NUMEROS GENERADORES

4 AULA DIDACTICA 6.00x8.00MT, ESTR. REG. CUBIERTA CONCRETO.

LOCALIZACION AREA DIAMETRO KG/CML


CLAVE: CONCEPTO PZA CANTIDAD U.
EJE TRAMO TIPO HOJA: 1 DE 16LARGO ANCHO ALTURA
EDIFICIO
01 CIMENTACION
11061 LIMPIA TRAZO Y NIVELACION DEL TERRENO (AREA DE EDIFICIO) A-B 1-5 PROYECC. EDIF 1 25.20 10.40 262.08 M2

11071 EXCAVACION A MANO EN TERRENO INVESTIGADO E/OBRA CUALQ. A,B 1-5 Z1 2 26.50 0.80 1.00 42.40
PROF. INCL. AFINE DE TALUDES Y ACARREO DENTRO Y FUERA DE 1,5 A-B Z2 2 7.20 0.90 1.00 12.96
LA OBRA DE MATERIAL NO UTILIZADO. 2,3,4 A-B Z3 3 7.20 1.00 1.00 21.60
NOTA: EN CASO DE EXISTIR DESPALMES SE CONSIDERARA HASTA UN RODAPIE BANQ. 1 24.76 0.35 0.46 3.99 FRENTE
75% DE MATERIAL UTIL. RODAPIE BANQ. 2 0.675 0.35 0.46 0.22 COSTADOS
SE COBRARA 60.88 M3 60.88 M3 (MATERIAL UTIL) + 20.29 M3 DESPERDICIADO
M3

11101 PLANTILLA CONCRETO HECHO E/OBRA FC=100KG/CM2. 6 CM.ESP A,B 1-5 Z1 2 26.50 0.80 42.40
1,5 A-B Z2 2 7.20 0.90 12.96
2,3,4 A-B Z3 3 7.20 1.00 21.60
FRENTE RODAPIE BANQ. 1 24.76 0.35 8.67
COSTADOS RODAPIE BANQ. 2 0.675 0.35 0.47
M2

11121 RELLENO COMPACTADO D/MATERIAL PRODUCTO DE EXCAVACION EXCAVACION 81.17


C/PISON Y AGUA E/CAPAS DE 20CM. ESP. INCL.ACARREO DENTRO - VOL. DE PLANTILLA -5.17
DE LA OBRA MEDIR COMPACTADO - VOL. CONCRETO ZAPATAS -8.94
(CT + CD) / 0.35 x 0.10 - VOL. CONCRETO EN CT's y CD -1.65
- VOL. ENRASE 14 CM -4.70
- VOL. ENRASE 21 CM -7.01
(0.14 x 0.21 x 0.69) x 30 pzas - VOL K1 EN ENRASE -0.61
(0.14 x 0.25 x 0.69) x 5 pzas - VOL K2 EN ENRASE -0.12
(0.14 x 0.15 x 0.69) x 10 pzas - VOL K EN ENRASE -0.14
SUBTOTAL: 52.83
+ MATERIAL UTIL DISPONIBLE UTILIZADO EN EL CONCEPTO 11131: 8.05
M3

11131 SUM Y RELLENO MAT. INERTE COMPACT. C/PISON Y AGUA E/CAPAS A-B 1-5 INT. AULA 4 7.79 5.86 0.15 27.39
20CM.ESP.INCL.ACARREO DENTRO (VOL. EN AREA DE DESPALME) > A-B 1-2, 4-5 INT. AULA 2 7.20 5.05 0.25 18.18
DE OBRA MEDIR COMPACT. (VOL. EN AREA DE DESPALME) > A-B 2-4 INT. AULA 2 7.20 5.00 0.25 18.00
BANQ. 1 24.26 0.775 0.40 7.52
NOTA: POR DESPLAME, SE CONSIDERARA HASTA 25CM DE ESPESOR DE 71.09
RELLENO VOLUMEN MATERIAL UTIL CONCEPTO 11071 60.88
RELLENO Y COMPACTACION CONCEPTO 11121 -52.83
MATERIAL UTIL DISPONIBLE: 8.05 -8.05
M3

