Professional Documents
Culture Documents
Nov. 2016
CONTENTS
1. Report 01 – 14
6. Design of Proposed Bridge including Hydraulic Particular and Sub- 113 - 248
Soil Investigation Report
1. R E P O R T
1.1 Preliminary
1.7 Proposed New Bridge at Ch. 142.700 in replacement of existing Arch Bridge
1.10 Labour
1.11 Rates
1.14 Drawings
1
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
1. R E P O R T
1.1 Preliminary
State : Bihar
N.H. No. : 80
2
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
section from Km. 136 to Km. 166 (Sabour to Ramjanipur) has been taken up for its
strengthening work under Annual Plan 2016-17 approved by M/oSRT&H.
The project section under consideration from Km. 136 to Km. 166 (Sabour to
Ramjanipur) has been badly damaged due to flood over-topping and breach at several
locations. The Existing Bituminous pavement is badly damaged during the Rainy
season of August 2016. Immediate restoration and strengthening work of project section
becomes essential in view of present damage due to Rains and Flooding.
Image of Road condition in Km 139 (Breach Zone) Image of Road condition in Km. 143 (Breach Zone)
Image of road condition in Km. 143 Image of road condition at chainage 144 Km
Image of road condition in Km. 144 Image of road condition at Km. 152
3
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Image of road Condition in Km. 161 Image of road condition at Km. 163
Provision of GSB (150 mm. Thick) 20 % approx. has been made in cost estimate as
leveling course and filling of pot Holes. The section wise of pavement type under
strengthening work is detailed in next chapter.
Suitable Diversion Shall be constructed on right side of existing bridge for smooth
movement of Traffic during construction of New Bridge.
4
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
The Project Section under consideration from Km. 136 (Sabour) to Km. 166
(Ramjanipur) is the part of NH-80, which mainly passes through Premnagar, Sabour,
Ghoshpur, Farka, Masarh, Sankarpur, Fulkia, Ghogha, Pakkisarai, Trimuhan,
Pakartaria, Kahalgaon, Kalipura, Anadipur and finally terminates at Ramjanipur Km.
166. The existing Highway in project section is of Intermediate to Two-Lane standard.
Around 40 % of Project Section falls in Built-up section. The Right of Way in the
Project Section is found ranging from 16.00 m. to 25 m.
5
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
6
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
1 135 136 1000 Poor Pot holes, Alligator Cracks, Longitudinal Cracks , Loss of
2 136 137 1000 Poor Aggregates and Hungry Surfaces
3 137 138 1000 Poor Alligator Cracks, Longitudinal Cracks, Loss of Aggregates
4 138 138.15 150 Poor and Hungry Surfaces have been noticed
5 138.15 139.6 1450 Extremely Poor The Road has been breached at some locations by nearby
water logged area . Except that Edge failures, Slope
failure, loss of aggregates and big pot holes
6 139.6 142 2400 Poor Disintegration, Pot holes, Alligator Cracks, Rutting, Edge
7 142 142.25 250 Poor cracks Loss of Aggregates and Hungry Surfaces
8 142.25 142.35 100 Extremely Poor The Road has been breached at the locations by nearby
defined stream line. Except that Edge failures ,Slope
failure, loss of aggregates a have been noticed
9 142.35 143 650 Poor
Big Pot holes, Alligator Cracks, , Loss of Aggregates,
10 143 144 1000 Poor
Rutting, Disintegration of aggregates, Hungry Surfaces
11 144 145 1000 Poor
and water logging in the carriageway
12 145 146 1000 Poor
13 146 146.1 100 Poor Alligator Cracks, Loss of Aggregates, Disintegration of
aggregates
14 14.1 141.25 127150 Extremely Poor Crust has been completely uprooted in the carriageway
15 146.25 147 750 Extremely Poor
7
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
a. Bridges
There are 4 Major Bridge and 6 Nos. of Minor Bridges Falls in the Project
Section. The details of Existing bridges is presented in table below:
The existing narrow arch Bridge (7 x 4.60 = 33 m.) at Ch. 142.700 of NH-80 is found in
damaged condition. Replacement of the existing Arch Bridge by New RCC High-level
Bridge is essential. Considering the available ROW in the project section, it has been
proposed to construct the New RCC High-level Bridge on existing Alignment after it’s
dismantling. Suitable Diversion Shall be constructed on right side of existing bridge for
smooth movement of Traffic during construction of New Bridge.
8
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
b. Culverts
Total 24 nos. of Culverts (HP, Slab, Slab & Box) has been identified in the project
section. Summary and condition of Existing Culverts is presented below in the table 1.8
Out of Total 24 Culverts condition of 7 Culverts is very alarming as they are badly damaged
due to Flood situation and breach in August 2016 and needs immediate replacement by New
Box Culvert as detailed in Table 1.9 below.
9
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
142.500 Right Yellowish Grey 100 99.96 95.57 90.55 9.45 31.45 16.25 15.20 CL 16.45 1.72 6.82 7.07 5.32 5.78
Silty Clay
144.750 Right Brownish Silty 100 99.96 97.07 89.65 10.35 29.65 15.65 14.00 CL 15.75 1.73 6.57 6.82 5.07 5.53
Clay
146.400 Left Yellowish Grey 100 99.96 96.3 84.20 15.8 30.25 15.85 14.40 CL 15.75 1.75 6.73 6.98 5.23 5.69
Silty Clay
148.500 Right Brownish Silty 98.63 98.26 96.12 92.98 5.65 32.25 18.15 14.10 CL 15.65 1.73 6.86 7.11 5.36 5.82
Clay
150.400 Left Brownish Silty 100 98.38 94.05 89.30 10.7 31.35 17.75 13.60 CL 16.05 1.71 6.38 6.63 4.88 5.34
Clay
152.600 Right Dark Brown 100 98.09 95.2 90.20 9.8 32.45 17.65 14.80 CL 15.95 1.72 6.59 6.84 5.09 5.55
Silty Clay
10
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Km./ Location Visual Sieve Analysis (% Passing) Sand Atterberg Limits Type of S. Proctor Test
C.B.R. Test Result
Chaina Classification Content soil
ge of soil as per OMC. Max. Without 4 days
IS (in %) Dry den. Soaking Soaking
Classifi (gm/cc)
