You are on page 1of 2

METER INSPECTION / COMPLIANCE CHECKLIST

Date of Inspection:
Name of Inspector and Company:
Company and Location (Field and LSD):
Operator e.g., Pengrowth :
y Required by Compliance Code Auditor Comments welcomed anywhere on sheet
DATA ATTRIBUTE OPTIONS
1 Site Type Compressor Satellite Well Battery Other
2 Gas Measurement Type Separator Effluent (Wet Metered) Plunger Timer Pump Jack
3 Effluent Meter Test Tap & Location to Meter y Yes No N/A Upstream Downstream
4 Fuel Gas & Items y Metered Estimated List Items If Estimated Below in Notes.

5 Fuel Gas Location i.e., Up or DN of Meter Upstream Downstream Eg. Texsteam 5100 or 1x2 Cat Heater or Pump Jack Engine
GAS

6 Fuel Gas Meter Pressure/ Temp Corrected Yes No


7 Fuel PD Meter Date of Last Calibration y mm/dd/yyyy Calibration Tag Attached Yes ✘ No
8 Fuel PD Meter Manufacturer / Model # / Serial # Make: Model: Serial:
9 Meter Name e.g., Test, Sales / Tag Number

y Orifice Vortex Turbine Ultrasonic PD


10 Primary Device
Thermal V-Cone Other
Annubar
11 Isolation Valve Off Changer & Size y Ball Needle (Fullport) Needle (Unable To Determine If Fullport) Size:______

12 Drip Pots Installed Yes No


13 Sensing Lines Sloped to Changer (1" / ft) Yes No Tubing Size
14 Orifice Plates Properly Stored y Yes No N/A Comments:

15 Orifice Changer Simplex Senior Plate Size:


16 Meter Run Manufacturer y Meter Run Figure # (3A, 3C, etc.)
17 Meter Run Size (Upstream / Downstream) y (U) mm Inch (D) mm Inch
19 Meter Run Tag Attached (Welded on) Yes No
20 Meter Run Bypass Yes No Open Closed
GAS

21 Meter Installed to Industry Standard y Yes No Explain: Don't Know

EFM/RTU PLC DCS Chart


22 Chart/EFM
Make Model: Serial:
23 Second Measurement Device If Present Chart Recorder Transmitter/EFM Make: Model:
24 Transmitter and Chart Recorder Location y Same Side of Changer Opposite Side of Changer Shared Sensing Line
25 Volume Verification Performed (Flowcheck) EFM/RTU PLC 0.25% of Range Don't Know
26 Device Range DP Range Static Temp Range
27 Calibration Tag on Transmitter y Yes No Date of Calibration: mm/dd/yyyy
28 Calibration Report in Chart Recorder y Yes No Date of Calibration: mm/dd/yyyy
29 Chart Recorder Type Three Pen Two Pen
30 Chart Recorder Differential Pressure y >25% of Scale <25% of Scale
31 Differential Pen Zeroed Once/Chart Cycle Yes No
32 Chart Rotation 24 Hour 7 Day 8 Day Other
33 Recorder Housed Yes No
GAS

34 Chart Over Range Under Range Painting


35 Inking Properly Yes No
36 All Pertinent Info Recorded on Chart Yes No Explain: Don't Know
37 Flowing Gas Temperature Indication Temp Pen TI on Meter Run TI on Sep No TI RTD
38 Temperature Element Inserted inThermowell Yes No
39 Current Analysis in Device Yes No Date: mm/dd/yyyy Don't Know
40 Sample Point Location Meter Run Upstream of Meter Meter Run Downstream of Meter Vessel Pipeline Other

41 SP Tag (Lab or Company)& Probe Installed Label? Yes No Probe Installed? Yes No

Oil Emulsion LPG/NGL

Page 1 380123094.xls
DATA ATTRIBUTE OPTIONS Yes No
42 Product Type Oil Emulsion LPG/NGL Condensate
43 Liquid Stream Inlet Test Well Group Treater Sales

Orifice Ultrasonic Vortex PD Turbine Thermal


44 Liquid Meter Type
Mass Other
CONDENSATE

45 Liquid Meter Temperature Compensated y Yes No Don't Know


46 Liquid Meter Prover Tap y Yes No
47 Liquid Meter Prover Tap Configuration y Upstream of Dump Valve Downstream of Dump Valve
48 Prover Tap and Line Size y Prover Tap Size: Line Size:

49 Dump Valve Downstream of Meter Yes No


50 Level Controller Throttle Snap Acting Don't Know
51 Bypass Valve Open Closed
52 Meter Size mm Inch
EMMULSION

53 Meter Manufacturer / Model # / Serial # Make: Model: Serial:


54 Meter Factor/ K - Factor MF: KF:

55 Date of Last Calibration mm/dd/yyyy Calibration Tag Attached Yes No


56 Sample Method Grab Proportional None Other
57 Sample Points Have Tag (Lab or Pengrowth) Yes No
58 Sample Probes Installed y Yes No
59 Meter Calibration y Inline Bench Don't Know
60 Liquid Meters Installed Correctly Yes No Don't Know
Recombined Downstream of Gas Meter Tanked No
OIL

61 Liquids Recombined or Tanked Potenial to do either or? Yes


62 Tank Gauge Method Gauge Board Radar Hydrostatic Head Other

Inventory 75 mm Resolution Yes No Don't Know


63 Tank Type, Guage Resolution, & Size
Delivery Point 3 mm Resolution Yes No Don't Know
64 Calibration Tags on Electronic Tank Guaging mm/dd/yyyy Calibration Tag Attached Yes No
66 Product Type Produced Fresh Water
67 Liquid Stream Inlet Test Wellhead Group Treater Inj/Disposal
Orifice Ultrasonic Vortex PD Turbine Mass
68 Liquid Meter Type
Other
69 Liquid Meter Prover Tap Yes No
70 Liquid Meter Prover Tap Configuration Upstream of Dump Valve Downstream of Dump Valve
71 Prover Tap Size Same as Line Size Yes No
WATER

72 Water Dump Valve Downstream of Meter Yes No


73 Meter Size mm Inch
74 Meter Factor/ K - Factor MF: KF:

75 Date of Last Calibration y mm/dd/yyyy Calibration Tag Attached Yes No


76 Liquid Meters Installed Correctly Yes No Don't Know
77 Liquids Recombined or Tanked Recombined Downstream of Gas Meter Potenial to do either or? Yes No
78 Tank Gauge Method Gauge Board Radar Hydrostatic Head Other
79 Calibration Tags on Electronic Tank Guaging mm/dd/yyyy Calibration Tag Attached Yes No
Notes:

Page 2 380123094.xls

You might also like