Software Development Life Cycle (SDLC) is a procedural process, in the development of a

software product. The process is carried in a set of steps, which explains the whole idea
about how to go through each product.

The classification of Software Development Life Cycle process is as follows

1. Planning
2. Analysis
3. Design
4. Software Development
5. Implementation
6. Software Testing
7. Deployment
8. Maintenance

Software Testing is an important factor in a product's life cycle, as the product will have
greater life, only when it works correctly and efficiently according to the customer's
requirements.

Introduction to Software Testing

Before moving further towards introduction to software testing, we need to know a few concepts that will
simplify the definition of software testing.
• Error: Error or mistake is a human action that produces wrong or incorrect
result.
• Defect (Bug, Fault): A flaw in the system or a product that can cause the
component to fail or misfunction.
• Failure: It is the variance between the actual and expected result.
• Risk: Risk is a factor that could result in negativity or a chance of loss or
damage.

Thus Software testing is the process of finding defects/bugs in the system, that occurs due
to an error in the application, which could lead to failure of the resultant product and
increase in probability of high risk. In short, software testing have different goals and
objectives, which often include:

1. finding defects;
2. gaining confidence in and providing information about
the level of quality;
3. preventing defects.

If you are new to the field of software testing, then the article software testing for beginners will be of
great help.

Scope of Software Testing

The primary function of software testing is to detect bugs in order to correct and uncover it.
The scope of software testing includes execution of that code in various environment and
also to examine the aspects of code - does the software do what it is supposed to do and
function according to the specifications? As we move further we come across some
questions such as "When to start testing?" and "When to stop testing?" It is recommended to
start testing from the initial stages of the software development. This not only helps in
rectifying tremendous errors before the last stage, but also reduces the rework of finding the
bugs in the initial stages every now and then. It also saves the cost of the defect required to
find it. Software testing is an ongoing process, which is potentially endless but has to be
stopped somewhere, due to the lack of time and budget. It is required to achieve maximum
profit with good quality product, within the limitations of time and money. The tester has to
follow some procedural way through which he can judge if he covered all the points required
for testing or missed out any. To help testers to carry out these day-to-day activities, a
baseline has to be set, which is done in the form of checklists. Read more on checklists for software
tester.

Software Testing Key Concepts


o Defects and Failures: As we discussed earlier, defects are not caused only
due to the coding errors, but most commonly due to the requirement gaps in
the non-functional requirement, such as usability, testability, scalability,
maintainability, performance and security. A failure is caused due to the
deviation between an actual and an expected result. But not all defects result
to failures. A defect can turn into a failure due to the change in the
environment and or the change in the configuration of the system
requirements.
o Input Combination and Preconditions: Testing all combination of inputs
and initial state (preconditions), is not feasible. This means finding large
number of infrequent defects is difficult.
o Static and Dynamic Analysis: Static testing does not require execution of
the code for finding defects, whereas in dynamic testing, software code is
executed to demonstrate the results of running tests.
o Verification and Validation: Software testing is done considering these two
factors.
 Verification: This verifies whether the product is done according to the
specification?
 Validation: This checks whether the product meets the customer
requirement?
o Software Quality Assurance: Software testing is an important part of the
software quality assurance. Quality assurance is an activity, which proves the suitability
of the product by taking care of the quality of a product and ensuring that the
customer requirements are met.

Software Testing Types:

Software test type is a group of test activities that are aimed at testing a component or
system focused on a specific test objective; a non-functional requirement such as usability,
testability or reliability. Various types of software testing are used with the common
objective of finding defects in that particular component.

Software testing is classified according to two basic types of software testing: Manual
Scripted Testing and Automated Testing.

Manual Scripted Testing:


• Black Box Testing
• White Box Testing
• Gray Box Testing

The levels of software testing life cycle includes :

• Unit Testing
• Integration Testing
• System Testing
• Acceptance Testing
1. Alpha Testing
2. Beta Testing

Other types of software testing are:

• Functional Testing
• Performance Testing
1. Load Testing
2. Stress Testing
• Smoke Testing
• Sanity Testing
• Regression Testing
• Recovery Testing
• Usability Testing
• Compatibility Testing
• Configuaration Testing
• Exploratory Testing

For further explanation of these concepts, read more on types of software testing.

Automated Testing: Manual testing is a time consuming process. Automation testing


involves automating a manual process. Test automation is a process of writing a computer
program in the form of scripts to do a testing which would otherwise need to be done
manually. Some of the popular automation tools are Winrunner, Quick Test Professional
(QTP), LoadRunner, SilkTest, Rational Robot, etc. Automation tools category also includes
maintenance tool such as TestDirector and many other.

Software Testing Methodologies

The software testing methodologies or process includes various models that built the
process of working for a particular product. These models are as follows:

• Waterfall Model
• V Model
• Spiral Model
• Rational Unified Process(RUP)
• Agile Model
• Rapid Application Development(RAD)

These models are elaborated briefly in software testing methodologies.


Software Testing Artifacts

Software testing process can produce various artifacts such as:


• Test Plan: A test specification is called a test plan. A test plan is documented so that
it can be used to verify and ensure that a product or system meets its design
specification.
• Traceability matrix: This is a table that correlates or design documents to test
documents. This verifies that the test results are correct and is also used to change
tests when the source documents are changed.
• Test Case: Test cases and software testing strategies are used to check the
functionality of individual component that is integrated to give the resultant product.
These test cases are developed with the objective of judging the application for its
capabilities or features.
• Test Data: When multiple sets of values or data are used to test the same
functionality of a particular feature in the test case, the test values and changeable
environmental components are collected in separate files and stored as test data.
• Test Scripts: The test script is the combination of a test case, test procedure and
test data.
• Test Suite: Test suite is a collection of test cases.

Software Testing Process

Software testing process is carried out in the following sequence, in order to find faults in
the software system:

1. Create Test Plan


2. Design Test Case
3. Write Test Case
4. Review Test Case
5. Execute Test Case
6. Examine Test Results
7. Perform Post-mortem Reviews
8. Budget after Experience

Here is a sample Test Case for you:

# Software Test Case for Login Page:

• Purpose: The user should be able to go to the Home page.


• Pre-requisite:
1. S/w should be compatible with the Operating
system.
2. Login page should appear.
3. User Id and Password textboxes should be
available with appropriate labels.
4. Submit and Cancel buttons with appropriate
captions should be available.
• Test Data: Required list of variables and their values should be
available.eg: User Id:{Valid UserId, Invalid UserId, empty},
Password:{Valid, Invalid, empty}.

Test
Sr.N
Cas Test Case Name Steps/Action Expected Results
o
e Id
User views the page to check
whether it includes UserId and
Checking User Password textboxes with Screen dispalys user
1. TC1. Interface appropriate labels. Also expects interface requirements
requirements. that Submit and Cancel buttons according to the user.
are available with appropriate
captions
Textbox for UserId i)Error message is
i)User types numbers into the
should: displayed for numeric
textbox.
i)allow only alpha- data.
numeric characters{a-
z, A-Z}
2. TC2. ii)not allow special ii)Text is accepted when
characters ii)User types alphanumeric data in user enters alpha-
like{'$','#','!','~','*',... the textbox. numeric data into the
} textbox.
iii)not allow numeric
characters like{0-9}
i)Error message is
displayed when user
i)User enters only two characters
enters less than six
Checking functionality in the password textbox.
characters in the
of the Password
password textbox.
textbox:
i)Textbox for Password System accepts data
ii)User enters more than six
3. TC3. should accept more when user enters more
characters in the password
than six characters. than six characters into
textbox.
ii)Data should be the password textbox.
displayed in encrypted System accepts data in
format. ii)User checks whether his data is
the encrypted format
displayed in the encrypted
else displays an error
format.
message.
i)System displays
i)User checks whether 'SUBMIT'
'SUBMIT' button as
button is enabled or disabled.
enabled
Checking functionality ii)System is redirected
4. TC4.
of 'SUBMIT' button. ii)User clicks on the 'SUBMIT' to the 'Home' page of
button and expects to view the the application as soon
'Home' page of the application. as he clicks on the
'SUBMIT' button.
5. TC5. Checking functionality i)System displays
i)User checks whether 'CANCEL'
of 'CANCEL' button. 'CANCEL' button as
button is enabled or disabled.
enabled.
ii)User checks whether the ii)System clears the
data available in the
textboxes for UserId and
UserId and Password
Password are reset to blank by
textbox when user clicks
clicking on the 'CANCEL' button.
on the 'CANCEL' button.

Fault Finding Techniques in Software Testing

Finding of a defect or fault in the earlier parts of the software not only saves time and
money, but is also efficient in terms of security and profitability. As we move forward
towards the different levels of the software, it becomes difficult and tedious to go back for
finding the problems in the initial conditions of the components. The cost of finding the
defect also increases. Thus it is recommended to start testing from the initial stages of the
life cycle.

There are various techniques involved alongwith the types of software testing. There is a
procedure that is to be followed for finding a bug in the application. This procedure is
combined into the life cycle of the bug in the form of contents of a bug, depending upon the
severity and priority of that bug. This life cycle is named as the bug life cycles, which helps the
tester in answering the question - how to log a bug?

Measuring Software Testing

There arises a need of measuring the software, both, when the software is under
development and after the system is ready for use. Though it is difficult to measure such an
abstract constraint, it is essential to do so. The elements that are not able to be measured,
needs to be controlled. There are some important uses of measuring the software:

• Software metrics helps in avoiding pitfalls such as


1. cost overruns,
2. in identifying where the problem has raised,
3. clarifying goals.
• It answers questions such as:
1. What is the estimation of each process activity?,
2. How is the quality of the code that has been
developed?,
3. How can the under developed code be
improved?, etc.
• It helps in judging the quality of the software, cost and effort
estimation, collection of data, productivity and performance
evaluation.

Some of the common software metrics are:

• Code Coverage
• Cyclomatic complexity
• Cohesion
• Coupling
• Function Point Analysis
• Execution time
• Source lines of code
• Bug per lines of code
In short, measurement of a software is for understanding, controlling and improvement of
the software system. Software is subject to changes, with respect to, changing
environmental conditions, varying user requirements, as well as configuration and
compatibility issues. This gives rise to the development of newer and updated versions of
software. But, there should be some source of getting back to the older versions easily and
working on them efficiently. Testers play a vital role in this. Here is where change management
comes into picture.

Software Testing as a Career

Software testing is a good career opportunity for those who are interested in the software industry.
Video game testing is an offshoot of software testing. There are many industries specializing
in this field. Believe it or not, you can actually get paid to test video games. You can read more on how to
become a video game tester .

Software Testing Interview Questions

I hope this article has helped you gain a deeper insight into software testing. If you are
planning to choose the software testing industry as your career ground, you might like to go
through this extensive list of software testing interview questions. Before you step out for a job in the
testing field or before you take your first step towards becoming a software tester, you can
acquire these software testing certifications.

Software Testing Certifications

Software testing certifications will not only boost up ones knowledge, but also prove to be
beneficial for his academic performance. There are some software testing certification
programs that can support the professional aspirations of software testers and quality
assurance specialists.

• ISTQB- International Software Testing Qualifications Board


• CSTE- Certified Software Tester
• CSTP- Certified Software Test Professional
• CTM- Certified Test Manager
• CSPM- Certified Software Project Manager
• CSPE- Certified Software Process Engineer
• CAST- Certified Associate in Software Testing

Quality Assurance Certifications:

• CSQA- Certified Software Quality Analyst


• Software Quality Assurance Certification
• CSQE- Certified Software Quality Engineer
• CQIA- Certified Quality Improvement Associate

Software testing is indeed a vast field and accurate knowledge is crucial to ensure the
quality of the software developed. I consider that this article on software testing tutorial
must have given you a clearer idea on various software testing types, methodologies and
different software testing strategies.
Software Development Life Cycle
What is Software Development Life Cycle?

The Software Development Life Cycle is a step-by-step process involved in the development
of a software product. It is also denoted as Software Development process in certain parts of
the world. The whole process is generally classified into a set of steps and a specific
operation will be carried out in each of the steps.

Classification
The basic classification of the whole process is as follows

• Planning
• Analysis
• Design
• Development
• Implementation
• Testing
• Deployment
• Maintenance

Each of the steps of the process has its own importance and plays a significant part in the
product development. The description of each of the steps can give a better understanding.

Planning
This is the first and foremost stage in the development and one of the most important
stages. The basic motive is to plan the total project and to estimate the merits and demerits
of the project. The Planning phase includes the definition of the intended system,
development of the project plan, and Parallel management of the plan throughout the
proceedings of the development.

A good and matured plan can create a very good initiative and can positively affect the
complete project.

Analysis
The main aim of the analysis phase is to perform statistics and requirements gathering.
Based on the analysis of the project and due to the influence of the results of the planning
phase, the requirements for the project are decided and gathered.

Once the requirements for the project are gathered, they are prioritized and made ready for
further use. The decisions taken in the analysis phase are out and out due to the
requirements analysis. Proceedings after the current phase are defined.

Design
Once the analysis is over, the design phase begins. The aim is to create the architecture of
the total system. This is one of the important stages of the process and serves to be a
benchmark stage since the errors performed until this stage and during this stage can be
cleared here.

Most of the developers have the habit of developing a prototype of the entire software and
represent the software as a miniature model. The flaws, both technical and design, can be
found and removed and the entire process can be redesigned.

Development and Implementation

The development and implementation phase is the most important phase since it is the
phase where the main part of the project is done. The basic works include the design of the
basic technical architecture and the maintenance of the database records and programs
related to the development process.

One of the main scenarios is the implementation of the prototype model into a full-fledged
working environment, which is the final product or software.

Testing
The testing phase is one of the final stages of the development process and this is the phase
where the final adjustments are made before presenting the completely developed software
to the end-user.

In general, the testers encounter the problem of removing the logical errors and bugs. The
test conditions which are decided in the analysis phase are applied to the system and if the
output obtained is equal to the intended output, it means that the software is ready to be
provided to the user.

Maintenance
The toughest job is encountered in the maintenance phase which normally accounts for the
highest amount of money. The maintenance team is decided such that they monitor on the
change in organization of the software and report to the developers, in case a need arises.

The information desk is also provided with in this phase. This serves to maintain the
relationship between the user and the creator.
Software Testing - Check Lists For Software Tester
I would like to make a note that the following checklists are defined in most generic form
and do not promise to cover all processes that you are be required to go through and follow
during your work. There may be some processes which are completely missed out from the
lists or it may also contain processes which you don’t need to follow in your form of work.

First Things First


• Check the scripts assigned to you: This is the first and foremost process in the
list. There is no specific logic used to assign scripts to testers who should
execute them all, but you may come across practices where you will be
assigned script based on your work load for the day or your skill to understand
and execute it in least possible time.
• Check the status/comments of the defect in the Test Report Tool: Once you
unveil a bug, its very important to keep track of the status of it as you will
have to re-test the bug once it is fixed by a developer. Most of the times,
general practice is to confirm if any fix to a bug is successful as it also makes
it sure that the tester can proceed with other tests involving deeper side of
that particular functionality. Sometimes, it also addresses issues related to
understanding of functionality of the system for example: if a tester registered
a defect, which is not an actual bug as per the programming/business logic.
Then in that case, a comment from developer might help in understanding the
mistake committed by the tester.

Checks while executing scrips:


• Update the test data sheet with all values which are required such as user
name, functionality, test code etc.
• Use naming conventions defined as testing standards to define a bug
appropriately.
• Take screen prints for the script executed using naming conventions and
provide test data that you used for the testing. The screen prints will help
other testers and developers to understand how the test was executed and it
will also serve as a proof for you. If possible, try to explain the procedure you
followed, choice of data and your understanding etc.
• If your team is maintaining any type of tracking sheet, do not forget to update
all the tracking sheets for the bug, it’s status, time and date found, severity
etc.
• If you are using a test reporting tool, do not forget to execute the script in the
tool. Many test reporting tools require scripts to be executed in order to
initiate the life cycle of a bug. For example Test Director needs script to be
executed till the step where it the test script failed, other test steps before
failed test step are declared as passed.
• Update the tracking sheets with current status, status in reporting tools etc. if
it is required to be updated after you execute the script in the reporting tool.
• Check if you have executed all the scripts properly and updated the test
reporting tool.
• After you complete your days work, it is better to do a peer to peer review.
This step is very important and often helps in finding out missing
steps/processes.

Checks while logging defects


• First of all, confirm with your test lead if the defect is valid.
• Follow the appropriate naming conventions while logging defects.
• Before submitting the defect, get it reviewed by Work Lead/Team Lead.
• Give appropriate description and names in the defect screen prints as per
naming conventions.
• After submitting defects attach the screen prints for the defect on Test
Reporting Tool.
• Note down the defect number/unique identifier and update the test tracking
sheet with appropriate information.
• Maintain a defect log, defect tracking sheet, screen prints dump folder etc. for
a backup.

Checks for blocking and unblocking scripts

Blocking or unblocking of a script relates to a bug which affects execution of a script. For
example if there is a bug on login screen, which is not allowing anyone enter the account
after entering valid username and password and pressing OK button, there is no way you
can execute any test script which requires the account screen that comes after the login
screen.

• Confirm with your test lead/work lead if the scripts are really blocked due to
an existing bug.
• Block scripts with an active defect (Defect status:
New/Assigned/Fixed/Reopen)
• Update the current script/defect in test reporting tool and tracking sheets with
the defect number/unique identifier, which is blocking the execution of the
script or testing of the defect.
• If a defect is retested successfully, then unblock all scripts/defects blocked by
it.

At the end of day, send an update mail to your Team Lead/Work Lead which
should include the following:
• Scripts executed (Number)
• Defects raised/closed (Number)
• If any comments added on defects
• Issues/queries if any
Software Testing - Black Box Testing Strategy
What is a Black Box Testing Strategy?

Black Box Testing is not a type of testing; it instead is a testing strategy, which does not
need any knowledge of internal design or code etc. As the name "black box" suggests, no
knowledge of internal logic or code structure is required. The types of testing under this
strategy are totally based/focused on the testing for requirements and functionality of the
work product/software application. Black box testing is sometimes also called as "Opaque
Testing", "Functional/Behavioral Testing" and "Closed Box Testing".

The base of the Black box testing strategy lies in the selection of appropriate data as per
functionality and testing it against the functional specifications in order to check for normal
and abnormal behavior of the system. Now a days, it is becoming common to route the
Testing work to a third party as the developer of the system knows too much of the internal
logic and coding of the system, which makes it unfit to test the application by the developer.