4.75 2.36 0.425 0.075 LL PL PI cation 2.5 5.0 2.5 5.0
mm mm mm mm 1498 of mm mm mm mm
1970 Pen. Pen. Pen. Pen.
154.600 Left Grayish Silty 98.46 97.26 94.33 91.54 6.92 32.75 18.75 14.00 CL 16.45 1.67 6.86 7.11 5.36 5.82
Clay
156.500 Right Yellowish Grey 98.24 96.09 93.63 91.25 6.99 32.45 18.85 13.60 CL 16.35 1.68 6.74 6.99 5.24 5.70
Silty Clay
158.400 Left Brownish Silty 98.05 94.06 92.32 90.65 7.40 32.65 19.95 12.70 CL 16.25 1.69 6.95 7.20 5.45 5.91
Clay
160.300 Right Brownish Grey 99.84 97.65 94.31 90.80 9.04 30.25 19.85 10.40 CL 15.65 1.77 6.55 6.80 5.05 5.51
Silty Clay
162.250 Left Brownish Silty 100 96.22 93.18 91.35 8.65 30.85 19.55 11.30 CL 15.95 1.73 6.73 6.98 5.23 5.69
Clay
164.500 Right Dark Brown Silty 100 95.31 92.05 90.28 9.72 30.95 19.95 11.00 CL 16.15 1.75 6.92 7.17 5.42 5.88
Clay
165.500 Left Brownish Silty 100 99.96 96.96 91.10 8.90 32.75 20.45 12.30 CL 15.95 1.69 6.77 7.02 5.27 5.73
Clay
Note: Recommended CBR Value for Design of Road Crust = 5 %
Summary of 7 Days Mid Block Traffic Count Data – NH-80 (Near Sabour)
Name of Road: NH-80 From : 6.00 A.M. = On 16 July 2016
Road Classification : Intermediate / Two Lane To : 6.00 A.M. On : 22 July 2016
Location of Survey Station : At Ch. 137.250 Near Direction of Traffic : Up = To Kahalgaon
Sabour Down = To Baghalpur
FAST MOVING VEHICLES SLOW MOVING VEHICLES
Car, Bus Mini/ Motor Agri.T Total Fast Cycle Cycle Animal Drawn Hand Total Slow
Jeep, Midi Truck Cycle, rac. Moving Ricksha Vehicle Drawn Moving
Count Hour Van,Te Bus Scooter Trailer Vehicles w Vehicle Vehicles
Mini 2-Axle Multi-Axle Moped
mpo Truck Rigid
Agricul Rigid Semi Bullock Horse
tural Arti./
Tractor Articulat
ed
06AM - 08AM 114 48 58 147 181 285 66 312 84 1295 66 26 4 0 0 96
08AM - 10AM 141 27 52 168 213 308 84 336 96 1425 88 22 5 0 0 115
10AM - 12AM 123 24 48 138 235 263 72 248 82 1233 50 21 3 0 0 74
12AM - 02PM 156 21 42 165 190 248 81 216 74 1193 44 23 6 0 0 73
02PM - 04PM 132 18 66 183 217 233 64 262 88 1263 60 17 5 0 0 82
04PM - 06PM 168 24 48 144 210 285 61 312 86 1338 78 24 3 0 0 105
06PM - 08PM 108 42 38 96 231 255 58 152 52 1032 32 18 2 0 0 52
08PM - 10PM 78 51 16 63 193 165 53 112 40 772 20 0 0 0 0 20
10PM - 12PM 21 0 2 15 140 105 29 24 14 350 7 0 0 0 0 7
12PM - 02AM 6 0 0 6 68 45 14 8 6 154 3 0 0 0 0 3
02AM - 04AM 0 27 0 0 32 23 7 0 0 88 0 0 0 0 0 0
04AM - 06AM 66 54 32 81 238 120 36 144 42 813 22 11 5 0 0 38
11
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Value of PCU/ 1113 1008 1206 1809 6450 10496 2813 1063 1992 27950 235 243 264 0 0 742
Type of Vehicle
1.7 Proposed New Bridge at Ch. 142.700 in replacement of existing Arch Bridge
The existing narrow arch Bridge (7 x 4.60 = 33 m.) at Ch. 142.700 of NH-80 is found in
damaged condition. Replacement of the existing Arch Bridge by New RCC High-level
Bridge is essential. Considering the available ROW in the project section, it has been
proposed to construct the New RCC High-level Bridge on existing Alignment after it’s
dismantling. Suitable Diversion Shall be constructed on right side of existing bridge for
smooth movement of Traffic during construction of New Bridge.
The over-all formation width of Proposed Bridge has been kept 16.00 m. as per
Guidelines of IRC SP-73. Based on Hydraulic Particular, the proposed Span
arrangement of New Bridge has been kept 3 x 14.00 m. RCC T-Beam Girder + Slab
Bridge resting on Pile Foundation of 1.2 m. dia.
The available Land width at Proper Bridge Site is only 7 m.. For construction of New
Bridge with Formation width of 16 m. extra 13 m. Wide Land strip is required. The
Highway formation in immediate approaches either side of Bridge in a Length of 100
m. requires Land Acquisition Work in additional width of 10-12 m.. Total Land
Acquisition work involved in the Project is approx. 40 Dec. and Cost of Land
Acquisition work for proposed Bridge & Approaches in Km. 143 works out to Rs.