12010 CONCRETO FC=250KG/CM2 EN CIMENTACION TMA 3/4" INCLUYE: A,B 1-5 Z1 2 26.30 0.60 0.15 4.73
NUMEROS GENERADORES

4 AULA DIDACTICA 6.00x8.00MT, ESTR. REG. CUBIERTA CONCRETO.

LOCALIZACION AREA DIAMETRO KG/CML


CLAVE: CONCEPTO PZA CANTIDAD U.
EJE TRAMO TIPO HOJA: 2 DE 16LARGO ANCHO ALTURA
COLOCADO, VIBRADO Y CURADO. 1,5 A-B Z2 2 7.40 0.70 0.15 1.55
2,3,4 A-B Z3 3 7.40 0.80 0.15 2.66
A,B 1-5 CT1 2 26.30 0.21 0.35 3.87
1,2,3,4,5 A-B CD 5 7.79 0.14 0.35 1.91
M3

12021 CIMBRA EN CIMENTACION CON MADERA DE PINO 3a ACABADO A,B 1-5 Z1 2 26.30 EXTERIOR 0.15 7.89
COMUN INCL. CIMBRADO Y DESCIMBRADO A,B 1-5 Z1 2 22.50 INTERIOR 0.15 6.75
A,B 1-5 Z1 4 0.60 TAPAS 0.15 0.36
1,2,3,4,5 A-B Z2 y Z 3 10 7.40 CARAS 0.15 11.10
A,B 1-5 CT1 2 26.30 EXTERIOR 0.35 18.41
A,B 1-5 CT1 2 25.60 INTERIOR 0.35 17.92
A-B 1-5 CT1 4 0.21 TAPAS 0.35 0.29
1,2,3,4,5 A-B CD 10 7.79 CARAS 0.35 27.27
M2

12032 ACERO REFUERZO E/CIMENTACION #2 ALAMBRON FY=2530KG/CM2, A,B 1-5 CT1 154 x 2 0.96 2 0.251 74.22
INC. SUM., HABILIT. ARM., TRASLAPES, GANCHOS Y DESPERDIC. 1,2,3,4,5 A-B CD 39 x 5 0.82 2 0.251 40.13
KG

12034 ACERO REFUERZO EN CIMENTACION #3 FY=4200 KG/CM2 INCLUYE: A,B 1-5 Z1 3 x 2 26.26 3 0.557 87.76
SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, SILLETAS, A,B 1-5 Z1 90 x 2 0.56 3 0.557 56.15
GANCHOS Y DESPERDICIOS. 1,2,3,4,5 A-B Z2 y Z 3 5 x 4 8.56 3 0.557 95.36
1,2 A-B Z2 36 x 2 0.66 3 0.557 26.47
3,4,5 A-B Z3 36 x 3 0.76 3 0.557 45.72
1,2,3,4,5 A-B CD 5 x 4 8.17 3 0.557 91.01
ANCLAJES K, K1 40 x 4 0.40 3 0.557 35.65
KG

12035 ACERO REFUERZO DIAMETRO#4 Fy=4200KG/CM2 INCL.SUMINISTRO, A,B 1-5 CT1 4 x 2 26.26 4 0.996 209.24
HABILITADO, ARMADO, TRASLAPES, SILLETAS, GANCHOS Y DESP. ANCLAJES K2 5 x 4 0.50 4 0.996 9.96
KG

12076 MURETE ENRASE E/CIMENT.C/TABIQUE CONCR. 15x20x40CM ASENT. 1,2,3,4,5 A-B CAB 5 7.24 0.69 24.98
C/MORTERO CEM-ARE 1:5, 15CM.ESP FRENTE RODAPIE BANQ. 1 24.56 0.33 8.10
COSTADOS RODAPIE BANQ. 2 0.775 0.33 0.51
M2

