DAILY REPORT

Client: ARCI Site: Hyderabad


Date: 01.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3102 3110.2
2 KVAH 3130.6 3138.9
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:00:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 957 957
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 8199.9999999998 0
2 KVAH 8300.0000000002 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 01.8.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 10 10
TOTAL 24 24
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 CCM:Attended for Tubelight fittings cleaning
2 Attended for street light complaints
3 MET Lab:Electrixcal wirinhg removed in Director room.The accessories p
I DG SET:
1 1500KVA DG-3 Trial taken from 07:30 to 7:40 for 10 Mins.
2 Diesel Top up done to Day tanks on 31-07-2017 and Dip stick level taken
Prepared by: For Sterling & wilson Site
Incharge
SUDA SAINADH V.Trinadh
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
8199.9999999998
8300.0000000002
748.0
0.988
1.000

1500KVA DG -3 GRAND TOTAL


0:10:00 0:10:00
0 0
0 0
5 5
0 0.0
30.00 30.0
951 2865

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
8199.9999999998
8300.0000000002

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0
RRIED OUT(As per IEC) :

he accessories placed in MSDS store

ns.
stick level taken on 01-08-2017
For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 02.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3110.2 3119.1
2 KVAH 3138.9 3147.8
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:10:00 0:00:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 3 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 18.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 954 957
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 8900.0000000001 0
2 KVAH 8900.0000000001 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 02.8.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 10 10
TOTAL 25 24
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 CCM:Attended for Tubelight fittings checking & Fixing
2 Attended works at PMTC & XPS
3 Attended works at CMD
I DG SET:
1 500KVA DG-1 Trial taken from 07:30 to 7:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
SUDA SAINADH V.Trinadh
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
8900.0000000001
8900.0000000001
748.0
1.000
0.971

1500KVA DG -3 GRAND TOTAL


0:00:00 0:10:00
0 0
0 0
0 3
0 0.0
0.00 18.0
951 2862

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
8900.0000000001
8900.0000000001

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 1 Shift Engineer on Leave
RRIED OUT(As per IEC) :

s.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 03.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3119.1 3127.2
2 KVAH 3147.8 3156
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:10:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 3
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 18.00
Day Tank Diesel Stock
7 Status (Ltrs) 954 954
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 8099.9999999999 127.3
2 KVAH 8199.9999999998 147.6
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 04.8.17 11:58:00 12:13:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 5
4 GENERAL 10 8
TOTAL 25 23
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 CNOC:ACBs Preventive Maintenance-Total 7 ACBs done
2 Attended works CMD & PMTC/Nano
I DG SET:
1 500KVA DG-3 Trial taken from 07:30 to 7:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
SUDA SAINADH MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
8099.9999999999
8199.9999999998
748.0
0.988
0.971

1500KVA DG -3 GRAND TOTAL


0:00:00 0:10:00
127.3 127.3
147.6 147.6
0 3
0 0.0
0.00 18.0
951 2859

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
8227.2999999999
8347.5999999998

0:15:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0
RRIED OUT(As per IEC) :

s.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 03.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3127.2 3133.5
2 KVAH 3156 3162.3
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:00:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 954 954
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 6300.0000000002 127.3
2 KVAH 6300.0000000002 147.6
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 04.8.17 11:58:00 12:13:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 ACB Preventive Maintenance
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 10 8
TOTAL 25 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 CNOC:ACBs Preventive Maintenance-Total 7 ACBs done
2 Attended works CMD & PMTC/Nano
I DG SET:
1 1500KVA DG-3 Trial taken from 07:30 to 7:40 for 10 Mins.
2 DG-3 running from 11:58 Hrs to 12:22 Hrs.Duration 24min
Prepared by: For Sterling & wilson Site
Incharge
SUDA SAINADH MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
6300.0000000002
6300.0000000002
748.0
1.000
0.971

1500KVA DG -3 GRAND TOTAL


0:24:00 0:24:00
127.3 127.3
147.6 147.6
61 61
2.0868852459 2.1
152.50 152.5
890 2798

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
6427.3000000002
6447.6000000002

0:15:00

Downtime REMARK
Nil Nil

Activity REMARKS
7 Nos Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 3 Members W/O
RRIED OUT(As per IEC) :

ns.
min
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 05.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3133.5 3136.8
2 KVAH 3162.3 3165.5
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:10:00 0:00:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 3 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 18.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 951 954
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 3300.0000000002 0
2 KVAH 3199.9999999998 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 05.8.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 6 6
3 'C' SHIFT 4 4
4 GENERAL 7 7
TOTAL 22 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 Ground: FDB Cable termination work started at 11:30 till 21:00 near Gro
2 FDB: 240 sq.mm. link cable lugs all crimping done ok, and shifted to DG
3 DG Room: 18F1 & 18F2 ACB HY PM work done ok.
4 DG Room: 18F2 ACB made ON after completion of PM.
5 MSDS: All insulation mats cleaning work done ok.
I DG SET:
1 500KVA DG-1 Trial taken from 07:30 to 7:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
Aditya Kumar Thakur MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
3300.0000000002
3199.9999999998
748.0
1.031
0.971

1500KVA DG -3 GRAND TOTAL


0:00:00 0:10:00
0 0
0 0
0 3
0 0.0
0.00 18.0
890 2795

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
3300.0000000002
3199.9999999998

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 3 Members W/O
RRIED OUT(As per IEC) :
ll 21:00 near Ground
nd shifted to DG Room.

s.
For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 06.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3136.8 3140.2
2 KVAH 3165.5 3169.0
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:10:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 3
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 18.00
Day Tank Diesel Stock
7 Status (Ltrs) 951 951
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 3399.9999999996 0
2 KVAH 3500 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 06.08.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 7
3 'C' SHIFT 4 5
4 GENERAL 10 5
TOTAL 25 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 4 MVA Transformer RTCC panel-Contactor maintenance done for avoidi
I DG SET:
1 DG-2 Trial taken from 07:30 to 7:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
SUDA SAINADH MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
3399.9999999996
3500
748.0
0.971
0.971

1500KVA DG -3 GRAND TOTAL


0:00:00 0:10:00
0 0
0 0
0 3
0 0.0
0.00 18.0
890 2792

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
3399.9999999996
3500

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 3 Members on Leave
RRIED OUT(As per IEC) :
e done for avoiding humming noise

For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 07.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3140.2 3147.4
2 KVAH 3169.0 3176.2
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:00:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 951 951
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 7200.0000000003 0
2 KVAH 7199.9999999998 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 07.08.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
Cleaning & tightness checked and
In MSDS 110V Battery
1 measure the Voltage and specific
bank gravity found ok.
In DG room 110V Cleaning & Tightness checked and
2 Battery Bank measure the Voltage found ok.
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 6
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 12 7
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In LTSS-1 store Room Spare Aluminum Bus Bar removed for FDB Panel.
I DG SET:
1 DG-3 Trial taken from 07:30 to 7:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
Sundeep singh MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
7200.0000000003
7199.9999999998
748.0
1.000
0.971

1500KVA DG -3 GRAND TOTAL


0:10:00 0:10:00
0 0
0 0
5 5
0 0.0
30.00 30.0
885 2787

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
7200.0000000003
7199.9999999998

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS

PM Nil

PM Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 1 No on W/O, 3No's on Leave.
RRIED OUT(As per IEC) :
d for FDB Panel.