85,465,575/- as per prevelling rate of compensation fixed by Govt. of Bihar (4 times the
Circle Rate of Land + 12% Interest + 20 contingency + Rs. 5.00 Lakhs). The process of
Land Acquisition work has already been started by N.H. Division, Bhagalpur.
Coarse & Fine aggregate will be procured form nearest approved quarry as given below.
12
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
The specification and test result for stone metal, stone chips and other materials involved in
construction work shall be as per guidelines laid down in the I.R.C. special publication
“Specification for Road & Bridge works” latest 5th Revision 2013.
1.10 Labour
Skilled & unskilled labour for carrying out different items of works involved in proposed
construction is locally available. Other facilities such as transport, food, water & medical care
are easily available to them.
1.11 Rates
The finished rates for carrying out different items of works has been worked out on the basis of
“Current Schedules of Rates” of National Highway Wing, Bihar, effective from 01.04.2016 /
22-09-2016.
Detailed Cost Estimate for proposed Strengthening work of existing intermediate / Two Lane
NH - 80 Stretch Km. 136 to Km. 166 Sabour – Ramjanipur section in the State of Bihar has
been worked out based on detailed quantity computation as per finalised Design and Drawings
under DPR.
Unit rates for construction items have been analyzed on the basis of the formats given in the
standard Data Book for Analysis of Rates published in the year 2003 by Indian Roads Congress
on behalf of Ministry of Surface Transport, Road Wing, Govt. of India, New Delhi.
Current Schedule of Rates of RCD, Govt. of Bihar, effective from 01.04.2016 has been taken
under consideration and cost estimate has been finalised. Local quarries for stones and stone
aggregate for construction of road crust and bridge are available in the near vicinity. Stone
quarries at Mirzachauki have been proposed for carrying out the entire work. Sand from
Sanhaula River is available in the near vicinity. Cement & Steel required in construction work
shall be procured from Bhagalpur Town in the Project Section. Hume Pipe Factories has been
located at Godda (Jharkhand).
Based on quantity Computation and Analysis of Rates the Detailed Cost Estimate have been
arrived and abstract of Cost presented in Table Below
13
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour –
Ramjanipur Section including replacement of one Minor Damaged Arch Bridge
in Km. 143 Bridge in the state of Bihar
General Abstract of Cost
Total Cost
Sl. No. Description
(Rupees in Figures)
A. Cost of Civil Construction Work
1 Site Clearance and Dismantling 16,996,045
2 Earth Work 66,548,701
3 Grannular Sub bases and Base course 94,323,040
4 Concrete Pavement 260,839,740
5 Proposed Box Culverts 36,637,037
6 Construction of Proposed Bridge in Km. 143 Bridge 41,241,422
7 Drainage & Protective Work (Total Built-up Length =14.40 Km.) 185,546,891
8 Traffic Signs, Marking, Road Appurtenances 10,317,348
Sub-Total "A" 712,450,224
9 Add 2.8% As Contingency on "A" 19,948,606
Sub-Total "B" 732,398,830
10 Add 1.5% for Work Charge Establishment on "B" 10,985,982
11 Add 1% for Quality Control on "B" 7,323,988
12 Adding Labour Cess @1% on B 7,323,988
13 Add 9% for Agency Charge on "B" 65,915,895
14 Cost of Land Acquisition work for proposed Bridge & 8,450,600
Approaches in Km. 143 = Total area of Land Acquisition = 40
decimal. Cost of Land Acquisition as per present Rule
15 Cost of Survey/Investigation and DPR Preparation Payable to 1,750,000
Consultants appointed for this Project
Grand Total Cost in Rs. 834,149,284
Say Rs. 83.415 crores
The item wise Detailed Cost Estimate is presented in Chapter-3 of this DPR.
1.14 Drawings:
The following drawings has been attached here with:
Drawings Details: No. of sheets
Plan and Profile Drawing 31
Typical Cross Sections and other Miscellaneous Drawing 10
Detailed Drawings for Proposed New Bridge in Km. 143 13
14
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
15
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Contents
2.1 General
2.2 Cross-Sectional Elements
2.6 Culverts
16
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
2.1 General
The project section under consideration from Km. 136 to Km. 166 (Sabour to
Ramjanipur) has been badly damaged due to flood over-topping and breach at
several locations. The Existing Bituminous pavement is badly damaged during
the Rainy season of August 2016. Immediate restoration and strengthening
work of project section becomes essential in view of present damage due to
Rains and Flooding.
i) Type 1
This cross section is applicable for 7.00 m. wide Carriageway Section passing
through Rural Area. Under this proposal the existing Two Lane Highway has been
strengthen with Bituminous overlay as per design done based on recommended
CBR and IRC 37-2012.
Formation Width
12000
Earthen Earthen
Shoulder Existing Carriageway Shoulder
2500 7000 2500
Selected Earth
£ Selected Earth
3.0 % 2.5 % 2.5 % 3.0 %
2 2
1 1
17
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
ii) Type 2
This cross section is applicable for 5.50 m. wide Carriageway Section passing
through Rural Area. Under this proposal the existing Two Lane Highway has been
strengthen with Bituminous overlay as per design done based on recommended
CBR and IRC 37-2012.
Existing Carriageway
Formation Width
12000
Earthen Earthen
Shoulder Shoulder
3250 5500 3250
£
Selected Earth
3.0 % 2.5 % 2.5 % 3.0 %
2 2
1 1
iii) Type-3
This cross section is applicable for 7.00 m. wide Carriageway Section passing
through Built-up Section. Under this proposal the existing Two Lane Highway has
been strengthen with Bituminous overlay as per design done based on
recommended CBR and IRC 37-2012. Road Side RCC Drain cum Footpath also
proposed in the Project section.
