SUMMARY
A1 PREAMBLES
A2 CONCRETE WORKS
A3 CONCRETE REINFORCEMENT
A4 MASONRY AND BRICKWORK
A5 ROOFING WORKS, WATER AND DAMP PROOFING
A6 ALUMINIUM WORK
A7 METAL WORKS
A8 FINISHES TO WALLS AND CEILINGS
A9 FLOOR FINISHES
A10 JOINERY AND SUSPENDED CEILING WORKS
A11 SANITARY FITTINGS
A12 DAYWORKS
SUB TOTAL FOR CIVIL WORKS
B1 EXTRACTOR FAN
B2 VRV TYPE AIR CONDITIONING SYTEM
B3 VENTILATION SYSTEM HEAT RECOVERY UNITS
B4 HOT AND COLD WATER SERVICES
SUB TOTAL FOR MECHANICAL WORKS
C1 ELECTRICAL INSTALLATION
C2 EXTRA LOW VOLTAGE SERVICES
VAT AT 18%
241
TOTAL VALUE OF THE WORKS INCLUDING VAT
242
SECTION A - CIVIL WORKS
A1 Preambles
1.02 Allow of the temporary replacement of all services at roof level 1 Sum
1.03 Allow for all the required testing by an independent laboratory 1 Sum
in accordance with specifications.
1.04 Manufacture, supply and erect where indicated a weather proof 1 Sum
project sign boards, measuring a minimum 1200mm high x
2400mm wide, Contractor is responsible for all permits
required.
1.07 All rates are to include double handling where this is the case,
no claims will be accepted for double handling of material
and/or supplies.
1.08 Provision for insurance (CAR - contractor all risk) during the
progress of works, and for a period of 15 years after
completion.
1.09 Removal of existing membrane at roof level and cart away 732 m2
1.10 Removal of existing 'kontrabejt' at roof level and cart away 560 m2
1.11 Removal of existing 'apromorta' at roof level and cart away 130 m2
242
SECTION A - CIVIL WORKS
A2 Concrete Works
All rates for concrete are to include for the supply placement
and all the required testing by an independent laboratory in
accordance with specifications.
2.01 In cavities of 230mm thick hollow concrete block walls (area 50.00 m2
of walls measured).
243
Total for Bill A2 : Concrete Works
244
SECTION A - CIVIL WORKS
A3 Concrete Reinforcement
Manufacturer's name;
244
SECTION A - CIVIL WORKS
Softstone Coping
4.14 230m wide x 170mm high with weathered top, set on 125 m
parapet wall.
245
SECTION A - CIVIL WORKS
246
SECTION A - CIVIL WORKS
5.03 Import and spread out torba over proposed concrete roof. 90 m3
Rate to include for levelling due to different slab depths
5.06 Supply and lay 4kg/m2 polyester reinforced bituminous, torch 1,050 m2
welded water proofing membrane, with 300mm turnups to
vertical surfaces. To horizontal surfaces. PROVISIONAL
5.07 Extra over waterproof membrane for working over expansion rate m
joint. only
5.09 75mm thick concrete screed ("kontrabejt"), Grade C20 with 650 m2
10mm diameter chippings, laid to falls and current with a
power float finish, cast in appropriate bays, separated by
expansion joints (included)
246
SECTION A - CIVIL WORKS
A6 Aluminium Work
Preamble
b) All rates shall mean to include all costs, both direct and
indirect, in connection with the manufacture, transport, placing,
alignment, fixing and sealing of all Aluminium works in this Bill
of Quantities.
c) All rates shall mean to include all costs, both direct and
indirect for the cleaning of all floors, fittings, windows, doors,
glazing, casements and accessories from shavings, dust, finger
marks and carting away of waste material.
247
The aluminium frame system shall be capable of absorbing
thermal movements. The frame shall be using compatible and
suitably sized adjustable frame screws and plastic spacers.
The gaps between the frame and the stone/concrete shall be
sealed with mineral wool to prevent any air movement.
Windows
Doors
6.09 Door type B measuring 1000mm wide by 2200mm high. 1 no.
Glazing to be in laminated glass
248
6.10 Door type C measuring 1000mm wide by 2200mm high. 1 no.
249
SECTION A - CIVIL WORKS
A7 Metal Works
Externally
249
SECTION A - CIVIL WORKS
Rendering
8.01 Render surfaces of concrete/brick walls internally in one coat 6mm 550 m2
thick in a gypsum based coat.
