You are on page 1of 1

Overview Map

Layout of Penstock Decan & Water Supply

09
6.
77
Sc. 1:200

07
6.
77
Special Restricted Zone

Special Restricted Zone

04
6.
Object Ditch

77

20
6.

e
77

ca es
pip
Special Restricted Zone

Special Restricted Zone

Road Fence

De pip
n-
0

5
. 5

28
4
6.
7

PE est

7.
Bridge

77
77

77
Electric pole Special Restricted Zone

74

ing Asb
6.
77
Manhole Water culverts
Special Restricted Zone

ex ting
06
7.
77

to is
ist
Rocks Water base

n ex

69
8.
59

78
77
concrete quality:

7.

tio of

9.
77

77
3
River side

.6
Concrete wall

ec g
7
cleaning layer and lean concrete C12/15

61
77

nn cin
ck

7.
77
Existing pipeline Existing pipeline CDF structural concrete C20/25, XC2, GK<32/22

40

55
60

co pla
72
D100mm D200mm

7.

8.
sto
7.

Re 4
7.

77
77

6
77

7.
77

77
69
Existing pipeline Decan general:

7.
Existing pipeline Decan

77
D200mm D315mm

pe
All dimensions, coordinates and elevations must be checked. Natural measurements

84

11
7.

8.

1
wa st
Existing pipeline

21
New DWL Decan must be used.

21

0
77

77

ve be

0.
ter
8.
D160mm

7.

78

74
ssi As
New DWL Villages Edges of all concrete buildings and constructions above the ground must be broken.

ion

77

77

0.
91

78

28
Follow the instructions of the local site management.

7.

0.

16
56
77

78

0.
7.
All given measurements shown in KELAG drawings are minimum measurements (foundations,

89

78
xce

77
GPS Reference point

.1
fountain-head

sit

0. 6
7.

78 80.2
8
walls, etc)

32
22
e. E
77

77

0.

7
78
pip
po

96

38
7.
geological:

19

17

0.
77

2
8.

8.

78
0
77

8.
77

52
w

77
All working areas, pits, slopes and the area around them have to be properly secured by alequote

0.
43

78
0. pipe est
8.

11
ne
slope stabilisations.

b
77

0.
As

78
Slope stabilisations and pit boards have to be ordered, planned and approved by a geological

76

46
46
expert.

0.
8.

78
78
77
Protection measures against rockfall and land slides have to be executed.

45
0.
78
48

77880 0.50
556
8.

0. .5
78
77
construction phase 1 (implementation of drinking water pipeline):

53

9049
0.
4

01..
78
.8

7788
58
7
D

The existing drinking water pipelines must not be damaged or destroyed during construction

77

0.

46
56

78
phase 1.

2.
8.

95

78
77

78
92

0.
87

60
8.
8.

78
5

0.
77
77

0.
3

78
9.

78
Before the implementation of the drinking water systems any plans, pipes, valves, materials etc.

77

57
21
must be checked and approved by Hidro Drini.

70

0.
0.

0.

78
D

78
Pipes have to be placed only according to the instructions given by the pipe supplier.

78
78

0. 9
0.
DD

78 80.6
78 .04

65
78
9
77

02
2

66

94
38 1
96
0.
The new drinking water pipes are designed based on existing pipes as given in Geo-Land survey

0.

7
1. 78

73
1.

0.

0.
78

9.

78

78
72

93

3.
78
77
0 and according to the penstock axis defined by KelKos. The final position of the new drinking

76

78
9.

0.
.0
n

10

91
77

78
78

0.

0. .78
0

0.
01

0.
77
78
water pipes (and trench) in relation to the existing drinking water pipe has to be defined directly
8

78

78
86
itio

78
43

77879
7

46

1.

0. 85
0.
0.

0.
D

85
0.
on site.

78

78

7880.
78

78

78

34
76

7
1.

16
0.

83
78
78

1.
0.
ck pos

39
14

78
78
7881.5 7
Cables and pipes to be layed with are shown in the cross sections of the drinking water

0.
17
.5
1.

78
1

31
1.
78

78

41 1.34
pipeline-design.

17
05
78
1

1.
46
78

17

1. 6
9

1.
1.

78
D

781.4
0.

78
78
1.

e
44
9.

78

78

78

20
D
77

1.

02 ip
3
1.
ns ew

1.
78
Drinking water pipelines and any accessoirs as well as any other parts of the replaced dinking

.2
38
78

78

1
r0 np
78
1.

62
water supply system must not be contaminated with earth, soil, mineral liquids or similar. Before
D

78
52
19

1.
1.

78
2.

79
bringing into service the new system must be completely cleaned and desinfected.
3
D

52
78
pe rt n

04

be eca
.4

78

10
1.
1.
65
0

2.

6.
to

78
78

78
1.
78

78
32

78
D

98

85
D
0.

Position and elevation of new drinking water pipelines must be exactly surveyed - the build

am D
D
78

1.

1.
sta

5
78

78
y

89
design (dwg-file) has to be submitted to KELAG after the completion of each section.

