PROJECT/JOB NO. FOUND. OIL STORAGE TANK
PROJECT/JOB NAME CAL. FOUND. OIL STORAGE TANK
CLIENT NAME PT. SELE RAYA BELIDA
SITE NAME BLOCK BELIDA - SUNGAI ANGGUR
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME FOUND. OIL STORAGE TANK
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D
FOUNDATION LISTS
Group Name No. Description No. Description
FOUND. OIL STORAGE 1 F1
CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING DATA
3.2 PIER DATA
3.3 SECTION DATA
3.4 LOAD CASE
3.5 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE
1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL
- Pile Capacity
Items Value
Pile Name PHC Pile
Footing List F1
Diameter 250 mm
Length 6m
Thick 250 mm
Shape Square
Capacity ( Ha , Ua , Va ) 13.8 , 20.8 , 26.8 tonf
2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH
REFERENCE DWGS
NO. DWG NO. DWG TITLE
A01
NOTES
* OUTPUT UNIT : mm
01 1
F1
FOUNDATION LOCATION PLAN
SQUAD CHECK
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.
AS SHOWN
FOUND. OIL STORAGE TANK
OUTPUT UNIT : mm
REFERENCE DWGS
NO. DWG NO. DWG TITLE
6600 CL FOOTING
3300 TOP BOTTOM
TYP.
50
500
1500
D16@150
D16@150
3000
2000
NOTES
500
* PILE
450 450 D16@150
4-¡à250 PHC Pile
5700 D16@150 * ANCHOR BOLT
1X4-M12 ANC. BOLTS (TYPE TYPE L)
100 75
F1
SQUAD CHECK
100
150
SECTION
SCALE JOB NO. MICROFILM NO.
3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mmFt. Name F1
Ft. Type
2
Area 19.800 m
Ft. Thickness 500.00 mm
3
Ft. Volume 9.900 m
6600 Ft. Weight 23.760 tonf
Soil Height 150.00 mm
3
Soil Volume 2.970 m
Soil Weight 4.752 tonf
3000
150
500
6600
3000
2
Direction All Direct Section Area 19.800 m
3
F.Volume 9.900 m F.Weight 23.760 tonf
3
S.Volume 2.970 m S.Weight 4.752 tonf
Pier Wt 0.000 tonf Total Weight 28.512 tonf
3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
201 0.000 0.000 -28.512 0.000 0.000 3300.0 , 1500.0
202 0.210 0.520 -29.352 -0.260 0.105 3300.0 , 1500.0
203 1.707 1.707 -29.352 -0.854 0.854 3300.0 , 1500.0
204 0.000 0.000 -31.142 0.000 0.000 3300.0 , 1500.0
F1 p
205 0.210 0.520 -31.142 -0.260 0.105 3300.0 , 1500.0
206 1.707 1.707 -31.142 -0.854 0.854 3300.0 , 1500.0
207 0.052 0.130 -31.342 -0.065 0.026 3300.0 , 1500.0
208 0.000 0.000 -31.342 0.000 0.000 3300.0 , 1500.0
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Uni-Axial)
4.1.1 Formula
if footing is checked in Buoyancy SFz means SFz - Fb
SFz SMy X SFz SMx Y
- Uni Axial : Rx = , Ry =
S Xi S Yi
2 2
Np Np
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va => OK
Max(SHxi , SHyi)
b. Horizontal - Hmax = < Ha => OK
Np
c. Uplift - Uf < Ua => OK
Ver. / Uf. = Vertical / Uplift
Unit( tonf )
Ft.Name L.Comb. Pile R Max R Min Ru Uf Ra Ua Result
X-Dir 7.86 7.711
F1 206 PHC Pile 7.999 0 26.8 20.8 OK
Y-Dir 7.999 7.572
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
2
Unit(kgf/cm ,mm)
f(Flexure) f(Shear) fck fy1 fy2 f_cl f_clt fp_clb