12080 MURETE DE ENRASE EN CIMENT. C/TABIQUE CONCR. 20x20x40CM


ASENTADO CON MORTERO CEMENTO-ARENA 1:5, 20 CM. ESP. A,B 1-5 MURO 21 2 24.20 0.69 33.40 M2

02 ESTRUCTURA
21110 CIMBRA P/LOSAS ACAB. APARENTE C/TRIPLAY DE PINO 16MM INC. A-B 1-5 PLAFOND 1 25.20 10.56 266.11
NUMEROS GENERADORES

4 AULA DIDACTICA 6.00x8.00MT, ESTR. REG. CUBIERTA CONCRETO.

LOCALIZACION AREA DIAMETRO KG/CML


CLAVE: CONCEPTO PZA CANTIDAD U.
EJE TRAMO TIPO HOJA: 3 DE 16LARGO ANCHO ALTURA
CIMBRADO, DESCIMBR., CHAFLAN, GOTERO Y FRENTES (OCHAV.) PERIMETRO 2 ( 25.20 + 10.56 ) x 0.10 7.15
A,B 1-5 T1 2 25.06 0.20 -10.02
TRABE CENTRAL T2 1 24.36 0.25 -6.09
1,2,3,4,5 A-B MUROS 5 7.92 0.14 -5.54
M2
NUMEROS GENERADORES

4 AULA DIDACTICA 6.00x8.00MT, ESTR. REG. CUBIERTA CONCRETO.

LOCALIZACION AREA DIAMETRO KG/CML


CLAVE: CONCEPTO PZA CANTIDAD U.
EJE TRAMO TIPO HOJA: 4 DE 16LARGO ANCHO ALTURA
21115 CIMBRA APARENTE E/TRABES C/TRIPLAY DE PINO DE 16MM INCL. A,B 1-5 T1 2 25.06 EXTERIOR 0.28 14.03
CIMBRADO, DESCIMBR., CHAFLAN, GOTERO Y FRENTES (OCHAV.) A,B 1-5 T1 2 24.36 INTERIOR 0.32 15.59
A,B 1-5 T1 4 TAPAS 0.20 0.30 0.24
A,B 1-5 T1 8 3.90 0.20 FONDOS 6.24
TRABE CENTRAL T2 2 24.36 0.40 19.49
TRABE CENTRAL T2 1 24.36 0.25 FONDO 6.09
TRABE CENTRAL T2 2 TAPAS 0.25 0.40 0.20
AREA DE CONTACTO T2 10 0.25 0.40 -1.00
AREA = ( 0.71 / 2 ) x 7.80 = 2.77 1,2,3,4,5 A-B TIMP. 10 2.77 27.70
1,2,3,4,5 A-B CD2 10 7.80 0.20 15.60
M2

21201 ACERO REFUERZO E/ESTRUCT. C/ALAMBRON FY=2530KG/CM2 INC. A-B 1-5 T1 162 x 2 1.04 2 0.251 84.58
SUM., HABILIT., ARMADO, TRASL., GANCHOS SILLETAS Y DESPER. 1,2,3,4,5 A-B CD2 40 x 5 0.52 2 0.251 26.10
KG

21203 ACERO REFUERZO E/ESTRUCT.#3 FY=4200 KG/CM2 INCL. SUMINIS- ESTRIBOS T2 202 1.34 3 0.557 150.77
TRO, HABILIT., ARMADO,TRASLAPES,SILLET.GANCHOS Y DESPER. RFZOS EXTREMOS T2 2 x 2 2.01 3 0.557 4.48
ADICIONALES T2 2 25.02 3 0.557 27.87
TIMPANO 1,2,3,4,5 A-B VERTICAL 32 x 5 1.97(PROM) 3 0.557 175.57
TIMPANO 1,2,3,4,5 A-B HORIZONTAL 6 x 5 5.69(PROM) 3 0.557 95.08
LOSA LONGITUDINAL 13 VAR x ALERO RECTAS 13 x 2 25.16 3 0.557 364.37
5 VAR x ALERO DOBLADAS 5 x 2 25.32 3 0.557 141.03
16VAR x CABECERO BASTONES VOLADOS 16 x 2 1.58 3 0.557 28.16
16VAR x EJE BASTONES INTERMEDIOS 16 x 3 2.00 3 0.557 53.47
LOSA TRANSVERSAL 24VAR x ENTREEJE RECTAS 24 x 4 5.64 3 0.557 301.58
6VAR x CABECERO RECTAS 6 x 2 5.64 3 0.557 37.70
8VAR x ENTREEJE DOBLADAS 8 x 4 10.54 3 0.557 187.86
28VAR x ENTREEJE BASTONES VOLADOS 28 x 4 2.18 3 0.557 136.00
14VAR x ENTREEJE BASTONES CENTRALES 14 x 4 2.00 3 0.557 62.38
ANCLAJES K, K1 40 x 4 0.35 3 0.557 31.19
KG