In order to implement Black Box Testing Strategy, the tester is needed to be thorough with
the requirement specifications of the system and as a user, should know, how the system
should behave in response to the particular action.

Various testing types that fall under the Black Box Testing strategy are: functional testing,
stress testing, recovery testing, volume testing, User Acceptance Testing (also known as
UAT), system testing, Sanity or Smoke testing, load testing, Usability testing, Exploratory
testing, ad-hoc testing, alpha testing, beta testing etc.

These testing types are again divided in two groups: a) Testing in which user plays a role of
tester and b) User is not required.

Testing method where user is not required:

Functional Testing:

In this type of testing, the software is tested for the functional requirements. The tests are
written in order to check if the application behaves as expected.

Stress Testing:

The application is tested against heavy load such as complex numerical values, large
number of inputs, large number of queries etc. which checks for the stress/load the
applications can withstand.

Load Testing:

The application is tested against heavy loads or inputs such as testing of web sites in order
to find out at what point the web-site/application fails or at what point its performance
degrades.
Ad-hoc Testing:

This type of testing is done without any formal Test Plan or Test Case creation. Ad-hoc
testing helps in deciding the scope and duration of the various other testing and it also helps
testers in learning the application prior starting with any other testing.

Exploratory Testing:

This testing is similar to the ad-hoc testing and is done in order to learn/explore the
application.

Usability Testing:

This testing is also called as ‘Testing for User-Friendliness’. This testing is done if User
Interface of the application stands an important consideration and needs to be specific for
the specific type of user.

Smoke Testing:

This type of testing is also called sanity testing and is done in order to check if the
application is ready for further major testing and is working properly without failing up to
least expected level.

Recovery Testing:

Recovery testing is basically done in order to check how fast and better the application can
recover against any type of crash or hardware failure etc. Type or extent of recovery is
specified in the requirement specifications.

Volume Testing:

Volume testing is done against the efficiency of the application. Huge amount of data is
processed through the application (which is being tested) in order to check the extreme
limitations of the system.

Testing where user plays a role/user is required:

User Acceptance Testing:

In this type of testing, the software is handed over to the user in order to find out if the
software meets the user expectations and works as it is expected to.

Alpha Testing:

In this type of testing, the users are invited at the development center where they use the
application and the developers note every particular input or action carried out by the user.
Any type of abnormal behavior of the system is noted and rectified by the developers.
Beta Testing:

In this type of testing, the software is distributed as a beta version to the users and users
test the application at their sites. As the users explore the software, in case if any
exception/defect occurs that is reported to the developers.
Software Testing - White Box Testing Strategy

What is a White Box Testing Strategy?

White box testing strategy deals with the internal logic and structure of the code. White box
testing is also called as glass, structural, open box or clear box testing. The tests written
based on the white box testing strategy incorporate coverage of the code written, branches,
paths, statements and internal logic of the code etc.

In order to implement white box testing, the tester has to deal with the code and hence is
needed to possess knowledge of coding and logic i.e. internal working of the code. White
box test also needs the tester to look into the code and find out which unit/statement/chunk
of the code is malfunctioning.

Advantages of White box testing are:

i) As the knowledge of internal coding structure is prerequisite, it becomes very easy to find
out which type of input/data can help in testing the application effectively.

ii) The other advantage of white box testing is that it helps in optimizing the code
iii) It helps in removing the extra lines of code, which can bring in hidden defects.

Disadvantages of white box testing are:

i) As knowledge of code and internal structure is a prerequisite, a skilled tester is needed to


carry out this type of testing, which increases the cost.

ii) And it is nearly impossible to look into every bit of code to find out hidden errors, which
may create problems, resulting in failure of the application.

Types of testing under White/Glass Box Testing Strategy:

Unit Testing:

The developer carries out unit testing in order to check if the particular module or unit of
code is working fine. The Unit Testing comes at the very basic level as it is carried out as
and when the unit of the code is developed or a particular functionality is built.

Static and dynamic Analysis:

Static analysis involves going through the code in order to find out any possible defect in the
code. Dynamic analysis involves executing the code and analyzing the output.

Statement Coverage:
In this type of testing the code is executed in such a manner that every statement of the
application is executed at least once. It helps in assuring that all the statements execute
without any side effect.

Branch Coverage:

No software application can be written in a continuous mode of coding, at some point we


need to branch out the code in order to perform a particular functionality. Branch coverage
testing helps in validating of all the branches in the code and making sure that no branching
leads to abnormal behavior of the application.

Security Testing:

Security Testing is carried out in order to find out how well the system can protect itself from
unauthorized access, hacking – cracking, any code damage etc. which deals with the code of
application. This type of testing needs sophisticated testing techniques.

Mutation Testing:

A kind of testing in which, the application is tested for the code that was modified after
fixing a particular bug/defect. It also helps in finding out which code and which strategy of
coding can help in developing the functionality effectively.

Besides all the testing types given above, there are some more types which fall under both
Black box and White box testing strategies such as: Functional testing (which deals with the
code in order to check its functional performance), Incremental integration testing (which
deals with the testing of newly added code in the application), Performance and Load testing
(which helps in finding out how the particular code manages resources and give
performance etc.) etc.
Software Testing - Acceptance Testing

Acceptance testing (also known as user acceptance testing) is a type of testing carried out
in order to verify if the product is developed as per the standards and specified criteria and
meets all the requirements specified by customer. This type of testing is generally carried
out by a user/customer where the product is developed externally by another party.

Acceptance testing falls under black box testing methodology where the user is not very much
interested in internal working/coding of the system, but evaluates the overall functioning of
the system and compares it with the requirements specified by them. User acceptance
testing is considered to be one of the most important testing by user before the system is
finally delivered or handed over to the end user.

Acceptance testing is also known as validation testing, final testing, QA testing, factory
acceptance testing and application testing etc. And in software engineering, acceptance
testing may be carried out at two different levels; one at the system provider level and
another at the end user level (hence called user acceptance testing, field acceptance testing
or end-user testing).

Acceptance testing in software engineering generally involves execution of number test cases which
constitute to a particular functionality based on the requirements specified by the user.
During acceptance testing, the system has to pass through or operate in a computing
environment that imitates the actual operating environment existing with user. The user
may choose to perform the testing in an iterative manner or in the form of a set of varying
parameters (for example: missile guidance software can be tested under varying payload,
different weather conditions etc.).

The outcome of the acceptance testing can be termed as success or failure based on the
critical operating conditions the system passes through successfully/unsuccessfully and the
user’s final evaluation of the system.

The test cases and test criterion in acceptance testing are generally created by end user
and cannot be achieved without business scenario criteria input by user. This type of testing
and test case creation involves most experienced people from both sides (developers and
users) like business analysts, specialized testers, developers, end users etc.

Process involved in Acceptance Testing


1. Test cases are created with the help of business analysts, business customers (end
users), developers, test specialists etc.
2. Test cases suites are run against the input data provided by the user and for the
number of iterations that the customer sets as base/minimum required test runs.
3. The outputs of the test cases run are evaluated against the criterion/requirements
specified by user.
4. Depending upon the outcome if it is as desired by the user or consistent over the
number of test suites run or non conclusive, user may call it successful/unsuccessful
or suggest some more test case runs.
5. Based on the outcome of the test runs, the system may get rejected or accepted by
the user with or without any specific condition.

Acceptance testing is done in order to demonstrate the ability of system/product to perform


as per the expectations of the user and induce confidence in the newly developed
system/product. A sign-off on contract stating the system as satisfactory is possible only
after successful acceptance testing.

Types of Acceptance Testing

User Acceptance Testing: User acceptance testing in software engineering is considered


to be an essential step before the system is finally accepted by the end user. In general
terms, user acceptance testing is a process of testing the system before it is finally accepted
by user.

Alpha Testing & Beta Testing: Alpha testing is a type of acceptance testing carried out at
developer’s site by users (internal staff). In this type of testing, the user goes on testing the
system and the outcome is noted and observed by the developer simultaneously.

Beta testing is a type of testing done at user’s site. The users provide their feedback to the
developer for the outcome of testing. This type of testing is also known as field testing.
Feedback from users is used to improve the system/product before it is released to other
users/customers.

Operational Acceptance Testing: This type of testing is also known as operational


readiness/preparedness testing. It is a process of ensuring all the required components
(processes and procedures) of the system are in place in order to allow user/tester to use it.

Contact and Regulation Acceptance Testing: In contract and regulation acceptance


testing, the system is tested against the specified criteria as mentioned in the contract
document and also tested to check if it meets/obeys all the government and local authority
regulations and laws and also all the basic standards.
Software Testing - Stress Testing

Stress testing has different meaning for different industries where it is used. For a financial
industry/sector, stress testing means a process of testing financial instruments to find out
their robustness and level of accuracy they can maintain under extreme conditions such as
sudden or continuous market crash at a certain level, sudden or extreme change in various
parameters, for example interest rates, repo and reverse repo used in the financial sector,
sudden rise or decline in the price of materials that can affect financial projections etc. For
the manufacturing industry, stress testing may include different parameters and operating
process for testing of different systems. For medical industry, stress testing means a process
that can help understand a patient’s condition, etc.

Stress Testing in IT Industry

Stress testing in IT industry (hardware as well as software sectors) means testing of


software/hardware for its effectiveness in giving consistent or satisfactory performance under
extreme and unfavorable conditions such as heavy network traffic, heavy processes load,
under or over clocking of underlying hardware, working under maximum requests for
resource utilization of the peripheral or in the system etc.

In other words, stress testing helps find out the level of robustness and consistent or
satisfactory performance even when the limits for normal operation for the system
(software/hardware) is crossed.

Most important use of stress testing is found in testing of software and hardware that are
supposed to be operating in critical or real time situation. Such as a website will always be
online and the server hosting the website must be able to handle the traffic in all possible
ways (even if the traffic increases manifold), a mission critical software or hardware that
works in real time scenario etc. Stress testing in connection with websites or certain
software is considered to be an effective process of determining the limit, at which the
system/software/hardware/website shows robustness, is always available to perform its task,
effectively manages the load than the normal scenario and even shows effective error
management under extreme conditions.

Need for Stress Testing

Stress testing is considered to be important because of following reasons:


1. Almost 90% of the software/systems are developed with an assumption that they will
be operating under normal scenario. And even if it is considered that the limit of
normal operating conditions will be crossed, it is not considerably as high as it really
could be.
2. The cost or effect of a very important (critical) software/system/website failure under
extreme conditions in real time can be huge (or may be catastrophic for the
organization or entity owning the software/system).
3. It is always better to be prepared for extreme conditions rather than letting the
system/software/website crash, when the limit of normal operation is crossed.
4. Testing carried out by the developer of the system/software/website may not be
sufficient to help unveil conditions which will lead to crash of the system/software
when it is actually submitted to the operating environment.
5. It's not always possible to unveil possible problems or bugs in a system/software,
unless it is subjected to such type of testing.

To help overcome problems like denial of service attacks, in case of web servers for a web
site, security breach related problems due to spamming, hacking and viruses etc., problems arising
out of conditions where software/system/website need to handle requests for resource
allocation for requesting processes at the time when all the required resources are already
allocated to some other process that needs some more resources to complete its work
(which is called as deadlock situation), memory leak, race condition etc.

This type of testing is mostly done with the help of various stress testing softwares available
in market. These tools are configured to automate a process of increasing stress (i.e.
creation and increasing degree of adverse environment) on a system/software/website and
capturing values of various parameters that help confirm the robustness, availability and
performance of the system/software/website being tested. Few of the actions involved in
stress testing are bombarding a website with huge number of requests, running of many
resource hungry applications in a computer, making numerous attempts to access ports of a
computer in order to hack it and use it for various purposes such as spamming, spreading
virus etc.

Intensity of the adverse conditions is increased slowly while measuring all the parameters till
the point where the system/software/website crashes. The collected data (observation and
parameter values) are used for further improvement of the system/software/website.
Software Testing - An Introduction To Usability Testing
Usability Testing:

As the term suggest, usability means how better something can be used over the purpose it
has been created for. Usability testing means a way to measure how people (intended/end
user) find it (easy, moderate or hard) to interact with and use the system keeping its
purpose in mind. It is a standard statement that "Usability testing measures the usability of
the system".

Why Do We Need Usability Testing?

Usability testing is carried out in order to find out if there is any change needs to be carried
out in the developed system (may it be design or any specific procedural or programmatic
change) in order to make it more and more user friendly so that the intended/end user who
is ultimately going to buy and use it receives the system which he can understand and use it
with utmost ease.

Any changes suggested by the tester at the time of usability testing, are the most crucial
points that can change the stand of the system in intended/end user’s view.
Developer/designer of the system need to incorporate the feedbacks (here feedback can be
a very simple change in look and feel or any complex change in the logic and functionality of
the system) of usability testing into the design and developed code of the system (the word
system may be a single object or an entire package consisting more than one objects) in
order to make system more and more presentable to the intended/end user.

Developer often try to make the system as good looking as possible and also tries to fit the
required functionality, in this endeavor he may have forgotten some error prone conditions
which are uncovered only when the end user is using the system in real time.

Usability testing helps developer in studying the practical situations where the system will
be used in real time. Developer also gets to know the areas that are error prone and the
area of improvement.

In simple words, usability testing is an in-house dummy-release of the system before the
actual release to the end users, where developer can find and fix all possible loop holes.

How Usability Test Is Carried Out?

Usability test, as mentioned above is an in-house dummy release before the actual release
of the system to the intended/end user. Hence, a setup is required in which developer and
testers try to replicate situations as realistic as possible to project the real time usage of the
system. The testers try to use the system in exactly the same manner that any end user
can/will do. Please note that, in this type of testing also, all the standard instruction of
testing are followed to make it sure that the testing is done in all the directions such as
functional testing, system integration testing, unit testing etc.
The outcome/feedback is noted down based on observations of how the user is using the
system and what are all the possible ways that also may come into picture, and also based
on the behavior of the system and how easy/hard it is for the user to operate/use the
system. User is also asked for his/her feedback based on what he/she thinks should be
changed to improve the user interaction between the system and the end user.

Usability testing measures various aspects such as:

How much time the tester/user and system took to complete basic flow?

How much time people take to understand the system (per object) and how many mistakes
they make while performing any process/flow of operation?

How fast the user becomes familiar with the system and how fast he/she can recall the
system’s functions?
And the most important: how people feel when they are using the system?

Over the time period, many people have formulated various measures and models for
performing usability testing. Any of the models can be used to perform the test.

Advantages of Usability Testing


• Usability test can be modified to cover many other types of testing such as functional
testing, system integration testing, unit testing, smoke testing etc. (with keeping the
main objective of usability testing in mind) in order to make it sure that testing is
done in all the possible directions.
• Usability testing can be very economical if planned properly, yet highly effective and
beneficial.
• If proper resources (experienced and creative testers) are used, usability test can
help in fixing all the problems that user may face even before the system is finally
released to the user. This may result in better performance and a standard system.
• Usability testing can help in uncovering potential bugs and potholes in the system
which generally are not visible to developers and even escape the other type of
testing.

Usability testing is a very wide area of testing and it needs fairly high level of understanding
of this field along with creative mind. People involved in the usability testing are required to
possess skills like patience, ability to listen to the suggestions, openness to welcome any
idea, and the most important of them all is that they should have good observation skills to
spot and fix the problems on fly.
Software Testing - Compatibility Testing
Compatibility testing is a non-functional software testing that helps evaluate a
system/application's performance in connection with the operating environment. Read on to
know more about compatibility testing.

Compatibility testing is one of the several types of software testing performed on a system that is
built based on certain criteria and which has to perform specific functionality in an already
existing setup/environment. Compatibility of a system/application being developed with, for
example, other systems/applications, OS, Network, decide many things such as use of the
system/application in that environment, demand of the system/application etc. Many a
times, users prefer not to opt for an application/system just because it is not compatible with
any other system/application, network, hardware or OS they are already using. This leads to
a situation where the development efforts taken by developers prove to be in vain.

What is Compatibility Testing

Compatibility testing is a type of testing used to ensure compatibility of the


system/application/website built with various other objects such as other web browsers,
hardware platforms, users (in case if its very specific type of requirement, such as a user
who speaks and can read only a particular language), operating systems etc. This type of
testing helps find out how well a system performs in a particular environment that includes
hardware, network, operating system and other software etc.

Compatibility testing can be automated using automation tools or can be performed


manually and is a part of non-functional software testing.

Developers generally lookout for the evaluation of following elements in a computing


environment (environment in which the newly developed system/application is tested and
which has similar configuration as the actual environment in which the system/application is
supposed to fit and start working).

Hardware: Evaluation of the performance of system/application/website on a certain


hardware platform. For example: If an all-platform compatible game is developed and is
being tested for hardware compatibility, the developer may choose to test it for various
combinations of chipsets (such as Intel, Macintosh GForce), motherboards etc.

Browser: Evaluation of the performance of system/website/application on a certain type of


browser. For example: A website is tested for compatibility with browsers like Internet
Explorer, Firefox etc. (usually browser compatibility testing is also looked at as a user
experience testing, as it is related to user’s experience of the application/website, while
using it on different browsers).
Network: Evaluation of the performance of system/application/website on network with
varying parameters such as bandwidth, variance in capacity and operating speed of
underlying hardware etc., which is set up to replicate the actual operating environment.

Peripherals: Evaluation of the performance of system/application in connection with


various systems/peripheral devices connected directly or via network. For example: printers,
fax machines, telephone lines etc.

Compatibility between versions: Evaluation of the performance of system/application in


connection with its own predecessor/successor versions (backward and forward
compatibility). For example: Windows 98 was developed with backward compatibility for
Windows 95 etc.

Softwares: Evaluation of the performance of system/application in connection with other


softwares. For example: Software compatibility with operating tools for network, web
servers, messaging tools etc.

Operating System: Evaluation of the performance of system/application in connection with


the underlying operating system on which it will be used.

Databases: Many applications/systems operate on databases. Database compatibility testing


is used to evaluate an application/system’s performance in connection to the database it will
interact with.

How helpful is it?

Compatibility testing can help developers understand the criteria that their
system/application needs to attain and fulfill, in order to get accepted by intended users who
are already using some OS, network, software and hardware etc. It also helps the users to
find out which system will better fit in the existing setup they are using.

