Professional Documents
Culture Documents
Alex Kirsch
Reservoir Engineer
Tullow Oil Company
The ability to reduce uncertainty and make accurate predictions based on the three viable
geological realizations increased Tullow reservoir engineers’ confidence that they could
drill a successful well in this compartment. The next step was to evaluate development
plans, including options to drill horizontal or straight holes. Using the Petrel Reservoir
Engineering/ECLIPSE workflow, they were able to evaluate a number of development
scenarios, visualize well locations, evaluate projected production results, reposition the
wells, and retest.
As a result, the team confidently submitted a well proposal and obtained the necessary
approvals to move forward with a development plan designed to effectively drain the
isolated compartment.
E-mail sisinfo@slb.com or contact your local Schlumberger representative to learn more. www.slb.com/sis
*Mark of Schlumberger
Other company, product, and service names
are the properties of their respective owners.
Copyright © 2008 Schlumberger. All rights reserved. 08-IS-111