D ra in w ith E a rth e n E a rth e n D ra in w ith
F o o tp a th s h o u ld e r s e d C a rria g e w a y
P ro p o se s h o u ld e r F o o tp a th
1500 2500 7000 2500 1500
S e le c te d E a rth £ S e le c te d E a rth
2 .5 % 2 .5 %
Built-up Zone
Built-up Zone
3 .0 % 3 .0 %
E xistin g R o a d C ru s t
BC = 40 m m . W e e p h o le s
D BM = 120 m m .
W M M = 200 m m .
G S B fo r L e v e llin g & P o t F illin g 2 0 %
T y p ic a l C ro s s S e c tio n (T y p e -3 )
iv) Type-4
This cross section is applicable for 5.50 m. wide Carriageway Section passing
through Built-up Section. Under this proposal the existing Two Lane Highway has
been strengthen with Bituminous overlay as per design done based on
recommended CBR and IRC 37-2012. Road Side RCC Drain cum Footpath also
proposed in the Project section.
D ra in w ith E a rth e n E a rth e n D ra in w ith
F o o tp a th s h o u ld e r P ro p o s e d C a rria g e w a y s h o u ld e r F o o tp a th
1500 3250 5500 3250 1500
S e le c te d E a rth £ S e le c te d E a rth
2 .5 % 2 .5 %
Built-up Zone
Built-up Zone
3 .0 % 3 .0 %
E x is tin g R o a d C ru s t
BC = 40 m m . W e e p h o le s
D BM = 120 m m .
W M M = 200 m m .
T y p ic a l C ro s s S e c tio n (T y p e -4 )
18
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
It has been proposed for Strengthening of existing Highway section with Cement
Concrete Pavement as per design. In the Built-up Zone existing Highway has been
strengthen to Two-lane with paved Shoulder configuration with Provision of Cement
concrete Pavement and Road Side RCC Drain cum Footpath.
Suitable opening with 150-mm. dia on side wall of drain shall be provided at an
interval of 7.5 m. for collecting/receiving the surface Run-off to Drain. Weep Holes
shall also be provided in Drain in Drain sidewalls. The inner bottom of drain in no
case shall be less than 0.40 m. below bottom of GSB level. For Inspection and
19
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
cleaning work of Drain, RCC Slab in Steel Angle Frame of Size 750 x 750 mm with
MS grating of dia 150 mm at center and hook for lifting shall be provided at regular
interval 10 m. throughout the length of drain.
1500
125mm R.C.C SLAB (M-20)
125
1500
G.L
125
RCC M-20 G.L
RCC M-20
1500 1000
R=50
125
R=50
75 THK.
125 P.C.C (1:3:6)
75 THK. 125 1250 125
P.C.C (1:3:6)
1650
125 1250 125
1650
R.C.C Covered Drain
R.C.C Covered Drain (Minimum Depth At Start)
(Maximum Depth at Disposal point)
For Safety of road user during night travel, retro-refectories road delineators have
been proposed at identified locations (Approach to Bridge, culverts & structure, speed
restricted section, curved sections, built-up section etc. in the project section. The
summary of such provision is presented below.
20
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
There are 4 Major Bridge and 6 Nos. of Minor Bridges Falls in the Project Section.
The details of Existing bridges is presented in table below:
Table: 2.2 Details of Major Bridges in the Project Section
Span Vertical
Sl Type of Length of Width of Bridge
Chainage Arrangemen Clearanc
No Bridge Bridge Bridge Condition
t e
1 146+050 PSC Girder 3 x 31.56 4.8 94.5 7.4 Good
2 154+060 PSC Girder 3 x 30 5.2 94.2 11.8 Good
3 154+470 Steel Truss 8 x 18.30 4.3 146.7 7.13 Good
PSC+RCC 3 x 31 + 1 x
4 157+990 5.3 115.2 7.45 Good
Girder 21
The existing narrow arch Bridge (7 x 4.60 = 33 m.) at Ch. 142.700 of NH-80 is found
in damaged condition. Replacement of the existing Arch Bridge by New RCC High-
level Bridge is essential. Considering the available ROW in the project section, it has
been proposed to construct the New RCC High-level Bridge on existing Alignment
after it’s dismantling. Suitable Diversion Shall be constructed on right side of existing
bridge for smooth movement of Traffic during construction of New Bridge.
The over-all formation width of Proposed Bridge has been kept 16.00 m. as per
Guidelines of IRC SP-73-2015. Based on Hydraulic Particular, the proposed Span
arrangement of New Bridge has been kept 3 x 14.00 m. RCC T-Beam Girder + Slab
Bridge resting on Pile Foundation of 1.2 m. dia. The Detailed Report on Existing
Bridge/Bridge Design / Hydraulic Particular / Sub-Soil Investigation Report is
enclosed in Chapter -6
Cross Section
3 – lane RCC High Level Bridge of overall Formation width 16.00 m. as per
Guidelines of IRC SP-73-2015 and IRC:5-2015
21
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Superstructure
Simply supported RCC T-Beam Girder & RCC Slab with Span arrangement of 3 x
14.00 m. has been proposed.
Substructure
RCC Solid wall Abutment and Solid wall type piers has been proposed.
Foundation
Bored cast in situ piles of dia 1200 mm. are proposed for the foundation of the
abutment and the piers. A pile capacity for abutment and pier has been marked in
enclosed respective working Drawing.
Bearing
Elastomeric Bearing as per Standard Drawing no.-SD/203 shall be adopted.
Expansion joints
Expansion Joints Shall be strip seal type from approved supplier.
