FOUNDATION DRAWING

NOTES

1.THIS DRAWING SHALL BE READ ALONG WITH ARCHITECTURAL


57.9" 105.7" 141.2" 102.2" 102.1" DRAWING.

2.DISCREPANCY IF NOTICED IN BETWEEN THIS DRAWIND AND


CONCERNED ARCHITECTURAL DRAWING SHALL BE BROUGHT TO
THE NOTICE OF THE ENGINEER.

3.ALL DIMENSIONS ARE IN INCH UNLESS OTHERWISE NOTED.

4.ONLY FIGURED DIMENSIONS SHALL BE FOLOWED AND NO


DIMENSION SHALL BE SCALED.
C1 C2 C3 C4
55.9"

5.ALL R.C.C. WORK SHALL BE OF M20 GRADE.


F1 F1 F1 F1
6. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE AS
FOLLOWS :-
C5 C6

C7
A) FOOTING : 50 MM

F6
F5 B) BEAM : 25 MM
81.8"

F6 C) SLAB : 20 MM
D) COLUMN : 40 MM
E) STAIRCASE SLAB : 20 MM

7. ALL REINFORCEMENT SHALL BE OF HIGH STRENGTH


C8 C9 DEFORMED STEEL BARS CONFORMING TO IS: 1786-1985 (GRADE
Fe-500) WITH 0.2%PROOF STRESS NOT LESS THAN 500 N/sqmm.
F1 F1
81.8"

8. THE BEARING CAPACITY OF THE SOIL IS ASSUMED AS 20.00


ton/sqrmtr. AT A DEPTH OF 1.8 MTR. FROM BENCH LEVEL.

10. THE POSITION OF HOOKS OF COLUMN TIES SHALL BE


VERTICALLY STAGGERED AND PLACED OPPOSITE FACE FOR
C10 C11 C13
C12

C14

C15
ALTERNATE TIES.

F1
F6

F6
F1 F5 F6 11. NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE
SECTION .
137.2"

12. DEVELOPMENT LENGTH FOR ANCHORAGE WILL BE 48 Ø.

* LAPS

4. AVOID LAPS IN BOTTOM BARS NEAR MID SPAN (EXCEPT FDN.)

5. AVOID LAPS IN TOP BARS NEAR SUPPORTS. (EXCEPT FDN.)


C16 C17 C18 C19 C20
6. DO NOT LAP MORE THEN 50% OF THE BARS AT ANY ONE
SECTION AND THE SAME SHALL BE STAGGERED.
F1 F6 F1 F5 F1
7. EMBBEDENMENT/ LAP LENGTH SHALL = 50 TIMES THE DIA OF
BAR.
FOUNDATION DRAWING

COLUMN LINKS
2
LONGER 4" THK PCC SHORTER
1 2 1

D
SHORTER

d
B

l
4" THK PCC
LONGER
4" L 4"

TYPICAL FOOTING - PLAN SECTION 1-1


TYPICAL DETAIL

SHORT DIR T10@5"c/c T10@5"c/c T10@5"c/c


M20:Fe415

LONG DIR T10@5"c/c T10@5"c/c T10@5"c/c


FOOTING
D,d 14", 6" 12", 6" 16", 8"

SIZE 44" x 42" 40" x 40" 54" x 52"


M15

P.C.C 4" THK 52" x 50" 48" x 48" 62" x 60"


COLUMNS MARKED C1, C2, C3, C4 C5, C11, C19 C6, C7, C12, C13
C8, C9, C10, C15 C14, C17
C16, C18, C20

FOOTING SCHEDULE
COLUMN DRAWING NOTES

1.THIS DRAWING SHALL BE READ ALONG WITH ARCHITECTURAL


DRAWING.

1448 2643 3531 2554 2553 2.DISCREPANCY IF NOTICED IN BETWEEN THIS DRAWIND AND
CONCERNED ARCHITECTURAL DRAWING SHALL BE BROUGHT TO
THE NOTICE OF THE ENGINEER.

3.ALL DIMENSIONS ARE IN INCH UNLESS OTHERWISE NOTED.

4.ONLY FIGURED DIMENSIONS SHALL BE FOLOWED AND NO


DIMENSION SHALL BE SCALED.

5.ALL R.C.C. WORK SHALL BE OF M20 GRADE.