For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 08.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3147.4 3155.3
2 KVAH 3176.2 3184.1
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:10 0:01:24
2 KWH Generated 0 60
3 KVAH Generated 0 90
Diesel Consumption
4 (Ltrs) 3 51
5 KWH/Ltr 0 1.1764705882
6 Ltrs/Hrs 1080.00 2185.71
Day Tank Diesel Stock
7 Status (Ltrs) 948 900
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 7900.0000000001 197.2
2 KVAH 7900.0000000001 250.9
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 08.08.17 10:37:00 10:50:00
1 08.08.17 14:43:00 14:47:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description

G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 6
3 'C' SHIFT 4 4
4 GENERAL 12 7
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In PMTC area 3 nos Tube lights removed and in place that 3 led fittings fixed
2 In DG room PLC batteries DG-1, DG-2 ,DG-3 Batteries PM carried out
3 CEC building Fan cable extension work done till switch board ( complaint given b
4 cec buliding : cable spare coming 35sq mm Checked And CU lugs made terminati
5 All street light poles JB Work is under process
I DG SET:
1 DG-1Trial taken from 07:30 to 7:40 for 10 Mins.
2 DG-3 EB failure taken from 10:38 to 11:01 & 14:35-14:47 for 36 Mins.
3 DG-2 EB failure taken from 11:00 to 12:24 for 1hr.24 mins
Prepared by: For Sterling & wilson Site
Incharge
V Nikhil chakravarthy MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
7900.0000000001
7900.0000000001
748.0
1.000
1.000

1500KVA DG -3 GRAND TOTAL


0:00:36 0:02:10
137.2 197.2
160.9 250.9
40 94
3.43 4.6
4000.00 7265.7
835 2683

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
8097.2000000001
8150.9000000001

0:13:00
0:04:00

Downtime REMARK
Nil Nil

Activity REMARKS

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 1No on W/O, 3 No's on Leave.
RRIED OUT(As per IEC) :
d fittings fixed
ed out
complaint given by Mr ramesh sir)
gs made termination removed in both ends and meggering done

7 for 36 Mins.
ns
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 09.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3155.3 3163.1
2 KVAH 3184.1 3191.9
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:10:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 3
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 18.00
Day Tank Diesel Stock
7 Status (Ltrs) 948 897
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 7799.9999999997 0
2 KVAH 7800.0000000002 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 09.08.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 12 9
TOTAL 26 23
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In CEC Building SPPS Dust Collecter equipment Incomming Cable Aluminum 35 Sq
given and Voltage checked found ok and equipment Trail Run taken found norma
2 In PMTC Spray pyrolysis labrotory Lighting, Fan & Ex. Fan 3 No's Pendent switch fi
3 In Sol-Gel Switch Board extention box connection removed and new connection
I DG SET:
1 DG-2 Trial taken from 07:30 to 7:40 for 10 Mins.

Prepared by: For Sterling & wilson Site


Incharge
Sundeep singh k MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
7799.9999999997
7800.0000000002
748.0
1.000
1.000

1500KVA DG -3 GRAND TOTAL


0:00:00 0:10:00
0 0
0 0
0 3
0 0.0
0.00 18.0
835 2680

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
7799.9999999997
7800.0000000002

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 2 No's on W/O, 1 No's on Leave.
RRIED OUT(As per IEC) :
ble Aluminum 35 Sqmm Cable Gland and Lugs Creamped and connection
aken found normal.250A Fuses 3No's replaced.
s Pendent switch fixed found ok. As per instruction by Mr. Jangareddy.
d new connection given. As per Mr.J V Roa.

For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 10.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3163.1 3178.2
2 KVAH 3191.9 3207.1
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:00:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 948 897
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 15099.9999999999 0
2 KVAH 15199.9999999998 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 09.08.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 6 6
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 9 9
TOTAL 24 24
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 MT Section: Leakage current problem attended and found SV Lamp Short so cabl
2 FPB: work in progress for FPB.
3 Street Light: All street Light Junction Boxes inspection work in progress.
I DG SET:
1 DG-3 Trial taken from 07:30 to 7:40 for 10 Mins.

Prepared by: For Sterling & wilson Site


Incharge
Aditya Kumar Thakur MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
15100
15200
748.0
0.993
1.000

1500KVA DG -3 GRAND TOTAL


0:10:00 0:10:00
0 0
0 0
5 5
0 0.0
30.00 30.0
830 2675

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
15099.9999999999
15199.9999999998

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 2 No's on W/O
RRIED OUT(As per IEC) :
amp Short so cable removed, work under process.

progress.

For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 11.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3171.2 3178.2
2 KVAH 3200.1 3207.1
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:10:00 0:00:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 3 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 18.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 945 897
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 7000 0
2 KVAH 7000 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 09.08.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 6 6
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 9 9
TOTAL 24 24
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 MT Section: Earthing problem rectified the same, work completed.
2 FPB: work in progress for FPB.
3 Street Light: All street Light Junction Boxes inspection work Completed.
4 Street Light: Pole No 51 Neutral cable burned so checked and cleaned with CRC n
5 Street Light: All street Light Junction Boxes inspection work Completed.
I DG SET:
1 DG-1 Trial taken from 07:30 to 7:40 for 10 Mins.

Prepared by: For Sterling & wilson Site


Incharge
Aditya Kumar Thakur MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
7000
7000
748.0
1.000
1.000

1500KVA DG -3 GRAND TOTAL


0:00:00 0:10:00
0 0
0 0
0 3
0 0.0
0.00 18.0
830 2672

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
7000
7000

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 2 No's on W/O
RRIED OUT(As per IEC) :
eted.

mpleted.
cleaned with CRC now made ok.
mpleted.