0.9 0.85 186.75 4000.00 4000.00 50.0 75.0 150.0
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd
2 , f = 0.9 , r.req =
fy
1- 1- (
0.85fck )
5.2.2 Check of Footing Reinforcement
Footing Name : F1 GroupType : Isolated
- X direction (All Width)
Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2
Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2
3000
1 2
SFz SMy Moment intia 4
-29.352 tonf 0.168 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 41.911 tonf-m , Mutop = 0 tonf-m
00
00
33
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
58.59 58.82
[B.M.D] [ tonf-m ]
-41.9
-31.4
-21
-10.5
0
10.5
21
31.4 36.73 36.88
41.91
41.9
[B/L.M.D] [ tonf-m / ft ]
-14
-10.5
-7
-3.5
0
3.5
7
10.5 12.24 12.29
13.97
14
3000
1 2
SFz SMy Moment intia 4
-29.352 tonf 1.195 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 42.424 tonf-m , Mutop = 0 tonf-m
00
00
33
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
57.87 59.54
[B.M.D] [ tonf-m ]
-42.4
-31.8
-21.2
-10.6
0
10.6
21.2
31.8 36.28 37.33
42.42
42.4
[B/L.M.D] [ tonf-m / ft ]
-14.1
-10.6
-7.1
-3.5
0
3.5
7.1
10.6 12.09 12.44
14.14
14.1
3000
1 2
SFz SMy Moment intia 4
-32.194 tonf 0.000 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 45.876 tonf-m , Mutop = 0 tonf-m
00
00
33
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
64.39 64.39
[B.M.D] [ tonf-m ]
-45.9
-34.4
-22.9
-11.5
0
11.5
22.9
34.4 40.37 40.37
45.88
45.9
[B/L.M.D] [ tonf-m / ft ]
-15.3
-11.5
-7.6
-3.8
0
3.8
7.6
11.5 13.46 13.46
15.29
15.3
3000
1 2
SFz SMy Moment intia 4
-31.668 tonf 0.084 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 45.168 tonf-m , Mutop = 0 tonf-m
00
00
33
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
63.28 63.39
[B.M.D] [ tonf-m ]
-45.2
-33.9
-22.6
-11.3
0
11.3
22.6
33.9 39.67 39.75
45.17
45.2
[B/L.M.D] [ tonf-m / ft ]
-15.1
-11.3
-7.5
-3.8
0
3.8
7.5
11.3 13.22 13.25
15.06
15.1
3000
1 2
SFz SMy Moment intia 4
-30.879 tonf 0.137 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 44.071 tonf-m , Mutop = 0 tonf-m
00
00
33
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
61.66 61.85
[B.M.D] [ tonf-m ]
-44.1
-33.1
-22
-11
0
11
22
33.1 38.66 38.78
44.07
44.1
[B/L.M.D] [ tonf-m / ft ]
-14.7
-11
-7.3
-3.7
0
3.7
7.3
11 12.89 12.93
14.69
14.7
3000
1 2
SFz SMy Moment intia 4
-31.668 tonf 1.195 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 45.724 tonf-m , Mutop = 0 tonf-m
00
00
33
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
62.5 64.17
[B.M.D] [ tonf-m ]
-45.7
-34.3
-22.9
-11.4
0
11.4
22.9
34.3 39.19 40.24
45.72
45.7
[B/L.M.D] [ tonf-m / ft ]
-15.2
-11.4
-7.6
-3.8
0
3.8
7.6
11.4 13.06 13.41
15.24
15.2
3000
1 2
SFz SMy Moment intia 4
-30.879 tonf 1.195 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 44.6 tonf-m , Mutop = 0 tonf-m
00
00
33
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
