You are on page 1of 15

SESSION PLAN

Sector : ELECTRONICS
Qualification Title : COMPUTER SYSTEMS SERVICING NCII
Unit of Competency : INSTALL AND CONFIGURE COMPUTER SYSTEMS
Module Title : INSTALLING AND CONFIGURING COMPUTER SYSTEMS
Learning Outcomes: At the end of the session, trainees must be able to:
LO 1. Assemble computer hardware
LO 2. Prepare installer
LO 3. Install operating system and drivers for peripherals/ devices
LO 4. Install application software
LO 5 Conduct testing and documentation

A. INTRODUCTION. This session covers the outcomes required in installing and configuring desktop and workstation computers systems. It consists of
competencies to assemble computer hardware, install operating system and drivers for peripherals/devices, and install application software as well as to
conduct testing and documentation.
B. LEARNING ACTIVITIES

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 2
NC II
MARFE C. INTENDENCIA
Revision # 0
LO 1. 1 Assemble Computer Hardware

Learning Content Methods Presentation Practice Feedback Resources Time

1.1. OH&S policies Individualized Trainee will read Trainee will Refer to answer *CBLM
and procedures learning information sheet 1.1-1 on Answer self – key 1.1-1 *Information sheet
“OH&S policies and check 1.1-1 *self-check
procedures” *answer key 1 hr.

Multimedia Trainee will view ppt slides Trainee will Compare trainee’s *ppt file
presentation with on OH&S policies and answer self responses to *Self-check
1 hr.
discussion procedures check1.1-1 answer key *Pc/ laptop
*Answer key

1.2 Tools, Individualized Trainee will read Trainee will Refer to answer CBLM* Information sheet
equipment and testing learning information sheet 1.1-2 on Answer self – key 1.1-2 *self-check
30
devices Tools, equipment and check 1.1-2 *answer key
mins.
testing devices
Trainee will read and Trainee will Trainee’s *Task sheet
interpret Task sheet 1.1-2 perform task performance will
*Performance criteria
“Identify Tools, equipment sheet 1.1-2 be evaluated
and testing devices. using *tools & equipment 15
performance devices mins
criteria checklist
1.1-2

Multimedia Trainee will view video clips Trainee will Compare trainee’s * video clips
presentation with on Tools, equipment and answer self responses to *Self-check
15
discussion testing devices chec1.1-2 answer key *Pc/ laptop
mins
*Answer key
Date Developed: Document No.
February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 3
NC II
MARFE C. INTENDENCIA
Revision # 0
demonstration Trainee will observe the Trainee will Evaluate output *checklist
advanced trainee’s perform return using *client
demonstration on Tools, demo on Tools, performance
equipment and testing equipment and criteria 1 hr
devices testing devices checklist 1.1-2
1.3. Procedures in Individualized Trainee will read Trainee will Refer to answer CBLM* Information sheet
Assembling Computer learning information sheet 1.1-3 on Answer self – key 1.1-3 *self-check
30 min
Hardware Procedures in Assembling checked 1.1-3 *answer key
Computer Hardware
Trainee will read and Trainee will Trainee’s *CBLM
interpret Job sheet 1.1-3 perform Job 1.1- performance will
*Task sheet
“ Assemble computer” 3 be evaluated
using *Performance criteria 30 min
performance * computer
criteria checklist
1.1-3
Multimedia Trainee will view video clip Trainee will Compare trainee’s * video clip
presentation with on assembling computer answer self responses to *Self-check
30 min
discussion checked1.1-3 answer key *Pc/ laptop
*Answer key
demonstration Trainee will observe the Trainee will Evaluate output *checklist
advanced trainee’s perform return using *client
1.5 hrs
demonstration on demo on performance *computer
assembling computer assembling criteria
computer checklist 1.1-3

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 4
NC II
MARFE C. INTENDENCIA
Revision # 0
1.4 Basic-input- Individualized Trainee will read Trainee will Refer to answer * CBLM
output-system (BIOS) learning information sheet 1.1-4 on Answer self – key 1.1-4 *Information sheet
30 min.
configuration Basic-input-output-system checked 1.1-4 *self-check
(BIOS) configuration *answer key