For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 12.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3178.2 3181.1
2 KVAH 3207.1 3210.0
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 3:34:00
2 KWH Generated 0 472
3 KVAH Generated 0 565
Diesel Consumption
4 (Ltrs) 0 167
5 KWH/Ltr 0 2.8263473054
6 Ltrs/Hrs 0.00 46.82
Day Tank Diesel Stock
7 Status (Ltrs) 945 730
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 2900.0000000001 472
2 KVAH 2900.0000000001 565
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 12.08.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 5 5
4 GENERAL 9 7
TOTAL 24 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 EB shutdown for 2 pole structure maintenance From 10:00 to 13:16
2 33kv isolator switch of double pole structure PM work done (10:00 to 13:16 )
3 For transformer -2 silica gel new one fixed.
4 Canteen: 16Amps extension box removed and fixed in another place in groun
I DG SET:
1 DG-2 Trial taken from 07:30 to 7:40 for 10 Mins.
2 DG-2 taken from 09:50 to 13:16 for 3 hrs16 Mins.( 33kv isolator switch 2 pole s

Prepared by: For Sterling & wilson Site


Incharge
V NIKHIL CHAKRAVARTHY MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
2900.0000000001
2900.0000000001
748.0
1.000
1.000

1500KVA DG -3 GRAND TOTAL


0:00:00 3:34:00
0 472
0 565
0 167
0 2.8
0.00 46.8
830 2505

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
3372.0000000001
3465.0000000001

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0 2 No's on LEAVE
0 2 No's on W/O
RRIED OUT(As per IEC) :
o 13:16
(10:00 to 13:16 )

her place in ground floor

tor switch 2 pole structure maintenance ,so EB shut down)

For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 13.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3181.1 3184.7
2 KVAH 3210.0 3213.7
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:00:00
2 KWH Generated 0 0:00:00
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 945 730
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 3599.9999999999 0
2 KVAH 3699.9999999998 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 13.08.17 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 5 6
4 GENERAL 11 6
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 MSDS -All control panels cleaning done
2 LTSS-1 & LTSS -2 CAPACITOR BANKS CHECKED AMPS
I DG SET:
1 DG-3 Trial taken from 07:30 to 7:40 for 10 Mins.

Prepared by: For Sterling & wilson Site


Incharge
V NIKHIL CHAKRAVARTHY MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
3599.9999999999
3699.9999999998
748.0
0.973
0.995

1500KVA DG -3 GRAND TOTAL


0:10:00 0:10:00
0 0
0 0
5 5
0 0.0
30.00 30.0
825 2500

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
3599.9999999999
3699.9999999998

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0 TOTAL MAN POWER 26
0
1
0 2 No's on LEAVE
1 3 No's on W/O
RRIED OUT(As per IEC) :

For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 14.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING
1 KWH 3184.7
2 KVAH 3213.7
3 MD(KVA) …..
4 PF (Daily) …..
5 PF (AVG-Monthly) …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1
1 Run Hrs (Hr:Min:Sec) 0:40:00
2 KWH Generated 33
3 KVAH Generated 39
Diesel Consumption
4 (Ltrs) 33
5 KWH/Ltr 1
6 Ltrs/Hrs 49.50
Day Tank Diesel Stock
7 Status (Ltrs) 912
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm

C TOTAL POWER CONSUMPTION (A+B) :


Sr.No DESCRIPTION TSEB
1 KWH 5800.0000000002
2 KVAH 5800.0000000002
D TSEB POWER FAILURE:
Sr.No DATE FROM
1 14.08.2017 6:25:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY
ROSTER
1 'A' SHIFT 5
2 'B' SHIFT 5
3 'C' SHIFT 5
4 GENERAL 11
TOTAL 26
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As
1 In PMTC - temporary connection to cooling tower motor for testing(
2 In Pmtc one way switch not working in room no 116 & 118 ,so replaced with
3 Met lab rest room for water filter no supply ,rectified the same
4 4 MVA trafo-1 tap changer counter problem , so rectified the same( tap positi
5 In canteen spoons dip immersion heater 16 A socket tripping continious chec
6 In LTSS-2 APFC ( capacitor panel ) Feeder no-4 & 7 wiring done and checked f
7 In LTSS-2 APFC ( capacitor panel ) Feeder no-6 wiring done and checked foun
I DG SET:
1 DG-1 EB failure taken from 6:25 to 6:55 for 30 mins
2 DG-1 Trial taken from 07:20 to 7:30 for 10 Mins.

Prepared by: For Sterling & wilson Site


Incharge
V NIKHIL CHAKRAVARTHY MOHANA KRISHNA
DAILY REPORT

bad

CONSUMPTION
FINAL READING (MF:1000)
3190.5 5800.0000000002
3219.5 5800.0000000002
….. 748.0
….. 1.000
….. 0.995

500KVA DG -2 1500KVA DG -3
0:00:00 0:00:00
0:00:00 0
0 0
0 0
0 0
0.00 0.00
730 825

1618mm------ 27404 Ltrs


):
DG SET TOTAL CONSUMPTION
33 5833.0000000002
39 5839.0000000002
TO
6:50:00 0:25:00

Description Downtime
Nil Nil

Description Activity
Nil Nil

NOs. ACTUAL NO. OF


PRESENT SUBSTITUTIONS
5 0
6 0
5 1
6 0
22 1
L COMPLAINTS CARRIED OUT(As per IEC) :
cooling tower motor for testing( complaint given by jangareddy sir)
oom no 116 & 118 ,so replaced with 6 amps switch new one.( D.K rao sir complaint)
ply ,rectified the same
em , so rectified the same( tap position is changing but counter not changing)
16 A socket tripping continious checked found heater problem need to replace.
no-4 & 7 wiring done and checked found ok
no-6 wiring done and checked found Y -phase not showing amps

6:55 for 30 mins


for 10 Mins.