21204 ACERO REFUERZO E/ESTRUCT.#4 FY=4200 KG/CM2 INCL. SUMINIS- RFZO CENTRAL T2 3 x 2 3.00 4 0.996 17.93
TRO, HABILIT., ARMADO,TRASLAPES,SILLET.GANCHOS Y DESPER. TRABE CENTRAL T2 2 x 1 25.02 4 0.996 49.84
A,B 1-5 T1 5 x 2 25.02 4 0.996 249.20
RFZO CENTRAL A,B 1-5 T1 6 x 2 4.00 4 0.996 47.81
RFZO EXTREMOS A,B 1-5 T1 4 x 2 2.51 4 0.996 20.00
1,2,3,4,5 A-B CD2 5 x 4 8.16 4 0.996 162.55
1,2,3,4,5 A-B K2 EN TIMPANO 5 x 4 0.94 4 0.996 18.72
1,2,3,4,5 A-B K2 ANCLAJES 5 x 4 0.35 4 0.996 6.97 KG

21205 ACERO REFUERZO E/ESTRUCT.#5 FY=4200 KG/CM2 INCL. SUMINIS-


TRO, HABILIT., ARMADO,TRASLAPES,SILLET.GANCHOS Y DESPER. TRABE CENTRAL T2 3 x 1 25.02 5 1.560 117.09 KG
NUMEROS GENERADORES

4 AULA DIDACTICA 6.00x8.00MT, ESTR. REG. CUBIERTA CONCRETO.

LOCALIZACION AREA DIAMETRO KG/CML


CLAVE: CONCEPTO PZA CANTIDAD U.
EJE TRAMO TIPO HOJA: 5 DE 16LARGO ANCHO ALTURA

21301 CONCRETO FC=250KG/CM2 E/ESTRUCT. Y LOSAS TMA 3/4" COL., A-B 1-5 LOSA 1 25.20 10.56 0.10 26.61
VIBRADO Y CURADO E/LOSAS, INCL.AFINE Y ACABADO P/RECIBIR A,B 1-5 T1 2 25.06 0.20 0.30 3.01
IMPERMEABILIZANTE 25.06 - ( 0.14 x 5 ) = 24.36 TRABE CENTRAL T2 1 24.36 0.25 0.40 2.44
( 0.71 / 2 ) x 7.80 = 2.77 1,2,3,4,5 A-B TIMPANO 5 2.77 0.14 1.94
1,2,3,4,5 A-B CD2 5 7.80 0.14 0.20 1.09
M3

03 ALBAÑILERIA Y ACABADOS
31001 CADENA CONCRETO FC=150KG/CM2 14x10CM INCL. CIMBRA APAR. A 1-5 ZOCLO 4 3.90 15.60
ARMADO C/2 VAR. #3 Y GRAPAS #2 @ 20CMS. B 1-5 ZOCLO 4 2.90 11.60
1,2,3,4,5 A-B ZOCLO 5 7.79 38.95
ML

31002 CADENA CONCRETO F'C=150KG/CM2 21x10CM INCL.CIMBRA APAR. A,B 1-5 ZOCLO 4 2.20 8.80
ARMADO C/2 VAR.#3 Y GRAPAS #2 @ 20CMS. A,B 1-5 ZOCLO 6 2.10 12.60
ML

