CARPETA ASFALTICA

U/M CANT.
CORPORACION M & S DE NICARAGUA

CARPETA ASFALTICA EN CALIENTE DE 5 CMS. M2 4,370.00

CARPETA ASFALTICA

U/M CANT.
ECONS

CARPETA ASFALTICA EN FRIO DE 5 CMS. M2 4,370.00

ANALISIS DE COSTOS UNITARIOS

DESCRIPCION U.M. CANT.


ADOQUINADO DE 3500 PSI M² 360.00

ARENA NETA (ADOQUIN PROINCO) (M2) 0.04 PERIMETRO DEL ADOQUIN (M)
AREA DE ADOQUIN CON JUNTA DE ARENA (CALICHE) (M2) 0.05 CALICHE ( M3 / M2 )
CANTIDAD DE ADOQUINES TIPO TRAFICO / M2 20.00 ESPESOR DE CALICHE (M)
LONGITUD (M) 70.00 ESPECIFICACION
ANCHO (M) -

ARENA DE COLCHÓN DE 5 CMS. M3 23.40


CONFORMACION Y COMPACTACION PARA ADOQ. M2 360.00
HACER COLCHON DE ARENA DE 5 CMS DE ESPESOR M2 360.00
ADOQUINES DE 3,500 PSI C/U 7,200.00
MEDIO ADOQUINES DE 3,500 PSI C/U 560.00
DESCARGAR ADOQUINES C/U 7,760.00
ACARREO INTERNO DE ADOQUINES C/U 7,760.00
ACARREO DE ARENA (CARGE Y DESCARGE) M3 32.07
COLOCACION DE ADOQUINES EN LINEA RECTA M2 360.00
ARENA PARA CALICHE - MOTASTEPE M3 8.67
COLAR ARENA DE CAUCE EN MALLA No. 4 M3 32.07
COLAR ARENA HUMEDA PARA CALICHE (MALLA No 16) M3 8.67
CONCRETO PARA REMATES LATERALES DE 3000 PSI M3 0.77
HACER REMATES DE CONCRETO PARA ADOQUINADO ML -
VIGA DE REMATE SIN REFUERZO DE 0.1 x 0.25 ML 70.00
RASTRILLO DE MADERA CU 4.00
PRUEBA DE RESISTENCIA DEL ADOQUIN CU 5.00
ESCOBILLONES PARA BARRER Y RECOGER ARENA CU 4.00
LIMPIEZA DEL ÁREA M2 360.00

DESPERDICIO % 6.00%

COSTO TOTAL
COSTO UNITARIO

ANALISIS DE COSTOS UNITARIOS

1,833.33
DESCRIPCION U.M. CANT.
BASE DE PIEDRA TRITURADA DE PROINCO
CLASE B M3 550.00

PRUEBA DE COMPACTACION( M3/CU ) 150.00

PIEDRA TRITURADA DE PROINCO CLASE B M3 770.00


MODULO DE COMPACTACIÓN (Compac.) M3 550.00
CUADRILLA DE TOPOGRAFIA DIAS -
PRUEBA DE COMPACTACION CU 3.67

IMPREVISTOS % -

COSTO TOTAL
COSTO UNITARIO

ANALISIS DE COSTOS UNITARIOS


1,000.00
DESCRIPCION U.M. CANT.
RELLENO Y COMPACTACION CON
MATERIAL SELECTO M3 400.00

PRUEBA DE COMPACTACION( M3/CU ) 100.00

MATERIAL SELECTO LOS MARTINEZ (SUMINISTRO, CARGADO M3 560.00


MODULO DE COMPACTACIÓN (Compac.) M3 400.00
CUADRILLA DE TOPOGRAFIA DIAS -
PRUEBA DE COMPACTACION CU 4.00

IMPREVISTOS % -

COSTO TOTAL
COSTO UNITARIO

ANALISIS DE COSTOS UNITARIOS

2,750.00
DESCRIPCION U.M. CANT.
SUB-BASE (60% HORMIGON Y 40% MAT.
SELECTO) M3 1,100.00

HORMIGÓN 0.60 REND. MEZCLADO DE MAT. (m3/hr)


MAT SELECTO 0.40

MATERIAL SELECTO LOS MARTINEZ (SUMINISTRO, CARGADO M3 616.00


HORMIGON ROJO (SUMINISTRO,CARGADO Y TRANSPORTE) M3 924.00
CARGADORA FRONTAL (MEZCLADO DE MATERIALES HRS 15.40
MODULO DE COMPACTACIÓN (Compac.) M3 1,100.00
CUADRILLA DE TOPOGRAFIA DIAS -
PRUEBA DE COMPACTACION CU 7.00

IMPREVISTOS % 0.050

COSTO TOTAL
COSTO UNITARIO

ANALISIS DE COSTOS UNITARIOS

250.00
DESCRIPCION U.M. CANT.
BASE DE MAT. SELECTO M3 100.00

MATERIAL SELECTO (SUMINISTRO, CARGADO Y TRANSPORTA M3 140.00


ACARREO DE MATERIAL M3 140.00
MODULO DE COMPACTACIÓN M3 100.00
PRUEBA DE COMPACTACION CU 1.00

IMPREVISTOS % 0.100

COSTO TOTAL
COSTO UNITARIO

ANALISIS DE COSTOS UNITARIOS

2,238.13
DESCRIPCION U.M. CANT.
SUB-BASE (70% HORMIGON Y 30% MAT.
SELECTO) M3 895.25
AREA 4,476.25
HORMIGÓN 0.70
MAT SELECTO 0.30
RENDIMIENTO CARGADOR ( MEZCALDO DE MATERIALES M3/HR) 100.00
RENDIMIENTO CARGADOR (CARGAR M3/HR ) 80.00
CICLO DE CAMIÓN ( MIN ) 30.00

MATERIAL SELECTO (SUMINISTRO, CARGADO Y TRANSPORTA M3 376.01


HORMIGON ROJO (SUMINISTRO,CARGADO Y TRANSPORTE) M3 877.35
CARGADORA FRONTAL (MEZCLADO DE MATERIALES) HRS 12.5335
CARGADORA FRONTAL (CARGA DE MATERIAL MEZCLADO) HRS 15.67
CAMIÓN VOLQUETE ( ACARREO INTERNO ) HRS 62.67
MODULO DE COMPACTACIÓN M3 895.25
PRUEBA DE COMPACTACION CU 6.00
IMPREVISTOS % 0.050

COSTO TOTAL
COSTO UNITARIO

ANALISIS DE COSTOS UNITARIOS


-
125.00
DESCRIPCION U.M. CANT.
SUB-BASE DE MAT. SELECTO M3 50.00

MATERIAL SELECTO (SUMINISTRO, CARGADO Y TRANSPORTA M3 70.00


MODULO DE COMPACTACIÓN M3 50.00
PRUEBA DE COMPACTACION CU -

IMPREVISTOS % 0.050

COSTO TOTAL
COSTO UNITARIO
Preliminar
es
(Incluye
movilizaci
ón y
desmovili
zación de
1 3000
equipo
amarillo,
así como
equipo
para
mitigación
de polvo)

Corte de
Material
con
equipo
2 Excavado 5.66
r 320 o
similar en
zona de
PTAR

Desalojo
de
material
3 de corte 6.2
con
botadero
en Obra

Suministr
o y
transporte
de
material
4 15
selecto
del Banco
los
Martinez
o similar
Conforma
ción y
compacta
ción
5 mecánica 10
de la
terracería
debajo de
PTAR.

Suministr
o,
transporte
y
dosificaci
6 ón de 30
cemento
en sitio.
(2bls de
cemento
por m3).
IMPREVISTOS
CU SUBC. 0% OTROS CU DG C TOTAL DG C TOTAL SUBC.

