You are on page 1of 4

TIME SCHEDULE-POOJAMODIA

DURATION
JOB NO. DESCRIPTION SOFTWARE ( IN HOUR)

WEEK 1

DAY 1-SUNDAY (6 NOVEMBER 2016)

Modification in Kitchen layout,PDF and Mail to Auto CAD


281 1
concern person Out Look
Amea Plan Finalization (In terms of Space
Division)

Partition Layout-Glass
346 Auto CAD 8.75

Reviewing the Drawings From Client (Chacking


Services, Sections and Further Details)

Modification in Al Jinahi Door Details and Auto CAD


294 1
Coordinating with concerned Person Out Look

REMARKS - TARGET ACHIEVED 10.25

DAY 2-MONDAY (7 NOVEMBER 2016)

Floor Finishing Plan

Flase Ceiling (Coordinationg with Ms. Jinane)


Lighting Layout (Coordinationg with Ms.
Jinane)
Auto CAD
346 Modification in Plan and Partition (Meeting 9
Rooms)
Preparing Drawings and Layouts for Meeting

Basic Section and AC Diffusers Layout

Coordinating With 3D person Out Look

REMARKS - AC Diffusers Layout (Auto CAD Too Slow) 9

DAY 3-TUESDAY (8 NOVEMBER 2016)

Floor Finishing Plan

Flase Ceiling (Coordinationg with Ms. Jinane)

Lighting Layout (Coordinationg with Ms.


Jinane)
Auto CAD
346 Modification in Plan and Partition (Meeting 9
Rooms)
Auto CAD
346 9

Preparing Drawings and Layouts for Meeting

Basic Section and AC Diffusers Layout

Coordinating With 3D person Out Look


REMARKS - AC Diffusers Layout (Auto CAD Too Slow) 9

DAY 4-WEDNESDAY (9 NOVEMBER 2016)

Fixinf Auto CAD Auto CAD 2

Partition Layout-Glass Auto CAD 3

Wall Cladding Details Auto CAD 1.5

346
Coordinating with Intact for Glass Partition Out Look 0.5
Details

Incorporating Interior Details to the File Auto CAD 3.25


Received From Client

Coordinating with Hani for 3D and Ms Jinane. Out Look __

REMARKS - Modifications In the Over All Layout 10.25

DAY 5-THURSDAY (10 NOVEMBER 2016)

Partition Htch 1

Updates in plan and PDF for Client 1

Fixing Auto CAD and Preparing Plan for the Auto CAD
2
services
346
Redrafting Ceiling (As it make the file very
heavy and cannot be xreffed to any other 5
Drawing))

AC Diffuser Layout 1.5

Coordinating with Hani for 3D and Ms Jinane. Out Look 0.5

REMARKS - Ceiling Layout Almost Finalised 10


WEEK 2

DAY 1-SUNDAY (13 NOVEMBER 2016)

Time Sheet and Time schedule Excel 0.5

Discussion and Material Selection ____ 1.5

Changes as per client's request (Furniture,


Ceiling, Flooring, Lighting, Space Division, Area Auto CAD 3.5
Updates)
346
Preparing color code plan Auto CAD 2
Presentation Power Point 1.5
Presentation PDF Adobe Acrobat 0.5

Coordinating with Hani for 3D and Ms Jinane. Out Look 0.5

REMARKS - Updates in plan and presentation 10

DAY 2-MONDAY (14 NOVEMBER 2016)

Working For AMEA Presentation Drawings Auto CAD 1.5

Printing Drawings For Presentation ____ 0.5

Location Of AC Diffussers Auto CAD 2

Revision in False Ceiling Auto CAD 0.5


346
Changes in Design as per Client's Request (Staff
Area, Prayer Room, Furniture layout for some Auto CAD 2
Offices, Small Partition changes)

Coordination with Nabeel and Jes for Services Auto CAD 1.5

Coordinating with Hani for 3D and Ms Jinane. Out Look 0.5

Updating Presentation Drawing as per the Auto CAD 1.5


meeting

REMARKS - Updates in plan and presentation 10

DAY 3-TUEsDAY (15 NOVEMBER 2016)


Revising Base Finishing Layout Auto CAD 2.5

Locating North, Updating Title Block and Auto CAD 1.5


sending Partition plan to Manoj Hawana

346 Preparing Elevation Of Hot Desk Area and Auto CAD, outlook 2
Lighting Selection for hani
346

Preparing Files to send it to clients with all Auto CAD 2.5


Modification as required
Write up and Area Calculation for Saif ___ 1
REMARKS - Updates in plan and presentation 9.5
DAY 3-TUESDAY (15 NOVEMBER 2016)

Revising Base Finishing Layout Auto CAD 2.5


Locating North, Updating Title Block and Auto CAD 1.5
sending Partition plan to Manoj Hawana
Preparing Elevation Of Hot Desk Area and
346 Auto CAD, outlook 2
Lighting Selection for hani
Preparing Files to send it to clients with all Auto CAD 2.5
Modification as required

Write up and Area Calculation for Saif ___ 1

REMARKS - Updates in plan and presentation 9.5


DAY 4-WEDNESDAY (16 NOVEMBER 2016)

Preparing Drop Box Link For Al Dah Full Set Of Out Look 1
Interior Draeing and Sendin to Ms. Jinane

Preparing Flooring Legend Auto CAD 2


346 Deciding size for the layouts Auto CAD 2.5
Make Layout A0 as Finalized Auto CAD 1.75
Preparing Lighting Legend ___ 1.75
Updates To Hani Outlook 0.5
REMARKS - Updates in plan and presentation 9.5
DAY 5-THRUSDAY (17 NOVEMBER 2016)
Chairman's Room Detail Drawing and Layout Auto CAD 1
Preparing Legends (Partition, Wall Cladding, Auto CAD 2
Ceiling)
Printing For Mr. Shadi-Discussion ____ 0.5
346 Preparing Tags Auto CAD 1
Revising Legends ___ 1.25
General Section Auto CAD 1

Revising General Layout (Admin, HR, Hot Desk, Auto CAD 1.5
Staff Area 1 to waiting and Lounge)

320 Preparing Tender Drawings Auto CAD 2

REMARKS - Updates in plan and presentation 10.25

You might also like