Sterling & wilson Site For ARCI


Incharge
OHANA KRISHNA Checked By
Issue Date: 01.06.2017

REMARK

GRAND TOTAL
0:40:00
33
39
33
1.0
49.5
2467

- 27404 Ltrs

TOTAL CONSUMPTION
5833.0000000002
5839.0000000002
0:25:00

REMARK
Nil

REMARKS
Nil

REMARK

TOTAL MAN POWER 26

1 No's on LEAVE
3No's on W/O
EC) :
plaint given by jangareddy sir)
ps switch new one.( D.K rao sir complaint)

changing but counter not changing)


ound heater problem need to replace.
ok
hase not showing amps

For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 15.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING
1 KWH 3190.5
2 KVAH 3219.5
3 MD(KVA) …..
4 PF (Daily) …..
5 PF (AVG-Monthly) …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1
1 Run Hrs (Hr:Min:Sec) 0:00:00
2 KWH Generated 0
3 KVAH Generated 0
Diesel Consumption
4 (Ltrs) 0
5 KWH/Ltr 0
6 Ltrs/Hrs 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 912
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm

C TOTAL POWER CONSUMPTION (A+B) :


Sr.No DESCRIPTION TSEB
1 KWH 3599.9999999999
2 KVAH 3500
D TSEB POWER FAILURE:
Sr.No DATE FROM
1 15.08.2017 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY
ROSTER
1 'A' SHIFT 5
2 'B' SHIFT 5
3 'C' SHIFT 4
4 GENERAL 12
TOTAL 26
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As
1
2
3
I DG SET:
1 DG-2 Trial taken from 07:30 to 7:40 for 10 Mins.
2

Prepared by: For Sterling & wilson Site


Incharge
V NIKHIL CHAKRAVARTHY MOHANA KRISHNA
DAILY REPORT

bad

CONSUMPTION
FINAL READING (MF:1000)
3194.1 3599.9999999999
3223.0 3500
….. 748.0
….. 1.029
….. 0.996

500KVA DG -2 1500KVA DG -3
0:10:00 0:00:00
0 0
0 0
3 0
0 0
18.00 0.00
727 825

1618mm------ 27404 Ltrs


):
DG SET TOTAL CONSUMPTION
0 3599.9999999999
0 3500
TO
0:00:00 0:00:00

Description Downtime
Nil Nil

Description Activity
Nil Nil

NOs. ACTUAL NO. OF


PRESENT SUBSTITUTIONS
5 0
5 0
4 0
8 0
22 0
L COMPLAINTS CARRIED OUT(As per IEC) :

for 10 Mins.

Sterling & wilson Site For ARCI


Incharge
OHANA KRISHNA Checked By
Issue Date: 01.06.2017

REMARK

GRAND TOTAL
0:10:00
0
0
3
0.0
18.0
2464

- 27404 Ltrs

TOTAL CONSUMPTION
3599.9999999999
3500
0:00:00

REMARK
Nil

REMARKS
Nil

REMARK

TOTAL MAN POWER 26

2No's on LEAVE
2No's on W/O
EC) :

For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 16.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3194.1 3200.6
2 KVAH 3223.0 3229.6
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00:00 0:00:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 912 727
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 6500 0
2 KVAH 6599.9999999999 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 16.08.2017 0:00:00 0:00:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 6 6
3 'C' SHIFT 4 4
4 GENERAL 8 8
TOTAL 23 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 Street Light: Near Old SED steps street light work completed, now wor
2 Canteen: Fan switch not working work completed ok.
3 PMTC: PDB 2G/I fdr: 01D, load current checking & 80A fuse replaced with 25A f
I DG SET:
1 1500KVA DG-3 Trial taken from 07:30 to 7:40 for 10 Mins.

Prepared by: For Sterling & wilson Site


Incharge
ADITYA KUMAR THAKUR MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
6500
6599.9999999999
748.0
0.985
0.996

1500KVA DG -3 GRAND TOTAL


0:10:00 0:10:00
0 0
0 0
5 5
0 0.0
30.00 30.0
820 2459

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
6500
6599.9999999999

0:00:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0 TOTAL MAN POWER 26
0
0
0 1 no's on Leave
0 3 no's W/of
RRIED OUT(As per IEC) :
pleted, now working.

eplaced with 25A fuse. Work completed.

ins.

For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 17.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3200.6 3207
2 KVAH 3229.6 3236.1
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:10 0:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 3 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 18.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 909 727
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 6400.0000000001 0
2 KVAH 6500 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 17.08.2017 10:50 11:17
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 DG Aux. Panel HY PM
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 8 8
TOTAL 22 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 DG Room: H/y PM of Aux. Panel work completed
2 Solar Cell: Industrial socket 1ф direct connection given to AC without stablizer,
3 CMD: T/L not working checked and rectified the same.
4 PMTC/NaNo: 250W MV Lamp fixing work done.
5 PMTC: 5Nos T/Ls, starters & choke removed & given to Mr. JangaReddy.
6 PMTC: 6 sq.mm extension cable & DB side connection is in progress.
I DG SET:
1 500KVA DG-1 Trial taken from 07:30 to 7:40 for 10 Mins.
1 1500KVA DG-3 made ON due to EB Failure from 10:50 to 11:20.
1 1500KVA DG-3 reading got reset, so KWH & KVAH consumption could n
Prepared by: For Sterling & wilson Site
Incharge
ADITYA KUMAR THAKUR MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
6400.0000000001
6500
748.0
0.985
0.996

1500KVA DG -3 GRAND TOTAL


0:30 0:40
0 0
0 0
55 58
0 0.0
110.00 128.0
765 2401

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
6400.0000000001
6500

0:27:00

Downtime REMARK
Nil Nil

Activity REMARKS
Completed Completed

NO. OF REMARK
SUBSTITUTIONS
0 TOTAL MAN POWER 26
0
0
0 2 no's on Leave
0 2 no's W/of
RRIED OUT(As per IEC) :

without stablizer, as per instructions by Mr. Srinivasan.

ngaReddy.
ogress.

ns.
to 11:20.
sumption could not be taken.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 18.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3207 3213.8
2 KVAH 3236.1 3242.9
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00 0:10
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 3
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 18.00
Day Tank Diesel Stock
7 Status (Ltrs) 909 724
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 6800.0000000002 0
2 KVAH 6800.0000000002 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 18.08.2017 0:00 0:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 DG Aux. Panel HY PM
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 8 8
TOTAL 22 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 MetLab: 4-pole TPN tripped near defractor room chiller, checked and m
2 NaNo: 1ф preventer and auto starter connection given to 3ф DoL starter.
3 CLPM: Director Room calling bell fixing work done-1Nos, and 1Nos calling bell h
4 CCM: supply connection checked and found all ok.
5 PMTC: 250W MH Lamp fitting work in progress.
6 New CEC: Extension Box-2Nos fixing done. Work completed.
7 CMD: Earth Strip flat modification work in progress, measurement taken.
I DG SET:
1 500KVA DG-2 Trial taken from 07:30 to 7:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
ADITYA KUMAR THAKUR MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
6800.0000000002
6800.0000000002
748.0
1.000
0.996

