N.B: Calculation as per "Design of Electrical Installation" by V.K.Jain & Amitabh Bajaj
Designed By: Jignesh.Parmar www.electricalnotes.wordpress.com
n Pole Calculation Spacing of Between Aluminium Conductor (IS:5613 Part-1)
Meter
Meter Voltage Selection according to Load & Distance
Meter
Nos Total Load 8000 Kva
Meter Power Factor 0.8
mm Total Distance 1.6 Km
2 Required Voltage for This Load 44.34 Kv
150
150
Kg
Kg
Kg.Meter
Kg
Kg
Meter
Kg.Meter
Kg
Kg
Kg
675
3 Factor of Safety
1 Wooden Pole
2 RCC Pole
3 PCC Pole
4 Steel Tubler Pole
5 Rail/RSJ Pole
6 Struts (Steel Pole)
7 Struts (RCC/PCC)
8 PCC Pole for 33 KV
2 Class of Pole Max.Length of Pole (M)
17 Meter (Class-1) 17
17 Meter (Class-2) 17
17 Meter (Class-3) 17
17 Meter (Class-4) 17
16 Meter (Class-5) 16
12.5 Meter (Class-6) 12.5
12 Meter (Class-7) 12
11 Meter (Class-8) 11
11 Meter (Class-9) 11
9 Meter (Class-10) 9
7.5 Meter 7.5
Not in List
17
17
17
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
Factor of Safety Span
3.5 50
2.5 100
2.5 100
2 80
2 80
2.5 80
3 80
2 80
Min.Ultimate
Transverse Load
from 0.6meter from
Top(Kg)
3000
2300
2000
1400
1100
1000
800
700
500
300
200
500 10
3000
2300
2000
1400
1100
1050
1050
1000
800
600
500
300
200
200
200
150
150
150