Footpath Railing
Railing on footpath side shall be as per Standard Drawing no.-SD/202n with minor
modification to incorporate IRC:5-2015
The bridge has been designed for three lane as the carriageway width is 11.00m
which is more than 9.6m as per table no.-2 of IRC-6
Apart from the dead load & Live Load Wind Load and Earthquake Forces has also be
taken into account. Impact, tractive and breaking forces has also considered as per the
provision of IRC-6.
Code \ Specification
Standard Specification and code of practice for road bridges of IRC wherever
applicable are followed. Following codes have been generally followed:
IRC-5 : General Features of Design
IRC-6 : Load and Stresses
IRC-78 : Foundation and Sub-Structures
IRC-112 : Reinforced Cement Concrete Bridge
IRC-83 (Part-II) : Elastomeric Bearing
IRC : Standard Specification for Road and Bridge Works
IS-1893 : Criteria for Earthquake Resistant Design of Structures
IS-2911 (Part-1/Sec-2) : Design & Construction of Pile Foundation
22
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Sub-structures
Abutment & Pier : RCC M-30
Foundations
Pile & Pile Cap : RCC M-35
2.6 Culverts
Total 24 nos. of Culverts (HP, Slab, Slab & Box) has been identified in the project
section. Summary and condition of Existing Culverts is presented below in the table
2.4
Table 2.4 : Summary and condition of Existing Culverts
Type of
SL Structure Span Length Width of Vertical
Location Condition
No (Pipe, Slab Arrangement of Span Culvert Clearance
Box, Arch)
1 135+140 HP 1x1 1 12.1 0.65 Out of Total 24 Culverts
2 136+030 HP 1x1 1 12.1 1.12 condition of 7 Culverts
3 139+080 HP 2x1 2.86 7 3.42 are very alarming and
4 139+140 HP 1x1 1 20.7 1.15 needs immediate
5 142+290 HP 2x1 2 20.2 1.06 replacement by New
6 145+810 HP 1 x 1.00 1.0 12.15 1.05 Box Culvert as detailed
7 147+050 Slab 1x2.75 2.75 8 4.38 in Table 1.9 below.
8 148+330 Slab 1x5.70 5.7 9.75 1.4
9 149+140 Slab 1x0.55 0.55 1x1.85 2.98 For remaining culverts
10 149+820 Slab 1x0.92 0.92 12.3 0.33 up-gradation /
11 155+200 Slab 1x0.60 0.6 9.92 0.568 replacement shall be
12 155+380 Slab 1x0.90 0.9 11.855 1.29 carried out on Finalised
13 156+050 Slab 1x 0.81 0.81 12 0.87 alignment under Up-
14 158+670 Slab 1x1.247 1.247 11.02 0.463 gradation of NH-80
15 158+750 Slab 1x0.623 0.623 11.921 0.725 Stretch (Munger -
Bhagalpur –
16 160+350 Slab 1x2.02 2.02 11.87 0.85
Mirzachauki section)
17 160+940 Slab 1x2.671 2.671 11.81 2.46 from km 65 to km 190.
18 160+960 Slab 2x2.65 2.65 7.82 2.257 DPR has been finalised
19 162+580 Slab 1x0.77 0.77 11.96 0.847 by SAI Consultants
20 163+060 Slab 1x2.84 2.84 12.01 2 under M/oRT&H for
21 163+720 Slab 1x2.98 2.98 11.92 1.488 up-gradation of
22 163+820 Slab 1x0.77 0.77 11.93 0.566 Highway.
23 165+230 Slab 1x4.92 4.92 7 0.585
24 165+800 Slab 1x0.62 0.62 11.58 0.048
Out of Total 24 Culverts condition of 7 Culverts is very alarming as they are badly
damaged due to Flood situation and breach in August 2016 and needs immediate
replacement by New Box Culvert as detailed in Table 2.5 below.
23
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Proposal New
Type of Structure
SL Span Length of Width of Vertical Culvert in
Location (Pipe, Slab Box,
No Arrangement Span Culvert Clearance replacement of
Arch)
Existing Culvert
3 139+550 New Proposed at Breach Location Box Culvert (6 x 3.5)
4 142+290 HP 2x1 2 20.2 1.06 Box Culvert (4 x 2)
5 147+050 Slab 1x2.75 2.75 8 4.38 Box Culvert (6 x 5)
6 148+330 Slab 1x1.9 2.1 9.75 1.4 Box Culvert (4 x 2)
7 149+140 Slab 1x0.55 0.55 1x1.85 2.98 Box Culvert (4 x 3.5)
8 163+720 Slab 1x2.98 2.98 11.92 1.488 Box Culvert (4 x 2)
The existing Road Crust in Project Section in Project Section is presented in Table
below
Summary of Existing Road Crust in Project Section
Existing Base & Sub- Surfacing Total Crust
Sl. From Length
To (Km) Carriageway Base Layer Layer Thickness in
No. (Km) (m)
Width (m) In mm. in mm. mm.
1 135 136 1000 7 330 65 395
2 136 137 1000 7 325 75 400
3 137 138 1000 7 310 60 370
4 138 139 1000 5.5 315 72 387
5 139 140 1000 5.5 325 82 407
6 140 141 1000 5.5 330 84 414
7 141 142 1000 5.5 325 78 403
8 142 143 1000 5.5 310 76 386
9 143 144 1000 5.5 340 77 417
10 144 145 1000 5.5 315 72 387
11 145 146 1000 5.5 330 70 400
12 146 147 1000 5.5 340 68 408
13 147 148 1000 5.5 320 64 384
14 148 149 1000 5.5 325 74 399
15 149 150 1000 5.5 330 68 398
16 150 151 1000 5.5 335 73 408
17 151 152 1000 5.5 340 69 409
18 152 153 1000 5.5 330 76 406
19 153 154 1000 6.7 325 82 407
20 154 155 1000 6.7 315 84 399
21 155 156 1000 7 325 79 404
22 156 157 1000 7 335 68 403
23 157 158 1000 7 320 66 386
24 158 159 1000 7 330 68 398
25 159 160 1000 7 335 73 408
26 160 161 1000 7 320 77 397
27 161 162 1000 7 315 79 394
28 162 163 1000 7 320 71 391
29 163 164 1000 7 330 68 398
30 164 165 1000 7 330 65 395
31 165 166 1000 7 320 73 393
Average Crust Thickness 398 mm.
