You are on page 1of 5

Project : PROPOSED TWO-STOREY SLAB ROOF

Location : #42 QUIRINO STREET MAGSAYSAY TONDO


Owner : MR. & MRS. REYNALDO RAMOS

OUTLINE SPECIFICATIONS
(Materials and Finishes)

A. SITE DEVELOPMENT PLAN

1. Finish grade line in roads area shall be 2% slope higher than the existing
sidewalk.
2. Finish floor level in entry Porch shall be 200 mm higher than the finish
grade line.
3. 100 mm dia. uPVC Series 1000 shall also provide for downspouts.

B. CIVIL/STRUCTURAL WORKS

1. Foundation
 Soil bearing capacity assumed in the design is 220 kPa. This
parameter shall be verified by the Contractor at site prior to
commencement of construction. If actual bearing capacity is less
than the assumed value, the Engineer shall be notified immediately,
and footings shall be redesigned and adjusted as necessary.

 All foundations, ground slabs and other below ground structures and
substructure concrete block walls, unless otherwise noted, shall be
constructed on top of 50 mm Grade 20 blinding.

2. Concrete Works
 Footings, columns, beams, suspended slab, canopy and stairs shall be
4,000 psi (28 MPa)
 Slab on grade, wall footings, curb and outside stairs shall be 3,000
psi (21 MPa).
 All reinforcing steel shall be new billet, hot rolled, deformed bars
with minimum yield (fy) equal to 275 MPa (Grade 40)

Outline Specifications of Ramos Residence Page 1 of 5


 Minimum clear concrete cover shall be as follows:

Location Clear Cover


In contact with soil 75 mm
External face of beams and columns 40 mm
Internal face of beams and columns 20 mm
Suspended slabs 20 mm

 Openings of any size in walls, slabs, beams and columns shall not be
made without the Engineer’s approval. Minimum of two 16 mm steel
reinforcements of shall be provided at all sides and corners of
provided openings.

3. Masonry Works
 Concrete hollow blocks (CHB) shall have a minimum compressive
strength of 5 N/mm2
 All exterior walls shall be 6 inches non-loading type CHB with 10 mm
steel reinforcement at every 400 mm.
 All interior walls shall be 4 inch ordinary CHB with 10 mm steel
reinforcement at every 400 mm except as specified in the drawings.
 All CHB walls shall be stiffened with reinforced concrete beams at
every fourth course, and reinforced concrete post at every 3 m.
 All doors, windows and other openings shall be provided with minimum
of 200 mm X 300 mm lintel beams and columns, reinforced with 4 of
12 mm diameter longitudinal bars and 10 mm at 200 O.C. ties.

4. Roof Framing
 Steel roof framing shall be angular steel section trusses (ASTM A-
36), cold rolled channel section 50 x 100mm purlins at 800mm O.C.
 All welds shall be 3 mm minimum continuous fillet welds all around
unless otherwise shown.
 Roofing sheets shall be pre-painted long span, 0.50mm thick, rib tile
profile complete with insulation, gutter, ridge roll, flashing &
accessories.
 Entry porch canopy and 2 circular columns shall be provided with
aluminum cladding.
 Covered walkway roofing sheets shall be polycarbonate.

Outline Specifications of Ramos Residence Page 2 of 5


5. Waterproofing/Vapor Barrier
 Comfort rooms shall be provided with approved waterproofing
materials, installed in accordance with manufacturer’s requirements.

 Top face of roof deck slab shall be installed with approved


waterproofing materials, installed in accordance with manufacturer’s
requirements.

6. Formworks
 The interiors of all forms shall be thoroughly cleaned out before any
concrete is placed

 Formwork shall be general quality plywood. Reasonable re-use is


allowed if accepted by the Engineer.

 The inside surfaces of forms shall, except for permanent formwork,


or unless otherwise agreed by the Engineer, shall be coated with a
release agent approved by the Engineer. Release agents shall be
applied strictly in accordance with the manufacturer’s instructions,
applied evenly and shall not come into contact with the
reinforcement

 The periods before removal of temporary formwork shall be as


follows:

Minimum
Type of Formwork period before
removal
Vertical formwork to columns and walls 1 day
Bottom face formwork to slabs 4 days
Bottom face formwork to beams and props to slabs 10 days
Props to beams 14 days

 Formwork shall be removed without shock to or disturbance of the


concrete.

Outline Specifications of Ramos Residence Page 3 of 5


C. ARCHITECTURAL WORKS

1. Walls
 All exterior and interior walls shall be smoothly plastered and
painted.
 200 mm x 400 mm glazed wall tiles for all toilet and bath.
 Gypsum Board or ficem board partition on metal stud on all interior
partition as shown in the drawing.

2. Floors
 200 mm x 200 mm unglazed ceramic floor tiles for toilet and bath
and kitchen.
 Wood planks finish for stairs.
 Plain cement for all areas.
 4” base board shall be provided on all interior walls.

3. Ceilings
 Interior ceiling shall be 6 mm thick gypsum board on metal furring
on all areas
 All interior ceiling shall be provided with 4” cornice kiln dried wood.

4. Doors
 Main Door shall be 44 mm hollow core flush door with 6 mm thick
ordinary plywood on both face with wood carved design
 All interior door shall be hollow flush door with ¼” thick ordinary
plywood and painted.
 All toilet and bath rooms shall be PVC flush door with louvers at the
bottom.

5. Windows
 Casement windows on aluminum frame as indicated in the drawing.
 Awning type windows on aluminum frame as shown in the drawing.

6. Kitchen and Pantry


 Kitchen shall fit with kitchen counter top complete with stainless
sink and fittings, gas range, upper & lower cabinets, lights & etc.

Outline Specifications of Ramos Residence Page 4 of 5


D. PLUMBING WORKS

1. Water Supply
 All water supply lines shall be G.I. pipes and fittings Schedule 40
 Provide 3.60 cu. m. cistern near the existing overhead water tank.

2. Sanitary Lines
 All sanitary and ventilation lines shall be uPVC Series 1000 pipes
and fittings.

3. Plumbing Fixtures
 All fixtures shall be provided such as water closets, lavatories,
urinal, floor drains, toilet paper holder, facial mirror, & etc.

4. Catch Basin
 PVC/Pre-cast concrete pipe, catch basin and manholes shall be
provided as indicated in the drawings.

5. Downspout
 Downspout shall be 100mm dia. uPVC series 1000.

6. Septic Tank
 One (1) septic tank shall be provided the house.

7. Grease Trap
 One (1) grease trap shall be provided near kitchen

E. ELECTRICAL WORKS
 All electrical lines shall be provided with uPVC conduits and RSC
conduits for main electrical and telephone lines coming from the
service entrance pole.
 Service entrance pole shall be reinforced concrete.
 ACU outlet shall be provided as indicated in the drawings

Note:

In case there is a conflict between the contract drawings and outline


specifications, the latter shall prevail subject to confirmation with the
Engineer.

Outline Specifications of Ramos Residence Page 5 of 5