Excavator 8 cuvyd heaped, 7 cunyd struck, packed earth and dump into trucks. Optimum cut is 7 ft Eomoare the Ocout of tas excavator based ming conditions: ‘embankment ort deep at 90 degree sw.anate, Proof the following cauations (same ones as in the notes) are cored > Based on amount of construction procuced per hour (sa.yasnn| oS sesed: mon. ae b> To calculate volume compacted per hour PSS Ee Saar i Be Bh Stree % Congle | uTM FACE et =| Hise tan Foose |e lose mies Zenker cevinn B)aznte + B) ete Bikey = ein Oana sensor enasoMTTORM, To ay couse reeding cater Topic Name 1 Depreciation aves oo \ecraical eficensy Rinpal Blade Dozer ose Faso Prove Poe: Assignment type alessasingle fie oninetot oninetot oninetot oninetot oninetot oninetot oninetot oninetot Due date Sets, 22 March 2014, 08 00 AML Sete, 22 March 2014, 08 00 AML Feiay, 11 Ag 2016, 11.55 PML Feiay, 1 Ag 2016, 11.55 PAL Feiay, 11 Ag 2016, 11.55 PML Feiay, 1 Ag 2016, 11.55 PAL Fay, 18May 2015, 05.25 PUL Friay, 18May 2016, 08:50 PUL ray 8 ay 2016, 05:07 Friay, 18May 2016, 8:40 PUL Friay, 16May 2016, 0:40 FUL ‘Submitted ey, 21 Marsh 2014, 10:54 PAL ay, 21 Marsh 2016, 11:14 PAL “Thursday, 10 Ap 2014, 08:37 PAL “Thursday, 10 Ap 2014, 08:38 PAL “Thursday, 10 Ap. 2014, 08:38 PAL “Thursday, 10 Ap 2014, 06:39 PML

You might also like