24
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
The project section under consideration from Km. 136 to Km. 166 (Sabour to
Ramjanipur) has been badly damaged due to flood over-topping and breach at
several locations. The Existing Bituminous pavement is badly damaged during
the Rainy season of August. Immediate restoration and strengthening work of
project section becomes essential in view of present damage due to Rains and
Flooding.
The Km. wise summary of existing pavement condition is presented in Table below.
Summary Pavement Condition
Sl No From To Length Existing Pavement Remarks
(Km) (Km) (m) Condition
1 135 136 1000 Poor Pot holes, Alligator Cracks, Longitudinal Cracks ,
2 136 137 1000 Poor Loss of Aggregates and Hungry Surfaces
3 137 138 1000 Poor Alligator Cracks, Longitudinal Cracks, Loss of
4 138 138.15 150 Poor Aggregates and Hungry Surfaces have been noticed
5 138.15 139.6 1450 Extremely Poor The Road has been breached at some locations by
nearby water logged area . Except that Edge
failures, Slope failure, loss of aggregates and big
pot holes
6 139.6 142 2400 Poor Disintegration, Pot holes, Alligator Cracks, Rutting,
7 142 142.25 250 Poor Edge cracks Loss of Aggregates and Hungry
Surfaces
8 142.25 142.35 100 Extremely Poor The Road has been breached at the locations by
nearby defined streamline. Except that Edge
failures, Slope failure, loss of aggregates a have
been noticed
9 142.35 143 650 Poor
Big Pot holes, Alligator Cracks, , Loss of
10 143 144 1000 Poor
Aggregates, Rutting, Disintegration of aggregates,
11 144 145 1000 Poor
Hungry Surfaces and water logging in the
12 145 146 1000 Poor carriageway
13 146 146.1 100 Poor Alligator Cracks, Loss of Aggregates,
Disintegration of aggregates
14 14.1 141.25 127150 Extremely Poor Crust has been completely uprooted in the
carriageway
15 146.25 147 750 Extremely Poor
25
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
• Design Life: The design life has been adopted as 15 years as recommended by
IRC-37-2012, vide clause 4.3.2. However, considering the separate proposal
under finalisation in M/oRT&H for up-gradation of NH-80, the design of
overlay has been done for 10 years period only for existing NH-80 Section.
After 10 years period, further strengthening layer making up the short falls in
pavement thickness along with a profile corrective course after evaluation of
structural strength by non-destruction test, will be provided.
• Sub Grade: Since the present case is Strengthening of existing pavement. The
sub-Grade soil sample below of existing Pavement has been collected and CBR
data obtained after field and laboratory test on Soil. As per test results, the Sub
grade soils along the existing alignment from Km. 136 to Km. 166 are shows
similar character and are mostly Brownish Grey Silty Clay. The CBR values
ranging between 5.10 to 5.90. The recommended Design CBR (soaked) for
road section has been taken 5%.
• Design Traffic: Design Traffic for Project Section has been taken as 5444
commercial Vehicle per day and Average vehicle damage factor of 4.5 has been
adopted as per guidelines of IRC 37-2012.
N = 365 x [ ( 1+ r ) ^n – 1 ] x A x D x F
r
26
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
where ,
N = The cumulative number of standard axles to be catered for in the design in
terms of MSA
A = Initial traffic in the year of completion of construction in terms of
commercial vehicle per day
D = Lane distribtn. factor (para 4.5.1 of IRC:37-2012 2-lane single
carriageway) = 0.50
F = Vehicle damage factor =4.5
n = Design life in year
r = Annual growth rate of commercial vehicle
The traffic in the year of completion is estimated using the following formula:-
A = P ( 1 + r ) ^x
Where,
P = Number of commercial vehicles as per last count
x = Number of years between the last count and the year of completion of
construction
r = Annual growth rate of commercial vehicle
Based on the Traffic data, Existing Road Crust data, Pavement Condition Data, CBR
test result and Axle Load test data, Road Section Wise design of pavement have been
carried out and presented below with recommendation for adoption:
27
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
N = xAxDxF
r
Where, A= Initial traffic in the year of completion of construction
D= Lane distribution factor
F= Vehicle damage factor
n= Design life in years
r= Annual growth rate
N = 365x((1+5.0/100)^10-1) x 5716 x 0.50 x 1 x 4.5/ (5/100)/1000000
2.10 Recommended Crust Thickness and overlay for adoption under proposed
strengthening work of NH-80
Considering the Existing available Road Crust 350 mm. in the project section
as Sub-Base Layer. Then the Proposed Strengthening overlay in the Project
section will be 710 mm. – 350 mm. (existing) = 360 mm.