1500KVA DG -3 GRAND TOTAL


0:00 0:10
0 0
0 0
0 3
0 0.0
0.00 18.0
765 2398

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
6800.0000000002
6800.0000000002

0:00

Downtime REMARK
Nil Nil

Activity REMARKS
Completed Completed

NO. OF REMARK
SUBSTITUTIONS
0 TOTAL MAN POWER 26
0
0
0 2 no's on Leave
0 2 no's W/of
RRIED OUT(As per IEC) :
er, checked and made TPN now working ok.
DoL starter.
1Nos calling bell handover made. Work completed.

ment taken.

ns.
For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 19.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3213.8 3216.9
2 KVAH 3242.9 3246.0
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:18 0:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 5 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 16.67 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 904 724
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 3099.9999999999 0
2 KVAH 3099.9999999999 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 19.08.2017 0:00 0:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 ACB 17C HY PM
2 Cap Bank:
20A,20D,21A & 21D HY PM
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 6 6
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 7 7
TOTAL 22 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 LTSS#1:- HY PM for ACB 17C & Cap Bank: 20A,20D,21A & 21D work com
2 DG Room: 10F1 DG incomer ACB while PM work found alignment problem so re
I DG SET:
1 1500KVA DG-3 Trial taken from 07:30 to 7:40 for 10 Mins.
2 500KVA DG-1 Trial taken from 18:00 to 18:18 for 18 Mins.
Prepared by: For Sterling & wilson Site
Incharge
ADITYA KUMAR THAKUR MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
3099.9999999999
3099.9999999999
152.3
1.000
0.996

1500KVA DG -3 GRAND TOTAL


0:10 0:28
0 0
0 0
5 10
0 0.0
30.00 46.7
760 2388

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
3099.9999999999
3099.9999999999

0:00

Downtime REMARK
Nil Nil

Activity REMARKS
Completed Completed
Completed Completed

NO. OF REMARK
SUBSTITUTIONS
0 TOTAL MAN POWER 26
0
0
0 2 no's on Leave
0 2 no's W/of
RRIED OUT(As per IEC) :
& 21D work completed
ment problem so replaced with 4F1 ACB, work completed.

ins.
ins.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 20.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3216.9 3219.5
2 KVAH 3246.0 3248.6
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:10 0:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 3 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 18.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 901 724
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 2599.9999999999 0
2 KVAH 2599.9999999999 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 19.08.2017 0:00 0:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 ACB 10C HY PM
2 Cap Bank:
28A,28D,29A & 29D HY PM
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 7 7
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 6 6
TOTAL 22 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 LTSS#2:- HY PM for ACB 10C & Cap Bank: 28A,28D,29A & 29D work com
2 LTSS#2:- Earth Strip Hole punching work completed.
2 MSDS: Grass Cleaning work in & around Yard area, work completed.
I DG SET:
1 500KVA DG-1 Trial taken from 07:30 to 07:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
ADITYA KUMAR THAKUR MOHANA KRISHNA
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
2599.9999999999
2599.9999999999
152.3
1.000
0.996

1500KVA DG -3 GRAND TOTAL


0:00 0:10
0 0
0 0
0 3
0 0.0
0.00 18.0
760 2385

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
2599.9999999999
2599.9999999999

0:00

Downtime REMARK
Nil Nil

Activity REMARKS
Completed Completed
Completed Completed

NO. OF REMARK
SUBSTITUTIONS
0 TOTAL MAN POWER 26
0
0
0
0 5 no's W/of
RRIED OUT(As per IEC) :
& 29D work completed

pleted.

ins.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 21.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3219.5 3225.2
2 KVAH 3248.6 3254.4
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 3:00 0:10
2 KWH Generated 268 0
3 KVAH Generated 360 0
Diesel Consumption
4 (Ltrs) 116 3
5 KWH/Ltr 2.3103448276 0
6 Ltrs/Hrs 0.00 18.00
Day Tank Diesel Stock
7 Status (Ltrs) 785 721
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 5699.9999999998 530
2 KVAH 5800.0000000002 360
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 21.08.2017 10:10 10:20
2 21.08.2017 12:58 13:15
3 21.08.2017 13:45 13:52
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
Made OFF due to 11 KV outgoing
1 33 KV Trfo-1 feeder CT details to be note

11 KV PL-05,PL-01,PL- Made OFF due to 11 KV outgoing


2 02 feeder CT details to be note
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil NIL
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 6
2 'B' SHIFT 5 6
3 'C' SHIFT 4 4
4 GENERAL 12 6
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In PMTC MV lamp 250W 2 No's fixed found ok.
2 In CMD Earth pit connection is in progress
3 In MAT lab 40 KVA UPS observation done.
4 In SOLAR CELL 20A single pole MCB not working checked & replaced found ok.
I DG SET:
1 500KVA DG-2 Trial taken from 07:30 to 07:40 for 10 Mins.
2 DG-3 start due to EB Fail 3 times (10:10 to 10:22Min,13:00 to 13:30Min
3 DG-1 Start @14:05 to 17:05 for Sic building load.
Prepared by: For Sterling & wilson Site
Incharge
sundeep singh k MOHANA KRISHNA
EPORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
5699.9999999998
5800.0000000002
455.4
0.983
0.996

1500KVA DG -3 GRAND TOTAL


1:06 4:16
262 530
0 360
100 219
2.62 4.9
0.00 18.0
660 2166

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
6229.9999999998
6160.0000000002

0:10
0:17
0:07

Downtime REMARK

13:00 Made on @18:00Hrs

13:00 Made on @18:00Hrs

Activity REMARKS
NIL NIL

NO. OF REMARK
SUBSTITUTIONS
0 TOTAL MAN POWER 26
0
0
0
0 1 No-site incharge leave, 3 No-'s - W/of
RRIED OUT(As per IEC) :
eplaced found ok.

ins.
3:00 to 13:30Min & 13:40 to 14:04 Min)

For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 22.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3225.2 3236.8
2 KVAH 3254.4 3266.0
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00 0:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 785 721
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 11600.0000000004 0
2 KVAH 11599.9999999999 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 22.08.2017 0:00 0:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil NIL
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 12 8
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In Mat Lab Joithy madam cabin A/C not working checked MCB problem
2 In LTSS-1 2 No's Tube light not working checked choke problem so replaced fou
3 In CLPM wall mounted fan fixed in Student room as per Mr.Suribabu instruction
4 In PMTC Tube light fittings 3 No's fixed as per Mr. jangareddy instruction.
I DG SET:
1 1500KVA DG-3 Trial taken from 07:30 to 07:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
sundeep singh k MOHANA KRISHNA
EPORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
11600.0000000004
11599.9999999999
752.6
1.000
0.996

1500KVA DG -3 GRAND TOTAL


0:10 0:10
0 0
0 0
5 5
0 0.0
30.00 30.0
655 2161

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
11600.0000000004
11599.9999999999

0:00

Downtime REMARK
Nil Nil

Activity REMARKS
NIL NIL

NO. OF REMARK
SUBSTITUTIONS
0 TOTAL MAN POWER 26
0
0
0
0 1 No-site incharge leave, 3 No-'s - W/of
RRIED OUT(As per IEC) :
ed MCB problem so 32A MCB replaced found ok.
m so replaced found ok.
uribabu instruction.
instruction.

