rotation operation
5. State relation between limited switch Button operation
SP and closing spring NO
SP Sate of closing spring NC

Close energy non-stored NO of time delay closing


Open energy stored 11. Connected with monitor circuit, current
6. S5 in remote position shall be less than 5mA.
7. SBT1/2: advanced NO contacts 12. If other anti-tripping measures instead
of this anti-jump circuit, X2/4,5 can be
released.

23
24
Office Add: No.138 Ningkang W. Road,Yueqing City,
Zhejiang, P.R. China P.C.:325600
Factory Add: Weisi Road, Yueqing Economic Development zone
Yueqing, Zhejiang, P.R. China
Tel 0577-62558769 Fax 0577-27898866 / 62538979
http://www.heag.cn E-mail: sales@heag.com

You might also like