34.65 0.00 0.00 34.65 151,420.50 151,420.50

151,420.50 151,420.50

IMPREVISTOS
CU SUBC. 0% OTROS CU DG C TOTAL DG C TOTAL SUBC.

33.74 0.00 0.00 33.74 147,443.80 147,443.80

147,443.80 147,443.80

COSTO UNITARIO C$ COSTO TOTA


M.O. MAT SUB EQUIPO TOTAL M.O.
4.41 12.07 1.58 18.06
TRO DEL ADOQUIN (M) 0.86
CALICHE ( M3 / M2 ) 0.02
ESOR DE CALICHE (M) 0.01
ESPECIFICACION

6.36 4.80 11.16 -


- - - 0.16 0.16 -
0.10 0.10 34.37
0.43 0.04 0.47 -
0.24 0.02 0.26 -
0.02 0.02 169.47
0.02 0.02 169.47
2.37 2.37 76.14
1.54 1.54 553.49
6.36 4.80 11.16 -
1.08 1.08 34.67
11.34 11.34 98.27
114.00 114.00 -
0.48 0.48 -
0.64 7.84 - 0.45 8.93 44.80
4.50 4.50 -
30.00 30.00 150.00
4.50 4.50 -
0.46 0.46 167.35

89.88

1,587.90
4.41
0.40

COSTO UNITARIO C$ COSTO TOTA


M.O. MAT SUB EQUIPO TOTAL M.O.

0.26 20.39 - 14.09 34.74 C$

3.65

14.36 7.46 21.82 -


0.09 0.29 - 3.64 4.02 50.34
75.00 75.00 -
26.00 26.00 95.33

145.67
0.26
0.08
COSTO UNITARIO C$ COSTO TOTA
M.O. MAT SUB EQUIPO TOTAL M.O.

0.41 1.66 - 5.88 7.95 0.00

0.04 0.98 - 1.59 2.61 23.17


0.09 0.29 - 3.64 4.02 36.61
75.00 75.00 -
26.00 26.00 104.00

163.78
0.41
0.16

COSTO UNITARIO C$ COSTO TOTA


M.O. MAT SUB EQUIPO TOTAL M.O.

0.27 4.02 - 9.36 13.65 C$

LADO DE MAT. (m3/hr) 100.00

- 3.10 - 4.62 7.72 -


2.14 2.44 4.58 -
45.00 45.00 -
0.09 0.29 - 3.64 4.02 100.69
75.00 75.00 -
26.00 26.00 182.00

14.13

296.82
0.27

COSTO UNITARIO C$ COSTO TOTA


M.O. MAT SUB EQUIPO TOTAL M.O.
0.45 1.82 - 12.25 14.52 0.00

0.04 0.98 - 1.59 2.61 5.79


- - - 3.76 3.76 -
0.09 0.29 - 3.64 4.02 9.15
26.00 26.00 26.00

4.09

45.03
0.45

COSTO UNITARIO C$ COSTO TOTA


M.O. MAT SUB EQUIPO TOTAL M.O.

0.33 1.89 - 16.14 18.36 0.00

0.04 0.98 - 1.59 2.61 15.56


0.03 1.12 - 7.48 8.63 27.92
45.00 45.00 -
45.00 45.00 -
33.00 33.00 -
0.09 0.29 - 3.64 4.02 81.95
26.00 26.00 156.00
14.07

295.50
0.33

COSTO UNITARIO C$ COSTO TOTA


M.O. MAT SUB EQUIPO TOTAL M.O.
0.16 1.74 - 6.17 8.07 0.00

0.04 0.98 - 1.59 2.61 2.90


0.09 0.29 - 3.64 4.02 4.58
26.00 26.00 -

0.37

7.85
0.16
Gbl 1 $7,000.00

3000

M3 3,000.00 $

2.83

M3 3,900.00 $

3.1

M3 650

12
M3 2000

7.5

M3 150

28
AL SUBC.

AL SUBC.

