You are on page 1of 3

SAUDI ARAMCO ID/PID - 18-MAY-2005 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
RTR and Thermoplastic Piping Handling, Storage and
SAIC-S-4056 30-Apr-13 PLUMB
Preservation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Pipe shall be stored out of direct sunlight in a building or under a SAES-S-070


A1
cover that allows free air circulation. Para 5.2 a

Pipes shall not be stored directly on the ground. Pipes shall be SAES-L-350
A2
placed on mounds or sleepers. Para 7.1

Racks shall conform to factory shipping packages for each pipe size. SAES-S-070
A3
Shelves shall be provided for continuous support of the pipe. Para 5.2 b

If loose pipes are stacked on each other, the stack height shall not
SAES-S-070
A4 exceed 1.5 m. Adequate side support shall be provided to prevent
Para 5.2 c
slipping or rolling.

If pipe is stored on racks or bearing boards, the supports shall be at


SAES-S-070
A5 least 75 mm wide. Supports shall be spaced on 3 m centers
Para 5.2 d
maximum with the first supports 1.5 m from the end of the pipe.

SAES-S-070
A6 All supporting surfaces shall be free of sharp objects.
Para 5.2 e

Thermoplastic and RTR fittings shall be stored in their original


SAES-S-070
A7 containers. Fittings shall be stored in a building or under a cover that
Para 5.3
allows free air circulation.

Solvent cement and primer for thermoplastic piping shall be stored in SAES-S-070
A8
an air-conditioned building with a maximum temperature of 26.7°C. Para 5.4

Gaskets, O-rings, and locking keys shall be stored flat on racks SAES-S-070
A9
below 38°C and out of direct sunlight. Para 5.5

Adhesive for RTR piping shall be stored in an enclosure where SAES-S-070


A10
temperatures do not exceed 38°C. Para 5.6

Pipe and fittings shall be properly protected from impact, especially


SAES-S-070
A11 on their ends. They shall not be thrown, dropped, bumped, hit, or
Para 5.7
dragged and pushed over abrasive surfaces.

Loose thermoplastic or RTR pipe shall be handled by hand or, if the SAES-S-070
A12
pipe is too heavy, using nylon or cotton strap spreader slings. Para 5.8

Adhesive and solvent cement containers shall be tightly closed when


SAES-S-070
A13 not in use, and shall be returned to the storage facilities to minimize
Para 5.9
exposure to excessive temperatures.

Solvent cement and primer for thermoplastic and RTR piping should SAES-S-070
A14
not be stored if no expiration date is clearly marked on the container. Para 5.10

Page 1 of 3
End protectors on pipes, flanges, weld bevels, threads, and socket SAES-L-350
A15
ends shall be firmly attached. Para 7.4

Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-2005 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
RTR and Thermoplastic Piping Handling, Storage and
SAIC-S-4056 30-Apr-13 PLUMB
Preservation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-S-070 -- Installation of Utility Piping Systems, 5 December 2012

2-SAES-L-350 -- Construction of Plant Piping, 22 April 2009

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 3 of 3