60.92 62.6
[B.M.D] [ tonf-m ]
-44.6
-33.4
-22.3
-11.1
0
11.1
22.3
33.4 38.2 39.25
44.6
44.6
[B/L.M.D] [ tonf-m / ft ]
-14.9
-11.2
-7.4
-3.7
0
3.7
7.4
11.2 12.73 13.08
14.87
14.9
3000
1 2
SFz SMy Moment intia 4
-31.059 tonf 0.168 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 44.343 tonf-m , Mutop = 0 tonf-m
00
00
33
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
62 62.24
[B.M.D] [ tonf-m ]
-44.3
-33.3
-22.2
-11.1
0
11.1
22.2
33.3 38.87 39.02
44.34
44.3
[B/L.M.D] [ tonf-m / ft ]
-14.8
-11.1
-7.4
-3.7
0
3.7
7.4
11.1 12.96 13.01
14.78
14.8
3000
1 2
SFz SMx Moment intia 4
-29.352 tonf -0.416 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 14.884 tonf-m , Mutop = 0 tonf-m
00
00
15
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
57.87 59.54
[B.M.D] [ tonf-m ]
-14.9
-11.2
-7.4
-3.7
0
3.7
7.4 9.52 9.79
11.2
14.88
14.9
[B/L.M.D] [ tonf-m / ft ]
-2.3
-1.7
-1.1
-0.6
0
0.6
1.1 1.44 1.48
1.7
2.25
2.3
3000
1 2
SFz SMx Moment intia 4
-29.352 tonf -1.195 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 15.274 tonf-m , Mutop = 0 tonf-m
00
00
15
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
56.31 61.09
[B.M.D] [ tonf-m ]
-15.3
-11.5
-7.6
-3.8
0
3.8
7.6 9.26 10.05
11.5
15.27
15.3
[B/L.M.D] [ tonf-m / ft ]
-2.3
-1.7
-1.2
-0.6
0
0.6
1.2 1.4 1.52
1.7
2.31
2.3
3000
1 2
SFz SMx Moment intia 4
-32.194 tonf 0.000 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 16.097 tonf-m , Mutop = 0 tonf-m
00
00
15
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
64.39 64.39
[B.M.D] [ tonf-m ]
-16.1
-12.1
-8
-4
0
4
8 10.59 10.59
12.1
16.1
16.1
[B/L.M.D] [ tonf-m / ft ]
-2.4
-1.8
-1.2
-0.6
0
0.6
1.2 1.6 1.6
1.8
2.44
2.4
3000
1 2
SFz SMx Moment intia 4
-31.668 tonf -0.208 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 15.938 tonf-m , Mutop = 0 tonf-m
00
00
15
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
62.92 63.75
[B.M.D] [ tonf-m ]
-15.9
-12
-8
-4
0
4
8 10.35 10.49
12
15.94
15.9
[B/L.M.D] [ tonf-m / ft ]
-2.4
-1.8
-1.2
-0.6
0
0.6
1.2 1.57 1.59
1.8
2.41
2.4
3000
1 2
SFz SMx Moment intia 4
-30.879 tonf -0.338 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 15.608 tonf-m , Mutop = 0 tonf-m
00
00
15
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
61.08 62.43
[B.M.D] [ tonf-m ]
-15.6
-11.7
-7.8
-3.9
0
3.9
7.8 10.05 10.27
11.7
15.61
15.6
[B/L.M.D] [ tonf-m / ft ]
-2.4
-1.8
-1.2
-0.6
0
0.6
1.2 1.52 1.56
1.8
2.36
2.4
3000
1 2
SFz SMx Moment intia 4
-31.668 tonf -1.195 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 16.432 tonf-m , Mutop = 0 tonf-m
00
00
15
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
60.95 65.73
[B.M.D] [ tonf-m ]
-16.4
-12.3
-8.2
-4.1
0
4.1
8.2 10.02 10.81
12.3
16.43
16.4
[B/L.M.D] [ tonf-m / ft ]
-2.5
-1.9
-1.2
-0.6
0
0.6
1.2 1.52 1.64
1.9
2.49
2.5
3000
1 2
SFz SMx Moment intia 4