31017 CADENA/CASTILLO CONCR. FC=150KG/CM2 14x15CM, ARM.C/4V#3 B 1-5 K 4 EN MUROS BAJO VENTANA 0.73 2.92
EST#2 @15CM INCL.CIMBRA APARENTE Y CRUCES DE VARILLAS 1,2,3,4,5 A-B K 5 x 2 2.50 25.00
1,2,3,4,5 A-B K EN ENRASE 5 x 2 0.69 6.90
ML

31024 CADENA/CASTILLO CONCR. FC=150KG/CM2 14x15CM, ARM.C/4V#3 A 1-5 CD4 4 3.90 REPISON 15.60
EST#2 @30CM INCL.CIMBRA APARENTE B 1-5 CD4 4 2.90 REPISON 11.60
ML

31025 CADENA/CASTILLO CONCR. FC=150KG/CM2 14x20CM, ARM.C/4V#3 A,B 1-5 K1 13 x 2 2.40 62.40
EST#2 @15CM INCL.CIMBRA APARENTE Y CRUCES DE VARILLAS A,B 1-5 K1 2 x 2 2.50 10.00
A,B 1-5 K1 EN ENRASE 15 x 2 0.69 20.70
ML

31032 CASTILLO K2, CONCRETO FC=150 KG/CM2 SECC 14x25 ARMADA 1,2,3,4,5 A-B K2 5 2.50 12.50
CON 4 VARILLAS #4 EST#2 @15CM. 1,2,3,4,5 A-B K2 EN ENRASE 5 0.69 3.45
ML

31105 MURO DE TABIQUE ROJO COMUN DE 11 A 14CM ESP. ASENT. CON 1,2,3,4,5 A-B CAB. 5 7.24 2.50 90.50
MCA 1:3 ACABADO COMUN A 1-5 BAJO VENTANA 4 3.90 0.73 11.39
B 1-5 BAJO VENTANA 4 2.75 0.73 8.03
M2

31115 MURO TABIQUE ROJO COMUN 19-21CM ESP. ASENT. C/MORTERO


CEM-ARE 1:3, ACAB.COMUN P/ESTRUC.ZONA ALTA SISMICIDAD A,B 1-5 MOCHETA 1 8 x 2 0.84 2.40 32.26
NUMEROS GENERADORES

4 AULA DIDACTICA 6.00x8.00MT, ESTR. REG. CUBIERTA CONCRETO.

LOCALIZACION AREA DIAMETRO KG/CML


CLAVE: CONCEPTO PZA CANTIDAD U.
EJE TRAMO TIPO HOJA: 6 DE 16LARGO ANCHO ALTURA
MOCHETA 2 = (0.94 + 0.32 / 2) =0.63 A,B 1-5 MOCHETA 2 2 x 2 0.63 2.40 6.05
M2
NUMEROS GENERADORES

4 AULA DIDACTICA 6.00x8.00MT, ESTR. REG. CUBIERTA CONCRETO.

LOCALIZACION AREA DIAMETRO KG/CML


CLAVE: CONCEPTO PZA CANTIDAD U.
EJE TRAMO TIPO HOJA: 7 DE 16LARGO ANCHO ALTURA
31220 PISO CONCR. FC=150KG/CM2 10CM.ESP. ACAB.PULIDO O RAYADO A-B 1-5 INT.AULA 4 7.79 5.86 182.60
C/BROCHA PELO LOSAS 3.06x2M, JTAS FRIAS, ACAB.C/VOLT. BANQ. 1 24.70 0.995 24.58
B 1-5 PTA 4 1.00 0.14 0.56
B 1-5 REMETIDO EN MURO 8 3.90 0.07 2.18
M2