Trainee will read and Trainee will Trainee’s *Task sheet


interpret task sheet 1.1-4 perform task performance will
*Performance criteria 30 min
“Configure Basic-input- sheet 1.1-4 be evaluated
output-system (BIOS) using *computer
performance
criteria checklist
1.1-4
Multimedia Trainee will view video clip Trainee will Compare trainee’s * video clip
presentation with on Basic-input-output- answer self responses to *Self-check
30 min
discussion system (BIOS) configuration chec1.1-4 answer key *Pc/ laptop
*Answer key
demonstration Trainee will observe the Trainee will Evaluate output *checklist
advanced trainee’s perform return using *client
1.5 hrs
demonstration on demo on performance
Configure Basic-input- Configure Basic- criteria
output-system (BIOS input-output- checklist 1.1-4
system (BIOS)

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 5
NC II
MARFE C. INTENDENCIA
Revision # 0
LO. 2 Prepare installer
2.1 Creating portable Individualized learning Trainee will read Trainee will Refer to answer * CBLM
bootable devices information sheet 1.2-1 Answer self – key 1.2-1 *Information
30 min
on Creating portable checked 1.2-1 sheet
bootable devices *self-check
*answer key
Trainee will read and Trainee will Trainee’s *Task sheet
interpret task sheet 1.2-1 perform the performance will
*Performance
Creating portable activity task be evaluated
criteria
bootable devices sheet 1.2-1 using 30 min
performance *portable
criteria checklist devices
1.2-1
Multimedia presentation with Trainee will view video Trainee will Compare *video clip
discussion clip slides on Creating answer self- trainee’s *Self-check
30 min
portable bootable check 1.2-1 responses to *Pc/ laptop
devices answer key *Answer key
demonstration Trainee will observe the Trainee will Evaluate output *checklist
advanced trainee’s perform return using *client
demonstration on demo on performance *portable
Creating portable Creating criteria devices 1.5 hrs
bootable devices portable checklist 1.2-1
bootable
devices

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 6
NC II
MARFE C. INTENDENCIA
Revision # 0
2.2 Preparing Individualized learning Trainee will read Trainee will Refer to answer * CBLM
Customized installers information sheet 1.2-2 Answer self – key 1.2-2 *Information
30 min
on Preparing Customized checked 1.2-2 sheet
installers *self-check
*answer key
Trainee will read and Trainee will Trainee’s *Task sheet
interpret task sheet 1.2-2 perform the performance will
*Performance 30 min
Preparing Customized activity task be evaluated
criteria
installers sheet 1.2-2 using
performance installer devices
criteria checklist
1.2-2

Multimedia presentation with Trainee will view ppt Trainee will Compare *ppt file
discussion slides on Preparing answer self trainee’s *Self-check
1 hr
Customized installers chec1.2-2 responses to *Pc/ laptop
answer key *Answer key
2.3 Installing of Individualized learning Trainee will read Trainee will Refer to answer * CBLM
portable applications information sheet 1.2-3 Answer self – key 1.2-3 *Information
30 min
on Installing of portable checked 1.2-3 sheet
applications *self-check
*answer key
Trainee will read and Trainee will Trainee’s *Job sheet
interpret job sheet 1.2-3 perform the performance will
*Performance 30 min
Installing of portable activity task be evaluated
criteria
applications sheet 1.2-3 using
performance * installer
criteria checklist devices
1.2-3

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 7
NC II
MARFE C. INTENDENCIA
Revision # 0
Multimedia presentation with Trainee will view video Trainee will Compare * video clips
discussion clips on Installing of answer self trainee’s *Self-check
30 min
portable applications checked1.2-3 responses to *Pc/ laptop
answer key *Answer key
Demonstration Trainee will observe the Trainee will Evaluate output *checklist
advanced trainee’s perform return using *client
demonstration on demo on performance installer devices
Installing of portable Installing of criteria 2.5 hrs
applications portable checklist 1.2-3
applications
LO. . 3. Install operating system and drivers for peripherals/ devices

3.1 Installing Operating Individualized Learning Trainee will read Trainee will Refer to answer * CBLM
system (OS) information sheet 1.3-1 Answer self – key 1.3-1 *Information
30 min
on Installing Operating checked 1.3-1 sheet
system (OS) *self-check
*answer key
Trainee will read and Trainee will Trainee’s *job sheet
interpret job sheet 1.3- perform the performance
*Performance
1 Installing Operating activity task sheet will be
criteria
system (OS) 1.3-1 evaluated using 30 min
performance *installation
criteria checklist procedures
1.3-1
Multimedia presentation with Trainee will view ppt Trainee will Compare *video clip
discussion slides on Installing answer self trainee’s *Self-check
30 min
Operating system (OS) checked 1.3-1 responses to *Pc/ laptop
answer key *Answer key

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 8
NC II
MARFE C. INTENDENCIA
Revision # 0
Demonstration Trainee will observe the Trainee will Evaluate output *checklist
advanced trainee’s perform return using *client
1.5 hrs
demonstration on demo on Installing performance *installation
Installing Operating Operating system criteria procedures
system (OS) (OS) checklist 1.3-1
3.2 Installing and Individualized Learning Trainee will read Trainee will Refer to answer * CBLM
configuring information sheet 1.3-2 Answer self – key 1.3-2 *Information
30 min
Peripherals/devices on Installing and checked 1.3-2 sheet
drivers configuring *self-check
Peripherals/devices *answer key
drivers
Trainee will read and Trainee will Trainee’s *Task sheet
interpret task sheet 1.3- perform the performance
*Performance 30 min
2 activity task sheet will be
criteria
1.3-2 evaluated using
performance
criteria checklist
1.3-2
Multimedia presentation with Trainee will view video Trainee will Compare *video clip
discussion clip on Installing and answer self-check trainee’s *Self-check
30 min
configuring 1.3-2 responses to *Pc/ laptop
Peripherals/devices answer key *Answer key
drivers

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 9
NC II
MARFE C. INTENDENCIA
Revision # 0
Demonstration Trainee will observe the Trainee will Evaluate output *checklist
advanced trainee’s perform return using *client
demonstration on demo on Installing performance *installer
Installing and and configuring criteria procedures 1.5 hrs
configuring Peripherals/device checklist 1.3-2
Peripherals/devices s drivers
drivers
3.3 Accessing and Individualized Learning Trainee will read Trainee will Refer to answer * CBLM
installing OS and drivers information sheet 1.3-3 Answer self – key 1.3-3 *Information
30 min
on Accessing and checked 1.3-3 sheet
installing OS and drivers *self-check
*answer key
Trainee will read and Trainee will Trainee’s *Task sheet
interpret task sheet 1.3- perform the performance
*Performance
3 Accessing and activity task sheet will be
criteria
installing OS and drivers 1.3-3 evaluated using
performance *pictures
criteria checklist
1.3-3
Multimedia presentation with Trainee will view video Trainee will Compare *video clip
discussion clip on Accessing and answer self trainee’s *Self-check
30 min
installing OS and drivers checked1.3-3 responses to *Pc/ laptop
answer key *Answer key
Demonstration Trainee will observe the Trainee will Evaluate output *checklist
advanced trainee’s perform return using *client
1.5 hrs
demonstration on demo on performance *installation
Accessing and installing Accessing and criteria procedures
OS and drivers installing OS and checklist 1.3-3
drivers

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 10
NC II
MARFE C. INTENDENCIA
Revision # 0
3.4 Checking of the Individualized Learning Trainee will read Trainee will Refer to answer * CBLM
quality of the work information sheet 1.3-4 Answer self – key 1.3-4 *Information
on checking the quality checked 1.3-4 sheet
of the work *self-check 1 hr
*answer key

LO. 4. Install Application Software

4.1 Installing Application Individualized Learning Trainee will read Trainee will Answer Refer to * CBLM
software information sheet 1.4- self –checked 1.4-1 answer key 1.4- *Information
30 min
1on 1nstalling 1 sheet
Application software *self-check
*answer key
Trainee will read and Trainee will perform Trainee’s *Task sheet
interpret task sheet 1.4- the activity task performance
*Performance
1 1nstalling Application sheet 1.4-1 will be
criteria
software evaluated using 30 min
performance * video clip
criteria
checklist
1.4-1
Multimedia presentation with Trainee will view video Trainee will answer Compare * video clip
discussion clip on 1nstalling self checked1.4-1 trainee’s *Self-check
Application software responses to *Pc/ laptop
answer key *Answer key 30 min

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 11
NC II
MARFE C. INTENDENCIA
Revision # 0
Demonstration Trainee will observe the Trainee will perform Evaluate *checklist
advanced trainee’s return demo on output using *client
2.5 hr
demonstration on 1nstalling performance * installer
1nstalling Application Application software criteria procedures
software checklist 1.4-1
4.2 Installing Variation to Individualized Learning Trainee will read Trainee will Answer Refer to *CBLM
application software information sheet 1.4-2 self –checked 1.4-2 answer key 1.4- *Information
30 min
on Installing Variation to 2 sheet
application software *self-check
*answer key
Trainee will read and Trainee will perform Trainee’s *Task sheet
interpret task sheet 1.4- the activity task performance
*Performance
2 Installing Variation to sheet 1.4-2 will be
criteria
application software evaluated using 30 min
performance * installer
criteria procedures
checklist
1.4-2
Multimedia presentation with Trainee will view video Trainee will answer Compare * video clip
discussion clip on Installing self chec1.4-2 trainee’s *Self-check
Variation to application responses to *Pc/ laptop
software answer key *Answer key 30 min
Demonstration Trainee will observe the Trainee will perform Evaluate *checklist
advanced trainee’s return demo on output using *client
demonstration on Installing Variation performance installer
Installing Variation to to application criteria procedures 1.5 hrs
application software software checklist 1.4-2