The most important use of the compatibility testing is as already mentioned above: to
ensure its performance in a computing environment in which it is supposed to operate. This
helps in figuring out necessary changes/modifications/additions required to make the
system/application compatible with the computing environment.
Software Testing - Brief Introduction To Exploratory
Testing
Exploratory Software Testing, even though disliked by many, has found its place in the
Software Testing world. Exploratory testing is the only type of testing that can help in
uncovering bugs that stand more chance of being ignored by other testing strategies.

What is an Exploratory Testing?

Bach’s Definition: ‘Any testing to the extent that the tester actively controls the design of
the tests as those tests are performed and uses information gained while testing to design
new and better tests.’

Which simply can be put as: A type of testing where we explore software, write and execute
the test scripts simultaneously.

Exploratory testing is a type of testing where tester does not have specifically planned test
cases, but he/she does the testing more with a point-of-view to explore the software
features and tries to break it in order to find out unknown bugs.

A tester who does exploratory testing, does it only with an idea to more and more
understand the software and appreciate its features. During this process, he/she also tries to
think of all possible scenarios where the software may fail and a bug can be revealed.

Why do we need exploratory testing?


• At times, exploratory testing helps in revealing many unknown and un-detected
bugs, which is very hard to find out through normal testing.
• As exploratory testing covers almost all the normal type of testing, it helps in
improving our productivity in terms of covering the scenarios in scripted testing and
those which are not scripted as well.
• Exploratory Testing is a learn and work type of testing activity where a tester can at
least learn more and understand the software if at all he/she was not able to reveal
any potential bug.
• Exploratory testing, even though disliked by many, helps testers in learning new
methods, test strategies, and also think out of the box and attain more and more
creativity.

Who Does Exploratory Testing?

Any software tester knowingly or unknowingly does it!

While testing, if a tester comes across a bug, as a general practice, tester registers that bug
with the programmer. Along with registering the bug, tester also tries to make it sure that
he/she has understood the scenario and functionality properly and can reproduce the bug
condition. Once programmer fixes the bug, tester runs a test case with the same scenario
replication in which the bug had occurred previously. If tester finds that the bug is fixed,
he/she again tries to find out if the fix can handle any such same type of scenario with
different inputs.

For an example, lets consider that a tester finds a bug related to an input text field on a
form, where the field is supposed to accept any digit other than the digits from 1 to 100,
which it fails to and accepts the number 100. Tester logs this bug to the programmer and
now is waiting for the fix. Once programmer fixes the bug, it sends it across to the tester so
as to get it tested. Tester now will try to test the bug with same input value (100: as he/she
had found that this condition causes application to fail) in the field. If application rejects the
number (100) entered by the tester, he/she can safely close the defect.

Now, along with the above given test input value, which had revealed the bug, tester tries to
check if there is any other value from this set (0 to 100), which can cause the application to
fail. He/she may try to enter values from 0 to 100, or may be some characters or a
combination of character and numbers in any order. All these test cases are thought by the
tester as a variation of the type of value he/she had entered previously and represent only
one test scenario. This testing is called exploratory testing, as the tester tried to explore and
find out the possibility of revealing a bug by using any possible way.

What qualities I need to posses to be able to perform an Exploratory Testing?

As I mentioned above, any software tester can perform exploratory testing.


The only limit to the extent to which you can perform exploratory testing is your imagination
and creativity, more you can think of ways to explore, understand the software, more test
cases you will be able write and execute simultaneously.

Advantages of Exploratory Testing


• Exploratory testing can uncover bugs, which are normally ignored (or hard to find) by
other testing strategies.
• It helps testers in learning new strategies, expand the horizon of their imagination
that helps them in understanding & executing more and more test cases and finally
improve their productivity.
• Exploratory testing helps tester in confirming that he/she understands the application
and its functionality properly and has no confusion about the working of even a
smallest part of it, hence covering the most important part of requirement
understanding.
• As in case of exploratory testing, we write and execute the test cases simultaneously.
It helps in collecting result oriented test scripts and shading of load of unnecessary
test cases which do not yield and result.
• Exploratory testing covers almost all type of testing, hence tester can be sure of
covering various scenarios once exploratory testing is performed at the highest level
(i.e. if the exploratory testing performed can ensure that all the possible scenarios
and test cases are covered).
Waterfall Model in Testing
The waterfall model in testing is one of the most widely used and popular process module
for developing and designing software programs to meet specific customer needs. The linear
sequential properties of the model make it a universally accepted software development
process model.

Every piece of software that is released needs to undergo a rigorous and extreme testing
procedure before it can be released for general use. The waterfall model in testing is one such
testing procedure that has gained immense popularity over the years, owing to its simple
understandability and elementary design. The development of software is a long and
arduous process, and without proper testing and checking, it cannot be sold anywhere. The
process of software development is known as 'Software Development Process Models', and
these define the many stages of developing a software, right from the initial idea conception
to the final usage.

Waterfall model in testing envelopes the use of a design concept that is also known as
System Developing Life Cycle (SDLC) Model, or the Linear Sequential Model. Thus, waterfall model
in software engineering defines the various stages that a software developer must undertake in order
to ensure that the software is meeting customer requirements, and is working glitch free.

Waterfall Model Life-cycle

A lot of research and development is enforced during the various growth stages of any
particular software. The idea of generating a standardized model of testing (like the
waterfall model in testing) is to ensure that a software engineer follows the correct
sequence of process development, and does not get too far ahead too soon. Each line of the
program needs to be checked and double checked, and each stage of the waterfall model is
required to follow a standard protocol. The various waterfall model phases are as follows.
The waterfall model diagram shown above illustrates the various stages of this process.

Requirements Gathering

The first and most obvious step in software development is the gathering of all requirements
of the customer. The primary purpose of the final program is to serve the user, so therefore
all his needs and requirements need to be known in detail, before the development process
actually begins. The purpose of the model and a basic specifications and requirements chart
is made after careful consultation with the user, and this is incorporated into the
development process. Waterfall model in testing begins primarily with the gathering of all
pertinent and necessary data from the customer.

Requirements Analysis

Next up, these requirements are studied and analyzed closely, and the developer takes a
decision regarding which platform, which computer language, and what kind of databases
are necessary for the development process. A feasibility study is then carried out to ensure
that all resources are available and the actual programming of the software is possible. A
projected blueprint of sorts is created of the software.

Designing and Coding

This is where the real work begins, and the algorithms and the flowcharts of the software are
devised. Based on the data collected and the feasibility study carried out, the actual coding
of the program commences. Without the information gathered in the previous two stages,
the design of the program would be impossible. This is the most important stage of the
model, and the use of the waterfall model in testing would be impossible without something
to actually test. It goes without saying that the final design has to meet all the necessary
requirements of the customer.

Testing
Now comes the litmus test of the code developed. This stage defines the actual transition of
the program from a mere hypothesis to a real usable software. Without testing the
functionality of the code, all the possible bugs cannot be detected. Moreover, use of
waterfall model in testing also ensures that all the requirements of the customer are
satisfactorily met, and there are no loose ends anywhere in the code developed. If any flaws
or bugs are detected, the software is reverted to the designing stage and all the deficiencies
are fixed.

The designing process is divided into smaller parts known as units, and unit testing needs to
be carried out for each of these divisions individually. Once the units are declared to be flaw
free, they are integrated into the final system and then this system is tested to ensure
proper integration and compatibility between the various units. Waterfall model in testing
can only be done by dividing up the coded program into various manageable parts. Thus,
the importance of the testing phase in waterfall model is universally known and undoubted.

Final Acceptance

Once the design has been tried and tested by the testing team, the customers are given a
demo version of the final program. Now they must use the program and indicate whether
they are satisfied with the product or not. If they accept that the software is satisfactory and
as per their demands and requirements, the process is completed. On the other hand, if he
is dissatisfied with certain aspects of the software, or feels that an integral component is
missing, the design team proceeds to solve this problem. The benefits of dividing the work
into these various stages is that everyone knows what they are doing, and are specifically
trained to carry out their responsibility.

Waterfall model in testing ensures that a high degree of professionalism is met within the
development process, and that all the parties involved in this development process are
specialists in their respective fields.

Advantages of Waterfall Model in Testing

The primary advantage is that it is a linear model, and follows a proper sequence and order.
This is a crucial factor in determining the model's effectiveness and suitability. Also, since
the process is following a linear sequence, and documentation is produced at every stage, it
is easy to track down mistakes, deficiencies and any other problems that may arise. The
cost of resources at each stage get minimized due to the linear sequencing as well.

Disadvantages of Waterfall Model in Testing

As is the case with all other models, if the customer is ambiguous about his needs, the
design process can go horribly wrong. This factor is further highlighted by the fact that if
some mistake is made in a certain stage and is not detected or tracked, all the subsequent
steps will go wrong. Therefore the need for testing is very intense. Customers often have a
complaint that if they could get a sample of the software in the early stages, they could find
out whether it is suitable or not. Since they do not receive the program till it is almost
completed, it becomes a little more complicated for them to offer feedback. Thus, a situation
of complete trust from the client is essential.
Software Verification & Validation Model - An Introduction
An introduction to ‘Verification & Validation Model’ used in improvement of software project
development life cycle.

A perfect software product is built when every step is taken with full consideration that ‘A
right product is developed in a right manner’. ‘Software Verification & Validation’ is one such
model, which helps the system designers and test engineers to confirm that a right product
is build right way throughout the development process and improve the quality of the
software product.

‘Verification & Validation Model’ makes it sure that, certain rules are followed at the time of
development of a software product and also makes it sure that the product that is developed
fulfills the required specifications. This reduces the risk associated with any software project
up to certain level by helping in detection and correction of errors and mistakes, which are
unknowingly done during the development process.

What is Verification?

The standard definition of Verification goes like this: "Are we building the product RIGHT?"
i.e. Verification is a process that makes it sure that the software product is developed the
right way. The software should confirm to its predefined specifications, as the product
development goes through different stages, an analysis is done to ensure that all required
specifications are met.

Methods and techniques used in the Verification and Validation shall be designed carefully,
the planning of which starts right from the beginning of the development process. The
Verification part of ‘Verification and Validation Model’ comes before Validation, which
incorporates Software inspections, reviews, audits, walkthroughs, buddy checks etc. in each
phase of verification (every phase of Verification is a phase of the Testing Life Cycle)

During the Verification, the work product (the ready part of the Software being developed
and various documentations) is reviewed/examined personally by one ore more persons in
order to find and point out the defects in it. This process helps in prevention of potential
bugs, which may cause in failure of the project.

Few terms involved in Verification:

Inspection:
Inspection involves a team of about 3-6 people, led by a leader, which formally reviews the
documents and work product during various phases of the product development life cycle.
The work product and related documents are presented in front of the inspection team, the
member of which carry different interpretations of the presentation. The bugs that are
detected during the inspection are communicated to the next level in order to take care of
them.

Walkthroughs:
Walkthrough can be considered same as inspection without formal preparation (of any
presentation or documentations). During the walkthrough meeting, the presenter/author
introduces the material to all the participants in order to make them familiar with it. Even
when the walkthroughs can help in finding potential bugs, they are used for knowledge
sharing or communication purpose.

Buddy Checks:

This is the simplest type of review activity used to find out bugs in a work product during the
verification. In buddy check, one person goes through the documents prepared by another
person in order to find out if that person has made mistake(s) i.e. to find out bugs which the
author couldn’t find previously.

The activities involved in Verification process are: Requirement Specification verification,


Functional design verification, internal/system design verification and code verification
(these phases can also subdivided further). Each activity makes it sure that the product is
developed right way and every requirement, every specification, design code etc. is verified!

What is Validation?

Validation is a process of finding out if the product being built is right?


i.e. whatever the software product is being developed, it should do what the user expects it
to do. The software product should functionally do what it is supposed to, it should satisfy all
the functional requirements set by the user. Validation is done during or at the end of the
development process in order to determine whether the product satisfies specified
requirements.

Validation and Verification processes go hand in hand, but visibly Validation process starts
after Verification process ends (after coding of the product ends). Each Verification activity
(such as Requirement Specification Verification, Functional design Verification etc.) has its
corresponding Validation activity (such as Functional Validation/Testing, Code
Validation/Testing, System/Integration Validation etc.).

All types of testing methods are basically carried out during the Validation process. Test
plan, test suits and test cases are developed, which are used during the various phases of
Validation process. The phases involved in Validation process are: Code Validation/Testing,
Integration Validation/Integration Testing, Functional Validation/Functional Testing, and
System/User Acceptance Testing/Validation.

Terms used in Validation process:

Code Validation/Testing:

Developers as well as testers do the code validation. Unit Code Validation or Unit Testing is a
type of testing, which the developers conduct in order to find out any bug in the code
unit/module developed by them. Code testing other than Unit Testing can be done by testers
or developers.

Integration Validation/Testing:

Integration testing is carried out in order to find out if different (two or more) units/modules
co-ordinate properly. This test helps in finding out if there is any defect in the interface
between different modules.

Functional Validation/Testing:

This type of testing is carried out in order to find if the system meets the functional
requirements. In this type of testing, the system is validated for its functional behavior.
Functional testing does not deal with internal coding of the project, in stead, it checks if the
system behaves as per the expectations.

User Acceptance Testing or System Validation:

In this type of testing, the developed product is handed over to the user/paid testers in order
to test it in real time scenario. The product is validated to find out if it works according to the
system specifications and satisfies all the user requirements. As the user/paid testers use
the software, it may happen that bugs that are yet undiscovered, come up, which are
communicated to the developers to be fixed. This helps in improvement of the final product.
Spiral Model - A New Approach Towards Software
Development
The Waterfall model is the most simple and widely accepted/followed software development
model, but like any other system, Waterfall model does have its own pros and cons. Spiral
Model for software development was designed in order to overcome the disadvantages of
the Waterfall Model.

In last article we discussed about "Waterfall Model", which is one of the oldest and most
simple model designed and followed during software development process. But "Waterfall
Model" has its own disadvantages such as there is no fair division of phases in the life cycle,
not all the errors/problems related to a phase are resolved during the same phase, instead
all those problems related to one phase are carried out in the next phase and are needed to
be resolved in the next phase, this takes much of time of the next phase to solve them. The
risk factor is the most important part, which affects the success rate of the software
developed by following "The Waterfall Model".

In order to overcome the cons of "The Waterfall Model", it was necessary to develop a new
Software Development Model, which could help in ensuring the success of software project.
One such model was developed which incorporated the common methodologies followed in
"The Waterfall Model", but it also eliminated almost every possible/known risk factors from
it. This model is referred as "The Spiral Model" or "Boehm’s Model".

There are four phases in the "Spiral Model" which are: Planning, Evaluation, Risk Analysis
and Engineering. These four phases are iteratively followed one after other in order to
eliminate all the problems, which were faced in "The Waterfall Model". Iterating the phases
helps in understating the problems associated with a phase and dealing with those problems
when the same phase is repeated next time, planning and developing strategies to be
followed while iterating through the phases. The phases in "Spiral Model" are:

Plan: In this phase, the objectives, alternatives and constraints of the project are
determined and are documented. The objectives and other specifications are fixed in order
to decide which strategies/approaches to follow during the project life cycle.

Risk Analysis: This phase is the most important part of "Spiral Model". In this phase all
possible (and available) alternatives, which can help in developing a cost effective project
are analyzed and strategies are decided to use them. This phase has been added specially
in order to identify and resolve all the possible risks in the project development. If risks
indicate any kind of uncertainty in requirements, prototyping may be used to proceed with
the available data and find out possible solution in order to deal with the potential changes
in the requirements.

Engineering: In this phase, the actual development of the project is carried out. The output
of this phase is passed through all the phases iteratively in order to obtain improvements in
the same.

Customer Evaluation: In this phase, developed product is passed on to the customer in


order to receive customer’s comments and suggestions which can help in identifying and
resolving potential problems/errors in the software developed. This phase is very much
similar to TESTING phase.

The process progresses in spiral sense to indicate iterative path followed, progressively
more complete software is built as we go on iterating through all four phases. The first
iteration in this model is considered to be most important, as in the first iteration almost all
possible risk factors, constraints, requirements are identified and in the next iterations all
known strategies are used to bring up a complete software system. The radical dimensions
indicate evolution of the product towards a complete system.

However, as every system has its own pros and cons, "The Spiral Model" does have its pros
and cons too. As this model is developed to overcome the disadvantages of the "Waterfall
Model", to follow "Spiral Model", highly skilled people in the area of planning, risk analysis
and mitigation, development, customer relation etc. are required. This along with the fact
that the process needs to be iterated more than once demands more time and is somehow
expensive task.
Rational Unified Process (RUP) Methodology

The rational unified process (RUP) is a software process product designed as an object-
oriented and web-enabled program development methodology by Rational Software
Corporation, a division acquired by IBM, since 2003. This article provides a brief overview of
the rational unified process (RUP) methodology.

Rational Unified Process (RUP) methodology is an software engineering tool which


compounds development aspects such as manuals, documents, codes, models, etc. with the
procedural aspects of development such as techniques, mechanics, defined stages, and
practices within a unified framework.

What is RUP?

Rational Unified Process (RUP) methodology is fast becoming a popular software development to map
business process and practices. Development is phased into four stages. RUP methodology
is highly flexible in its developmental path, as any stage can be updated at any time. The
first stage or inception centers on assessing needs, requirements, viability and feasibility of
the program or project. The second step or elaboration measures the architecture of the
system's appropriateness based on the project needs. The third stage is the construction
phase, wherein the actual software system is made, by developing components and
features. This phase also includes the first release of the developed software. The final stage
is that of transition, and marks the end of the development cycle, if all objectives are met.
This phase deals with the training of the end users, beta testing and the final
implementation of the system.

Understanding RUP: Six Best Industry Practices of RUP

RUP is designed to incorporate the six best software industry practices for software
development, while stressing strongly on object-oriented design. They are basically six
ideas, when followed while designing any software project, will reduce errors and faults and
ensure optimal productivity. The practices are listed below:

Develop Iteratively

Loops are created to add extra information or to facilitate processes that are added later in
the development stage.

Requirements
Gathering requirements is essential to the success of any project. The end users' needs have
to be built into the system completely.

Components
Large projects, when split into components, are easier to test and can be more methodically
integrated into a larger system. Components allow the use of code reuse through the use of
object-oriented programming.

Design Model Visual


Many projects use Unified Modeling Language (UML) to perform object-oriented analysis and
designs, which consist of diagrams to visually represent all major components.

