Professional Documents
Culture Documents
Government of Pakistan
(Please submit the signed & stamped copy of this document latest by 15th March 2018)
University/Institute Detail:
Name of Comsat Institute of University/Campus GT Road,Wah Cant
University/Institution Information and Technology Address:
+92 51 9314382-83
Telephone & Fax No: & Department Name:
+92-51-4546850 Electrical Engineering
Wah Cantt.
City: Province: Punjab
* Preferred areas are Artificial Intelligence, Cloud Infrastructure, Cyber Security, Internet of
Things, Augmented and Virtual Reality, Wearables and Implantable, Shared Economy, Robotics, 3D/4D
Printing, NeuroTech and Blockchain.
Page 1|4
Ministry of Information Technology
Government of Pakistan
E. Project Objectives:
Purpose of the “Smart Hybrid invertor” is to mentor and groom the BS students by working
on real challenges of the industries. And develop a link of academia institutions with the
industries, which will strengthen the industry academia link. And provide un-interrupted,
hybrid, and cheapest solution to the industry and home users.
Page 2|4
Ministry of Information Technology
Government of Pakistan
J. Equipment required for making (Please indicate in tabular form the required
prototype/working model: equipment along with estimated cost)
S.No Item Name No of Units Per Unit Cost (in Rs) Total (in Rs)
Solar Plate 1 10000 10000
Wind Turbine 1 5000 5000
Transformer 2 1000 2000
Page 3|4
Ministry of Information Technology
Government of Pakistan
Page 4|4
Ministry of Information Technology
Government of Pakistan
It is undertaken that the undersigned has understood and accepted the “terms & conditions” of
the program, attached with this form and further reiterate that, if the subject FYP is approved,
the reimbursement of Funds claimed through Expenditure Report shall be in accordance with the
“terms & conditions” of the Program and the undersigned will be liable to return the unutilized
amount and other cost not approved by the Ignite-National Technology Fund, if any.
It is further undertaken that Expenditure Report of approved FYPs shall be furnished along with
the supporting documents as devised in attached Terms and Conditions of the Program and other
required deliverables as and when required by Ignite.
----------------------------------------------------------------------------------------------------------------------------- --
Evaluator’s Signatures------------------------
Page 4|4