8.03 Render surface of brick walls externally (in shafts, parapet walls, etc.) 225 m2
in two coats 6mm base coat in cement and sand (1:3) and 3mm
setting coat on cement:lime:sand (1:1:6) including two coats "xahx" or
limewash as directed by the Architect-in-charge
Pointing
8.04 Clean down, scrape where required, rake out joints and point with 500 m2
lime mortar surfaces of stone walls internally area only, including two
coats of limewash.
8.05 Clean down, scrape where required, rake out joints and point with 250 m2
lime mortar surfaces of stone walls externally, as directed by the
Architect in charge.
Sundries
8.06 Apply 1 mist coat and 2 full coats of water emulsion paint to all walls. 1,350 m2
8.07 Apply two coats of approved water based coloured sand paint on 225 m2
rendered surfaces externally as directed.
250
SECTION A - CIVIL WORKS
A9 Floor Finishes
Preamble
All work shall be measured net as laid. Rates are to include for
all waste and straight or raked cutting.
Beds
9.01 Bed of torba 100mm (average) thick, spread and levelled to 660 m2
receive tiles.
Tiles
9.02 Supply and lay internal type, first quality, ceramic gres floor tiles 660 m2
450mm x 450mm medium size, including for laying and
grouting
9.03 Supply, lay and grout internal type, first quality, glazed ceramic 50 m2
wall tiles, 200mm x 200mm to include for 1 in no. 400mm high
base border and 200mm high upper border having a different
colour.
9.04 Supply and lay best quality 200mm x 200mm ceramic floor tiles 120 m2
(minimum 6mm thickness) in bathrooms and laboratories
including laying and grouting. Colour, size and/or pattern, if
any, to be decided by the Architect in charge upon submission
of samples by contractor.
9.05 Provide and lay resin skirting 175mm high x 18mm thick with 300 m
chamfer edge. Rate is to include fixing with adhesive and
grouting of joints.
251
SECTION A - CIVIL WORKS
Preamble
i) Rates for internal joinery are to include for the manufacture
and fixing in white deal of doors and other fittings inclusive of
all necessary frames/linings, architrave's, glazing,
ironmongery, and finishing where necessary.
Doors Internally
10.01 Door type A,1200mm x 2300mm, in Door Schedules Booklet 7 no.
and fixing (class-room door - White deal).
Suspended Ceilings
10.04 Supply, transport, assemble and fix suspended ceiling 660 m2
consisting of 600mm x 600mm tiles, supported by a ceiling
hung frame structure. Rate is to include all required
bulheads around the stair well
252
SECTION A - CIVIL WORKS
11.01 Supply and fix close coupled water closet (WC) in white 2 no.
vitreous china, complete with wall enchased flushing
including heavy duty toilet cover. Rate to include all
necessary connections
11.02 Suppply and fix wash hand basin in white vitreous china 2 no.
approx. 450mmx300mm complete with pedestal, including
monoblock basin mixer and pop-up waste. Rate to include
all necessary connections
11.03 Supply and install stainless steel floor drain. Rate is to 2 no.
include connection to sewer gully.
253
SECTION A - CIVIL WORKS
A12 Dayworks
Preamble
i) Dayworks will only be payable when expressly ordered in
writing by the Architect.
ii) For labour the man-hour rate shall cover all other charges
of every description, including bonus, incentives,
superintendent, foremen, administrative staff, timekeeper,
insurances, pensions, holidays with pay, use of small tools
(including sharpening), appliances and plant (not included in
‘plant’ below), establishment charges profit and VAT.
Labour
12.01 Provide for stone-masons 300 h
Plant
12.04 Provide for 15 tonne rubber tyred crane 100 h
Material
12.06 Provide the sum of €16,310 for the net cost of materials 1 L.S.
expended on dayworks.
12.07 Add to the above the cost of delivery, unloading, unpacking, 1 L.S.
storing, protecting, hoisting, distributing on site, and profit.
254
SECTION B - MECHANICAL WORKS
B1 Extractor Fan
1.08 Aluminium tap-in collars c/w steel clamp strips for the
following flexible duct diameters.
255
1.15 250mm wide x 250mm high 1 no.
1.22 Duct work for respective fan EF2 to be installed in L.S. L.S.
comms room including outside weather grill and return
interanl grill in comms room two way. The ine
1.23 Door transfer grill to cater for the flow of EF2 L.S. L.S.
256
Total for Bill B1 : Extractor Fan
257
SECTION B - MECHANICAL WORKS
RATE (excl.
ITEM DESCRIPTION QTY UNIT
VAT)
257
2.15 Control and power wiring including first fix, fittings, and L.S. L.S.
any other accessories between indoor units, controllers,
and outdoor units. Wiring between double pole switch
and indoor units and isolator and outdoor unit to be
carried out by the Air Conditioning Contractor.