Quality and Defects Management

for quality and defects is an integral part of software development. There are also a
Testing
number of testing patterns that should be developed, to gauge the readiness of the project
for its release.

Synchronized Changes

All components created by separate teams, either from different locations or on different
platforms need to be synchronized and verified constantly.

Rational Unified Process (RUP) methodology's developmental approach has proved to be


very resourceful and successful for a number of reasons. The entire development process
takes into account the changing requirements and integrates them. Risks and defects can,
not only be discovered but addressed, and reduced or eliminated in the middle of
integration process. As defects are detected along the process, errors and performance
bottlenecks can be rectified by making use of the several iterations (loops). RUP provides a
prototype at the completion of each iteration, which make it easier for the developers to
synchronize and implement changes.

methodology is designed to work as an online help that provides


Rational Unified Process (RUP)
content, guidelines, processes templates, and examples for all stages of program
development. To be a certified solution designer, authorized to use this methodology, one
needs to get a minimum of 62% in IBM RUP certification examination.
What is Rational Unified Process (RUP)

Rational Unified Process (RUP) is a comprehensive software engineering process. It features


a disciplined approach towards industry-tested practices for designing softwares and
systems within a development organization. Continue reading, if you want to know what is
rational unified process (RUP)?

The concept of Rational Unified Process (RUP) came from the Rational Software Corporation,
a division of IBM (International Business Machines Corporation). It keeps a check on effective
project management and high-quality production of software. The basic methodology followed in
RUP is based on a comprehensive web-enabled program development and object-oriented
approach.The 'Rational Unified Process' adopts the 'Unified Modeling Language' and
provides the best practiced guidelines, templates and illustrations of all aspects for program
development. Here is a simple breakdown of all the aspects related to this concept, so as to
give you a brief understanding as to what is rational unified process (RUP)?

There are primarily four phases or stages of development that is concluded with a release in
RUP. Here is a quick review of all the four stages or cycles.

Inception Phase

In the inception phase, the goal is to develop the parent idea into a product vision by
defining its scope and the business case. The business case includes business context,
factors influencing success, risk assessment and financial forecast. This is to get an
understanding of the business drivers and to justify the launch of the project. This phase is
to identify the work flows required by the project.

Elaboration Phase

Here the architectural foundation, project plan and high-risk factors of the project are
determined, after analyzing the problem domain. For establishing these objectives, an in-
and-out knowledge of the system is a must. In other words, the performance requirements,
scope and functionality of the system, influence the deciding factor in the architectural
concept of the project. Architectural and planning decisions are governed by the most
critical use-cases. So, a perfect understanding of the use-cases and an articulated vision is
what this phase of elaboration looks forward to achieve. This is an important phase. Since,
after this phase the project is carried on to a level where any changes might cause
disastrous outcome for the entire operation.

Construction Phase

As the name suggests, the phase involves construction of the software system or project.
Here, development of the remaining components and application features is performed.
Thereafter, they are integrated into the product which is moved from an architectural
baseline to a completed system. In short, the source code and the application design is
created for the software for its transition to the user community. The construction phase is
the first external release of the software, wherein, adequate quality with optimization of
resources is achieved rapidly.
Transition Phase

Transition phase marks the transition of the project from development to production. This
stage is to ensure that the user requirements have been satisfied and met by the product.
The initiative is done by testing the product before its release as a beta version. This beta
version is enhanced by bug fixing, site preparation, manual completion, defect identification
and improving performance and usability. Other objectives are also taken up. They include

• Training users and maintainers for successful operation of the


system
• Purchasing hardware
• Converting data from old to new systems
• Arranging for activities for successful launch of the product
• Holding sessions of learning lessons for improving future
process and tool environment.

Rational Unified Process mentions six best practices, which have to be kept in mind when
designing any software. These practices help prevent flaws in the project development and
create more scope for efficient productivity. These six practices are as follows.
1. An iterative (executing the same set of instructions a
given number of times or until a specified result is obtained)
approach towards the software development.
2. Managing user requirements.
3. Use and test individual components before being
integrated into a larger system. Use 'Unified Modeling Language'
tool to get a visual model of the components, users and their
interaction relating to the project. Constant testing of the
software quality is considered one of the best practices in any
software development.
4. For a successful iterative development, monitoring,
tracking and controlling changes made to a system is essential
for a team to work together as a single unit.

The concept of rational unified process has endless explanation and description. Each and
every important and essential considerations in a software development has been defined to
its root. RUP results in a reduced IT costs, improved IT business, higher quality, higher
service level and sharper adaptability, and most importantly, higher ROI (return on
investments), and many other benefits. The above is just a theoretical brief explanation to
the question as to what is RUP? However, a clearer and elaborated idea can be achieved
once the process is put into practical use.
Quality Assurance Certification

The process of quality assurance helps in testing the products and services as per the
desired standards and the needs of customers. The quality assurance certifications for the
software industry, organic food, and many other products are discussed in the following
article.

In short, the activity or process that proves the suitability of a product for the intended
purpose could be described as quality assurance. The quality assurance process takes care
of the quality of the products and ensures that customer requirements pertaining to the
products are met. The certifications used to assess different products have different
parameters which should be understood thoroughly. Total quality management is vital for the survival
and profitability of business nowadays.

Quality Assurance Certification (Software Industry)

Certifications like the ISO and CMMi, P-CMM, etc., are some of the most sought after quality
certifications in the IT-ITES sector. The quality assurance procedures are implemented in
software testing.

International Standards Organization (ISO): It is a European standard used for quality


assurance. The ISO 9000 systems makes use of different documents or procedures for
quality assurance, namely, ISO 9001, ISO 9002, ISO 9003. The ISO 9000 and ISO 9003
documents contain supporting guidelines. The ISO 9001 looks after the design, production,
installation and maintenance/servicing, while the ISO 9002 is used for production and
installation only. The final inspection is done with the help of the ISO 9003 model.

Capability Maturity Model Integration (CMMi): The CMMi acts as a guiding force in the
improvement of the processes of an organization. The management of development,
acquisition and maintenance of the services and products of a company is also improved
with the help of CMMi. A set of proven practices are placed in a structure to assess the
process area capability and organizational maturity of a company. The priorities for
improvement are established and it is seen that these priorities are implemented properly
with the help of CMMi.
People Capability Maturity Model (P-CMM): The P-CMM model is similar to SW-CMM (Software
Capability Maturity Model) in its approach. The objective of P-CMM is to improve the
software development capability of an organization by means of attracting, developing,
motivating, organizing and retaining the manpower or the required talent. The management
and development of the workforce of a company is guided by the P-CMM model. The P-CMM
model makes use of the best current practices used in organizational and human resource
development to achieve its objectives.

e Services Capability Model (eSCM): The eSCM model serves the needs of the BPO/ITES
industries. This model is used to assist the customers in measuring the service provider's
capability. The measurement is needed for establishing and managing the outsourcing
relationships which improve continually.

BS 7799: It is a security standard which originated in the mid-nineties, and till the year 2000
it evolved into a model known known as BS EN ISO17799. It is difficult to comply with the
requirements/standards of this model since it covers the security issues comprehensively
and contains the control requirements that are significant in number.

QAI Certification Program

The Quality Assurance International (QAI) is an agency which awards the organic
certification to the Producers, Private labelers, Processors, Retailers, Distributors and other
'links' involved in the production of organic food.

Food and Drug Administration Certification

The Food and Drug Administration (FDA) of the US awards quality assurance certification for
the food products which comply with the performance and safety standards. The FDA
certifies different types of products like the dietary supplements, drugs & vaccines, medical
devices, animal drugs & food, cosmetic products, etc.

Canadian Standards Association (CSA) International

The various products certified under the CSA are building products, heating & cooling
equipment, concrete products, home equipment, health care equipment, gas appliances,
etc. Rigorous tests are conducted in order to award the quality assurance certificates.

The quality control and quality assurance certifications help in developing the trust of customers in a
particular product. The quality assurance certificates awarded by various agencies also act
as a motivational force for industries to maintain the required standards. The short account
of various agencies awarding the certifications would help the concerned people in the
industries.
Software Testing - Test Cases

What are test cases in software testing, how they are designed and why they are so
important to the entire testing scenario, read through to know more..

What is a Test Case?

A test case is a set of conditions or variables and inputs that are developed for a particular
goal or objective to be achieved on a certain application to judge its capabilities or features.

It might take more than one test case to determine the true functionality of the application
being tested. Every requirement or objective to be achieved needs at least one test case.
Some software development methodologies like Rational Unified Process (RUP) recommend
creating at least two test cases for each requirement or objective; one for performing testing
through positive perspective and the other through negative perspective.

Test Case Structure

A formal written test case comprises of three parts -

1. Information
Information consists of general information about the test case.
Information incorporates Identifier, test case creator, test case
version, name of the test case, purpose or brief description and
test case dependencies.

2. Activity
Activity consists of the actual test case activities. Activity
contains information about the test case environment, activities
to be done at test case initialization, activities to be done after
test case is performed, step by step actions to be done while
testing and the input data that is to be supplied for testing.

3. Results
Results are outcomes of a performed test case. Results data
consist of information about expected results and the actual
results.

Designing Test Cases

Test cases should be designed and written by someone who understands the function or
technology being tested. A test case should include the following information -

• Purpose of the test


• Software requirements and Hardware requirements (if any)
• Specific setup or configuration requirements
• Description on how to perform the test(s)
• Expected results or success criteria for the test

Designing test cases can be time consuming in a testing schedule, but they are worth giving
time because they can really avoid unnecessary retesting or debugging or at least lower it.
Organizations can take the test cases approach in their own context and according to their
own perspectives. Some follow a general step way approach while others may opt for a
more detailed and complex approach. It is very important for you to decide between the two
extremes and judge on what would work the best for you. Designing proper test cases is
very vital for your software testing plans as a lot of bugs, ambiguities, inconsistencies and
slip ups can be recovered in time as also it helps in saving your time on continuous
debugging and re-testing test cases.
Software Testing - Contents of a Bug

Complete list of contents of a bug/error/defect that are needed at the time of raising a bug
during software testing. These fields help in identifying a bug uniquely.

When a tester finds a defect, he/she needs to report a bug and enter certain fields, which
helps in uniquely identifying the bug reported by the tester. The contents of a bug are as
given below:

Project: Name of the project under which the testing is being carried out.

Subject: Description of the bug in short which will help in identifying the bug. This generally
starts with the project identifier number/string. This string should be clear enough to help
the reader in anticipate the problem/defect for which the bug has been reported.

Description: Detailed description of the bug. This generally includes the steps that are
involved in the test case and the actual results. At the end of the summary, the step at
which the test case fails is described along with the actual result obtained and expected
result.

Summary: This field contains some keyword information about the bug, which can help in
minimizing the number of records to be searched.

Detected By: Name of the tester who detected/reported the bug.

Assigned To: Name of the developer who is supposed to fix the bug. Generally this field
contains the name of developer group leader, who then delegates the task to member of his
team, and changes the name accordingly.
Test Lead: Name of leader of testing team, under whom the tester reports the bug.

Detected in Version: This field contains the version information of the software application
in which the bug was detected.

Closed in Version: This field contains the version information of the software application in
which the bug was fixed.

Date Detected: Date at which the bug was detected and reported.

Expected Date of Closure: Date at which the bug is expected to be closed. This depends
on the severity of the bug.

Actual Date of Closure: As the name suggests, actual date of closure of the bug i.e. date
at which the bug was fixed and retested successfully.

Priority: Priority of the bug fixing. This specifically depends upon the functionality that it is
hindering. Generally Medium, Low, High, Urgent are the type of severity that are used.

Severity: This is typically a numerical field, which displays the severity of the bug. It can
range from 1 to 5, where 1 is high severity and 5 is the lowest.

Status: This field displays current status of the bug. A status of ‘New’ is automatically
assigned to a bug when it is first time reported by the tester, further the status is changed
to Assigned, Open, Retest, Pending Retest, Pending Reject, Rejected, Closed, Postponed,
Deferred etc. as per the progress of bug fixing process.

Bug ID: This is a unique ID i.e. number created for the bug at the time of reporting, which
identifies the bug uniquely.

Attachment: Sometimes it is necessary to attach screen-shots for the tested functionality


that can help tester in explaining the testing he had done and it also helps developers in re-
creating the similar testing condition.

Test Case Failed: This field contains the test case that is failed for the bug.

Any of above given fields can be made mandatory, in which the tester has to enter a valid
data at the time of reporting a bug. Making a field mandatory or optional depends on the
company requirements and can take place at any point of time in a Software Testing project.
Software Testing - Bug Life Cycles

Various life cycles that a bug passes through during a software testing process.

What is a Bug Life Cycle?


The duration or time span between the first time bug is found (‘New’) and closed
successfully (status: ‘Closed’), rejected, postponed or deferred is called as ‘Bug/Error Life
Cycle’.

(Right from the first time any bug is detected till the point when the bug is fixed and closed,
it is assigned various statuses which are New, Open, Postpone, Pending Retest, Retest,
Pending Reject, Reject, Deferred, and Closed. For more information about various statuses
used for a bug during a bug life cycle, you can refer to article ‘Software Testing – Bug &
Statuses Used During A Bug Life Cycle’)

There are seven different life cycles that a bug can passes through:

< I > Cycle I:


1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) Test lead finds that the bug is not valid and the bug is ‘Rejected’.

< II > Cycle II:


1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) The bug is verified and reported to development team with status as ‘New’.
4) The development leader and team verify if it is a valid bug. The bug is invalid and is
marked with a status of ‘Pending Reject’ before passing it back to the testing team.
5) After getting a satisfactory reply from the development side, the test leader marks the
bug as ‘Rejected’.

< III > Cycle III:


1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) The bug is verified and reported to development team with status as ‘New’.
4) The development leader and team verify if it is a valid bug. The bug is valid and the
development leader assigns a developer to it marking the status as ‘Assigned’.
5) The developer solves the problem and marks the bug as ‘Fixed’ and passes it back to the
Development leader.
6) The development leader changes the status of the bug to ‘Pending Retest’ and passes on
to the testing team for retest.
7) The test leader changes the status of the bug to ‘Retest’ and passes it to a tester for
retest.
8) The tester retests the bug and it is working fine, so the tester closes the bug and marks it
as ‘Closed’.

< IV > Cycle IV:


1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) The bug is verified and reported to development team with status as ‘New’.
4) The development leader and team verify if it is a valid bug. The bug is valid and the
development leader assigns a developer to it marking the status as ‘Assigned’.
5) The developer solves the problem and marks the bug as ‘Fixed’ and passes it back to the
Development leader.
6) The development leader changes the status of the bug to ‘Pending Retest’ and passes on
to the testing team for retest.
7) The test leader changes the status of the bug to ‘Retest’ and passes it to a tester for
retest.
8) The tester retests the bug and the same problem persists, so the tester after confirmation
from test leader reopens the bug and marks it with ‘Reopen’ status. And the bug is passed
back to the development team for fixing.

< V > Cycle V:


1) A tester finds a bug and reports it to Test Lead.
2) The Test lead verifies if the bug is valid or not.
3) The bug is verified and reported to development team with status as ‘New’.
4) The developer tries to verify if the bug is valid but fails in replicate the same scenario as
was at the time of testing, but fails in that and asks for help from testing team.
5) The tester also fails to re-generate the scenario in which the bug was found. And
developer rejects the bug marking it ‘Rejected’.

< VI > Cycle VI:


1) After confirmation that the data is unavailable or certain functionality is unavailable, the
solution and retest of the bug is postponed for indefinite time and it is marked as
‘Postponed’.

< VII > Cycle VII:


1) If the bug does not stand importance and can be/needed to be postponed, then it is given
a status as ‘Deferred’.

This way, any bug that is found ends up with a status of Closed, Rejected, Deferred or
Postponed.
Software Testing - How To Log A Bug (Defect)

A brief introduction to how a bug/defect/error is reported during software testing.

As we already have discussed importance of Software Testing in any software development


project (Just to summarize: Software testing helps in improving quality of software and
deliver a cost effective solution which meet customer requirements), it becomes necessary
to log a defect in a proper way, track the defect, and keep a log of defects for future
reference etc.

As a tester tests an application and if he/she finds any defect, the life cycle of the defect
starts and it becomes very important to communicate the defect to the developers in order
to get it fixed, keep track of current status of the defect, find out if any such defect (similar
defect) was ever found in last attempts of testing etc. For this purpose, previously manually
created documents were used, which were circulated to everyone associated with the
software project (developers and testers), now a days many Bug Reporting Tools are
available, which help in tracking and managing bugs in an effective way.

How to report a bug?

It’s a good practice to take screen shots of execution of every step during software testing.
If any test case fails during execution, it needs to be failed in the bug-reporting tool and a
bug has to be reported/logged for the same. The tester can choose to first report a bug and
then fail the test case in the bug-reporting tool or fail a test case and report a bug. In any
case, the Bug ID that is generated for the reported bug should be attached to the test case
that is failed.

At the time of reporting a bug, all the mandatory fields from the contents of bug (such as
Project, Summary, Description, Status, Detected By, Assigned To, Date Detected, Test Lead,
Detected in Version, Closed in Version, Expected Date of Closure, Actual Date of Closure,
Severity, Priority and Bug ID etc.) are filled and detailed description of the bug is given along
with the expected and actual results. The screen-shots taken at the time of execution of test
case are attached to the bug for reference by the developer.
After reporting a bug, a unique Bug ID is generated by the bug-reporting tool, which is then
associated with the failed test case. This Bug ID helps in associating the bug with the failed
test case.

After the bug is reported, it is assigned a status of ‘New’, which goes on changing as the bug
fixing process progresses.

If more than one tester are testing the software application, it becomes a possibility that
some other tester might already have reported a bug for the same defect found in the
application. In such situation, it becomes very important for the tester to find out if any bug
has been reported for similar type of defect. If yes, then the test case has to be blocked with
the previously raised bug (in this case, the test case has to be executed once the bug is
fixed). And if there is no such bug reported previously, the tester can report a new bug and
fail the test case for the newly raised bug.

If no bug-reporting tool is used, then in that case, the test case is written in a tabular
manner in a file with four columns containing Test Step No, Test Step Description, Expected
Result and Actual Result. The expected and actual results are written for each step and the
test case is failed for the step at which the test case fails.

This file containing test case and the screen shots taken are sent to the developers for
reference. As the tracking process is not automated, it becomes important keep updated
information of the bug that was raised till the time it is closed.
Software Testing Interview Questions

If you are looking for a job in software testing industry, it is imperative that along with a
sound knowledge of the corresponding field, you must also be equipped with the answers for
the most likely questions you'll be facing during an interview. We have compiled here a list
of some common software testing interview questions. Have a look...

Software testing industry presents a plethora of career opportunities for candidates, who are
interested in pursuing a career in the software industry. If you are the kind of a person, who
does not enjoy software development, yet very keen about making a career in the software field,
then software testing could be the right option for you. Software testing field offers several job
positions in testing, Quality Assurance (QA), Quality Control etc. However, you need to have
your basics in place, so as to improve your chances of acquiring a job in this particular
industry.

Preparing for the Interview

Before applying for any IT job, it is imperative that you have a sound understanding of the
field you are hoping to venture in. Besides being technically sound, you should also keep
yourself abreast with the latest tools and trends in the software testing industry. Remember,
software testing is a volatile field, hence, the things that you learned in your curriculum may
have become obsolete by the time you are ready for a job. There are several types of software testing
and software testing methodologies, which you must be thorough with, before going for an interview.
Typically, your set of interview questions for software testing would depend upon the
particular area of software testing you are interested in. Hence, we have divided the
questions into five common categories. More on job interview tips.

Interview Questions for Software Testing


Software Testing Interview Questions on Product Testing
• What will be the test cases for product testing? Give an example of
test plan template.
• What are the advantages of working as a tester for a product
based company as opposed to a service based company?
• Do you know how a product based testing differs from a project
based testing? Can you give a suitable example?
• Do you know what is exactly meant by Test Plan? Name its
contents? Can you give a sample Test Plan for a Login Screen?
• How do you differentiate between testing a product and testing
any web-based application?
• What is the difference between Web based testing and Client
server testing?
• How to perform SOAP Testing manually?
• Explain the significance of Waterfall model in developing a product.

Software Testing Interview Questions on Quality Assurance


• How do you ensure the quality of the product?
• What do you do when there isn't enough time for thorough
testing?
• What are the normal practices of the QA specialists with
perspective of a software?
• Can you tell the difference between high level design and low
level design?
• Can you tell us how Quality Assurance differs from Quality
Control?
• You must have heard the term Risk. Can you explain the term in
a few words? What are the major components of the risk?
• When do you say your project testing is completed? Name the
factors.
• What do you mean by a walk through and inspection?
• What is the procedure for testing search buttons of a web
application both manually and using Qtp8.2?
• Explain Release Acceptance Testing. Explain Forced Error
Testing. Explain Data Integrity Testing. Explain System
Integration Testing.
• How does compatibility testing differ while testing in Internet
explorer and testing in Firefox?

Software Testing Interview Questions on Testing Scenarios


• How do you know that all the scenarios for testing are covered?
• Can you explain the Testing Scenario? Also explain scenario
based testing? Give an example to support your answer.
• Consider a yahoo application. What are the test cases you can
write?
• Differentiate between test scenario and test case?
• Is it necessary to create new Software requirement document,
test planning report, if it is a 'Migrating Project'?
• Explain the difference between smoke testing and sanity
testing?
• What are all the scenarios to be considered while preparing test
reports?
• What is an 'end to end' scenario?
• Other than requirement traceability matrix, what are the other
factors that we need to check in order to exit a testing process ?
• What is the procedure for finding out the length of the edit box
through WinRunner?

Software Testing Interview Questions on Automated Testing


• What automated testing tools are you familiar with?
• Describe some problems that you encountered while working
with an automated testing tool.
• What is the procedure for planning test automation?
• What is your opinion on the question that can a test automation
improve test effectiveness?
• Can you explain data driven automation?
• Name the main attributes of test automation?
• Do you think automation can replace manual testing?
• How is a tool for test automation chosen?
• How do you evaluate the tool for test automation?
• What are the main benefits of test automation according to
you?
• Where can test automation go wrong?
• Can you describe testing activities?
• What testing activities you need to automate?
• Describe common issues of test automation.
• What types of scripting techniques for test automation are you
aware of?
• Name the principles of good testing scripts for automation?
• What tools can you use for support of testing during the
software development life cycle?
• Can you tell us it the activities of a test case design be
automated?
• What are the drawbacks of automated software testing?
• What skills are needed to be a good software test automator?

Software Testing Interview Questions on Bug Tracking


• Can you have a defect with high severity and low priority and
vice-versa i.e high priority and low severity? Justify your answer.
• Can you explain the difference between a Bug and a Defect?
Explain the phases of bug life cycle
• What are the different types of Bugs we normally see in any of
the projects? Also include their severity.
• What is the difference between Bug Resolution Meeting and Bug
Review Committee? Who all participate in Bug Resolution Meeting
and Bug Review Committee?
• Can you name some recent major computer system failures
caused by software bugs? What do you mean by 'Reproducing a
bug'? What do you do, if the bug was not reproducible?
• How can you tell if a bug is reproducible or not?
• On what basis do we give priority and severity for a bug.
Provide an example for high priority and low severity and high
severity and low priority?
• Explain Defect Life Cycle in Manual Testing?
• How do you give a BUG Title & BUG Description for ODD
Division?
• Have you ever heard of a build interval period?

Software testing is a vast field and there is really no dearth of software testing interview
questions. You can explore the Internet for more software testing interview questions and of
course, the solutions. Hope this article helps you to get the job of your dreams. Good Luck!
Types of Software Testing

Software Testing is a process of executing software in a controlled manner. When the end
product is given to the client, it should work correctly according to the specifications and
requirements of the software. Defect in software is the variance between the actual and
expected results. There are different types of software testing, which when conducted help
to eliminate defects from the program.

Testing is a process of gathering information by making observations and comparing them


to expectations. – Dale Emery

In our day-to-day life, when we go out, shopping any product such as vegetable, clothes,
pens, etc. we do check it before purchasing them for our satisfaction and to get maximum
benefits. For example, when we intend to buy a pen, we test the pen before actually
purchasing it i.e. if its writing, does it break if it falls, does it work in extreme climatic
conditions, etc. So, though its the software, hardware or any product, testing turns to be
mandatory.

What is Software Testing?


Software Testing is a process of verifying and validating whether the program is performing
correctly with no bugs. It is the process of analyzing or operating software for the purpose of
finding bugs. It also helps to identify the defects / flaws / errors that may appear in the
application code, which needs to be fixed. Testing not only means fixing the bug in the code,
but also to check whether the program is behaving according to the given specifications and
testing strategies. There are various types of software testing strategies such as white box testing
strategy, black box testing strategy, grey box software testing strategy, etc.

Need of Software Testing Types


Types of Software Testing, depends upon different types of defects. For example:

• Functional testing is done to detect functional defects in a


system.
• Performance Testing is performed to detect defects when the
system does not perform according to the specifications
• Usability Testing to detect usability defects in the system.
• Security Testing is done to detect bugs/defects in the security
of the system.

The list goes on as we move on towards different layers of testing.

Types of Software Testing


Various software testing methodologies guide you through the consecutive software testing types. Those
who are new to this subject, here is some information on software testing - how to go about for beginners. To
determine the true functionality of the application being tested, test cases are designed to help
the developers. Test cases provide you with the guidelines for going through the process of
testing the software. Software testing includes two basic types of software testing, viz.
Manual Scripted Testing and Automated Testing.

• Manual Scripted Testing: This is considered to be one of the


oldest type of software testing methods, in which test cases are
designed and reviewed by the team, before executing it.
• Automated Testing: This software testing type applies
automation in the testing, which can be applied to various parts
of a software process such as test case management, executing
test cases, defect management, reporting of the bugs/defects.
The bug life cycle helps the tester in deciding how to log a bug and also
guides the developer to decide on the priority of the bug
depending upon the severity of logging it. Software bug testing or
software testing to log a bug, explains the contents of a bug that is to be
fixed. This can be done with the help of various bug tracking tools
such as Bugzilla and defect tracking management tools like the
Test Director.

Other Software Testing Types


Software testing life cycle is the process that explains the flow of the tests that are to be
carried on each step of software testing of the product. The V- Model i.e Verification and Validation Model
is a perfect model which is used in the improvement of the software project. This model
contains software development life cycle on one side and software testing life cycle on the other hand
side. Checklists for software tester sets a baseline that guides him to carry on the day-to-day activities.

Black Box Testing


It explains the process of giving the input to the system and checking the output, without
considering how the system generates the output. It is also called as Behavioral Testing.

Functional Testing: In this type of testing, the software is tested for the functional
requirements. This checks whether the application is behaving according to the
specification.

Performance Testing: This type of testing checks whether the system is performing
properly, according to the user's requirements. Performance testing depends upon the Load
and Stress Testing, that is internally or externally applied to the system.

1. Load Testing : In this type of performance testing, the


system is raised beyond the limits in order to check the
performance of the system when higher loads are applied.
2. Stress Testing : In this type of performance testing, the
system is tested beyond the normal expectations or operational
capacity

Usability Testing: This type of testing is also called as 'Testing for User Friendliness'. This
testing checks the ease of use of an application. Read more on introduction to usability testing.

Regression Testing: Regression testing is one of the most important types of testing, in
which it checks whether a small change in any component of the application does not affect
the unchanged components. Testing is done by re-executing the previous versions of the
application.

Smoke Testing: Smoke testing is used to check the testability of the application. It is also
called 'Build Verification Testing or Link Testing'. That means, it checks whether the
application is ready for further major testing and working, without dealing with the finer
details.

Sanity Testing: Sanity testing checks for the behavior of the system. This type of software
testing is also called as Narrow Regression Testing.

Parallel Testing: Parallel testing is done by comparing results from two different systems
like old vs new or manual vs automated.

Recovery Testing: Recovery testing is very necessary to check how fast the system is able
to recover against any hardware failure, catastrophic problems or any type of system crash.

Installation Testing: This type of software testing identifies the ways in which installation
procedure leads to incorrect results.

Compatibility Testing: Compatibility Testing determines if an application under supported


configurations perform as expected, with various combinations of hardware and software
packages. Read more on compatibility testing.

Configuration Testing: This testing is done to test for compatibility issues. It determines
minimal and optimal configuration of hardware and software, and determines the effect of
adding or modifying resources such as memory, disk drives and CPU.

Compliance Testing: This type of testing checks whether the system was developed in
accordance with standards, procedures and guidelines.

Error-Handling Testing: This software testing type determines the ability of the system to
properly process erroneous transactions.

Manual-Support Testing: This type of software testing is an interface between people and
application system.

Inter-Systems Testing: This type of software testing method is an interface between two
or more application systems.

Exploratory Testing: Exploratory Testing is a type of software testing, which is similar to


ad-hoc testing, and is performed to explore the software features. Read more on exploratory
testing.

Volume Testing: This testing is done, when huge amount of data is processed through the
application.
Scenario Testing: This type of software testing provides a more realistic and meaningful
combination of functions, rather than artificial combinations that are obtained through
domain or combinatorial test design.

User Interface Testing: This type of testing is performed to check, how user-friendly the
application is. The user should be able to use the application, without any assistance by the
system personnel.

System Testing: System testing is the testing conducted on a complete, integrated


system, to evaluate the system's compliance with the specified requirements. This type of
software testing validates that the system meets its functional and non-functional
requirements and is also intended to test beyond the bounds defined in the
software/hardware requirement specifications.

User Acceptance Testing: Acceptence Testing is performed to verify that the product is
acceptable to the customer and it's fulfilling the specified requirements of that customer.
This testing includes Alpha and Beta testing.

1. Alpha Testing: Alpha testing is performed at the


developer's site by the customer in a closed environment. This
testing is done after system testing.
2. Beta Testing: This type of software testing is done at the
customer's site by the customer in the open environment. The
presence of the developer, while performing these tests, is not
mandatory. This is considered to be the last step in the software
development life cycle as the product is almost ready.

White Box Testing


It is the process of giving the input to the system and checking, how the system processes
the input, to generate the output. It is mandatory for a tester to have the knowledge of the
source code.

Unit Testing: This type of testing is done at the developer's site to check whether a
particular piece/unit of code is working fine. Unit testing deals with testing the unit as a
whole.

Static and Dynamic Analysis: In static analysis, it is required to go through the code in
order to find out any possible defect in the code. Whereas, in dynamic analysis the code is
executed and analyzed for the output.

Statement Coverage: This type of testing assures that the code is executed in such a way
that every statement of the application is executed at least once.

Decision Coverage: This type of testing helps in making decision by executing the
application, at least once to judge whether it results in true or false.

Condition Coverage: In this type of software testing, each and every condition is executed
by making it true and false, in each of the ways at least once.

Path Coverage: Each and every path within the code is executed at least once to get a full
path coverage, which is one of the important parts of the white box testing.

Integration Testing: Integration testing is performed when various modules are integrated
with each other to form a sub-system or a system. This mostly focuses in the design and
construction of the software architecture. Integration testing is further classified into
Bottom-Up Integration and Top-Down Integration testing.

1. Bottom-Up Integration Testing: In this type of integration


testing, the lowest level components are tested first and then
alleviate the testing of higher level components using 'Drivers'.
2. Top-Down Integration Testing: This is totally opposite to
bottom-up approach, as it tests the top level modules are tested
and the branch of the module are tested step by step using
'Stubs' until the related module comes to an end.

Security Testing: Testing that confirms how well a system protects itself against
unauthorized internal or external, or willful damage of code, means security testing of the
system. Security testing assures that the program is accessed by the authorized personnel
only.

Mutation Testing: In this type of software testing, the application is tested for the code
that was modified after fixing a particular bug/defect.

Software testing methodologies and different software testing strategies help to get through
this software testing process. These various software testing methods show you the outputs,
using the above mentioned software testing types, and helps you check if the software
satisfies the requirement of the customer. Software testing is indeed a vast subject and one
can make a successful carrier in this field. You could go through some software testing
interview questions, to prepare yourself for some software testing tutorials.
Software Testing - Brief Introduction To Security Testing

Security testing is an important process in order to ensure that the systems/applications that
your organization is using meet security policies and are free from any type of loopholes
that can cause your organization a big loss.

Security Testing of any developed system (or a system under development) is all about
finding out all the potential loopholes and weaknesses of the system, which might result into
loss/theft of highly sensitive information or destruction of the system by an
intruder/outsider. Security Testing helps in finding out all the possible vulnerabilities of the
system and help developers in fixing those problems.

Need of Security Testing

• Security test helps in finding out loopholes that can cause loss of important
information and allow any intruder enter into the systems.
• Security Testing helps in improving the current system and also helps in ensuring
that the system will work for longer time (or it will work without hassles for the
estimated time).
• Security Testing doesn’t only include conformance of resistance of the systems your
organization uses, it also ensures that people in your organization understand and
obey security policies. Hence adding up to the organization-wide security.
• If involved right from the first phase of system development life cycle, security
testing can help in eliminating the flaws into design and implementation of the
system and in turn help the organization in blocking the potential security loopholes
in the earlier stage. This is beneficial to the organization almost in all aspects
(financially, security and even efforts point of view).

Who need Security Testing?


Now a day, almost all organizations across the world are equipped with hundreds of
computers connected to each other through intranets and various types of LANs inside the
organization itself and through Internet with the outer world and are also equipped with data
storage & handling devices. The information that is stored in these storage devices and the
applications that run on the computers are highly important to the organization from the
business, security and survival point of view.

Any organization small or big in size, need to secure the information it possesses and the
applications it uses in order to protect its customer’s information safe and suppress any
possible loss of its business.

Security testing ensures that the systems and applications used by the organizations are
secure and not vulnerable to any type of attack.

What are the different types of Security Testing?


Following are the main types of security testing:

• Security Auditing: Security Auditing includes direct inspection of the application


developed and Operating Systems & any system on which it is being developed. This
also involves code walk-through.
• Security Scanning: It is all about scanning and verification of the system and
applications. During security scanning, auditors inspect and try to find out the
weaknesses in the OS, applications and network(s).

• Vulnerability Scanning: Vulnerability scanning involves scanning of the application


for all known vulnerabilities. This scanning is generally done through various
vulnerability scanning software.

• Risk Assessment: Risk assessment is a method of analyzing and deciding the risk
that depends upon the type of loss and the possibility/probability of loss occurrence.
Risk assessment is carried out in the form of various interviews, discussions and
analysis of the same. It helps in finding out and preparing possible backup-plan for
any type of potential risk, hence contributing towards the security conformance.

• Posture Assessment & Security Testing: This is a combination of Security


Scanning, Risk Assessment and Ethical Hacking in order to reach a conclusive point
and help your organization know its stand in context with Security.

• Penetration Testing: In this type of testing, a tester tries to forcibly access and
enter the application under test. In the penetration testing, a tester may try to enter
into the application/system with the help of some other application or with the help of
combinations of loopholes that the application has kept open unknowingly.
Penetration test is highly important as it is the most effective way to practically find
out potential loopholes in the application.

• Ethical Hacking: It’s a forced intrusion of an external element into the system &
applications that are under Security Testing. Ethical hacking involves number of
penetration tests over the wide network on the system under test.
Manual Testing Interview Questions

The following article takes us through some of the most common manual testing interview
questions. Read to know more.

Manual testing is one of the oldest and most effective ways in which one can carry out
software testing. Whenever a new software is invented, software testing needs to be done to test
for its effectiveness and it is for this purpose that manual testing is required. Manual testing
is one of the types of software testing which is an important component of the IT job sector and does
not use any automation methods and is therefore tedious and laborious.

Manual testing requires a tester who needs to have certain qualities because the job
demands it - he needs to be observant, creative, innovative, speculative, open-minded,
resourceful, patient, skillful and possess certain other qualities that will help him with his
job. In the following article we shall not be concentrating on what a tester is like, but what
some of the manual testing interview questions are. So if you have a doubt in this regard,
read the following article to know what some interview questions on manual testing are.

Manual Testing Interview Questions for Freshers

The following are some of the interview questions for manual testing. This will give you a fair
idea of what these questions are like.

• What is the accessibility testing?