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 12
NC II
MARFE C. INTENDENCIA
Revision # 0
4.3 Installing Software Individualized Learning Trainee will read Trainee will Answer Refer to * CBLM
updates information sheet 1.4-3 self –checked 1.4-3 answer key 1.4- *Information
30 min
on Installing Software 3 sheet
updates *self-check
*answer key
Trainee will read and Trainee will perform Trainee’s *Task sheet
interpret task sheet 1.4- the activity task performance
*Performance
3 Installing Software sheet 1.4-3 will be
criteria
updates evaluated using 30 min
performance * installer
criteria procedures
checklist
1.4-3
Multimedia presentation with Trainee will view video Trainee will answer Compare *video clip
discussion clips on Installing self check1.4-3 trainee’s *Self-check
Software updates responses to *PC/ laptop
answer key *Answer key 30 min
Demonstration Trainee will observe the Trainee will perform Evaluate *checklist
advanced trainee’s return demo on output using *client
demonstration on Installing Software performance installer
Installing Software updates criteria procedures 1.5 hrs
updates checklist 1.4-3

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 13
NC II
MARFE C. INTENDENCIA
Revision # 0
LO.5 Conduct Testing and Documentation

5.1 Testing Devices / Individualized Learning Trainee will read Trainee will Refer to * CBLM
systems and/or information sheet 1.5-1 Answer self – answer key 1.5- *Information
1 hr
installation on Testing Devices / checked 1.5-1 1 sheet
systems and/or *self-check
installation *answer key
Trainee will read and Trainee will Trainee’s *Task sheet
interpret task sheet 1.5-1 perform the performance
*Performance 1.5 hr
Testing Devices / systems activity task will be
criteria
and/or installation sheet 1.5-1 evaluated using
performance *
criteria
checklist
1.5-1
5.2 Conducting Stress Individualized Learning Trainee will read Trainee will Refer to * CBLM
test information sheet 1 .5-2 Answer self – answer key 1.5- *Information
2.5
on checked 1.5-2 2 sheet
*self-check hr
*answer key
5.3 5S and 3Rs Individualized Learning Trainee will read Trainee will Refer to *Information
information sheet 1.5- Answer self – answer key 1.5- sheet
2.5 hr
3on checked 1.5-3 3 *self-check
*answer key

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 14
NC II
MARFE C. INTENDENCIA
Revision # 0
5.4 Documentation in Individualized Learning Trainee will read Trainee will Refer to * CBLM
relation to the test information sheet 1.5-4 Answer self – answer key 1.5- *Information
30 min
on checked 1.5-4 4 sheet
*self-check
*answer key
Trainee will read and Trainee will Trainee’s *Task sheet
interpret task sheet 1.5 - perform the performance
*Performance 30 min
4 activity task will be
criteria
sheet 1.5-4 evaluated using
performance *pictures
criteria
checklist
1.5-4
Demonstration Trainee will observe the Trainee will Evaluate *checklist
advanced trainee’s perform return output using *client
1.5 hr
demonstration on demo on performance
criteria
checklist 1.5-4

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 15
NC II
MARFE C. INTENDENCIA
Revision # 0
C. ASSESSMENT PLAN

Written Test on: Assemble computer hardware, Prepare installer, Install operating system and drivers for peripherals/ devices, Install application software
Conduct testing and document

Oral Questioning on : Assemble computer hardware, Prepare installer, Install operating system and drivers for peripherals/ devices, Install application software

Performance Test on: Assemble computer hardware

NOTE: Written test and oral Interview will be conducted inside the TVE building.
Performance Test will be conducted inside the Computer Laboratory

D. TEACHER’S SELF-REFLECTION OF THE SESSION


Trainees/students who can perform the standard requirement of the qualification shall be competent (C) while trainees/students who cannot perform within the
standard requirement of the qualification shall be not competent (NC) in his/her rating. Trainees/students who can be proved competent have greater
opportunity here and abroad.

Date Developed: Document No.


February 5, 2018 Issued by:
COMPUTER SYSTEMS Date Revised:
SERVICING
Developed by: Page 16
NC II
MARFE C. INTENDENCIA
Revision # 0

You might also like