32001 APLANADO EN MUROS C/MORTERO CEMENTO-ARENA PROP. 1:2:6 1,2,3,4,5 A-B CABECERO 10 7.75 2.50 193.75
A PLOMO Y REGLA ACABADO C/LLANA MADERA INCL.REMATES Y A-B 1-5 MOCHETA 1 2 x 2 (2.20+1.58) / 2 2.40 18.14
EMBOQUILLADOS A-B 1-5 MOCHETA 2 8 x 2 0.98 2.40 37.63
A-B 1-5 MOCHETA 3 2 x 2 (1.08+0.46) / 2 2.40 7.39
A-B 1-5 MOCHETA 4 3 x 2 2.10 2.40 30.24
A 1-5 M - BAJO VENT. 4 x 2 3.90 0.88 27.46
B 1-5 M - BAJO VENT. 4 x 2 2.90 0.88 20.42
A,B 1-5 PTAS MURO 21 4 0.25 2.40 2.40
PTAS MURO 14 4 0.18 0.88 0.63
VENT MURO 21 12 0.25 1.52 4.56
MURO INCLINADO 2 x 2 0.25 2.50 2.50
REPISON M14 4 3.90 0.18 2.81
REPISON M14 4 2.90 0.18 2.09
M2

34003 PINTURA VINILICA LAVABLE EN MUROS, COLUMNAS, TRABES Y CIMBRA EN LOSA CONCEPTO 21110 251.61
PLAFONES, TRABAJO TERMINADO INCL.PREPARACION DE SUPER- CIMBRA EN TRABES CONCEPTO 21115 104.18
FICIE REBABEAR Y PLASTE NECESARIO INCL. ZOCLOS APLANADOS CONCEPTO 32001 350.03
A 1-5 ZOCLO 1 26.30 EXTERIOR 0.10 2.63
A 1-5 ZOCLO 1 25.60 INTERIOR 0.10 2.56
B 1-5 ZOCLO 1 22.30 EXTERIOR 0.10 2.23
B 1-5 ZOCLO 1 21.60 INTERIOR 0.10 2.16
1,2,3,4,5 A-B ZOCLO 10 7.79 CARAS 0.10 7.79
A,B 1'- 5' ZOCLO 4 ESP.MURO INCLINADO 0.21 0.10 0.08
B 1-5 ZOCLO 4 ESP.MURO 21 0.21 0.10 0.08
B 1-5 ZOCLO 4 ESP.MURO 14 0.14 0.10 0.06
M2

37005 LIMPIEZA DE PISOS DE CONCRETO Y/O MOSAICO CON CEPILLO


AGUA, ACIDO CLORHIDRICO PISOS DE CONCRETO CONCEPTO 31220 209.92 M2

37030 LIMPIEZA DE VIDRIOS Y TABLETAS POR AMBAS CARAS. A 1-5 4 3.90 1.52 23.71
B 1-5 4 2.90 1.52 17.63
M2

04 HERRERIA
NUMEROS GENERADORES

4 AULA DIDACTICA 6.00x8.00MT, ESTR. REG. CUBIERTA CONCRETO.

LOCALIZACION AREA DIAMETRO KG/CML


CLAVE: CONCEPTO PZA CANTIDAD U.
EJE TRAMO TIPO HOJA: 8 DE 16LARGO ANCHO ALTURA
41313 SYC CANCELERIA ALUMINIO ANODIZADO NAT. LINEA 2x1" INCL.VI- A 1-5 4 3.90 1.52 23.71
DRIO 6MM ESP. HERRAJES Y TODO LO NECES. P/FUNCIONAMIENTO B 1-5 4 2.90 1.52 17.63
M2

05 INSTALACIONES
51002 SALIDA DE ALUMBRADO O CONTACTO CON CAJA DE LAMINA A-B 1-5 PARA LUMINARIA 30x30 VOLADO FRONTAL 4.00
Y TUBO Fo. PARED DELG. AULAS 16.00
SAL

51011 SUM. ARM. Y COL. LUMINARIA INCAND.SOBREPON. 30x30CM. INCL. A-B 1-5 LUMINARIA VOLADO FRONTAL 4.00
GAB. LAMINA, DIFUSOR VIDRIO DE GOTA Y 2 FOCOS 100w TRAB.T. LUMINARIA AULAS 16.00
PZA