Mins.
For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 23.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3236.8 3244.5
2 KVAH 3266 3273.7
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:34:00 0:00:00
2 KWH Generated 30 0
3 KVAH Generated 46 0
Diesel Consumption
4 (Ltrs) 25 0
5 KWH/Ltr 1.2 0
6 Ltrs/Hrs 44.12 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 760 721
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 7699.9999999998 30
2 KVAH 7699.9999999998 46
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 23.08.2017 10:33:00 10:40:00
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 12 8
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 Complaints attended at PMTC,CCM & Sol-Gel Buildings.
I DG SET:
1 500KVA DG-1 Trial taken from 07:30 to 07:40 for 10 Mins.
2 Load taken on DG-1 for CNOC about 34min i.e from 10:55Hrs to 11:29Hr
3 Plant Load taken on DG-3 about 24min i.e from 10:35 to 10:59 due to EB
Prepared by: For Sterling & wilson Site
Incharge
SUDA SAINADH V.Trinadh
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
7699.9999999998
7699.9999999998
752.6
1.000
0.996

1500KVA DG -3 GRAND TOTAL


0:24:00 0:58:00
0 30
0 46
45 70
0 1.2
112.50 156.6
610 2091

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
7729.9999999998
7745.9999999998

0:07:00

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 1 No Leave, 3 members - W/O
RRIED OUT(As per IEC) :

ns.
55Hrs to 11:29Hrs.
o 10:59 due to EB Failure.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 24.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3244.5 3251.2
2 KVAH 3273.7 3280.4
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00 0:10
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 3
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 18.00
Day Tank Diesel Stock
7 Status (Ltrs) 760 718
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 6699.9999999998 0
2 KVAH 6700.0000000003 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 24.08.2017 10:17 10:21
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 8 8
TOTAL 22 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 V-Gate: Grass cutting machine connection given.
2 SolGel: 6A switch replaced near to staircase.
3 MetLab: 63A New MCB replaced from MSDS store at X-ray deffraction ro
4 PMTC: T/L fitting checked & rectified, Starter: 6Nos, T/L-3Nos, choke-1N
5 CCM: in CCM Building AC power plug problem, checked & rectified, wor
I DG SET:
1 500KVA DG-2 Trial taken from 07:30 to 07:40 for 10 Mins.
2 1500KVA DG-3 made ON due to EB Failure from 10:15 to 10:39.
Prepared by: For Sterling & wilson Site
Incharge
ADITYA KUMAR THAKUR V.Trinadh
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
6699.9999999998
6700.0000000003
752.6
1.000
0.996

1500KVA DG -3 GRAND TOTAL


0:24 0:34
0 0
0 0
25 28
0 0.0
62.50 80.5
605 2083

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
6699.9999999998
6700.0000000003

0:04

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 Leave: 1Nos, W/Of-3Nos
RRIED OUT(As per IEC) :

ray deffraction room.


-3Nos, choke-1Nos replaced old ones, work completed.
& rectified, work completed.

ns.
o 10:39.
For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 25.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3251.2 3254.1
2 KVAH 3280.4 3283.4
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00 0:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 760 718
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 2900.0000000001 0
2 KVAH 3000 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 25.08.2017 Nil Nil
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 6
2 'B' SHIFT 5 6
3 'C' SHIFT 4 4
4 GENERAL 12 6
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In MSDS CRP panels,11 KV Panels, Battery room, cleanining done.
2 In CCM building 1-phase welding machine connection given.
3 In LTSS-2 unwanted matirials shifted to LTSS-1 store room.
I DG SET:
1 1500KVA DG-3 Trial taken from 07:30 to 07:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
Sundeep singh Mohan Krishna
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
2900.0000000001
3000
752.6
0.967
0.992

1500KVA DG -3 GRAND TOTAL


0:10 0:10
0 0
0 0
5 5
0 0.0
30.00 30.0
580 2058

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
2900.0000000001
3000

#VALUE!

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 Leave: 2Nos, W/Of-2Nos
RRIED OUT(As per IEC) :
ning done.
iven.
m.

Mins.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 26.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3254.1 3257.3
2 KVAH 3283.4 3286.6
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:10 0:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 3 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 18.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 757 718
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 3200.0000000003 0
2 KVAH 3199.9999999998 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 26.08.2017 Nil Nil
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description

Fdr-1F1,6F1(ACB),
7F1,7F2,,7F3,8F2,8F3,9
1 In SIC Building H/Y PM Done.
F2,9F3 (LDB
PANEL),PDB(1&2),
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 6
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 12 7
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In CCM Building welding machine connection removed from FPB-2 and
2 In New CEC building street light 3 No's not working informed by (Mr.A.R
days.need to rectify.
I DG SET:
1 1500KVA DG-3 Trial taken from 07:30 to 07:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
Sundeep singh Mohan Krishna
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
3200.0000000003
3199.9999999998
752.6
1.000
0.993

1500KVA DG -3 GRAND TOTAL


0:00 0:10
0 0
0 0
0 3
0 0.0
0.00 18.0
580 2055

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
3200.0000000003
3199.9999999998

#VALUE!

