PROJECT TITLE: WORK TITLE:

PRE-CONCRETING INSPECTION
CHECK LIST

PROJECT OWNER: CONSULTANT: DATE :


LOCATION :
BUILDING :
ELEMENT OF STR :
CONTRACTOR: GRADE OF CONCRETE :
CONCRETE SUPPLIER :
START OF INSPECTION :
FINISH OF INSPECTION :
SUBMITTAL
No. DESCRIPTION OK NO REMARKS
1 RFI
2 Shop Drawing
3 Method of Statement
4 Mix Design
SETTING OUT
No. DESCRIPTION OK NO REMARKS
1 Gridline Position (tolerance ±6mm if ≥ 3m;
tolerance ±3mm if < 3m)
2 Structural Finish Level (SFL)
3 Verticality
WORKS BELOW LOWEST FLOOR LEVEL
No. DESCRIPTION OK NO REMARKS
1 Remove Stagnant Water and Soft Soil
2 Sand or Hardcore
3 Anti Termite Treatment (if needed)
4 Lean Concrete
FORM WORK
No. DESCRIPTION OK NO REMARKS
1 Free from Cracks, Defects and Rubbish
2 Tight Joint and Gaps (seal if must)
3 Adequate Supported and Propped (rib max 300mm)
5 Dimension (Length, Width & Height)
6 Concrete Level Marked
REINFORCEMENT
No. DESCRIPTION OK NO REMARKS
1 Correct Grade, Size, Number and Spacing
2 Adequate Lapping, Chairs and Spacer
3 Rebar Securely and Properly Tied in Place
4 Covers as Required
5 Free from Oil, Dust, Soil, and Loose Rust
6 Adequate Starter Bar (if needed)
CONCRETING
No. DESCRIPTION OK NO REMARKS
1 Correct Grade and from Approved Supplier
2 Placing within 2 Hours from Dispatching (check DO)
3 Sufficient Slump (as per approved mix design)
4 Sufficient Sample
5 MEP Opening/ Embedded (if any)
EQUIPMENT & TOOLS
No. DESCRIPTION OK NO REMARKS
1 Slump Test Tools (cone, bar, platform & tape meter)
2 Sample Cube Tools (cube, bar, cart, shove, trowel)
3 Crane with Concrete Container or Concrete Pump
4 Concrete Vibrator (with min. 1 stand by)
5 Concreting Recorder (forms & tools)
6 Curing Material (compund/ goni/ carpet)
7 Lighting (for night concreting).
INSPECTED BY: VERIFIED BY:

DATE: DATE: