Degin for torsion (Arc Beam) Fck 20

Size b D d Fy 500
0.23 0.45 0.39 L
Load from slab= t/m e
Load from Wall= 0.900 t/m
Self Weight of beam= 0.259 t/m l
Total UDL(w) 1.159 t/m Arc Length(L)
Straight Len.(l)
Moment WL2 x 1.5= 4.597 t.m e
(Mu)=
8

Torsional Moment(Tu)
at support = w x e x L/2 x 1.5= 1.103 t.m

Moment due to Torsion(Mt)

= 1.919 t.m
Equivalent Moment(Me1)
Me1=Mu+Mt
Me1 6.516 t.m
Me2 1.919 t.m
Provide tension steel only

438 mm2

Transverse reinforcement(Asv) Side Cover Top & bottom cover


Vu 4.00 t 0.025 m 0.04 m

b1 180 mm
d1 310 mm

Spacing (S) 100

Asv= 45 mm2

Tu=Vu+1.6(Tu/B) Tu= 11.67 t


Asv= 68.81 mm2
4.6 m
4.45 m

0.276 m
Degin for torsion (Arc Beam) Fck 20
Size b D d Fy 500
0.3 0.6 0.54 L
Load from slab= 1.600 t/m e
Load from Wall= 0.600 t/m
Self Weight of beam= 0.450 t/m l
Total UDL(w) 2.650 t/m Arc Length(L)
Straight Len.(l)
Moment WL2 x 1.5= 19.922 t.m e
(Mu)=
8

Torsional Moment(Tu)
at support = w x e x L/2 x 1.5= 5.109 t.m
Additional point load= 7 t
Additional Tu due to point load 1.75 tm
Moment due to Torsion(Mt)

= 9.017 t.m
Equivalent Moment(Me1)
Me1=Mu+Mt
Me1 28.938 t.m
Me2 9.017 t.m
Provide tension steel only

1656 mm2

Transverse reinforcement(Asv) Side Cover Top & bottom cover


Vu 18.94 t 0.025 m 0.04 m

b1 250 mm
d1 460 mm

Spacing (S) 125

Asv= 128 mm2


Tu=Vu+1.6(Tu/B) Tu= 46.19 t
Asv= 100.00 mm2
5 m
5 m

0.25 m
Degin for torsion (Arc Beam) Fck 20
Size b D d Fy 500
0.23 0.6 0.54 L
Load from slab= 0.600 t/m e
Load from Wall= 0.450 t/m
Self Weight of beam= 0.345 t/m l
Total UDL(w) 1.395 t/m Arc Length(L)
Straight Len.(l)
Moment WL2 x 1.5= 5.535 t.m e
(Mu)=
8

Torsional Moment(Tu)
at support = w x e x L/2 x 1.5= 0.866 t.m
Additional Tu due to point load 0
Moment due to Torsion(Mt)

= 1.839 t.m
Equivalent Moment(Me1)
Me1=Mu+Mt
Me1 7.374 t.m
Me2 1.839 t.m
Provide tension steel only

337 mm2

Transverse reinforcement(Asv) Side Cover Top & bottom cover


Vu 4.81 t 0.025 m 0.04 m

b1 180 mm
d1 460 mm

Spacing (S) 200

Asv= 48 mm2

Tu=Vu+1.6(Tu/B) Tu= 10.84 t


Asv= 92.29 mm2
4.6 m
4.53 m

0.18 m
Degin for torsion (Arc Beam) Fck 20
Size b D d Fy 500
0.3 1.15 1.09 L
Load from slab= 2.400 t/m e
Load from Wall= 0.000 t/m
Self Weight of beam= 0.863 t/m l
Total UDL(w) 3.263 t/m Arc Length(L)
Straight Len.(l)
Moment WL2 x 1.5= 19.043 t.m e
(Mu)=
8

Torsional Moment(Tu)
at support = w x e x L/2 x 1.5= 4.934 t.m
Additional point load= 5 t
Additional Tu due to point load 1.25
Moment due to Torsion(Mt)

= 14.027 t.m
Equivalent Moment(Me1)
Me1=Mu+Mt
Me1 33.070 t.m
Me2 14.027 t.m
Provide tension steel only

740 mm2

Transverse reinforcement(Asv) Side Cover Top & bottom cover


Vu 12.23 t 0.025 m 0.04 m

b1 250 mm
d1 1010 mm

Spacing (S) 125

Asv= 56 mm2
Vt=Vu+1.6(Tu/B) Vt= 38.55 t
Asv= 101.62 mm2
5 m
5 m

0.25 m
Degin for torsion (Arc Beam) Fck 20
Size b D d Fy 500
0.3 0.3 0.24 L
Load from s 1.200 t/m e
Load from Wall= 0.000 t/m
Self Weight of beam= 0.225 t/m l
Total UDL(w) 1.425 t/m Arc Length(L)
Straight Len.(l)
Moment WL2 x 1.5= 5.411 t.m e
(Mu)=
8

Torsional Moment(Tu)
at support = w x e x L/2 x 1.5= 0.926 t.m
Additional Tu due to point load 0.04
Moment due to Torsion(Mt)

= 1.089 t.m
Equivalent Moment(Me1)
Me1=Mu+Mt
Me1 6.500 t.m
Me2 1.089 t.m
Provide tension steel only

911 mm2

Transverse reinforcement(Asv) Side Cover Top & bottom cover


Vu 4.81 t 0.025 m 0.04 m

b1 250 mm
d1 160 mm

Spacing (S) 150

Asv= 80 mm2

Tu=Vu+1.6(Tu/B) Tu= 9.75 t


Asv= 140.03 mm2
4.5 m
4.42 m

0.18 m