28
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
29
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour –
Ramjanipur Section including replacement of one Minor Damaged Arch Bridge
in Km. 143 Bridge in the state of Bihar
General Abstract of Cost
Total Bid Prices
Sl. No. Description
(Rupees in Figures)
A. Cost of Civil Construction Work
1 Site Clearance and Dismantling 16,996,045
2 Earth Work 66,548,701
3 Grannular Sub bases and Base course 94,323,040
4 Concrete Pavement 260,839,740
5 Proposed Box Culverts 36,637,037
6 Construction of Proposed Bridge in Km. 143 Bridge 41,241,422
7 Drainage & Protective Work (Total Built-up Length =14.40 Km.) 185,546,891
8 Traffic Signs, Marking, Road Appurtenances 10,317,348
Sub-Total "A" 712,450,224
9 Add 2.8% As Contingency on "A" 19,948,606
Sub-Total "B" 732,398,830
10 Add 1.5% for Work Charge Establishment on "B" 10,985,982
11 Add 1% for Quality Control on "B" 7,323,988
12 Adding Labour Cess @1% on B 7,323,988
13 Add 9% for Agency Charge on "B" 65,915,895
14 Cost of Land Acquisition work for proposed Bridge & 8,450,600
Approaches in Km. 143 = Total area of Land Acquisition = 40
decimal. Cost of Land Acquisition as per present Rule
15 Cost of Survey/Investigation and DPR Preparation Payable to 1,750,000
Consultants appointed for this Project
Grand Total Cost in Rs. 834,149,284
Say Rs. 83.415 crores
Superintending Engineer
N.H. Circle
Baghalpur
30
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including replacement of one Minor
Damaged Arch Bridge in Km. 143 Bridge in the State of Bihar.
Bill No.-1 : SITE CLEARANCE AND DISMANTLING
Estimated Unit Rate (Rs.)
Item Description Unit Amount in Rs.
Quantity In Figure In Words
1.01 Dismantling of existing structures like culverts, bridges, retaining walls
and other structure comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 1000 metres as per MoRTH
Technical Specifications Clause 202.
(i) Brick /Stone Masonry (Widening & Reconstruction of Culverts, cum
785.00 280.00 219,800.00
Bridges, Drains etc.)
(ii) Apron/Stone Pitching cum 80.00 207.00 16,560.00
(iii) Plain Concrete/reinforced cement concrete structures including
cleaning, straightening & cutting of bars and separating them out
from RCC/PCC
a) PCC (Drains, Culverts/Bridges Abutments/Piers & Wing Wall) cum 540.00 500.00 270,000.00
(iv) Removing Hume Pipe (600 to 900 mm. dia.) Lm 65.00 183.00 11,895.00
1.02 Dismantling of flexible pavements and disposal of dismantled materials up
to a lead of 1000 metres, stacking serviceable and unserviceable materials
separately as per MoRTH Technical Specifications Clause 202.
31
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including replacement of one Minor
Damaged Arch Bridge in Km. 143 Bridge in the State of Bihar.
Bill No. 2 : EARTH WORK
Estimated Unit Rate (Rs.)
Item Description Unit Amount in Rs.
Quantity In Figure In Words
2.01 Earthwork in excavation necessary for construction of roadway and
drainage including dressing, trimming and compacting the cut
formation in accordance with requirements of lines, grades and
cross fall complete as per Technical Specifications Clause 301 and
disposal of all cut material including necessary stacking of suitable
material with all lifts and leads.
(a) All types of soils including marshy soil and ordinary rock cum 111600 97.74 10907372
2.02 Construction of embankment to achieve 12 m. formation width with
suitable Soil obtained from road cutting with all leads and lifts all
complete as per drawings and Tech. Specifications Clause 305. cum 89280 172.85 15432464
(80% of Excavated Earth)
2.03 Construction of embankment to achieve 12 m. formation width with
suitable earth obtained from and Borrow Area with all leads and
cum 150595 267.00 40208865
lifts all complete as per drawings and Tech. Specifications Clause
305.
Total Amount for Bill No. 2 66,548,701
32
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including replacement of one Minor
Damaged Arch Bridge in Km. 143 Bridge in the State of Bihar.
Bill No. 3 GRANNULAR SUB BASES AND BASE COURSE
Unit Rate (Rs.)
Estimated
Item Description Unit Amount in Rs.
Quantity In Figure In Words
33
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including replacement of one Minor
Damaged Arch Bridge in Km. 143 Bridge in the State of Bihar.
Bill No. 4 : CONCRETE PAVEMENT
Estimated Unit Rate (Rs.)
Item Description Unit Amount in Rs.
Quantity In Figure In Words
4.01 Providing and applying Bituminous Primer Coat with cut back bitumen of
MC-30 grade over granular surface with bituminous emulsion complete as
per drawing and Technical Specifications Clause 502 @ 7.50 kg per 10 sqm 196,000 29.10 5703600
sqm
4.02 Providing and applying tack coat over prepared surface with bituminous
emulsion complete as per Technical Specifications Clause 503.
(a) On granular surface treated with primer or dry and hungry
bituminous surface @ 2.75 kg per 10 sqm sqm 196,000 11.50 2254000
(b)
On normal bituminous surface @ 2.25 kg per 10 sqm sqm 196,000 9.78 1915900
4.03 Providing and laying 120 mm. thick Dense graded Bituminous Macadam
(DBM) using Modified Bitumen (Refinery Packed & produce) as per cum 23,520 7669.00 180374880
drawing and Technical Specifications Clauses 505 and 501
4.04 Providing and laying 40 mm. Thick Bituminous Concrete (BC) wearing
course using Modified Bitumen (Refinery Packed & produce) complete as cum 7,840 9004.00 70591360
per drawing and Technical Specifications Clauses 507
34
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including replacement of one Minor
Damaged Arch Bridge in Km. 143 Bridge in the State of Bihar.
35
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
5.11 Providing and fixing Tar paper bearing complete as per drawing and IRC: SP:
sqm 57.60 116.00 6682
13-2004.
5.12 Providing and fixing drainage spouts in Slab and Box culvert as per drawing
and Technical Specifications Section 2705. Nr. 32.00 922.00 29504
5.13 Providing 75 mm thick RCC M-30 wearing course over Box Culvert Deck all
complete as per drawing and Technical Specifications Section 2700. sqm 40.63 9983.00 405569
36
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
5.17 Painting culvert No. with synthetic enamel complete as per drawing,
Technical Specification Section 800, IRC:7-1971 and directions of the Nr. 16.00 365.00 5840
Engineer.
