Case ID Priority Section name Designed by Executed by

Data Section Ram

TC_01

Date Range Ram

TC_02

Periodicity Ram
TC_03

Setup Ram

TC_04
Submit Ram

TC_05

Preset Ram
TC_06

Project section Ram

TC_07

Variable section Ram

TC_08

Data Section Ram

TC_09
TC_10 *Load (User limit validation) Ram
Test name pre-Condition

- Logged into application successfully


Validation of project section - Application is ready with all fetched data

User must be logged in successfully


-application should be ready with all
Validation of Date range prefetched data

User must be logged in successfully


-application should be ready with all
Validation for monthly Periodicity prefetched data

User must be logged in successfully


-application should be ready with all
Validation for quarterly Periodicity prefetched data

User must be logged in successfully


-application should be ready with all
Validation for SemiAnually periodicity prefetched data

User must be logged in successfully


-application should be ready with all
Validation for annual periodicity prefetched data
*Validation for annual periodicity_SPL CASE
(for all short duration projects )

*Validation for different periodicity in doc_SPL CASE


(periodicity of the load is different)

User must be logged in successfully


-application should be ready with all
Validation of Load functionality prefetched data

Validation of export functionality

Validation of import functionality

Validation of submit functionality

Validation for Save functionality


Validation for add functionality

Validation for option functionality

User must be logged in successfully


-application should be ready with all
Validation for delete functionality prefetched data

User must be logged in successfully


-application should be ready with all
Validation for Project section prefetched data

User must be logged in successfully


-application should be ready with all
Validation for variable section prefetched data

User must be logged in successfully


-application should be ready with all
Validation for Data section prefetched data

*Load (User limit validation) NA


Test Steps Test data

Click the project drop down and select Load NA


check include inactive tag checkbox and click Load NA
check filtering criteria checkboxes (Editable and/or Link selection) and click load

Select the required Activity/Project from dropdown


Select the Start and End Dates from the calender control
click load button

Select the required Activity/Project from dropdown


Select the Start and End Dates from the calender control
Select the Monthly Periodicity
Clck on Load button

Select the required Activity/Project from dropdown


Select the Start and End Dates from the calender control
Select the quarterly Periodicity
Clck on Load button

Select the required Activity/Project from dropdown


Select the Start and End Dates from the calender control
Select the SemiAnually Periodicity
Clck on Load button

Select the required Activity/Project from dropdown


Select the Start and End Dates from the calender control
Select the annual Periodicity
Clck on Load button
Select the required Activity/Project from dropdown
Select the Start and End Dates from the calender control
Select the annual Periodicity
Clck on Load button

Select the required Activity/Project from dropdown


Select the Start and End Dates from the calender control
Select the Periodicity as monthly
Set the Load to annual

-Select the required Activity/Project from dropdown


-Select the Start and End Dates from the calender control
-Select the Periodicity
-Clck on Load button

-Select the required Activity/Project from dropdown


-Select the Start and End Dates from the calender control
-Select the Periodicity
-Clck on eexport

-Select the required Activity/Project from dropdown


-Select the Start and End Dates from the calender control
-Select the Periodicity
-Clck on import button

-Select the required Activity/Project from dropdown


-Select the Start and End Dates from the calender control
-Select the Periodicity
-Make changes in the data grid
- Submit button is clicked

-Select the required Activity/Project from dropdown


-Select the Start and End Dates from the calender control
-Select the Periodicity
-Make changes in the data grid
-Click on Save button
Click on Add button

Click on Add button

-Select the required Activity/Project from dropdown


-Select the Start and End Dates from the calender control
-Select the Periodicity
-Click load

-Select the required Activity/Project from dropdown


-Select the Start and End Dates from the calender control
-Select the Periodicity
-Click load

-Select the required Activity/Project from dropdown


-Select the Start and End Dates from the calender control
-Select the Periodicity
-Click load

Try Login to the system with upto 11 parallel open sessions


Expected Result

Should fill all the variables with default selection criteria


Should fill all the variables with default selection criteria including inacive tags
Should load only editable and/or link selections data

Should fetch all project data for the seleted date range

All project data within the date range and maching monthly periodicity are loaded on screen

All project data within the date range and maching quarterly periodicity are loaded on screen

All project data within the date range and maching half-yearly periodicity are loaded on screen

All project data within the date range and maching yearly periodicity are loaded on screen
For (some) projects the duration doesn’t fall in the selected date range being shorter in duration
Those are found to be greyed-out

here the project will be rolled up to create an annual value. The values are divided by 12 during the load and then displayed

All project data within the date range and maching periodicity are stacked under the parent node project and then displayed o

Should be able to export/download the loaded data in flat file format to local system

Should be able to import/upload the data in flat file format to the system

Changes made is committed/reflected under poject

Changes made is saved in RAM for the current session(Does not reflect in project hierarchy until submit)
Adds a new independent parent node or project

NA

Deletes a node from the loaded data

Should load all matching parent nod names in this section

Along with checkbox, ID,name and Variable columns should be displayed


Should load all matching variables data for the parent node and populated under above columns

Status , Units and the annual range columns fields to be present


Data tobe populated as per the filtered criteria under above fields
*For greyed-out data refer TC_03 SPL_CASE

System should allow upto 10 parallel sessions and any extra login should be prompted with .
Actual Result Status P/F Remarks