11071 EXCAVACION A MANO EN TERRENO INVESTIGADO E/OBRA CUALQ. A,B 1-5 Z1 2 26.50 0.80 1.00 42.40
PROF. INCL. AFINE DE TALUDES Y ACARREO DENTRO Y FUERA DE 1,5 A-B Z2 2 7.20 0.90 1.00 12.96
LA OBRA DE MATERIAL NO UTILIZADO. 2,3,4 A-B Z3 3 7.20 1.00 1.00 21.60
NOTA: EN CASO DE EXISTIR DESPALMES SE CONSIDERARA HASTA UN RODAPIE BANQ. 1 24.76 0.35 0.46 3.99 FRENTE
75% DE MATERIAL UTIL. RODAPIE BANQ. 2 0.675 0.35 0.46 0.22 COSTADOS
SE COBRARA 60.88 M3 60.88 M3 (MATERIAL UTIL) + 20.29 M3 DESPERDICIADO
M3
11101 PLANTILLA CONCRETO HECHO E/OBRA FC=100KG/CM2. 6 CM.ESP A,B 1-5 Z1 2 26.50 0.80 42.40
1,5 A-B Z2 2 7.20 0.90 12.96
2,3,4 A-B Z3 3 7.20 1.00 21.60
FRENTE RODAPIE BANQ. 1 24.76 0.35 8.67
COSTADOS RODAPIE BANQ. 2 0.675 0.35 0.47
M2
11131 SUM Y RELLENO MAT. INERTE COMPACT. C/PISON Y AGUA E/CAPAS A-B 1-5 INT. AULA 4 7.79 5.86 0.15 27.39
20CM.ESP.INCL.ACARREO DENTRO (VOL. EN AREA DE DESPALME) > A-B 1-2, 4-5 INT. AULA 2 7.20 5.05 0.25 18.18
DE OBRA MEDIR COMPACT. (VOL. EN AREA DE DESPALME) > A-B 2-4 INT. AULA 2 7.20 5.00 0.25 18.00
BANQ. 1 24.26 0.775 0.40 7.52
NOTA: POR DESPLAME, SE CONSIDERARA HASTA 25CM DE ESPESOR DE 71.09
RELLENO VOLUMEN MATERIAL UTIL CONCEPTO 11071 60.88
RELLENO Y COMPACTACION CONCEPTO 11121 -52.83
MATERIAL UTIL DISPONIBLE: 8.05 -8.05
M3
12010 CONCRETO FC=250KG/CM2 EN CIMENTACION TMA 3/4" INCLUYE: A,B 1-5 Z1 2 26.30 0.60 0.15 4.73
NUMEROS GENERADORES
12021 CIMBRA EN CIMENTACION CON MADERA DE PINO 3a ACABADO A,B 1-5 Z1 2 26.30 EXTERIOR 0.15 7.89
COMUN INCL. CIMBRADO Y DESCIMBRADO A,B 1-5 Z1 2 22.50 INTERIOR 0.15 6.75
A,B 1-5 Z1 4 0.60 TAPAS 0.15 0.36
1,2,3,4,5 A-B Z2 y Z 3 10 7.40 CARAS 0.15 11.10
A,B 1-5 CT1 2 26.30 EXTERIOR 0.35 18.41
A,B 1-5 CT1 2 25.60 INTERIOR 0.35 17.92
A-B 1-5 CT1 4 0.21 TAPAS 0.35 0.29
1,2,3,4,5 A-B CD 10 7.79 CARAS 0.35 27.27
M2
12032 ACERO REFUERZO E/CIMENTACION #2 ALAMBRON FY=2530KG/CM2, A,B 1-5 CT1 154 x 2 0.96 2 0.251 74.22
INC. SUM., HABILIT. ARM., TRASLAPES, GANCHOS Y DESPERDIC. 1,2,3,4,5 A-B CD 39 x 5 0.82 2 0.251 40.13
KG
12034 ACERO REFUERZO EN CIMENTACION #3 FY=4200 KG/CM2 INCLUYE: A,B 1-5 Z1 3 x 2 26.26 3 0.557 87.76
SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, SILLETAS, A,B 1-5 Z1 90 x 2 0.56 3 0.557 56.15
GANCHOS Y DESPERDICIOS. 1,2,3,4,5 A-B Z2 y Z 3 5 x 4 8.56 3 0.557 95.36
1,2 A-B Z2 36 x 2 0.66 3 0.557 26.47
3,4,5 A-B Z3 36 x 3 0.76 3 0.557 45.72
1,2,3,4,5 A-B CD 5 x 4 8.17 3 0.557 91.01
ANCLAJES K, K1 40 x 4 0.40 3 0.557 35.65
KG
12035 ACERO REFUERZO DIAMETRO#4 Fy=4200KG/CM2 INCL.SUMINISTRO, A,B 1-5 CT1 4 x 2 26.26 4 0.996 209.24
HABILITADO, ARMADO, TRASLAPES, SILLETAS, GANCHOS Y DESP. ANCLAJES K2 5 x 4 0.50 4 0.996 9.96
KG
12076 MURETE ENRASE E/CIMENT.C/TABIQUE CONCR. 15x20x40CM ASENT. 1,2,3,4,5 A-B CAB 5 7.24 0.69 24.98
C/MORTERO CEM-ARE 1:5, 15CM.ESP FRENTE RODAPIE BANQ. 1 24.56 0.33 8.10
COSTADOS RODAPIE BANQ. 2 0.775 0.33 0.51
M2
02 ESTRUCTURA
21110 CIMBRA P/LOSAS ACAB. APARENTE C/TRIPLAY DE PINO 16MM INC. A-B 1-5 PLAFOND 1 25.20 10.56 266.11
NUMEROS GENERADORES
21201 ACERO REFUERZO E/ESTRUCT. C/ALAMBRON FY=2530KG/CM2 INC. A-B 1-5 T1 162 x 2 1.04 2 0.251 84.58
SUM., HABILIT., ARMADO, TRASL., GANCHOS SILLETAS Y DESPER. 1,2,3,4,5 A-B CD2 40 x 5 0.52 2 0.251 26.10
KG
21203 ACERO REFUERZO E/ESTRUCT.#3 FY=4200 KG/CM2 INCL. SUMINIS- ESTRIBOS T2 202 1.34 3 0.557 150.77
TRO, HABILIT., ARMADO,TRASLAPES,SILLET.GANCHOS Y DESPER. RFZOS EXTREMOS T2 2 x 2 2.01 3 0.557 4.48
ADICIONALES T2 2 25.02 3 0.557 27.87
TIMPANO 1,2,3,4,5 A-B VERTICAL 32 x 5 1.97(PROM) 3 0.557 175.57
TIMPANO 1,2,3,4,5 A-B HORIZONTAL 6 x 5 5.69(PROM) 3 0.557 95.08
LOSA LONGITUDINAL 13 VAR x ALERO RECTAS 13 x 2 25.16 3 0.557 364.37
5 VAR x ALERO DOBLADAS 5 x 2 25.32 3 0.557 141.03
16VAR x CABECERO BASTONES VOLADOS 16 x 2 1.58 3 0.557 28.16
16VAR x EJE BASTONES INTERMEDIOS 16 x 3 2.00 3 0.557 53.47
LOSA TRANSVERSAL 24VAR x ENTREEJE RECTAS 24 x 4 5.64 3 0.557 301.58
6VAR x CABECERO RECTAS 6 x 2 5.64 3 0.557 37.70
8VAR x ENTREEJE DOBLADAS 8 x 4 10.54 3 0.557 187.86
28VAR x ENTREEJE BASTONES VOLADOS 28 x 4 2.18 3 0.557 136.00
14VAR x ENTREEJE BASTONES CENTRALES 14 x 4 2.00 3 0.557 62.38
ANCLAJES K, K1 40 x 4 0.35 3 0.557 31.19
KG
21204 ACERO REFUERZO E/ESTRUCT.#4 FY=4200 KG/CM2 INCL. SUMINIS- RFZO CENTRAL T2 3 x 2 3.00 4 0.996 17.93