-30.879 tonf -1.195 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 16.037 tonf-m , Mutop = 0 tonf-m
00
00
15
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
59.37 64.15
[B.M.D] [ tonf-m ]
-16
-12
-8
-4
0
4
8 9.77 10.55
12
16.04
16
[B/L.M.D] [ tonf-m / ft ]
-2.4
-1.8
-1.2
-0.6
0
0.6
1.2 1.48 1.6
1.8
2.43
2.4
3000
1 2
SFz SMx Moment intia 4
-31.059 tonf -0.416 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Mubottom = 15.738 tonf-m , Mutop = 0 tonf-m
00
00
15
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
61.29 62.95
[B.M.D] [ tonf-m ]
-15.7
-11.8
-7.9
-3.9
0
3.9
7.9 10.08 10.35
11.8
15.74
15.7
[B/L.M.D] [ tonf-m / ft ]
-2.4
-1.8
-1.2
-0.6
0
0.6
1.2 1.53 1.57
1.8
2.38
2.4
Unit : mm
6600
3000
2370
6006
3000
1 2
SFz SMy Moment intia 4
-29.352 tonf 0.168 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -14.706 tonf
00
06
00
33
60
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
58.59 58.82
[S.F.D] [ tonf ]
14.65
14.7
11
7.4
3.7
0
-3.7
-7.4
-11
-14.71
-14.7
[S/L.F.D] [ tonf / ft ]
4.88
4.9
3.7
2.5
1.2
0
-1.2
-2.5
-3.7
-4.9
-4.9
3000
1 2
SFz SMy Moment intia 4
-29.352 tonf 1.195 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -14.885 tonf
00
06
00
33
60
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
57.87 59.54
[S.F.D] [ tonf ]
14.9 14.47
11.2
7.4
3.7
0
-3.7
-7.4
-11.2
-14.89
-14.9
[S/L.F.D] [ tonf / ft ]
5 4.82
3.7
2.5
1.2
0
-1.2
-2.5
-3.7
-4.96
-5
3000
1 2
SFz SMy Moment intia 4
-32.194 tonf 0.000 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -16.097 tonf
00
06
00
33
60
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
64.39 64.39
[S.F.D] [ tonf ]
16.1
16.1
12.1
8
4
0
-4
-8
-12.1
-16.1
-16.1
[S/L.F.D] [ tonf / ft ]
5.37
5.4
4
2.7
1.3
0
-1.3
-2.7
-4
-5.37
-5.4
3000
1 2
SFz SMy Moment intia 4
-31.668 tonf 0.084 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -15.849 tonf
00
06
00
33
60
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
63.28 63.39
[S.F.D] [ tonf ]
15.82
15.8
11.9
7.9
4
0
-4
-7.9
-11.9
-15.85
-15.8
[S/L.F.D] [ tonf / ft ]
5.27
5.3
4
2.6
1.3
0
-1.3
-2.6
-4
-5.28
-5.3
3000
1 2
SFz SMy Moment intia 4
-30.879 tonf 0.137 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -15.463 tonf
00
06
00
33
60
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
61.66 61.85
[S.F.D] [ tonf ]
15.41
15.5
11.6
7.7
3.9
0
-3.9
-7.7
-11.6
-15.46
-15.5
[S/L.F.D] [ tonf / ft ]
5.14
5.2
3.9
2.6
1.3
0
-1.3
-2.6
-3.9
-5.15
-5.2
3000
1 2
SFz SMy Moment intia 4
-31.668 tonf 1.195 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -16.044 tonf
00
06
00
33
60
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
62.5 64.17
[S.F.D] [ tonf ]
16 15.62
12
8
4
0
-4
-8
-12
-16.04
-16
[S/L.F.D] [ tonf / ft ]
5.3 5.21
4
2.7
1.3
0
-1.3
-2.7
-4
-5.35
-5.3
3000
1 2
SFz SMy Moment intia 4
-30.879 tonf 1.195 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -15.649 tonf
00
06
00
33
60