Downtime REMARK
Nil Nil

Activity REMARKS

PM Done Found Normal

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 Leave: 3Nos, W/Of-1Nos
RRIED OUT(As per IEC) :
from FPB-2 and given connection in street light pole P.No-95.
rmed by (Mr.A.R Srinivas) checked Cable fault from previous

Mins.
For ARCI
Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 27.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3257.3 3260.4
2 KVAH 3286.6 3289.7
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00 0:10
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 0 3
5 KWH/Ltr 0 0
6 Ltrs/Hrs 0.00 18.00
Day Tank Diesel Stock
7 Status (Ltrs) 757 715
40KL Tank Diesel Stock
8 Status (Ltrs) 1618mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 3099.9999999999 0
2 KVAH 3099.9999999999 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 27.08.2017 Nil Nil
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 6 6
2 'B' SHIFT 6 6
3 'C' SHIFT 6 6
4 GENERAL 4 4
TOTAL 22 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 Street Light: P.Nos: 04,08,80 & 101 Earthing provided from Junction box
2 Street Light: P.Nos: 72 & 73 found Earthing not provided, checked and fo
material required. Work in progress
3 Street Light: P.Nos: 106 found Junction Box Bolt broken, needed to be w
I DG SET:
1 500KVA DG-2 Trial taken from 07:30 to 07:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
Aditya Kumar Thakur V.Trinadh
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
3099.9999999999
3099.9999999999
752.6
1.000
0.993

1500KVA DG -3 GRAND TOTAL


0:00 0:10
0 0
0 0
0 3
0 0.0
0.00 18.0
580 2052

1618mm------ 27404 Ltrs

TOTAL CONSUMPTION
3099.9999999999
3099.9999999999

#VALUE!

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 Leave: 1 Nos, W/Of-3 Nos
RRIED OUT(As per IEC) :
om Junction box to earthing wire, work completed.
d, checked and found pole to pole earthing to be provided,so

needed to be welding for closure of door.

ns.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 28.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3260.4 3266.5
2 KVAH 3289.7 3295.8
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:00 0:06
2 KWH Generated 0 2
3 KVAH Generated 0 2
Diesel Consumption
4 (Ltrs) 0 5
5 KWH/Ltr 0 0.4
6 Ltrs/Hrs 0.00 50.00
Day Tank Diesel Stock
7 Status (Ltrs) 950 1025
40KL Tank Diesel Stock
8 Status (Ltrs) 1585mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 6099.9999999999 2
2 KVAH 6100.0000000004 2
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 28.08.2017 Nil Nil
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 6
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 12 7
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In CMD Power plug socket not working checked & rectified.
2 In cmd Tube light not working checked & rectified.
3 In MSDS Store cleaned & unwanted materials shifted to LTSS-1 store roo
3 In PMTC Nano modification work wall side hole to be close.
4 In Main security gate Right side from entrance 70W Halogen lamp not w
replaced (Materials arranged from old SED Building) and rectified found
5 In CLPM opposite to CEC infront of CLPM shutter 2 No's LED lamp(43W)
fitted.
I DG SET:
1 1500KVA DG-3 Trial taken from 07:30 to 07:40 for 10 Mins.
2 DG-2 500 KVA Start @ 14:50 to 14:56 Hr for 6 min for Feeder MEDB-1 l
3 DG's Day tank filled DG-1-193 Ltrs,DG-2-315 Ltrs,DG-3-167 Ltrs.
Prepared by: For Sterling & wilson Site
Incharge
Sundeep singh k Mohan Krishna
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
6099.9999999999
6100.0000000004
752.6
1.000
0.994

1500KVA DG -3 GRAND TOTAL


0:10 0:16
0 2
0 2
5 10
0 0.4
30.00 80.0
747 2722

1585mm------ 26729 Ltrs

TOTAL CONSUMPTION
6101.9999999999
6102.0000000004

#VALUE!

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 Leave: 1 Nos, W/Of-3 Nos
RRIED OUT(As per IEC) :
fied.

LTSS-1 store room.


ose.
ogen lamp not working checked and 70W lamp,capacitor, ignator
d rectified found ok.
LED lamp(43W) temporory fixed taken from LTSS-2 new fittings
Mins.
eeder MEDB-1 load checking.
167 Ltrs.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 29.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3266.5 3272.8
2 KVAH 3295.8 3302.1
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:10 0:10
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 3 3
5 KWH/Ltr 0 0
6 Ltrs/Hrs 18.00 18.00
Day Tank Diesel Stock
7 Status (Ltrs) 947 1022
40KL Tank Diesel Stock
8 Status (Ltrs) 1585mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 6300.0000000002 0
2 KVAH 6299.9999999997 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 29.08.2017 Nil Nil
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 5 5
3 'C' SHIFT 4 4
4 GENERAL 12 8
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In old SED building 2 No's Halozen lamp fittings removed on 28.08.17 is
2 In CLPM Building Compressor shead lighting complaint given Mr.A. R srin
replaced found ok.
3 In CLPM building student room wall mounted fan Extended cable is join
Suryababu instruction.(Informed to Mr. A.R Srinvas and taken permissio
3 In TTI building Mr. Balaji roa cabin Lighting complaint given Mr.Jayakum
No's choke replaced found ok.

4 In TTI building solar panel covering done.


I DG SET:
1 500KVA (DG-1 & DG-2), 1500 KVA DG-3Trial taken from 07:30 to 07:40 f
Prepared by: For Sterling & wilson Site
Incharge
Sundeep singh k Mohan Krishna
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
6300.0000000002
6299.9999999997
752.6
1.000
0.994

1500KVA DG -3 GRAND TOTAL


0:10 0:30
0 0
0 0
5 11
0 0.0
30.00 66.0
742 2711

1585mm------ 26729 Ltrs

TOTAL CONSUMPTION
6300.0000000002
6299.9999999997

#VALUE!

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 Leave: 2 Nos, W/Of-2 Nos
RRIED OUT(As per IEC) :
d on 28.08.17 is refixed on same location.
given Mr.A. R srinvas checked & rectified.1 No. Choke & Starter

ded cable is jointed.(1 Sqmm 3 core cable 4mtr.)as per Mr


taken permission)
iven Mr.Jayakumar checked and rectified.3 No's 4-pin CFL lamp & 2
07:30 to 07:40 for 10 Mins.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 30.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING FINAL READING
1 KWH 3272.8 3280.2
2 KVAH 3302.1 3309.5
3 MD(KVA) ….. …..
4 PF (Daily) ….. …..
5 PF (AVG-Monthly) ….. …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1 500KVA DG -2
1 Run Hrs (Hr:Min:Sec) 0:10 0:00
2 KWH Generated 0 0
3 KVAH Generated 0 0
Diesel Consumption
4 (Ltrs) 3 0
5 KWH/Ltr 0 0
6 Ltrs/Hrs 18.00 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 944 1022
40KL Tank Diesel Stock
8 Status (Ltrs) 1585mm-
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB DG SET
1 KWH 7399.9999999996 0
2 KVAH 7400.0000000001 0
D TSEB POWER FAILURE:
Sr.No DATE FROM TO
1 30.08.2017 Nil Nil
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY NOs. ACTUAL
ROSTER PRESENT
1 'A' SHIFT 5 5
2 'B' SHIFT 6 6
3 'C' SHIFT 4 4
4 GENERAL 11 7
TOTAL 26 22
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As p
1 In CCM building LDB panel 16A ELCB removed in place off 40A MCB fixed checked
2 In PMTC/NANO Area 2 No's Techinicians alloted for routine observation & Minor
3 In DG Room DG Incommer breaker (10F1) 4000A is kept in (4F1) feeder. As per (M
3 In new CLPM Tube light fitting tobe remove and shifting their position due to Duc
4 In CLPM for Grass cutting machine temporory connection given from Pole No-93