TRO, HABILIT., ARMADO,TRASLAPES,SILLET.GANCHOS Y DESPER. TRABE CENTRAL T2 2 x 1 25.02 4 0.996 49.84
A,B 1-5 T1 5 x 2 25.02 4 0.996 249.20
RFZO CENTRAL A,B 1-5 T1 6 x 2 4.00 4 0.996 47.81
RFZO EXTREMOS A,B 1-5 T1 4 x 2 2.51 4 0.996 20.00
1,2,3,4,5 A-B CD2 5 x 4 8.16 4 0.996 162.55
1,2,3,4,5 A-B K2 EN TIMPANO 5 x 4 0.94 4 0.996 18.72
1,2,3,4,5 A-B K2 ANCLAJES 5 x 4 0.35 4 0.996 6.97 KG
21301 CONCRETO FC=250KG/CM2 E/ESTRUCT. Y LOSAS TMA 3/4" COL., A-B 1-5 LOSA 1 25.20 10.56 0.10 26.61
VIBRADO Y CURADO E/LOSAS, INCL.AFINE Y ACABADO P/RECIBIR A,B 1-5 T1 2 25.06 0.20 0.30 3.01
IMPERMEABILIZANTE 25.06 - ( 0.14 x 5 ) = 24.36 TRABE CENTRAL T2 1 24.36 0.25 0.40 2.44
( 0.71 / 2 ) x 7.80 = 2.77 1,2,3,4,5 A-B TIMPANO 5 2.77 0.14 1.94
1,2,3,4,5 A-B CD2 5 7.80 0.14 0.20 1.09
M3
03 ALBAÑILERIA Y ACABADOS
31001 CADENA CONCRETO FC=150KG/CM2 14x10CM INCL. CIMBRA APAR. A 1-5 ZOCLO 4 3.90 15.60
ARMADO C/2 VAR. #3 Y GRAPAS #2 @ 20CMS. B 1-5 ZOCLO 4 2.90 11.60
1,2,3,4,5 A-B ZOCLO 5 7.79 38.95
ML
31002 CADENA CONCRETO F'C=150KG/CM2 21x10CM INCL.CIMBRA APAR. A,B 1-5 ZOCLO 4 2.20 8.80
ARMADO C/2 VAR.#3 Y GRAPAS #2 @ 20CMS. A,B 1-5 ZOCLO 6 2.10 12.60
ML
31017 CADENA/CASTILLO CONCR. FC=150KG/CM2 14x15CM, ARM.C/4V#3 B 1-5 K 4 EN MUROS BAJO VENTANA 0.73 2.92
EST#2 @15CM INCL.CIMBRA APARENTE Y CRUCES DE VARILLAS 1,2,3,4,5 A-B K 5 x 2 2.50 25.00
1,2,3,4,5 A-B K EN ENRASE 5 x 2 0.69 6.90
ML
31024 CADENA/CASTILLO CONCR. FC=150KG/CM2 14x15CM, ARM.C/4V#3 A 1-5 CD4 4 3.90 REPISON 15.60
EST#2 @30CM INCL.CIMBRA APARENTE B 1-5 CD4 4 2.90 REPISON 11.60
ML
31025 CADENA/CASTILLO CONCR. FC=150KG/CM2 14x20CM, ARM.C/4V#3 A,B 1-5 K1 13 x 2 2.40 62.40
EST#2 @15CM INCL.CIMBRA APARENTE Y CRUCES DE VARILLAS A,B 1-5 K1 2 x 2 2.50 10.00
A,B 1-5 K1 EN ENRASE 15 x 2 0.69 20.70
ML
31032 CASTILLO K2, CONCRETO FC=150 KG/CM2 SECC 14x25 ARMADA 1,2,3,4,5 A-B K2 5 2.50 12.50
CON 4 VARILLAS #4 EST#2 @15CM. 1,2,3,4,5 A-B K2 EN ENRASE 5 0.69 3.45
ML
31105 MURO DE TABIQUE ROJO COMUN DE 11 A 14CM ESP. ASENT. CON 1,2,3,4,5 A-B CAB. 5 7.24 2.50 90.50