• What is Ad Hoc Testing?
• What is the Alpha Testing?
• What is Beta Testing?
• What is Component Testing?
• What is Compatibility Testing?
• What is Data Driven Testing?
• What is Concurrency Testing?
• What is Conformance Testing?
• What is Context Driven Testing?
• What is Conversion Testing?
• What is Depth Testing?
• What is Dynamic Testing?
• What is End-to-End testing?
• What is Endurance Testing?
• What is Installation Testing?
• What is Gorilla Testing?
• What is Exhaustive Testing?
• What is Localization Testing?
• What is Loop Testing?
• What is Mutation Testing?
• What is Positive Testing?
• What is Monkey Testing?
• What is Negative Testing?
• What is Path Testing?
• What is Ramp Testing?
• What is Performance Testing?
• What is Recovery Testing?
• What is the Regression testing?
• What is the Re-testing testing?
• What is Stress Testing?
• What is Sanity Testing?
• What is Smoke Testing?
• What’s the Volume Testing?
• What’s the Usability testing?
• What is Scalability Testing?
• What is Soak Testing?
• What’s the User Acceptance testing?

These were some of the manual testing interview questions for freshers, let us now move on
to other forms of manual testing questions.

Software Testing Interview Questions for Freshers

Here are some software testing interview questions that will help you get into the more intricate and
complex formats of this form of manual testing.

• Can you explain the V model in manual testing?


• What is the water fall model in manual testing?
• What is the structure of bug life cycle?
• What is the difference between bug, error and defect?
• How does one add objects into the Object Repository?
• What are the different modes of recording?
• What does 'testing' mean?
• What is the purpose of carrying out manual testing for a
background process that does not have a user interface and how
do you go about it?
• Explain with an example what test case and bug report are.
• How does one go about reviewing a test case and what are the
types that are available?
• What is AUT?
• What is compatibility testing?
• What is alpha testing and beta testing?
• What is the V model?
• What is debugging?
• What is the difference between debugging and testing? Explain
in detail.
• What is the fish model?
• What is port testing?
• Explain in detail the difference between smoke and sanity
testing.
• What is the difference between usability testing and GUI?
• Why does one require object spy in QTP?
• What is the test case life cycle?
• Why does one save .vsb in library files in qtp winrunner?
• When do we do update mode in qtp?
• What is virtual memory?
• What is visual source safe?
• What is the difference between test scenarios and test
strategy?
• What is the difference between properties and methods in qtp?

Why do these manual testing interview questions help? They help you to prepare for what
lies ahead. The career opportunities that an IT job provides is greater that what many other fields
provide, and if you're from this field then you'll know what I'm talking about, right?
Extreme Programming (XP)

What is Extreme Programming and what's it got to do with testing?

Extreme Programming (XP) is a software development approach for small teams on risk-
prone projects with unstable requirements. It was created by Kent Beck who described the
approach in his book 'Extreme Programming Explained' (See the Softwareqatest.com Books
page.). Testing ('extreme testing') is a core aspect of Extreme Programming. Programmers
are expected to write unit and functional test code first - before writing the application code.
Test code is under source control along with the rest of the code. Customers are expected to
be an integral part of the project team and to help develope scenarios for acceptance/black
box testing. Acceptance tests are preferably automated, and are modified and rerun for each
of the frequent development iterations. QA and test personnel are also required to be an
integral part of the project team. Detailed requirements documentation is not used, and
frequent re-scheduling, re-estimating, and re-prioritizing is expected.
Traceability Matrix

A method used to validate the compliance of a process or product with the requirements for
that process or product. The requirements are each listed in a row of the matrix and the
columns of the matrix are used to identify how and where each requirement has been
addressed.

Contents:

 Definition
 Description
 Requirements of Traceability Matrix
 Baseline Traceability Matrix
 Building a Traceability Matrix
 Useful Traceability Matrices
 Sample Traceability Matrix

Definition

In a software development process, a traceability matrix is a table that correlates any two
baselined documents that require a many to many relationship to determine the
completeness of the relationship. It is often used with high-level requirements (sometimes
known as marketing requirements) and detailed requirements of the software product to the
matching parts of high-level design, detailed design, test plan, and test cases.

Common usage is to take the identifier for each of the items of one document and place
them in the left column. The identifiers for the other document are placed across the top
row. When an item in the left column is related to an item across the top, a mark is placed in
the intersecting cell. The number of relationships are added up for each row and each
column. This value indicates the mapping of the two items. Zero values indicate that no
relationship exists. It must be determined if one must be made. Large values imply that the
item is too complex and should be simplified.

To ease with the creation of traceability matrices, it is advisable to add the relationships to
the source documents for both backward traceability and forward traceability. In other
words, when an item is changed in one baselined document, it's easy to see what needs to
be changed in the other.

Description

Description

A table that traces the requirements to the system deliverable component for that stage
that responds to the requirement.

Size and Format

For each requirement, identify the component in the current stage that responds to the
requirement. The requirement may be mapped to such items as a hardware component, an
application unit, or a section of a design specification.

Traceability Matrix Requirements

Traceability matrices can be established using a variety of tools including requirements


management software, databases, spreadsheets, or even with tables or hyperlinks in a word
processor.

A traceability matrix is created by associating requirements with the work products that
satisfy them. Tests are associated with the requirements on which they are based and the
product tested to meet the requirement.
Above is a simple traceability matrix structure. There can be more things included in a
traceability matrix than shown. In traceability, the relationship of driver to satisfier can be
one-to-one, one-to-many, many-to-one, or many-to-many.

Traceability requires unique identifiers for each requirement and product. Numbers for
products are established in a configuration management (CM) plan.

Traceability ensures completeness, that all lower level requirements come from higher level
requirements, and that all higher level requirements are allocated to lower level
requirements. Traceability is also used to manage change and provides the basis for test
planning.

Baseline Traceability Matrix

Description

A table that documents the requirements of the system for use in subsequent stages to
confirm that all requirements have been met.

Size and Format

Document each requirement to be traced. The requirement may be mapped to such things
as a hardware component, an application unit, or a section of a design specification.
Building a Traceability Matrix
Use a Traceability Matrix to:

• verify and validate system specifications


• ensure that all final deliverable documents are included in the system specification,
such as process models and data models

• improve the quality of a system by identifying requirements that are not addressed
by configuration items during design and code reviews and by identifying extra
configuration items that are not required. Examples of configuration items are
software modules and hardware devices
• provide input to change requests and future project plans when missing
requirements are identified
• provide a guide for system and acceptance test plans of what needs to be tested.

Need for Relating Requirements to a Deliverable

Taking the time to cross-reference each requirement to a deliverable ensures that a


deliverable is consistent with the system requirements. A requirement that cannot be
mapped to a deliverable is an indication that something is missing from the
deliverable. Likewise, a deliverable that cannot be traced back to a requirement may mean
the system is delivering more than required.

Use a Traceability Matrix to Match Requirements to a Deliverable

There are many ways to relate requirements to the deliverables for each stage of the
system life cycle.

One method is to:

• create a two-dimensional table


• allow one row for each requirements specification paragraph (identified by paragraph
number from the requirements document)
• allow one column per identified configuration item (such as software module or
hardware device)
• put a check mark at the intersection of row and column if the configuration item
satisfies the stated requirement

Useful Traceability Matrices

Various traceability matrices may be utilized throughout the system life cycle. Useful ones
include:

• Functional specification to requirements document: It shows that each requirement


(obtained from a preliminary requirements statement provided by the customer or
produced in the Concept Definition stage) has been covered in an appropriate section
of the functional specification.
• Top level configuration item to functional specification: For example, a top level
configuration item, Workstation, may be one of the configuration items that satisfies
the function Input Order Information. On the matrix, each configuration item would
be written down the left hand column and each function would be written across the
top.

• Low level configuration item to top level configuration item: For example, the top
level configuration item, Workstation, may contain the low level configuration items
Monitor, CPU, keyboard, and network interface card.
• Design specification to functional specification verifies that each function has been
covered in the design.
• System test plan to functional specification ensures you have identified a test case or
test scenario for each process and each requirement in the functional specification.

Although the construction and maintenance of traceability matrices may be time-consuming,


they are a quick reference during verification and validation tasks.

Sample Traceability Matrix

A traceability matrix is a report from the requirements database or repository. What


information the report contains depends on your need. Information requirements determine
the associated information that you store with the requirements. Requirements
management tools capture associated information or provide the capability to add it.

The examples show forward and backward tracing between user and system requirements.
User requirement identifiers begin with "U" and system requirements with "S." Tracing S12
to its source makes it clear this requirement is erroneous: it must be eliminated, rewritten,
or the traceability corrected.

For requirements tracing and resulting reports to work, the requirements must be of good
quality. Requirements of poor quality transfer work to subsequent phases of the SDLC,
increasing cost and schedule and creating disputes with the customer.

A variety of reports are necessary to manage requirements. Reporting needs should be


determined at the start of the effort and documented in the requirements management
plan.
Boundary Value Analysis
Overview

Boundary value analysis is a software testing design technique to determine test cases
covering off-by-one errors. The boundaries of software component input ranges are areas of
frequent problems.

Contents:

 Introduction

 What is Boundary Value Analysis?


 Purpose
 Applying Boundary Value Analysis
 Performing Boundary Value Analysis

Introduction

Testing experience has shown that especially the boundaries of input ranges to a software
component are liable to defects. A programmer implement e.g. the range 1 to 12 at an
input, which e.g. stands for the month January to December in a date, has in his code a line
checking for this range. This may look like:

if (month > 0 && month < 13)

But a common programming error may check a wrong range e.g. starting the range at 0 by
writing:

if (month >= 0 && month < 13)

For more complex range checks in a program this may be a problem which is not so easily
spotted as in the above simple example.
Definition

Boundary value analysis is a methodology for designing test cases that concentrates
software testing effort on cases near the limits of valid ranges Boundary value analysis is a
method which refines equivalence partitioning. Boundary value analysis generates test
cases that highlight errors better than equivalence partitioning.

The trick is to concentrate software testing efforts at the extreme ends of the equivalence
classes. At those points when input values change from valid to invalid errors are most likely
to occur. As well, boundary value analysis broadens the portions of the business
requirement document used to generate tests. Unlike equivalence partitioning, it takes into
account the output specifications when deriving test cases.

Purpose

The purpose of boundary value analysis is to concentrate the testing effort on error prone
areas by accurately pinpointing the boundaries of conditions,

(e.g., a programmer may specify >, when the requirement states > or =).

Applying Boundary Value Analysis

To set up boundary value analysis test cases you first have to determine which boundaries
you have at the interface of a software component. This has to be done by applying the
equivalence partitioning technique. Boundary value analysis and equivalence partitioning
are inevitably linked together. For the example of the month in a date you would have the
following partitions:

... -2 -1 0 1 .............. 12 13 14 15 .....


--------------|-------------------|---------------------
invalid partition 1 valid partition invalid partition 2
Applying boundary value analysis you have to select now a test case at each side of the
boundary between two partitions. In the above example this would be 0 and 1 for the lower
boundary as well as 12 and 13 for the upper boundary. Each of these pairs consists of a
"clean" and a "dirty" test case. A "clean" test case should give you a valid operation result of
your program. A "dirty" test case should lead to a correct and specified input error treatment
such as the limiting of values, the usage of a substitute value, or in case of a program with a
user interface, it has to lead to warning and request to enter correct data. The boundary
value analysis can have 6 testcases.n, n-1,n+1 for the upper limit and n, n-1,n+1 for the
lower limit.

A further set of boundaries has to be considered when you set up your test cases. A solid
testing strategy also has to consider the natural boundaries of the data types used in the
program. If you are working with signed values this is especially the range around zero (-1,
0, +1). Similar to the typical range check faults, programmers tend to have weaknesses in
their programs in this range. e.g. this could be a division by zero problem where a zero value
may occur although the programmer always thought the range started at 1. It could be a
sign problem when a value turns out to be negative in some rare cases, although the
programmer always expected it to be positive. Even if this critical natural boundary is clearly
within an equivalence partition it should lead to additional test cases checking the range
around zero. A further natural boundary is the natural lower and upper limit of the data type
itself. E.g. an unsigned 8-bit value has the range of 0 to 255. A good test strategy would also
check how the program reacts at an input of -1 and 0 as well as 255 and 256.

The tendency is to relate boundary value analysis more to the so called black box testing
,which is strictly checking a software component at its interfaces, without consideration of
internal structures of the software. But looking closer at the subject, there are cases where it
applies also to white box testing.

After determining the necessary test cases with equivalence partitioning and subsequent
boundary value analysis, it is necessary to define the combinations of the test cases when
there are multiple inputs to a software component.

Performing Boundary Value Analysis

There are two steps:


1. Identify the equivalence classes.

2. Design test cases.

STEP 1: IDENTIFY EQUIVALENCE CLASSES

Follow the same rules you used in equivalence partitioning. However, consider the output
specifications as well. For example, if the output specifications for the inventory system
stated that a report on inventory should indicate a total quantity for all products no greater
than 999,999, then you d add the following classes to the ones you found previously:

6. The valid class ( 0 < = total quantity on hand < = 999,999 )

7. The invalid class (total quantity on hand <0)

8. The invalid class (total quantity on hand> 999,999 )

STEP 2: DESIGN TEST CASES

In this step, you derive test cases from the equivalence classes. The process is similar to
that of equivalence partitioning but the rules for designing test cases differ. With
equivalence partitioning, you may select any test case within a range and any on either side
of it with boundary analysis, you focus your attention on cases close to the edges of the
range.

Rules for Test Cases

1. If the condition is a range of values, create valid test cases for each end of the range and
invalid test cases just beyond each end of the range. For example, if a valid range of
quantity on hand is -9,999 through 9,999, write test cases that include:

1. the valid test case quantity on hand is -9,999


2. the valid test case quantity on hand is 9,999
3. the invalid test case quantity on hand is -10,000 and
4. the invalid test case quantity on hand is 10,000

You may combine valid classes wherever possible, just as you did with equivalence
partitioning, and, once again, you may not combine invalid classes. Don�t forget to
consider output conditions as well. In our inventory example the output conditions generate
the following test cases:

1. the valid test case total quantity on hand is 0


2. the valid test case total quantity on hand is 999,999
3. the invalid test case total quantity on hand is -1 and
4. the invalid test case total quantity on hand is 1,000,000

2. A similar rule applies where the, condition states that the number of values must lie
within a certain range select two valid test cases, one for each boundary of the range, and
two invalid test cases, one just below and one just above the acceptable range.

3. Design tests that highlight the first and last records in an input or output file.

4. Look for any other extreme input or output conditions, and generate a test for each of
them.
Agile Testing
Introduction

Agile software development is a conceptual framework for software engineering that


promotes development iterations throughout the life-cycle of the project.

There are many agile development methods; most minimize risk by developing software in
short amounts of time. Software developed during one unit of time is referred to as an
iteration, which may last from one to four weeks. Each iteration is an entire software project:
including planning, requirements analysis, design, coding, testing, and documentation. An
iteration may not add enough functionality to warrant releasing the product to market but
the goal is to have an available release (without bugs) at the end of each iteration. At the
end of each iteration, the team re-evaluates project priorities.

Agile methods emphasize face-to-face communication over written documents. Most agile
teams are located in a single open office sometimes referred to as a bullpen. At a minimum,
this includes programmers and their "customers" (customers define the product; they may
be product managers , business analysts, or the clients). The office may include testers,
interaction designers, technical writers, and managers.

Agile methods also emphasize working software as the primary measure of progress.
Combined with the preference for face-to-face communication, agile methods produce very
little written documentation relative to other methods. This has resulted in criticism of agile
methods as being undisciplined.

Contents:

 History
 Principles behind agile methods — The Agile Manifesto
 Comparison with other methods
 Suitability of agile methods
 Agile data
 Agile methods and method tailoring
 Agile methods
 Measuring agility
 Criticism
 Agile Principles

History

Agile software development is a conceptual framework for software engineering that


promotes development iterations throughout the life-cycle of the project.

There are many agile development methods; most minimize risk by developing software in
short amounts of time. Software developed during one unit of time is referred to as an
iteration, which may last from one to four weeks. Each iteration is an entire software project:
including planning, requirements analysis, design, coding, testing, and documentation. An
iteration may not add enough functionality to warrant releasing the product to market but
the goal is to have an available release (without bugs) at the end of each iteration. At the
end of each iteration, the team re-evaluates project priorities.

Agile methods emphasize face-to-face communication over written documents. Most agile
teams are located in a single open office sometimes referred to as a bullpen. At a minimum,
this includes programmers and their "customers" (customers define the product; they may
be product managers, business analysts, or the clients). The office may include testers,
interaction designers, technical writers, and managers.

Agile methods also emphasize working software as the primary measure of progress.
Combined with the preference for face-to-face communication, agile methods produce very
little written documentation relative to other methods. This has resulted in criticism of agile
methods as being undisciplined.

The modern definition of agile software development evolved in the mid 1990s as part of a
reaction against "heavyweight" methods, as typified by a heavily regulated, regimented,
micro-managed use of the waterfall model of development. The processes originating from
this use of the waterfall model were seen as bureaucratic, slow, demeaning, and
inconsistent with the ways that software developers actually perform effective work. A case
can be made that agile and iterative development methods are a return to development
practice seen early in the history of software development. Initially, agile methods were
called "lightweight methods." In 2001, prominent members of the community met at
Snowbird, Utah, and adopted the name "agile methods." Later, some of these people formed
The Agile Alliance, a non-profit organization that promotes agile development.
Methodologies similar to Agile created prior to 2000—include Scrum (1986), Crystal Clear,
Extreme Programming (1996), Adaptive Software Development, Feature Driven
Development, and DSDM (1995).

Extreme Programming (usually abbreviated as "XP") was created by Kent Beck in 1996 as a
way to rescue the struggling Chrysler Comprehensive Compensation (C3) project. While that
project was eventually canceled, the methodology was refined by Ron Jeffries' full-time XP
coaching, public discussion on Ward Cunningham's Portland Pattern Repository wiki and
further work by Beck, including a book in 1999. Elements of Extreme Programming appear
to be based on Scrum and Ward Cunningham's Episodes pattern language.

Principles

Agile methods are a family of development processes, not a single approach to software
development. In 2001, 17 prominent figures in the field of agile development (then called
"light-weight methodologies") came together at the Snowbird ski resort in Utah to discuss
ways of creating software in a lighter, faster, more people-centric way. They created the
Agile Manifesto, widely regarded as the canonical definition of agile development, and
accompanying agile principles.

Some of the principles behind the Agile Manifesto are

• Customer satisfaction by rapid, continuous delivery of useful software


• Working software is delivered frequently (weeks rather than months)
• Working software is the principal measure of progress
• Even late changes in requirements are welcomed
• Close, daily cooperation between business people and developers
• Face-to-face conversation is the best form of communication
• Projects are built around motivated individuals, who should be trusted
• Continuous attention to technical excellence and good design
• Simplicity
• Self-organizing teams
• Regular adaptation to changing circumstances
The publishing of the manifesto spawned a movement in the software industry known as
agile software development.