C1 C2 C3 C4
1397

6. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE AS


FOLLOWS :-

A) FOOTING : 50 MM
C5 C6 C7 B) BEAM : 25 MM
C) SLAB : 20 MM
2046

D) COLUMN : 40 MM
E) STAIRCASE SLAB : 20 MM

7. ALL REINFORCEMENT SHALL BE OF HIGH STRENGTH


DEFORMED STEEL BARS CONFORMING TO IS: 1786-1985 (GRADE
Fe-500) WITH 0.2%PROOF STRESS NOT LESS THAN 500 N/sqmm.
C8 C9
8. THE BEARING CAPACITY OF THE SOIL IS ASSUMED AS 20.00
2045

ton/sqrmtr. AT A DEPTH OF 1.8 MTR. FROM BENCH LEVEL.

10. THE POSITION OF HOOKS OF COLUMN TIES SHALL BE


VERTICALLY STAGGERED AND PLACED OPPOSITE FACE FOR
ALTERNATE TIES.
C10 C11 C12 C13 C14 C15
11. NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE
SECTION .

12. DEVELOPMENT LENGTH FOR ANCHORAGE WILL BE 48 Ø.


3430

* LAPS

4. AVOID LAPS IN BOTTOM BARS NEAR MID SPAN (EXCEPT FDN.)

5. AVOID LAPS IN TOP BARS NEAR SUPPORTS. (EXCEPT FDN.)

6. DO NOT LAP MORE THEN 50% OF THE BARS AT ANY ONE


C16 C17 C18 C19 C20 SECTION AND THE SAME SHALL BE STAGGERED.

7. EMBBEDENMENT/ LAP LENGTH SHALL = 50 TIMES THE DIA OF


BAR.

COLUMN SCHEDULE
M20:Fe415M20:Fe415

0M SIZE 9" X 12" 9" X 9" 9" X 13"

TO STEEL 6-T12 4-T12 6-T12

3.35M LINKS T8 @ 6" T8 @ 6" T8 @ 6"

-1.8M SIZE 9" X 12" 9" X 9" 9" X 13"

TO STEEL 6-T12 4-T12 6-T12

0M LINKS T8 @ 6" T8 @ 6" T8 @ 6"

COLUMN MARKED C1, C2, C3, C4, C5, C11, C19 C7, C14, C16
C6, C8, C9, C10,
C12, C13, C15,
C17, C18, C20
M20 : Fe415 : COVER = 2" M20 : Fe415 : COVER = 2" M20 : Fe415 : COVER = 2"

0M

LINKS LINKS LINKS


TO
T8@7"c/c T8@7"c/c T8@7"c/c

3.35M

9"

9"

9"
T12 T12 T12
12" 9" 13"

6-T12 4-T12 6-T12


M20 : Fe415 : COVER = 2" M20 : Fe415 : COVER = 2" M20 : Fe415 : COVER = 2"

-1.8M

LINKS LINKS LINKS


TO
T8@7"c/c T8@7"c/c T8@7"c/c

0M
9"

9"

9"
T12 T12 T12
12" 9" 13"

6-T12 4-T12 6-T12

COLUMN MARKED C1, C2, C3, C4, C6, C5, C11, C19 C7, C14, C16
C8, C9, C10, C12,
C13, C15, C17, C18,
C20

COLUMN AND WALL SCHEDULE


(SCALE 1:25) COLUMN DRAWING
PLINTH BEAM DETAILS

NOTES

1448 2643 3531 2554 2553 1.THIS DRAWING SHALL BE READ ALONG WITH ARCHITECTURAL
DRAWING.

2.DISCREPANCY IF NOTICED IN BETWEEN THIS DRAWIND AND


CONCERNED ARCHITECTURAL DRAWING SHALL BE BROUGHT TO
THE NOTICE OF THE ENGINEER.

3.ALL DIMENSIONS ARE IN INCH UNLESS OTHERWISE NOTED.


PB1 PB2 PB3
C1 C2 C3 C4 4.ONLY FIGURED DIMENSIONS SHALL BE FOLOWED AND NO
DIMENSION SHALL BE SCALED.

PB30
PB22

PB23

PB24

PB27

PB28
1397

5.ALL R.C.C. WORK SHALL BE OF M20 GRADE.


PB4 PB5
6. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE AS
PB17

C5 C6

C7
FOLLOWS :-
PB21
2046

A) FOOTING : 50 MM
B) BEAM : 25 MM
C) SLAB : 20 MM
D) COLUMN : 40 MM
PB6

PB26

PB29
E) STAIRCASE SLAB : 20 MM
C8 C9
7. ALL REINFORCEMENT SHALL BE OF HIGH STRENGTH
DEFORMED STEEL BARS CONFORMING TO IS: 1786-1985 (GRADE
PB20
PB16

PB18
2045

Fe-500) WITH 0.2%PROOF STRESS NOT LESS THAN 500 N/sqmm.