MCA 1:3 ACABADO COMUN A 1-5 BAJO VENTANA 4 3.90 0.73 11.39
B 1-5 BAJO VENTANA 4 2.75 0.73 8.03
M2
32001 APLANADO EN MUROS C/MORTERO CEMENTO-ARENA PROP. 1:2:6 1,2,3,4,5 A-B CABECERO 10 7.75 2.50 193.75
A PLOMO Y REGLA ACABADO C/LLANA MADERA INCL.REMATES Y A-B 1-5 MOCHETA 1 2 x 2 (2.20+1.58) / 2 2.40 18.14
EMBOQUILLADOS A-B 1-5 MOCHETA 2 8 x 2 0.98 2.40 37.63
A-B 1-5 MOCHETA 3 2 x 2 (1.08+0.46) / 2 2.40 7.39
A-B 1-5 MOCHETA 4 3 x 2 2.10 2.40 30.24
A 1-5 M - BAJO VENT. 4 x 2 3.90 0.88 27.46
B 1-5 M - BAJO VENT. 4 x 2 2.90 0.88 20.42
A,B 1-5 PTAS MURO 21 4 0.25 2.40 2.40
PTAS MURO 14 4 0.18 0.88 0.63
VENT MURO 21 12 0.25 1.52 4.56
MURO INCLINADO 2 x 2 0.25 2.50 2.50
REPISON M14 4 3.90 0.18 2.81
REPISON M14 4 2.90 0.18 2.09
M2
34003 PINTURA VINILICA LAVABLE EN MUROS, COLUMNAS, TRABES Y CIMBRA EN LOSA CONCEPTO 21110 251.61
PLAFONES, TRABAJO TERMINADO INCL.PREPARACION DE SUPER- CIMBRA EN TRABES CONCEPTO 21115 104.18
FICIE REBABEAR Y PLASTE NECESARIO INCL. ZOCLOS APLANADOS CONCEPTO 32001 350.03
A 1-5 ZOCLO 1 26.30 EXTERIOR 0.10 2.63
A 1-5 ZOCLO 1 25.60 INTERIOR 0.10 2.56
B 1-5 ZOCLO 1 22.30 EXTERIOR 0.10 2.23
B 1-5 ZOCLO 1 21.60 INTERIOR 0.10 2.16
1,2,3,4,5 A-B ZOCLO 10 7.79 CARAS 0.10 7.79
A,B 1'- 5' ZOCLO 4 ESP.MURO INCLINADO 0.21 0.10 0.08
B 1-5 ZOCLO 4 ESP.MURO 21 0.21 0.10 0.08
B 1-5 ZOCLO 4 ESP.MURO 14 0.14 0.10 0.06
M2
37030 LIMPIEZA DE VIDRIOS Y TABLETAS POR AMBAS CARAS. A 1-5 4 3.90 1.52 23.71
B 1-5 4 2.90 1.52 17.63
M2
04 HERRERIA
NUMEROS GENERADORES
05 INSTALACIONES
51002 SALIDA DE ALUMBRADO O CONTACTO CON CAJA DE LAMINA A-B 1-5 PARA LUMINARIA 30x30 VOLADO FRONTAL 4.00
Y TUBO Fo. PARED DELG. AULAS 16.00
SAL
51011 SUM. ARM. Y COL. LUMINARIA INCAND.SOBREPON. 30x30CM. INCL. A-B 1-5 LUMINARIA VOLADO FRONTAL 4.00
GAB. LAMINA, DIFUSOR VIDRIO DE GOTA Y 2 FOCOS 100w TRAB.T. LUMINARIA AULAS 16.00
PZA
51354 S Y C TABLERO DE CONTROL P/4 CIRCUITOS MONOFASICO (Q04) A-B 1,2 INT. AULA 1 1 1.00 PZA
08 ADHERIDOS
83063 IMPERM.ACAB.APAR.PREFABR.ASF.MODIF.APLIC.C/TERMOF.ACAB.
C/GRAVILLA REOLITA Y PIGMENTO DESMAL. A FUEGO C/RESINA A-B 1-5 1 25.20 10.60 267.12 M2
FRENTE
COSTADOS
TOTAL= $ 1,279,531.12