In 2005, Alistair Cockburn and Jim Highsmith gathered another group of people —
management experts, this time — and wrote an addendum, known as the PM Declaration of
Interdependence.
Comparison with other methods

Agile methods are sometimes characterized as being at the opposite end of the spectrum
from "plan-driven" or "disciplined" methodologies. This distinction is misleading, as it implies
that agile methods are "unplanned" or "undisciplined". A more accurate distinction is to say
that methods exist on a continuum from "adaptive" to "predictive". Agile methods exist on
the "adaptive" side of this continuum.

Adaptive methods focus on adapting quickly to changing realities. When the needs of a
project change, an adaptive team changes as well. An adaptive team will have difficulty
describing exactly what will happen in the future. The further away a date is, the more
vague an adaptive method will be about what will happen on that date. An adaptive team
can report exactly what tasks are being done next week, but only which features are
planned for next month. When asked about a release six months from now, an adaptive
team may only be able to report the mission statement for the release, or a statement of
expected value vs. cost.

Predictive methods, in contrast, focus on planning the future in detail. A predictive team can
report exactly what features and tasks are planned for the entire length of the development
process. Predictive teams have difficulty changing direction. The plan is typically optimized
for the original destination and changing direction can cause completed work to be thrown
away and done over differently. Predictive teams will often institute a change control board
to ensure that only the most valuable changes are considered.

Agile methods have much in common with the "Rapid Application Development" techniques
from the 1980/90s as espoused by James Martin and others

Contrasted with other iterative development methods

Most agile methods share other iterative and incremental development methods' emphasis
on building releasable software in short time periods.

Agile development differs from other development models as in this model time periods are
measured in weeks rather than months and work is performed in a highly collaborative
manner, and most agile methods also differ by treating their time period as a strict timebox.
Contrasted with the waterfall model

Agile development does not have much in common with the waterfall model. As of 2004, the
waterfall model is still in common use. The waterfall model is the most predictive of the
methodologies, stepping through requirements capture, analysis, design, coding, and testing
in a strict, pre-planned sequence. Progress is generally measured in terms of deliverable
artifacts—requirement specifications, design documents, test plans, code reviews and the
like.

The main problem of the waterfall model is the inflexible nature of the division of a project
into separate stages, so that commitments are made early on, and it is difficult to react to
changes in requirements. Iterations are expensive. This means that the waterfall model is
likely to be unsuitable if requirements are not well understood or are likely to change
radically in the course of the project.

Agile methods, in contrast, produce completely developed and tested features (but a very
small subset of the whole) every few weeks or months. The emphasis is on obtaining the
smallest workable piece of functionality to deliver business value early, and continually
improving it/adding further functionality throughout the life of the project.

Some agile teams use the waterfall model on a small scale, repeating the entire waterfall
cycle in every iteration. Other teams, most notably Extreme Programming teams, work on
activities simultaneously.

Contrasted with Cowboy Coding

Cowboy coding is the absence of a defined method: team members do whatever they feel is
right. Agile development's frequent re-evaluation of plans, emphasis on face-to-face
communication, and relatively sparse use of documents sometimes causes people to
confuse it with cowboy coding. Agile teams, however, do follow defined (and often very
disciplined and rigorous) processes.

As with all methodologies, the skill and experience of the users define the degree of success
and/or abuse of such activity. The more rigid controls systematically embedded within a
process offer stronger levels of accountability of the users. The degradation of well-intended
procedures can lead to activities often categorized as cowboy coding.
Suitability of agile methods

Although agile methods differ in their practices, they share a number of common
characteristics, including iterative development, and a focus on interaction, communication,
and the reduction of resource-intensive intermediate artifacts. The suitability of agile
methods in general can be examined from multiple perspectives. From a product
perspective, agile methods are more suitable when requirements are emergent and rapidly
changing; they are less suitable for systems that have high criticality, reliability and safety
requirements, though there is no complete consensus on this point. From an organizational
perspective, the suitability can be assessed by examining three key dimensions of an
organization: culture, people, and communication. In relation to these areas a number of key
success factors have been identified (Cohen et al., 2004):

• The culture of the organization must be supportive of negotiation


• People must be trusted
• Fewer staff, with higher levels of competency
• Organizations must live with the decisions developers make
• Organizations need to have an environment that facilitates rapid communication
between team members

The most important factor is probably project size. As size grows, face-to-face
communication becomes more difficult. Therefore, most agile methods are more suitable
for projects with small teams, with fewer than 20 to 40 people. Large scale agile software
development remains an active research area.

Another serious problem is that initial assumptions or overly rapid requirements


gathering up front may result in a large drift from an optimal solution, especially if the
client defining the target product has poorly formed ideas of their needs. Similarly, given
the nature of human behaviour, it's easy for a single "dominant" developer to influence
or even pull the design of the target in a direction not necessarily appropriate for the
project. Historically, the developers can, and often do, impose solutions on a client then
convince the client of the appropriateness of the solution, only to find at the end that the
solution is actually unworkable. In theory, the rapidly iterative nature should limit this,
but it assumes that there's a negative feedback, or even appropriate feedback. If not,
the error could be magnified rapidly.
This can be alleviated by separating the requirements gathering into a separate phase (a
common element of Agile systems), thus insulating it from the developer's influence, or
by keeping the client in the loop during development by having them continuously trying
each release. The problem there is that in the real world, most clients are unwilling to
invest this much time. It also makes QAing a product difficult since there are no clear
test goals that don't change from release to release.

In order to determine the suitability of agile methods individually, a more sophisticated


analysis is required. The DSDM approach, for example, provides a so-called ‘suitability-
filter’ for this purpose.

The DSDM and Feature Driven Development (FDD) methods, are claimed to be suitable
for any agile software development project, regardless of situational characteristics.

A comparison of agile methods will reveal that they support different phases of a software
development life-cycle to varying degrees. This individual characteristic of agile methods
can be used as a selection criterion for selecting candidate agile methods. In general a
sense of project speed, complexity, and challenges will guide you to the best agile methods
to implement and how completely to adopt them.

Agile development has been widely documented (see Experience Reports, below, as well as
Beck, and Boehm and Turner as working well for small (<10 developers) co-located teams. Agile
development is expected to be particularly suitable for teams facing unpredictable or rapidly
changing requirements.

Agile development's applicability to the following scenarios is open to question:

• Large scale development efforts (>20 developers), though scaling strategies and
evidence to the contrary have been described.
• Distributed development efforts (non-co-located teams). Strategies have been
described in Bridging the Distance and Using an Agile Software Process with Offshore

Development
• Mission- and life-critical efforts
• Command-and-control company cultures

It is worth noting that several large scale project successes have been documented by
organisations such as BT which have had several hundred developers situated in the UK,
Ireland and India, working collaboratively on projects and using Agile methodologies. While
questions undoubtedly still arise about the suitability of some Agile methods to certain
project types, it would appear that scale or geography, by themselves, are not necessarily
barriers to success.

Barry Boehm and Richard Turner suggest that risk analysis be used to choose between adaptive
("agile") and predictive ("plan-driven") methods. The authors suggest that each side of the
continuum has its own home ground:

Agile home ground:

• Low criticality
• Senior developers
• Requirements change very often
• Small number of developers
• Culture that thrives on chaos

Plan-driven home ground:

• High criticality
• Junior developers
• Requirements don't change too often
• Large number of developers
• Culture that demands order

Agile data

One of the most challenging parts of an agile project is being agile with data. Typically this is
where projects hit legacy systems and legacy requirements. Many times working with data
systems requires lengthy requests to teams of specialists who are not used to the speed of
an agile project and insist on exact and complete specifications. Typically the database
world will be at odds with agile development. The agile framework seeks as much as
possible to remove these bottlenecks with techniques such as generative data models
making change fast. Models for data serve another purpose, often a change of one table
column can be a critical issue requiring months to rebuild all the dependent applications.
An agile approach would try to encapsulate data dependencies to go fast and allow change.
But ultimately relational data issues will be important for agile projects and are a common
blockage point. As such agile projects are best suited where projects don't contain big
legacy databases. It still isn't the end of the world because if you can build your data
dependencies to be agile regardless of legacy systems you will start to prove the merit of
the approach as all other systems go through tedious changes to catch up with data
changes while in the protected agile data system the change would be trivial.

Agile methods and method tailoring

In the literature, different terms refer to the notion of method adaptation, including ‘method
tailoring’, ‘method fragment adaptation’ and ‘situational method engineering’. Method
tailoring is defined as:

A process or capability in which human agents through responsive changes in, and dynamic
interplays between contexts, intentions, and method fragments determine a system
development approach for a specific project situation.

Potentially, almost all agile methods are suitable for method tailoring. Even the DSDM
method is being used for this purpose and has been successfully tailored in a CMM context.
Situation-appropriateness can be considered as a distinguishing characteristic between agile
methods and traditional software development methods, with the latter being relatively
much more rigid and prescriptive. The practical implication is that agile methods allow
project teams to adapt working practices according to the needs of individual projects.
Practices are concrete activities and products which are part of a method framework. At a
more extreme level, the philosophy behind the method, consisting of a number of
principles, could be adapted (Aydin, 2004).

In the case of XP the need for method adaptation is made explicit. One of the fundamental
ideas of XP is that there is no process that fits every project as such, but rather practices
should be tailored to the needs of individual projects. There are also no experience reports
in which all the XP practices have been adopted. Instead, a partial adoption of XP practices,
as suggested by Beck, has been reported on several occasions.
A distinction can be made between static method adaptation and dynamic method
adaptation. The key assumption behind static method adaptation is that the project
context is given at the start of a project and remains fixed during project execution. The
result is a static definition of the project context. Given such a definition, route maps can
be used in order to determine which structured method fragments should be used for that
particular project, based on predefined sets of criteria. Dynamic method adaptation, in
contrast, assumes that projects are situated in an emergent context. An emergent context
implies that a project has to deal with emergent factors that affect relevant conditions but
are not predictable. This also means that a project context is not fixed, but changing during
project execution. In such a case prescriptive route maps are not appropriate. The practical
implication of dynamic method adaptation is that project managers often have to modify
structured fragments or even innovate new fragments, during the execution of a project
(Aydin et al, 2005).

Agile Methods

Some of the well-known agile software development methods:

• Agile Modeling
• Agile Unified Process (AUP)
• Agile Data
• Daily kickoff and review of goals
• short release cycles

• Responsive Development
• Generalism - Use of generic skill sets which are common across the team not reliance
on specific skill sets which are scarce
• Test Driven Development (TDD)
• Feature Driven Development (FDD)
• Behavior Driven Development (BDD)
• Essential Unified Process (EssUP)

Other approaches:
• Software Development Rhythms
• Agile Documentation
• ICONIX Process
• Microsoft Solutions Framework (MSF)
• Agile Data Method
• Database refactoring

Measuring agility

While agility is seen by many as a means to an end, a number of approaches have been
proposed to quantify agility. Agility Index Measurements (AIM) score projects against a
number of agility factors to achieve a total. The similarly-named Agility Measurement Index,
scores developments against five dimensions of a software project (duration, risk, novelty,
effort, and interaction). Other techniques are based on measurable goals. Another study
using fuzzy mathematics has suggested that project velocity can be used as a metric of
agility.

While such approaches have been proposed to measure agility, the practical application of
such metrics has yet to be seen.

Criticism

Agile development is sometimes criticized as cowboy coding. Extreme Programming's initial


buzz and controversial tenets, such as pair programming and continuous design, have
attracted particular criticism, such as McBreen and Boehm and Turner. Many of the
criticisms, however, are believed by Agile practitioners to be misunderstandings of agile
development.

In particular, Extreme Programming is reviewed and critiqued by Matt Stephens's and Doug
Rosenberg's Extreme Programming Refactored.

Criticisms include:

• Lack of structure and necessary documentation


• Only works with senior-level developers
• Incorporates insufficient software design
• Requires too much cultural change to adopt
• Can lead to more difficult contractual negotiations
• Can be very inefficient -- if the requirements for one area of code change through
various iterations, the same programming may need to be done several times over.
Whereas if a plan was there to be followed, a single area of code is expected to be
written once.
• Impossible to develop realistic estimates of work effort needed to provide a quote,
because at the beginning of the project no one knows the entire scope/requirements
• Drastically increases the chances of scope creep due to the lack of detailed
requirements documentation

The criticisms regarding insufficient software design and lack of documentation are
addressed by the Agile Modeling method which can easily be tailored into agile processes
such as XP.

Agile software development has been criticized because it will not bring about the claimed
benefits when programmers of average ability use this methodology, and most development
teams are indeed likely to be made up of people with average (or below) skills.

Agile Principles

There are ten principles of Agile Testing:

Agile Principle #1: Active user involvement is imperative

It's not always possible to have users directly involved in development projects, particularly
if the Agile Development project is to build a product where the real end users will be
external customers or consumers.
In this event it is imperative to have a senior and experienced user representative involved
throughout.

Not convinced? Here's 16 reasons why!

• Requirements are clearly communicated and understood (at a high level) at the
outset
• Requirements are prioritised appropriately based on the needs of the user and
market
• Requirements can be clarified on a daily basis with the entire project team, rather
than resorting to lengthy documents that aren't read or are misunderstood
• Emerging requirements can be factored into the development schedule as
appropriate with the impact and trade-off decisions clearly understood
• The right product is delivered

• As iterations of the product are delivered, that the product meets user expectations
• The product is more intuitive and easy to use
• The user/business is seen to be interested in the development on a daily basis
• The user/business sees the commitment of the team
• Developers are accountable, sharing progress openly with the user/business every
day
• There is complete transparency as there is nothing to hide
• The user/business shares responsibility for issues arising in development; it’s not a
customer-supplier relationship but a joint team effort
• Timely decisions can be made, about features, priorities, issues, and when the
product is ready
• Responsibility is shared; the team is responsible together for delivery of the product
• Individuals are accountable, reporting for themselves in daily updates that involve
the user/business
• When the going gets tough, the whole team - business and technical - work together!

Agile Principle #2: Agile Development teams must be empowered


An Agile Development project team must include all the necessary team members to make
decisions, and make them on a timely basis.

Active user involvement is one of the key principles to enable this, so the user or user
representative from the business must be closely involved on a daily basis.

The project team must be empowered to make decisions in order to ensure that it is their
responsibility to deliver the product and that they have complete ownership. Any
interference with the project team is disruptive and reduces their motivation to deliver.

The team must establish and clarify the requirements together, prioritise them together,
agree to the tasks required to deliver them together, and estimate the effort involved
together.

It may seem expedient to skip this level of team involvement at the beginning. It’s tempting
to get a subset of the team to do this (maybe just the product owner and analyst), because
it’s much more efficient. Somehow we’ve all been trained over the years that we must be
100% efficient (or more!) and having the whole team involved in these kick-off steps seems
a very expensive way to do things.

However this is a key principle for me. It ensures the buy-in and commitment from the entire
project team from the outset; something that later pays dividends. When challenges arise
throughout the project, the team feels a real sense of ownership. And then it's doesn't seem
so expensive.

Agile Principle #3: Time waits for no man!

In Agile Development,requirements evolve, but timescales are fixed.

This is in stark contrast to a traditional development project, where one of the earliest goals
is to capture all known requirements and baseline the scope so that any other changes are
subject to change control.

Traditionally, users are educated that it’s much more expensive to change or add
requirements during or after the software is built. Some organisations quote some
impressive statistics designed to frighten users into freezing the scope. The result: It
becomes imperative to include everything they can think of – in fact everything they ever
dreamed of! And what’s more, it’s all important for the first release, because we all know
Phase 2’s are invariably hard to get approved once 80% of the benefits have been realised
from Phase 1.

Ironically, users may actually use only a tiny proportion of any software product, perhaps as
low as 20% or less, yet many projects start life with a bloated scope. In part, this is because
no-one is really sure at the outset which 20% of the product their users will actually use.
Equally, even if the requirements are carefully analysed and prioritised, it is impossible to
think of everything, things change, and things are understood differently by different people.

Agile Development works on a completely different premise. Agile Development works on


the premise that requirements emerge and evolve, and that however much analysis and
design you do, this will always be the case because you cannot really know for sure what
you want until you see and use the software. And in the time you would have spent
analysing and reviewing requirements and designing a solution, external conditions could
also have changed.

So if you believe that point – that no-one can really know what the right solution is at the
outset when the requirements are written – it’s inherently difficult, perhaps even practically
impossible, to build the right solution using a traditional approach to software development.

Traditional projects fight change, with change control processes designed to minimise and
resist change wherever possible. By contrast, Agile Development projects accept change; in
fact they expect it. Because the only thing that’s certain in life is change.

There are different mechanisms in Agile Development to handle this reality. In Agile
Development projects, requirements are allowed to evolve, but the timescale is fixed. So to
include a new requirement, or to change a requirement, the user or product owner must
remove a comparable amount of work from the project in order to accommodate the
change.

This ensures the team can remain focused on the agreed timescale, and allows the product
to evolve into the right solution. It does, however, also pre-suppose that there’s enough non-
mandatory features included in the original timeframes to allow these trade-off decisions to
occur without fundamentally compromising the end product.
So what does the business expect from its development teams? Deliver the agreed business
requirements, on time and within budget, and of course to an acceptable quality. All
software development professionals will be well aware that you cannot realistically fix all of
these factors and expect to meet expectations. Something must be variable in order for the
project to succeed. In Agile Development, it is always the scope (or features of the product)
that are variable, not the cost and timescale.

Although the scope of an Agile Development project is variable, it is acknowledged that only
a fraction of any product is really used by its users and therefore that not all features of a
product are really essential. For this philosophy to work, it’s imperative to start development
(dependencies permitting) with the core, highest priority features, making sure they are
delivered in the earliest iterations.

Unlike most traditional software development projects, the result is that the business has a
fixed budget, based on the resources it can afford to invest in the project, and can make
plans based on a launch date that is certain.

Agile Principle #4: Agile requirements are barely sufficient!

Agile Development teams capture requirements at a high level and on a piecemeal basis,
just-in-time for each feature to be developed.

Agile requirements are ideally visual and should be barely sufficient, i.e. the absolute
minimum required to enable development and testing to proceed with reasonable efficiency.
The rationale for this is to minimise the time spent on anything that doesn’t actually form
part of the end product.