2.16 Centralized remote control, schedule timer and unified L.S L.S.
ON/OFF control. These shall connect and control
individually the outdoor units in the respective zone as
shown in drawings.
2.17 Concrete plinth on upper roof, 100mm thick and vibration L.S. L.S.
isolation pads each not less than 20mm thickness.
2.20 Maintenance agreement for a period of three (3) years L.S. L.S.
from date of commissioning for air conditioning system,
including consumables
258
AMOUNT (excl.
VAT)
259
260
SECTION B - MECHANICAL WORKS
RATE (excl.
ITEM DESCRIPTION QTY UNIT
VAT)
3.01 Energy recovery unit HRU c/w accessories with an air volume 1 no.
flow rate of 1400l/s. The fan should have a speed controller
three stage.
3.02 Remote controller for heat recovery unit including first fix- 1 no.
vertical drops buried in wall chase while horizontal runs clipped
conduit clipped to ceiling and wiring as specified. It should have
motorised dampers that closes when switched off.
3.09 Aluminium tap-in collars c/w steel clamp strips for the following
flexible duct diameters:
259
Supply Diffusers
Supply, install and commission the following louvered face
diffusers complete with insulated plenum box to deal with
the indicated volume flow rate as described in the
specifications. All air supply diffusers shall be complete
with volume control dampers and white in colour.
Return Grilles
Supply, install and commission the following egg-crate
type grilles complete with insulated plenum box to deal
with the indicated volume flow rate as described in the
specifications. All air return grilles shall be complete with
volume control dampers and white in colour.
260
3.25 400mm x 300mm No. 3
3.29 Test points on main supply and return duct work on roof 25mm No. 8
diameter with tap.
3.33 Wiring of supply cable between the HRU and isolator installed L.S. L.S.
by others. To be installed on galvanised cable tray with the
necessary support.
3.34 Supply and connecting up of HRU to the centralized control. L.S. L.S.
Wiring including first fix, fittings, and any other accessories
between centralized controller and HRU. All wiring to be
installed inside conduit/ flexible conduit adequately sized.
3.35 Testing, commissioning and handing over of ventilation system. L.S. L.S.
3.36 Maintenance agreement for a period of three (3) years from L.S. L.S.
date of commissioning for ventilation system, including
consumables
As fitted drawings:
261
Total for Bill B3 : Ventilation System Heat Recovery Units
262
AMOUNT
(excl. VAT)
263
264
265
266
SECTION B - MECHANICAL WORKS
RATE (excl.
ITEM DESCRIPTION QTY UNIT
VAT)
262
4.08 15mm PP-R 80 PN 20 fusion weld pipe work c/w 19mm 12 m
thick closed cell rubber insulation DHWS & R
4.12 Lockable bib cocks c/w pad lock DN 15mm bronze 1 no.
quarter turn ball valves.
263
4.22 Dimantling extisting sink drains, and connected to the L.S. L.S.
erected drainage system of the new sinks that are to be
installed in the floor above. Any bends, tees, eye rods
etc.. Are the trade demands are to be included in the
item. Allowance for two sinks is to be included.
4.23 Dismantling, extending to floor above and reconnect rain L.S. L.S.
water pipes with the roof above. This should inlcude any
connections and grills on roof levels as necessary. (4
connection to be included)
4.24 Floor drain c/w stainless steel grill including water seal. L.S. L.S.
Pipe work, Ǿ 50 PP material and any other fittings
required to terminate in gully as trade demands. Anchors
and other fixtures are to be included in item.
4.25 Builder's Works to allow pipes to pass through walls and LS L.S.
making good to avoid water ingress.
4.27 Maintenance agreement for a period of three (3) years L.S. L.S.
from date of commissioning covering all the systems
described above, including consumables.
As fitted drawings:
264
AMOUNT
(excl. VAT)
265
266
267
SECTION C - ELECTRICAL & EXTRA LOW VOLTAGE SERVICES
C1 ELECTRICAL INSTALLATION
Distribution Boards
1.01 Supply, install and connect-up Distribution Board DB-3 in 1 L.S.
Utility Room at Level 3, 315 Amps, 12 Way, TP+N
comprising of:
265
1.07 From DB-AC to VRF1 in 4 core 16mm.sq. cable 11 m
XLPE/PVC/SWA/PVC
1.08 From DB-AC to VRF2 in 4 core 16mm.sq. cable 11 m
XLPE/PVC/SWA/PVC
1.09 From DB-AC to HRU1 in 4 core 6mm.sq. cable 8 m
XLPE/PVC/SWA/PVC
1.10 From DB-3 to CU-3A in 3 x 10mm.sq. cable PVC 15 m
DB-3
1.22 One lighting point controlled by one switch 8 no.
1.23 Two lighting points controlled by one switch 11 no.
1.24 Three lighting points controlled by one switch 2 no.
266
1.25 Eight lighting points controlled by one switch 1 no.
1.26 Two lighting points controlled by 2 x 2way switches 1 no.
1.27 Five lighting points controlled by 2 x 2way switches 2 no.
1.28 Six lighting points controlled by 2 x 2way swithces and 3 in 1 no.
1.29 Two lighting points and one extractor fan point controlled by 1 no.
1.30 Emergency lighting fixtures 10 no.
CU-3A
1.31 One lighting point controlled by one switch 1 no.
1.32 Four lighting points controlled by one switch 2 no.
CU-3B
1.33 One lighting point controlled by one switch 1 no.
1.34 Four lighting points controlled by one switch 2 no.
DB-AC
1.35 Three lighting points controlled by one weatherproof 1 no.
switch
1.40 Type 'C': 2 x 26W CFL Soffit Recessed Round Downlighter 14 no.
1.42 Type 'D' - 2 x 18W CFL Soffit Recessed Light Fixutre 3 no.
267
1.48 Ceiling Mount Occupancy Sensor c/w the necessary 10 no.
accessories to turn on light when light is only needed
when a person is present.
DB-3
1.49 Twin 13Amp Switched Socket outlets 34 no.
1.50 13 Amp DP fused switch for AC Indoor Unit 5 no.
1.51 13Amp DP fused switch c/w flex outlet for Overhead Project 5 no.
1.52 13Amp DP fused switch for Overhead projector screen 5 no.
1.53 13Amp DP fused switch and flex outlet for Hand Dryer 2 no.
1.54 13Amp DP fused switch for Water Heater 1 no.
CU-3A
1.55 Twin 13Amp Switched Socket outlets 23 no.
1.56 13 Amp DP fused switch for AC Indoor Unit 2 no.
CU-3B
1.57 Twin 13Amp Switched Socket outlets 18 no.
1.58 13 Amp DP fused switch for AC Indoor Unit 2 no.
DB-AC
1.59 Single 13Amp Weatherproof socket outlet 1 no.
1.60 80Amp TP+N IP55 Isolator for VRF1 and VRF 2 2 no.
1.61 32Amp TP+N IP55 Isolator for HRU1 1 no.
Other Services
1.62 Testing and Certification of the complete Electrical 1 L.S.
Installations covered by the Scope of this Tender
1.64 Allow for all Builders' Work necessary for the above listed 1 L.S.
installation, including wall and ceiling slab penetrations
268
1.65 Provision of FULL Documentation and Technical 1 L.S.
Literature covering ALL Electrical Services Installations
269
SECTION C - ELECTRICAL & EXTRA LOW VOLTAGE SERVICES
2.07 Supply, assemble, fix and connect-up Patch Panel PP- 1 no.
LA, 24U, wall mounted in Lab 'A', third floor, as
specified, allowing extra space for Cable Management,
patch leads, etc., (Power Supply included in Electrical
Section)
2.08 Supply, assemble, fix and connect-up Patch Panel PP- 1 no.
LB, 24U, wall mounted in Lab 'B', third floor, as
specified, allowing extra space for Cable Management,
patch leads, etc., (Power Supply included in Electrical
Section)
2.09 Wiring of Voice and Data Communication Points in 2 38 no.
x 4 Pair CAT 5E Cable per outlet, on Cable Tray,
through chased 25mm dia. PVC Conduit and Trunking,
complete with dual RJ45 outlets, as specified (Trunking
and Cable Tray included in another BOQ Item)
2.10 Supply, fix and connect up 24 RJ45 Port, 2 Giga Bits 1 no.
per second data transfer rate, Ethernet 1000Base-T, 19
inch rack mounting to IEEE 802.3.
269
2.11 2x4 Pair UTP Cat 5e cable + 50 pair voice cable from 25 m
PP-LA to PP-LB
2.12 100mm x 100mm PVC Box chased in wall for 14 no.
connection of wiring above soffit to the ceiling mounted
overhead projector
2.17 Test and commission the complete Voice and Data 1 L.S.
Network, including Submission of Test Results
Other Services
2.18 Testing and Certification of the complete Low Voltage 1 L.S.
Services Installations covered by the scope of this
tender
2.20 Allow for all Builder's Work necessary for the above 1 L.S.
listed installation, including wall and ceiling slab
penetrations
270
Total for Bill C2 : EXTRA LOW VOLTAGE SERVICES
271