51051 SAL.CONTACTO POLAR.DUPLEX 15AMP.AH. C/CAJA LAM.y TUBO


CONDUIT P.D. A-B 1-5 2 x 4 AULAS 8.00 SAL

51354 S Y C TABLERO DE CONTROL P/4 CIRCUITOS MONOFASICO (Q04) A-B 1,2 INT. AULA 1 1 1.00 PZA

08 ADHERIDOS
83063 IMPERM.ACAB.APAR.PREFABR.ASF.MODIF.APLIC.C/TERMOF.ACAB.
C/GRAVILLA REOLITA Y PIGMENTO DESMAL. A FUEGO C/RESINA A-B 1-5 1 25.20 10.60 267.12 M2

84014 SYC PUERTA C/TABLERO DE MULTIPANEL INCL.MARCO Y CONTRA-


MARCO ALUM. 2" 1x2.50M INCL.CHAPA TIPO CAPFCE, TRAB. TERM. A-B 1-5 4 4.00 PZA
ENERADORES
COSTO
G. CUBIERTA CONCRETO. PROMEDIO $ 6,664.22
M2

TOTAL P.U. TOTAL


HOJA: 9 DE 16

262.08 $9.83 $ 2,576.25

FRENTE
COSTADOS

81.17 $163.79 $ 13,294.83

86.10 $183.66 $ 15,813.13

60.88 $108.74 $ 6,620.09

63.04 $2,702.17 $ 170,344.80


ENERADORES
COSTO
G. CUBIERTA CONCRETO. PROMEDIO $ 6,664.22
M2

TOTAL P.U. TOTAL


HOJA: 10 DE 16

14.72 $3,028.96 $ 44,586.29

89.99 $307.36 $ 27,659.33

114.35 $32.47 $ 3,712.94

438.12 $29.06 $ 12,731.77

219.20 $26.81 $ 5,876.75

33.59 $879.71 $ 29,549.46

33.40 $879.71 $ 29,382.31


ENERADORES
COSTO
G. CUBIERTA CONCRETO. PROMEDIO $ 6,664.22
M2

TOTAL P.U. TOTAL


HOJA: 11 DE 16

251.61 $606.70 $ 152,653.00


ENERADORES
COSTO
G. CUBIERTA CONCRETO. PROMEDIO $ 6,664.22
M2

TOTAL P.U. TOTAL


HOJA: 12 DE 16

104.18 $435.79 $ 45,400.60

110.68 $32.47 $ 3,593.78

1,797.51 $29.06 $ 52,235.64

573.02 $26.81 $ 15,362.67

117.09 $25.30 $ 2,962.38


ENERADORES
COSTO
G. CUBIERTA CONCRETO. PROMEDIO $ 6,664.22
M2

TOTAL P.U. TOTAL


HOJA: 13 DE 16

35.09 $2,834.83 $ 99,474.18

66.15 $216.02 $ 14,289.72

21.40 $292.61 $ 6,261.85

34.82 $247.51 $ 8,618.30

27.20 $279.96 $ 7,614.91

93.10 $247.51 $ 23,043.18

15.95 $279.96 $ 4,465.36

109.92 $455.69 $ 50,089.44


ENERADORES
COSTO
G. CUBIERTA CONCRETO. PROMEDIO $ 6,664.22
M2

TOTAL P.U. TOTAL


HOJA: 14 DE 16

38.31 $455.69 $ 17,457.48


ENERADORES
COSTO
G. CUBIERTA CONCRETO. PROMEDIO $ 6,664.22
M2

TOTAL P.U. TOTAL


HOJA: 15 DE 16

209.92 $299.40 $ 62,850.05

350.03 $176.16 $ 61,660.58

723.41 $73.46 $ 53,141.55

209.92 $13.46 $ 2,825.52

41.34 $17.38 $ 718.49


ENERADORES
COSTO
G. CUBIERTA CONCRETO. PROMEDIO $ 6,664.22
M2

TOTAL P.U. TOTAL


HOJA: 16 DE 16

41.34 $1,294.94 $ 53,532.82

20.00 $1,098.92 $ 21,978.40

20.00 $2,152.57 $ 43,051.40

8.00 $1,519.18 $ 12,153.44

1.00 $5,639.12 $ 5,639.12

267.12 $302.76 $ 80,873.25

4.00 $3,859.01 $ 15,436.04

TOTAL= $ 1,279,531.12