Agile Development can be mistaken by some as meaning there’s no process; you just make
things up as you go along – in other words, JFDI! That approach is not so much Agile but
Fragile!

Although Agile Development is much more flexible than more traditional development
methodologies, Agile Development does nevertheless have quite a bit of rigour and is based
on the fairly structured approach of lean manufacturing as pioneered by Toyota.
However any requirements captured at the outset should be captured at a high level and in
a visual format, perhaps for example as a storyboard of the user interface. At this stage,
requirements should be understood enough to determine the outline scope of the product
and produce high level budgetary estimates and no more.

Ideally, Agile Development teams capture these high level requirements in workshops,
working together in a highly collaborative way so that all team members understand the
requirements as well as each other. It is not necessarily the remit of one person, like the
Business Analyst in more traditional projects, to gather the requirements independently and
write them all down; it’s a joint activity of the team that allows everyone to contribute,
challenge and understand what’s needed. And just as importantly, why.

XP (eXtreme Programming) breaks requirements down into small bite-size pieces called User
Stories. These are fundamentally similar to Use Cases but are lightweight and more
simplistic in their nature.

An Agile Development team (including a key user or product owner from the business)
visualises requirements in whiteboarding sessions and creates storyboards (sequences of
screen shots, visuals, sketches or wireframes) to show roughly how the solution will look and
how the user’s interaction will flow in the solution. There is no lengthy requirements
document or specification unless there is an area of complexity that really warrants it.
Otherwise the storyboards are just annotated and only where necessary.

A common approach amongst Agile Development teams is to represent each requirement, use
case or user story, on a card and use a T-card system to allow stories to be moved around
easily as the user/business representative on the project adjusts priorities.

Requirements are broken down into very small pieces in order to achieve this; and actually
the fact it’s going on a card forces it to be broken down small. The advantage this has over
lengthy documentation is that it's extremely visual and tangible; you can stand around the
T-card system and whiteboard discussing progress, issues and priorities.

The timeframe of an Agile Development is fixed, whereas the features are variable. Should it
be necessary to change priority or add new requirements into the project, the user/business
representative physically has to remove a comparable amount of work from scope before
they can place the new card into the project.
This is a big contrast to a common situation where the business owner sends numerous new
and changed requirements by email and/or verbally, somehow expecting the new and
existing features to still be delivered in the original timeframes. Traditional project teams
that don't control changes can end up with the dreaded scope creep, one of the most
common reasons for software development projects to fail.

Agile teams, by contrast, accept change; in fact they expect it. But they manage change by
fixing the timescales and trading-off features.

Cards can of course be backed up by documentation as appropriate, but always the principle
of agile development is to document the bare minimum amount of information that will
allow a feature to be developed, and always broken down into very small units.

Using the Scrum agile management practice, requirements (or features or stories, whatever
language you prefer to use) are broken down into tasks of no more than 16 hours (i.e. 2
working days) and preferably no more than 8 hours, so progress can be measured
objectively on a daily basis.

Agile Principle #5: How d'you eat an elephant?

One bite at a time! Likewise, agile software development projects are delivered in small bite-
sized pieces, delivering small, incremental *releases* and iterating.

In more traditional software development projects, the (simplified) lifecycle is Analyse,


Develop, Test - first gathering all known requirements for the whole product, then
developing all elements of the software, then testing that the entire product is fit for release.

In agile software development, the cycle is Analyse, Develop, Test; Analyse, Develop, Test;
and so on... doing each step for each feature, one feature at a time.

Advantages of this iterative approach to software development include:

• Reduced risk: clear visibility of what's completed to date throughout a project


• Increased value: delivering some benefits early; being able to release the product
whenever it's deemed good enough, rather than having to wait for all intended
features to be ready
• More flexibility/agility: can choose to change direction or adapt the next iterations
based on actually seeing and using the software
• Better cost management: if, like all-too-many software development projects, you
run over budget, some value can still be realised; you don't have to scrap the whole
thing if you run short of funds

For this approach to be practical, each feature must be fully developed, to the extent that
it's ready to be shipped, before moving on.

Another practicality is to make sure features are developed in *priority* order, not
necessarily in a logical order by function. Otherwise you could run out of time, having built
some of the less important features - as in agile software development, the timescales are
fixed.

Building the features of the software ”broad but shallow” is also advisable for the same
reason. Only when you've completed all your must-have features, move on to the should-
haves, and only then move on to the could-haves. Otherwise you can get into a situation
where your earlier features are functionally rich, whereas later features of the software are
increasingly less sophisticated as time runs out.

Try to keep your product backlog or feature list expressed in terms of use cases, user
stories, or features - not technical tasks. Ideally each item on the list should always be
something of value to the user, and always deliverables rather than activities so you can
'kick the tyres' and judge their completeness, quality and readiness for release.

Agile Principle #6: Fast but not so furious!

Agile software development is all about frequent delivery of products. In a truly


agile world, gone are the days of the 12 month project. In an agile world, a 3-6 month
project is strategic!

Nowhere is this more true than on the web. The web is a fast moving place. And with
the luxury of centrally hosted solutions, there's every opportunity to break what would have
traditionally been a project into a list of features, and deliver incrementally on a very regular
basis - ideally even feature by feature.
On the web, it's increasingly accepted for products to be released early (when they're basic,
not when they're faulty!). Particularly in the Web 2.0 world, it's a kind of perpetual beta. In
this situation, why wouldn't you want to derive some benefits early? Why wouldn't you
want to hear real user/customer feedback before you build 'everything'? Why wouldn't you
want to look at your web metrics and see what works, and what doesn't, before building
'everything'?

And this is only really possible due to some of the other important principles of agile
development. The iterative approach, requirements being lightweight and captured just-in-
time, being feature-driven, testing integrated throughout the lifecycle, and so on.
So how frequent is *frequent*?

Scrum says break things into 30 day Sprints.

That's certainly frequent compared to most traditional software development projects.

Consider a major back-office system in a large corporation, with traditional projects of 6-


12 months+, and all the implications of a big rollout and potentially training to hundreds of
users. 30 days is a bit too frequent I think. The overhead of releasing the software is just too
large to be practical on such a regular basis.

Agile Principle #7: "done" means "DONE!"

In agile development, "done" should really mean "DONE!".

Features developed within an iteration (Sprint in Scrum), should be 100% complete by the
end of the Sprint.

Too often in software development, "done" doesn't really mean "DONE!". It doesn't mean
tested. It doesn't necessarily mean styled. And it certainly doesn't usually mean accepted by
the product owner. It just means developed.
In an ideal situation, each iteration or Sprint should lead to a release of the product.
Certainly that's the case on BAU (Business As Usual) changes to existing products. On
projects it's not feasible to do a release after every Sprint, however completing each
feature in turn enables a very precise view of progress and how far complete the
overall project really is or isn't.

So, in agile development, make sure that each feature is fully developed, tested, styled,
and accepted by the product owner before counting it as "DONE!". And if there's any doubt
about what activities should or shouldn't be completed within the Sprint for each feature,
"DONE!" should mean shippable.

The feature may rely on other features being completed before the product could really be
shipped. But the feature on its own merit should be shippable. So if you're ever unsure if a
feature is 'done enough', ask one simple question: "Is this feature ready to be
shipped?".

It's also important to really complete each feature before moving on to the next...

Of course multiple features can be developed in parallel in a team situation. But within the
work of each developer, do not move on to a new feature until the last one is shippable. This
is important to ensure the overall product is in a shippable state at the end of the
Sprint, not in a state where multiple features are 90% complete or untested, as is more
usual in traditional development projects.

In agile development, "done" really should mean "DONE!".


Agile Principle #8: Enough's enough!

Pareto's law is more commonly known as the 80/20 rule. The theory is about the law of
distribution and how many things have a similar distribution curve. This means that
*typically* 80% of your results may actually come from only 20% of your efforts!

areto's law can be seen in many situations - not literally 80/20 but certainly the principle
that the majority of your results will often come from the minority of your efforts.

So the really smart people are the people who can see (up-front without the benefit of hind-
sight) *which* 20% to focus on. In agile development, we should try to apply the 80/20
rule, seeking to focus on the important 20% of effort that gets the majority of the results.

If the quality of your application isn't life-threatening, if you have control over the scope, and if
speed-to-market is of primary importance, why not seek to deliver the important 80% of
your product in just 20% of the time? In fact, in that particular scenario, you could ask
why you would ever bother doing the last 20%?
that doesn't mean your product should be fundamentally flawed, a bad user experience,

or full of faults. It just means that developing some features, or the richness of some
features, is going the extra mile and has a diminishing return that may not be worthwhile.

So does that statement conflict with my other recent post: "done means DONE!"? Not really.
Because within each Sprint or iteration, what you *do* choose to develop *does* need
to be 100% complete within the iteration.

Agile Principle #9: Agile testing is not for dummies!

In agile development, testing is integrated throughout the lifecycle; testing the software
continuously throughout its development.
Agile development does not have a separate test phase as such. Developers are much
more heavily engaged in testing, writing automated repeatable unit tests to validate
their code.

Apart from being geared towards better quality software, this is also important to support
the principle of small, iterative, incremental releases.

With automated repeatable unit tests, testing can be done as part of the build, ensuring that
all features are working correctly each time the build is produced. And builds should be
regular, at least daily, so integration is done as you go too.

The purpose of these principles is to keep the software in releasable condition throughout
the development, so it can be shipped whenever it's appropriate.

The XPeXtreme Programming) agile methodology goes further still. XP recommends test
driven development, writing tests before writing the software.

But testing shouldn't only be done by developers throughout the development. There is still
a very important role for professional testers, as we all know "developers can't test for
toffee!" :-)

The role of a tester can change considerably in agile development, into a role more akin to
quality assurance than purely testing. There are considerable advantages having testers
involved from the outset
This is compounded further by the lightweight approach to requirements in agile
development, and the emphasis on conversation and collaboration to clarify requirements
more than the traditional approach of specifications and documentation.

Although requirements can be clarified in some detail in agile development (as long as
they are done just-in-time and not all up-front), it is quite possible for this to result in some
ambiguity and/or some cases where not all team members have the same understanding of
the requirements.

So what does this mean for an agile tester? A common concern from testers moving to
an agile development approach - particularly from those moving from a much more formal
environment - is that they don't know precisely what they're testing for. They don't have a
detailed spec to test against, so how can they possibly test it?
Even in a more traditional development environment, I always argued that testers could test
that software meets a spec, and yet the product could still be poor quality, maybe
because the requirement was poorly specified or because it was clearly written but just not
a very good idea in the first place! A spec does not necessarily make the product good!

In agile development, there's a belief that sometimes - maybe even often - these things
are only really evident when the software can be seen running. By delivering small
incremental releases and by measuring progress only by working software, the acid test is
seeing the software and only then can you really judge for sure whether or not it's good
quality.

Agile testing therefore calls for more judgement from a tester, the application of
more expertise about what's good and what's not, the ability to be more flexible and having
the confidence to work more from your own knowledge of what good looks like. It's certainly
not just a case of following a test script, making sure the software does what it says in the
spec.

And for these reasons, agile testing is not for dummies!

Agile Principle #10: No place for snipers!

Agile development relies on close cooperation and collaboration between all team
members and stakeholders.

Agile development principles include keeping requirements and documentation


lightweight, and acknowledging that change is a normal and acceptable reality in software
development.

This makes close collaboration particularly important to clarify requirements just-in-time


and to keep all team members (including the product owner) 'on the same page' throughout
the development.

You certainly can't do away with a big spec up-front *and* not have close
collaboration. You need one of them that's for sure. And for so many situations the latter
can be more effective and is so much more rewarding for all involved!
In situations where there is or has been tension between the development team and
business people, bringing everyone close in an agile development approach is akin to a
boxer keeping close to his opponent, so he can't throw the big punch! :-)

But unlike boxing, the project/product team is working towards a shared goal, creating
better teamwork, fostering team spirit, and building stronger, more cooperative
relationships.

There are many reasons to consider the adoption of agile development, and in the near
future I'm going to outline "10 good reasons to go agile" and explain some of the key
business benefits of an agile approach.

If business engagement is an issue for you, that's one good reason to go agile you
shouldn't ignore.
Software Development Life Cycle Models
I was asked to put together this high-level and traditional software life cycle information as a favor for a
friend of a friend, so I thought I might as well share it with everybody.

The General Model


Software life cycle models describe phases of the software cycle and the order in which those phases are
executed. There are tons of models, and many companies adopt their own, but all have very similar
patterns. The general, basic model is shown below:

General Life Cycle Model

Each phase produces deliverables required by the next phase in the life cycle. Requirements are
translated into design. Code is produced during implementation that is driven by the design. Testing
verifies the deliverable of the implementation phase against requirements.

Requirements
Business requirements are gathered in this phase. This phase is the main focus of the project managers
and stake holders. Meetings with managers, stake holders and users are held in order to determine the
requirements. Who is going to use the system? How will they use the system? What data should be
input into the system? What data should be output by the system? These are general questions that get
answered during a requirements gathering phase. This produces a nice big list of functionality that the
system should provide, which describes functions the system should perform, business logic that
processes data, what data is stored and used by the system, and how the user interface should work.
The overall result is the system as a whole and how it performs, not how it is actually going to do it.

Design
The software system design is produced from the results of the requirements phase. Architects have the
ball in their court during this phase and this is the phase in which their focus lies. This is where the details
on how the system will work is produced. Architecture, including hardware and software, communication,
software design (UML is produced here) are all part of the deliverables of a design phase.

Implementation
Code is produced from the deliverables of the design phase during implementation, and this is the longest
phase of the software development life cycle. For a developer, this is the main focus of the life cycle
because this is where the code is produced. Implementation my overlap with both the design and testing
phases. Many tools exists (CASE tools) to actually automate the production of code using information
gathered and produced during the design phase.
Testing
During testing, the implementation is tested against the requirements to make sure that the product is
actually solving the needs addressed and gathered during the requirements phase. Unit tests and
system/acceptance tests are done during this phase. Unit tests act on a specific component of the
system, while system tests act on the system as a whole.

So in a nutshell, that is a very basic overview of the general software development life cycle model. Now
lets delve into some of the traditional and widely used variations.

Waterfall Model
This is the most common and classic of life cycle models, also referred to as a linear-sequential life cycle
model. It is very simple to understand and use. In a waterfall model, each phase must be completed in
its entirety before the next phase can begin. At the end of each phase, a review takes place to determine
if the project is on the right path and whether or not to continue or discard the project. Unlike what I
mentioned in the general model, phases do not overlap in a waterfall model.

Waterfall Life Cycle Model

Advantages

• Simple and easy to use.


• Easy to manage due to the rigidity of the model – each phase has specific deliverables and a
review process.
• Phases are processed and completed one at a time.
• Works well for smaller projects where requirements are very well understood.

Disadvantages

• Adjusting scope during the life cycle can kill a project


• No working software is produced until late during the life cycle.
• High amounts of risk and uncertainty.
• Poor model for complex and object-oriented projects.
• Poor model for long and ongoing projects.
• Poor model where requirements are at a moderate to high risk of changing.

V-Shaped Model
Just like the waterfall model, the V-Shaped life cycle is a sequential path of execution of processes. Each
phase must be completed before the next phase begins. Testing is emphasized in this model more so
than the waterfall model though. The testing procedures are developed early in the life cycle before any
coding is done, during each of the phases preceding implementation.

Requirements begin the life cycle model just like the waterfall model. Before development is started, a
system test plan is created. The test plan focuses on meeting the functionality specified in the
requirements gathering.

The high-level design phase focuses on system architecture and design. An integration test plan is
created in this phase as well in order to test the pieces of the software systems ability to work together.

The low-level design phase is where the actual software components are designed, and unit tests are
created in this phase as well.

The implementation phase is, again, where all coding takes place. Once coding is complete, the path of
execution continues up the right side of the V where the test plans developed earlier are now put to use.

V-Shaped Life Cycle Model

Advantages

• Simple and easy to use.


• Each phase has specific deliverables.
• Higher chance of success over the waterfall model due to the development of test plans early on
during the life cycle.
• Works well for small projects where requirements are easily understood.

Disadvantages
• Very rigid, like the waterfall model.
• Little flexibility and adjusting scope is difficult and expensive.
• Software is developed during the implementation phase, so no early prototypes of the software
are produced.
• Model doesn’t provide a clear path for problems found during testing phases.

Incremental Model
The incremental model is an intuitive approach to the waterfall model. Multiple development cycles take
place here, making the life cycle a “multi-waterfall” cycle. Cycles are divided up into smaller, more easily
managed iterations. Each iteration passes through the requirements, design, implementation and testing
phases.

A working version of software is produced during the first iteration, so you have working software early on
during the software life cycle. Subsequent iterations build on the initial software produced during the first
iteration.

Incremental Life Cycle Model

Advantages

• Generates working software quickly and early during the software life cycle.
• More flexible – less costly to change scope and requirements.
• Easier to test and debug during a smaller iteration.
• Easier to manage risk because risky pieces are identified and handled during its iteration.
• Each iteration is an easily managed milestone.

Disadvantages

• Each phase of an iteration is rigid and do not overlap each other.


• Problems may arise pertaining to system architecture because not all requirements are gathered
up front for the entire software life cycle.

Spiral Model
The spiral model is similar to the incremental model, with more emphases placed on risk analysis. The
spiral model has four phases: Planning, Risk Analysis, Engineering and Evaluation. A software project
repeatedly passes through these phases in iterations (called Spirals in this model). The baseline spiral,
starting in the planning phase, requirements are gathered and risk is assessed. Each subsequent spirals
builds on the baseline spiral.

Requirements are gathered during the planning phase. In the risk analysis phase, a process is
undertaken to identify risk and alternate solutions. A prototype is produced at the end of the risk analysis
phase.

Software is produced in the engineering phase, along with testing at the end of the phase. The evaluation
phase allows the customer to evaluate the output of the project to date before the project continues to the
next spiral.

In the spiral model, the angular component represents progress, and the radius of the spiral represents
cost.

Spiral Life Cycle Model

Advantages

• High amount of risk analysis


• Good for large and mission-critical projects.
• Software is produced early in the software life cycle.
Disadvantages

• Can be a costly model to use.


• Risk analysis requires highly specific expertise.
• Project’s success is highly dependent on the risk analysis phase.
• Doesn’t work well for smaller projects.