5 LTSS-1 FPB-2 Incommer MCB 40A 4-pole Y-phase problem identified so y-phase t
6 Street light Pole No-42 connector problem so short circuit happened In FPB-01(LT
NANO/PMTC back side & CMD other places.
I DG SET:
1 500KVA DG-1 Trial taken from 07:30 to 07:40 for 10 Mins.
Prepared by: For Sterling & wilson Site
Incharge
Sundeep singh k Mohan Krishna
PORT
Issue Date: 01.06.2017

CONSUMPTION REMARK
(MF:1000)
7399.9999999996
7400.0000000001
752.6
1.000
0.994

1500KVA DG -3 GRAND TOTAL


0:00 0:10
0 0
0 0
0 3
0 0.0
0.00 18.0
742 2708

1585mm------ 26729 Ltrs

TOTAL CONSUMPTION
7399.9999999996
7400.0000000001

#VALUE!

Downtime REMARK
Nil Nil

Activity REMARKS
Nil Nil

NO. OF REMARK
SUBSTITUTIONS
0
0
0
0
0 Leave: 2 Nos, W/Of-2 Nos
RRIED OUT(As per IEC) :
MCB fixed checked & found ok. as per (Mr.A.R Srinivas) instruction.
servation & Minor works.
1) feeder. As per (Mr.Trinadh) instruction.
position due to Duct rooting.
n from Pole No-93 as per SFO instruction.

tified so y-phase terminal shift to Neutral side.


pened In FPB-01(LTSS-2) 32A MCB tripped.due to this lighting problem near

ns.
For ARCI

Checked By
DAILY REPORT
Client: ARCI Site: Hyderabad
Date: 31.08.2017
Safety Incidents:-
A TSEB POWER CONSUMPTION :
Sr.No DESCRIPTION INITIAL READING
1 KWH 3280.2
2 KVAH 3309.5
3 MD(KVA) …..
4 PF (Daily) …..
5 PF (AVG-Monthly) …..
B DG SET CONSUMPTION :
Sr.No DESCRIPTION 500KVA DG -1
1 Run Hrs (Hr:Min:Sec) 0:00
2 KWH Generated 0
3 KVAH Generated 0
Diesel Consumption
4 (Ltrs) 0
5 KWH/Ltr 0
6 Ltrs/Hrs 0.00
Day Tank Diesel Stock
7 Status (Ltrs) 944
40KL Tank Diesel Stock
8 Status (Ltrs) 1585mm
C TOTAL POWER CONSUMPTION (A+B) :
Sr.No DESCRIPTION TSEB
1 KWH 8500
2 KVAH 8599.9999999999
D TSEB POWER FAILURE:
Sr.No DATE FROM
1 31.08.2017 14:32
E MAJOR SHUTDOWN ACTIVITY
Sr.No Equipment name/no Description
1 Nil Nil
F PM/CM ACTIVITIES
Sr.No Equipment name/no Description
1 Nil Nil
G ATTENDANCE DETAILS :
Sr.No SHIFT NOs. AS PER DUTY
ROSTER
1 'A' SHIFT 5
2 'B' SHIFT 6
3 'C' SHIFT 4
4 GENERAL 11
TOTAL 26
H GENERAL WORK & SHOP ELECTRICAL COMPLAINTS CARRIED OUT(As
1 IN PMTC/NANO switch board supply checked and rectified ( MR .kutumba rao
2 IN PMTC/NANO PDB -2G Digital voltmeter not working ,checked found fuse blo
3 In CLPM building 2Nos LED lamps removed and kept at DG room
3 In Met lab OLD Director Room Tube lights 9Nos removed kept at LTSS-2 ( Com
4 In CCM Building Chipping is in progress so Light fitting arranged for Three Days
I DG SET:
1 500KVA DG-2 Trial taken from 07:30 to 07:40 for 10 Mins.
12 1500KVA DG-3 EB failure taken from 14:33 to 14:45 for 12Mins.
Prepared by: For Sterling & wilson Site
Incharge
V NIKHIL CHAKRAVARTHY Mohan Krishna
DAILY REPORT

bad

CONSUMPTION
FINAL READING (MF:1000)
3288.7 8500
3318.1 8599.9999999999
….. 752.6
….. 0.988
….. 0.994

500KVA DG -2 1500KVA DG -3
0:10 0:12
0 30
0 0
3 32
0 0.9375
18.00 160.00
1019 710

1585mm------ 26729 Ltrs


):
DG SET TOTAL CONSUMPTION
30 8530
0 8599.9999999999
TO
14:38 0:06

Description Downtime
Nil Nil

Description Activity
Nil Nil

NOs. ACTUAL NO. OF


PRESENT SUBSTITUTIONS
5 0
6 0
4 0
7 1
22 0
L COMPLAINTS CARRIED OUT(As per IEC) :
ked and rectified ( MR .kutumba rao)
r not working ,checked found fuse blown off ,so replaced fuse working ok
d and kept at DG room
9Nos removed kept at LTSS-2 ( Compaint given by A.R srinivas sir )
Light fitting arranged for Three Days ( Compaint given by A.R srinivas sir )

to 07:40 for 10 Mins.


14:33 to 14:45 for 12Mins.
Sterling & wilson Site For ARCI
Incharge
Mohan Krishna Checked By
Issue Date: 01.06.2017

REMARK

GRAND TOTAL
0:22
30
0
35
0.9
178.0
2673

- 26729 Ltrs

TOTAL CONSUMPTION
8530
8599.9999999999
0:06

REMARK
Nil

REMARKS
Nil

REMARK

Leave: 3 Nos, W/Of-2 Nos


EC) :

ff ,so replaced fuse working ok

given by A.R srinivas sir )


mpaint given by A.R srinivas sir )

For ARCI

Checked By