8. THE BEARING CAPACITY OF THE SOIL IS ASSUMED AS 20.00


PB7 PB8 PB9 PB10 ton/sqrmtr. AT A DEPTH OF 1.8 MTR. FROM BENCH LEVEL.

C10 C11 C13 10. THE POSITION OF HOOKS OF COLUMN TIES SHALL BE
C12

C14

C15
VERTICALLY STAGGERED AND PLACED OPPOSITE FACE FOR
ALTERNATE TIES.

11. NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE


PB15

PB25
PB19

PB31
3430

SECTION .

12. DEVELOPMENT LENGTH FOR ANCHORAGE WILL BE 48 Ø.

* LAPS

PB11 PB12 PB13 PB14 4. AVOID LAPS IN BOTTOM BARS NEAR MID SPAN (EXCEPT FDN.)

C16 C17 C18 C19 C20 5. AVOID LAPS IN TOP BARS NEAR SUPPORTS. (EXCEPT FDN.)

6. DO NOT LAP MORE THEN 50% OF THE BARS AT ANY ONE


SECTION AND THE SAME SHALL BE STAGGERED.

7. EMBBEDENMENT/ LAP LENGTH SHALL = 50 TIMES THE DIA OF


BAR.
PLINTH BEAM DETAILS

BEAM SCHEDULE (M20:Fe415) (LEVEL: 0m)

SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT


BEAM SHEAR STIRRUPS
NUMBERS B D STRAIGHT CURTAILED EXTRA EXTRA STRAIGHT EXTRA EXTRA
LEFT RIGHT LEFT SUPP RIGHT SUPP

B1 230 230 2-T12 - - - 2-T12 - 1-T12 2L-T8@170

B2,B3 230 230 2-T12 - - - 2-T12 1-T12 1-T12 2L-T8@100

B4,B25 230 300 2-T12 - - - 2-T12 1-T12 1-T12 2L-T8@110

B5,B26 230 300 2-T12 - - - 2-T12 1-T12 - 2L-T8@110,225,225

B6,B18 230 230 2-T12 - - - 3-T12 - - 2L-T8@100

B7,B9,B16,B29 230 230 2-T12 - - - 3-T12 - - 2L-T8@170

B8,B10,B17,B30 230 230 2-T12 - - - 2-T12 1-T12 - 2L-T8@100

B11,B19 230 230 2-T12 - - - 3-T12 - - 2L-T8@100,170,100

B12,B20 230 230 2-T12 - - - 2-T12 1-T12 - 2L-T8@170

B13,B21 230 230 2-T12 - - - 2-T12 - - 2L-T8@100,170,100

B14,B15,B22,B23 230 230 2-T12 - - - 2-T12 - - 2L-T8@170


,B24,B27,B28,B31
ROOF BEAM DETAILS

NOTES
57.9" 105.7" 141.2" 102.2" 102.1"
1.THIS DRAWING SHALL BE READ ALONG WITH ARCHITECTURAL
DRAWING.

2.DISCREPANCY IF NOTICED IN BETWEEN THIS DRAWIND AND


CONCERNED ARCHITECTURAL DRAWING SHALL BE BROUGHT TO
THE NOTICE OF THE ENGINEER.
RB1 RB2 RB3
3.ALL DIMENSIONS ARE IN INCH UNLESS OTHERWISE NOTED.
C1 C2 C3 C4

RB32
RB24

RB25

RB26

RB29

RB30
55.9"

4.ONLY FIGURED DIMENSIONS SHALL BE FOLOWED AND NO


DIMENSION SHALL BE SCALED.
RB4 RB5
5.ALL R.C.C. WORK SHALL BE OF M20 GRADE.
RB19

C5 C6

C7
6. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE AS
FOLLOWS :-
RB23
81.8"

A) FOOTING : 50 MM
B) BEAM : 25 MM
RB6 C) SLAB : 20 MM

RB28

RB31
D) COLUMN : 40 MM
C8 C9 E) STAIRCASE SLAB : 20 MM
RB22
RB18

RB20
81.8"

7. ALL REINFORCEMENT SHALL BE OF HIGH STRENGTH


DEFORMED STEEL BARS CONFORMING TO IS: 1786-1985 (GRADE
Fe-500) WITH 0.2%PROOF STRESS NOT LESS THAN 500 N/sqmm.