78 42.0
D

01
g

ch ew
39

3.
r
D

51

2.78
2.

65

78
2
e

2.
D

78
0.

en

78

2.
78
78

on f n
If necessary the existing drainage pipes along the road must be relocated in a way to ensure their

14

93
e

2.

2.
6
2
an m
D
87

.9
5
7

78
functionality.

78

3..72
2.
09 0.9

94

cti o
2
6
01
0.

78
78

.3
w
D

77883
78
78

2.
D
50 er

2
9
782.m b 1360

lle on
78
5

76
78
2.
D
15

1.
78 782 2.82

4
78
1.

3. 7 .89
construction phase 2 (implementation of penstock):

.9

79
1.
78

co cti
51 82

3
D

69
78

2
78
78 78 2.7 83

68 9

3
782.50 a ely

78
3

78 82.5

8.
2.

c
.
3. 93
D 7 781.8

78
78

to m0at

to nne
2. 2.8 6

32
2.

D
D

3. D .30

During the implementation of the penstock the new drinking water pipes must be kept in position

71
7
10

78
78

2.

6.

2
87 1

2.
82

.0
78
2. 83
w rox5i.0
44

79
20
1

with suitable measures. No damage or destruction allowed!

1
78
43

.9

79
78 82.
1.

80
8
7

5.
o
2

co
.8
3
1.5

78

78
78

e d app78
0

7
2
3.
983

78
78

D
.1

78

94
27.

p
02

In the first coupling before and after a fixing point an angular offset (in coupling) is not allowed.
9

i
60

78
25.4

78

2.
0

21

13 02

-p ent
D

3.
2
3.82

7
2.

78
41

.50
78

19
3.

3.

.6
3. 83.

03
78

23

F
78 7
6 8

78
3

78

7
3.

10

0.
7
01 2.7 .5
4

3.

78
7
2.

D 8
78

79
3.

m
.4 3. 78 82

3.
.6

All construction joints must be washed rough with water and compressed air during
78

7
78
46

3. .10

C ce
78

78
3

02
7

D
3D.

78

78

78 783
7

g
3.
78

the setting process.


a
1
45

13

tin repl 00
3. .48

4
5
3.

78
22 6

4.
0 .

.
0

2
3. .1
.6 783

78

31 4
82
71

0
8

3.

.5
78 83 78 83

78

s End surfaces must be retracted as soon as possible and opened up afterwards.


83 78

78 783
3. .2

9
.4

i
1
78

3
3.

7
6
78 783
7

ex t of
4 3

78
6

74
78 9

7.
66

78
51 .5 8

1
5
68

Prior to further concreting, the mounting surfaces must be cleaned carefully. The
3. 83 7

70 3.53

58 4

78
3.

9
3.
3

3.

f
3. .3
3. 3.19

1.
78

3.

0
78
78

o gh
4

.7

78783
7

79
78

.
D

78

old concrete must be moistened thoroughly.


46

2
63

3.

78
41

g 79
6
78 7

3.
78

in l len
7

0
9 .

7
.6 783

.5
3.
78

3.

78

6
78

7
52

79
a
00 .5

l a If there is a rock surface, concrete works are only allowed on cleaned rock surface.
3.

.00
4. 83

rep ; tot
4. .89
D

70
3

78

84

78 7
61
78

5
11

4.
78 783

02
3.

6
4
D

9
.

.8

78
1
02 783

.3
78
3. .76

7
.
.6

2
84
97 783
4

4
.738
90
73 83

78

0
.0
78 783

01 and
80

.0
24
48

0
3
84
3.
3. 7
61

79

0
0
8
3. .2.283

r
78

6.
4.

e
4.

79
8 7
.6

b
3.

m
78
78
78

n cha
4
78 787383

0m
78

5
4.
78
6

2
.9

i o 8
1

t
49
1

78

c
78

e l y approved for construction


8.

l
0

e
4.

een c o l a t
79
99

oxim
78
78

40

85

r
.6

84 .18

w p
72

t
5.

be a p
5

t
4.

4.

e
78

n
4.

p e
78

78 784

can-pi
.8

04

lacem
78

78 78
78

27

e p
3.
0 8

g D f r e
.3 7

o
79

in
8.

t t
8
6.

f exis lengh
82

78
8

7. 8

4.

o l
14

5.
9

6.

g ta
7886.9
04

n o
78

i
7.

t
78

c - sign
78

2
4

rep la er 002
date
78

7.

6
0 8

5.
.4 7
7
78

m b
78

a
13

n c h
51

collectio
9.

1.
78

78

79

b)
49
78 0

36
2
5.

a)
6.

7.
78

79
77 .2
52

6. 787
6.
78
8 3

1. 7

78

98
5.

79 91.4
60

owner:
79

7.
78
7
9
6 .9
79

EGU Decan

Copyright KELAG: This blueprint must not be copied, reproduced in any form nor handed out to third parties
without the explicit approval of the copyright owner
e
pip

date name scale


designed: mar 2014 Eder
implementation plan
checked:
approved: 1:200 area 1 V1-part 1

You might also like