BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 1 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-027-VI-3G-277
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 2 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-027-VI-3G-545
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 3 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-027-VI-3G-549
Filler Metal: EN ISO 14341-A G3Si1 (ER 70S-6) Trade Name: ESAB
Size: 1.0 mm LOT NO : 1686180
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 4 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-027-VI-3G-574
Filler Metal: EN ISO 14341-A G3Si1 (ER 70S-6) Trade Name: ESAB
Size: 1.0 mm LOT NO : 1686180
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 5 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-027-VI-3G-584
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 6 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-597
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 7 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-027-VI-3G-605
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 8 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-607
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 9 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-646
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 10 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-655
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 07/02/2018
Page 11 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-673
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 12 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-689
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 13 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-691
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 14 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-710
Filler Metal: EN ISO 14341-A G3Si1 (ER 70S-6) Trade Name: ESAB
Size: 1.0 mm LOT NO : 1686180
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Welding and found satisfactory.
Signature
Date 06/02/2018
Page 15 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-711
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 16 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-758
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 17 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FME-STR-001
Report No: FRJ-PQR-003-VI-3G-759
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 18 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-760
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 19 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-786
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 20 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-803
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 21 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-855
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018
Page 22 of 24
Welder Perfomance Weld Visual Inspection Report
Form NO.: FRJ-STR-001
Report No: FRJ-PQR-003-VI-3G-821
JOINT DETAILS
BW/3G
b. Visual Inspection was carried out after completion of Root welding and found satisfactory.
c. Visual Inspection was carried out after completion of Capping and found satisfactory.
Signature
Date 06/02/2018