RB7 RB8 RB9 RB10 RB11 8. THE BEARING CAPACITY OF THE SOIL IS ASSUMED AS 20.00
ton/sqrmtr. AT A DEPTH OF 1.8 MTR. FROM BENCH LEVEL.
C10 C11 C13
C12

C14

C15
10. THE POSITION OF HOOKS OF COLUMN TIES SHALL BE
VERTICALLY STAGGERED AND PLACED OPPOSITE FACE FOR
ALTERNATE TIES.
137.2"

RB17

RB27
RB21

RB33
11. NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE
SECTION .
RB12
12. DEVELOPMENT LENGTH FOR ANCHORAGE WILL BE 48 Ø.

* LAPS
RB13 RB14 RB15 RB16
4. AVOID LAPS IN BOTTOM BARS NEAR MID SPAN (EXCEPT FDN.)
C16 C17 C18 C19 C20
5. AVOID LAPS IN TOP BARS NEAR SUPPORTS. (EXCEPT FDN.)

6. DO NOT LAP MORE THEN 50% OF THE BARS AT ANY ONE


SECTION AND THE SAME SHALL BE STAGGERED.

7. EMBBEDENMENT/ LAP LENGTH SHALL = 50 TIMES THE DIA OF


BAR.
ROOF BEAM DETAILS
BEAM SCHEDULE (M20:Fe415) (LEVEL: 3.35m)
SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
BEAM SHEAR STIRRUPS
NUMBERS B D STRAIGHT CURTAILED EXTRA EXTRA STRAIGHT EXTRA EXTRA
LEFT RIGHT LEFT SUPP RIGHT SUPP

B1 9" 14" 2-T12 - - - 2-T16 - 1-T16 2L-T8@5"

B2,B9 9" 14" 2-T12 1-T12 - - 2-T16 1-T16 1-T16 2L-T8@5"

B3,B10 9" 14" 2-T12 1-T12 - - 2-T16 1-T16 - 2L-T8@5"

B4 9" 16" 2-T12 1-T12 - - 2-T16 - 1-T16 2L-T8@5",12",5"

B5 9" 16" 2-T12 1-T12 - - 2-T16 1-T16 - 2L-T8@4",5",5"

B6 9" 14" 2-T12 1-T12 - - 2-T12 - 1-T12 2L-T8@5"

B7,B11,B23,B24 9" 14" 2-T12 - - - 2-T16 - - 2L-T8@5"

B8 9" 14" 2-T12 1-T12 - - 2-T16 - 1-T16 2L-T8@5"

B12 9" 14" 2-T12 1-T12 - - 2-T12 - - 2L-T8@5",10",5"

B13 9" 16" 2-T12 - 1-T12 - 2-T16 - 1-T16 2L-T8@5",12",5"

B14 9" 16" 2-T12 - - - 2-T16 1-T16 - 2L-T8@5"

B15,B16 9" 16" 2-T12 - - - 2-T16 - - 2L-T8@5",12",12"

B17 9" 14" 2-T16 - - - 3-T12 - - 2L-T8@5"

B18 9" 14" 2-T12 - - - 2-T16 - 1-T16 2L-T8@10"

B19 9" 14" 2-T12 - 1-T12 - 2-T16 1-T16 - 2L-T8@5",10",5"

B20 9" 9" 2-T12 - - - 2-T12 - - 2L-T8@4",6",4"

B21 9" 14" 2-T12 - 1-T12 - 2-T16 - - 2L-T8@5",10",5"

B22 9" 14" 2-T12 - - - 2-T16 - - 2L-T8@5",10",5"

B25,B26,B29,B30 9" 9" 2-T12 - - - 2-T12 - - 2L-T8@6"

B27 9" 14" 2-T16 1-T16 - - 3-T16 - - 2L-T10@5"

B28 9" 14" 2-T16 1-T16 - - 2-T16 1-T16 1-T16 2L-T8@5",10",5"

B31 9" 16" 2-T16 - 1-T16 - 2-T16 1-T16 - 2L-T8@5",12",5"


2-T16

B32 9" 16" 2-T16 - - - 2-T16 - - 2L-T8@12"


2-T16

B33 9" 14" 2-T12 1-T12 - - 2-T12 1-T12 1-T12 2L-T8@4",4",5"