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
60.92 62.6
[S.F.D] [ tonf ]
15.6 15.23
11.7
7.8
3.9
0
-3.9
-7.8
-11.7
-15.65
-15.6
[S/L.F.D] [ tonf / ft ]
5.2 5.08
3.9
2.6
1.3
0
-1.3
-2.6
-3.9
-5.22
-5.2
3000
1 2
SFz SMy Moment intia 4
-31.059 tonf 0.168 tonf-m 71.8740 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -15.559 tonf
00
06
00
33
60
66
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
62 62.24
[S.F.D] [ tonf ]
15.5
15.6
11.7
7.8
3.9
0
-3.9
-7.8
-11.7
-15.56
-15.6
[S/L.F.D] [ tonf / ft ]
5.17
5.2
3.9
2.6
1.3
0
-1.3
-2.6
-3.9
-5.19
-5.2
3000
1 2
SFz SMx Moment intia 4
-29.352 tonf -0.416 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -14.884 tonf
00
70
00
15
23
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
57.87 59.54
[S.F.D] [ tonf ]
[S/L.F.D] [ tonf / ft ]
3000
1 2
SFz SMx Moment intia 4
-29.352 tonf -1.195 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -15.274 tonf
00
70
00
15
23
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
56.31 61.09
[S.F.D] [ tonf ]
[S/L.F.D] [ tonf / ft ]
3000
1 2
SFz SMx Moment intia 4
-32.194 tonf 0.000 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -16.097 tonf
00
70
00
15
23
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
64.39 64.39
[S.F.D] [ tonf ]
16.1 16.1
16.1
12.1
8
4
0
-4
-8
-12.1
-16.1
-16.1
[S/L.F.D] [ tonf / ft ]
2.44 2.44
2.4
1.8
1.2
0.6
0
-0.6
-1.2
-1.8
-2.44
-2.4
3000
1 2
SFz SMx Moment intia 4
-31.668 tonf -0.208 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -15.938 tonf
00
70
00
15
23
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
62.92 63.75
[S.F.D] [ tonf ]
15.73 15.73
15.9
12
8
4
0
-4
-8
-12
-15.94
-15.9
[S/L.F.D] [ tonf / ft ]
2.38 2.38
2.4
1.8
1.2
0.6
0
-0.6
-1.2
-1.8
-2.41
-2.4
3000
1 2
SFz SMx Moment intia 4
-30.879 tonf -0.338 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -15.608 tonf
00
70
00
15
23
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
61.08 62.43
[S.F.D] [ tonf ]
[S/L.F.D] [ tonf / ft ]
3000
1 2
SFz SMx Moment intia 4
-31.668 tonf -1.195 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -16.432 tonf
00
70
00
15
23
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
60.95 65.73
[S.F.D] [ tonf ]
[S/L.F.D] [ tonf / ft ]
3000
1 2
SFz SMx Moment intia 4
-30.879 tonf -1.195 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -16.037 tonf
00
70
00
15
23
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
59.37 64.15
[S.F.D] [ tonf ]
16 14.84 14.84
12
8
4
0
-4
-8
-12
-16.04
-16
[S/L.F.D] [ tonf / ft ]
3000
1 2
SFz SMx Moment intia 4
-31.059 tonf -0.416 tonf-m 14.8500 m 3 4
Area 2 Contact Area Critical Point Method
19.800 m Critical Max Point
Critical Value
Vu = -15.737 tonf
00
70
00
15
23
30
0
[ mm ]
[Loading]
[ tonf , tonf/m ]
61.29 62.95
[S.F.D] [ tonf ]
[S/L.F.D] [ tonf / ft ]
2
Ft.Name F1 Punching Area 3505.232 cm
Pile No. 2 bc / as 1 / 40
d 342.05mm Result OK