COSTO TOTAL C$
MAT SUB EQUIPO TOTAL

148.82 112.32 261.14


- 57.60 57.60
- - 34.37
3,088.80 281.66 3,370.46
135.24 12.32 147.56
- - 169.47
- - 169.47
- - 76.14
- - 553.49
55.13 41.61 96.74
- - 34.67
- - 98.27
87.78 - 87.78
- - -
548.80 31.50 625.10
18.00 - 18.00
- - 150.00
18.00 - 18.00
- - 167.35

246.03 - 32.22 368.14

### - 569.23 ###


12.07 - 1.58 18.06

COSTO TOTAL C$
MAT SUB EQUIPO TOTAL

11,057.20 - 5,744.20 16,801.40


158.18 - 2,004.23 2,212.75
- - - -
- - - 95.33

- - - -

### - ### ###


20.39 - 14.09 34.74
6.12 - 4.23 10.43
COSTO TOTAL C$
MAT SUB EQUIPO TOTAL

548.35 - 892.50 1,464.02


115.04 - 1,457.62 1,609.27
- - - -
- - - 104.00

- - - -

663.39 - ### ###


1.66 - 5.88 7.95
0.66 - 2.35

COSTO TOTAL C$
MAT SUB EQUIPO TOTAL

1,909.60 - 2,845.92 4,755.52


1,981.49 - 2,254.56 4,236.05
- - 693.00 693.00
316.35 - 4,008.47 4,425.51
- - - -
- - - 182.00

210.37 - 490.10 714.60

### - ### ###


4.02 - 9.36 13.65

COSTO TOTAL C$
MAT SUB EQUIPO TOTAL

137.09 - 223.13 366.01


- - 526.40 526.40
28.76 - 364.41 402.32
- - - 26.00

16.59 - 111.39 132.07

182.44 - ### ###


1.82 - 12.25 14.52

COSTO TOTAL C$
MAT SUB EQUIPO TOTAL

368.18 - 599.26 983.00


984.38 - 6,561.79 7,574.09
- - 564.01 564.01
- - 705.01 705.01
- - 2,068.03 2,068.03
257.47 - 3,262.34 3,601.76
- - - 156.00
80.50 - 688.02 782.59

### - ### ###


1.89 - 16.14 18.36

COSTO TOTAL C$
MAT SUB EQUIPO TOTAL

68.54 - 111.56 183.00


14.38 - 182.20 201.16
- - - -

4.15 - 14.69 19.21

87.07 - 308.45 403.37


1.74 - 6.17 8.07
TIPO CARPETA Sub base Base Carpeta Costo m2 Margen
Cu
Asfalto en frio 14.52 34.74 18.40 67.66 59.9905415
Asfalto en caliente 14.52 24.29 20.24 59.05 39.6311185
Adoquinado 14.52 24.29 18.06 56.87 34.4762355
Pavimento de concreto 24.29 18.00 42.29 0

TIPO CARPETA Sub base Base Carpeta Costo m2 Incremento % a costo de Concreto
Asfalto en frio 14.52 24.29 18.4 57.21 135%
Asfalto en caliente 14.52 24.29 20.24 59.05 140%
Adoquinado 14.52 24.29 18.06 56.87 134%
Pavimento de concreto 24.29 18 42.29 100%

Sub base
14.52
Incremento % a costo de Concreto

160%

140% Asfalto en caliente


Asfalto en frio Adoquinado
120%
Sub base
100% 100%

Incremento % a costo de
80% Concreto

60%

40%

20%

0%
Asfalto en frio Asfalto en Adoquinado Pavimento de
caliente concreto
Cuadro Comparativo de carpetas de Rodamiento

67.66
59.05
56.87
42.29
Base
24.29
Sub base

20.24
18.06
18.00
18.40
14.52

Asfalto en frio
Asfalto en caliente
Adoquinado
Pavimento de concreto
Sub base Base Carpeta Costo m2