5.18 Painting of RCC Railing and Parapets with two coats of cement based paint
as per technical specifications and the directions of the Engineer. sqm 192.00 368.00 70656
37
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including replacement of one Minor
Damaged Arch Bridge in Km. 143 Bridge in the State of Bihar.
6. Drainage and Protective Work
Estimated Unit Rate (Rs.)
Item Description Unit Amount in Rs.
Quantity In Figure In Words
6.01 Earthwork in excavation for foundation in all types of soil for construction of drains,
vertical fall, outfall and escape including transporting for use or disposal of surplus
cum 92,192 103 9,495,776
excavated earth with all leads and lifts as per MoRTH Technical Specifications
Section 300.
6.02 Construction of RCC M-20 grade Road side drain (As per Drawing) in Built-up
Section as per drawing including cost of cover, centering, shuttering with all leads
and lifts all complete job as per drawing and Technical Specifications Clause 1500, cum 19,807 5854 115,949,446
1700, 2100 & 2200.
6.03 Providing and fixing in position uncoated Fe-500 grade HSD reinforcement in
reinforced cement concrete structures complete as per drawing and Technical tonne 792 49214.00 38989299
Specifications Section 1600.
6.04 Providing PCC (M-15) in foundation of Drain as per drawing all complete job as
per Drawing, Technical Specifications Section 1700, 2100 and Direction of Engineer cum. 3,673 5181.00 19,031,238
6.05 Providing and laying RCC Drainage Pipe of 150 mm. Dia for Connecting Road
Side Drain to discharge surface runoff to side drain as shown in drawing all Lm 2,485 315 782,732
complete as per drawing & Technical Specifications Clause 2900.
6.06 Providing and erecting a "W Shaped" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m
high with 1.15 m below ground level, all steel parts and fitments to be galvanised by
hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be Lm 600 2164 1,298,400
fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm
long as per details & schedule attached in drawing all complete job as per Technical
Specifications clause 810, 811.
Total Amount for Bill No. 6 185,546,891
38
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including replacement of one Minor
Damaged Arch Bridge in Km. 143 Bridge in the State of Bihar.
7. Traffic Signs, Marking and Road Appurtenances
Estimated Unit Rate (Rs.)
Item Description Unit Amount in Rs.
Quantity In Figure In Words
7.01 Providing with hot applied thermoplastic paints conforming to
ASTM D36/BS-3262 (Part - I) as per drawing & Technical
Specifications Clause 803.
a. Lane/centre line/edge line/ transverse marking and any other
sqm 7,900.00 791.00 6,248,900
markings
b. Directional Arrows, lettering etc. as per Drg. No.61 of
MoRTH "Type Design for Inter-sections on National Nr. 45.00 755.00 33,975
Highways”.
7.02 Supplying and fixing at site retro-reflectorised type sign
boards/signs made of encapsulated lense type of reflective
sheeting fixed over aluminum sheeting 2.0 mm thick complete
including vertical pipes/ angles/ posts etc. all complete as per
supplied drawing and MoRTH Technical specifications Clause
801
A) Informatory Sign
i) Direction / advance Direction Sign (0.90 Sqm. Size) Nr. 32 12509 400,288
ii) Route Marker signs (600 x 450) Nr. 32 4412 141,184
B) Cautionary Signs Nr. 92 5258 483,736
C) Mandatory signs 0
i) Stop sign (900 octagonal) Nr. 60 8664 519,840
ii) Speed Limit sign, Overtaking prohibited (600 Dia) Nr. 90 4550 409,500
7.03 Providing and fixing retro-reflectorised road delineators
complete as per drawing and MoRTH Technical Specifications
Cl a) Road
80 Delineators Nr. 460.00 1065 489,900
b) Cluster of Red Reflectors Junctions Nr. 300.00 1065 319,500
c) Hazard markers Nr. 165.00 1865 307,725
d) Object markers Nr. 145.00 1890 274,050
39
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
7.06 Providing Painting on Road Side Tree trunk in first row adjacent
to carriageway up to height 2.00 m. (Alternative White & Red
Strips) all complete job as Technical Specifications Sections Nr. 1,450.00 300 435,000
800.
Total Amount for Bill No. 7 10,317,348
40
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Construction of High Level RCC Bridge in Replacement of Existing Narrow and Damaged
Arch Bridge in Mamalka at Chainage-142.680 in the State of Bihar
General Abstract of Cost for Proposed Bridge in Km. 143
Item Amount
Description
No. ( In Rs.)
Cost Estimate
A. Foundation Work
Sl Item Description of Work Unit Estimated Rate Amount
No. No. Quantity in Rs. in Rs.
1.01 12.1 Earth work in excavation of foundation of structures
(I) (A) as per drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, cum 246.312 103.00 25,370.00
dressing of sides and bottom and backfilling with
approved material. as per MORTH clause No. - 304
1.02 13.9 Back filling behind abutment, wing wall and return
wall with sandy Material complete as per drawing
and Technical Specification & as per clouse 710.1.4 cum 935.281 820.00 7,66,931.00
of IRC : 78 & 2200 of MORTH
1.03 12.39 Providing & Laying Plain Cement Concrete M-15
levelling course 100mm thick below the pile cap. as
per MOR&TH and Technical Specifications Sections cum 41.472 5,181.00 2,14,866.00
1100 & 1700
1.04 12.25 Providing bored cast-in-situ RCC Vertical Piles M-
35 Grade 1200 mm. Dia. with all required
accessories excluding reinforcement all complete m 615.200 14,750.00 90,74,200.00
job as per drawing and Technical Specifications
Sections 1100, 1600 and 1700
1.05 12.38 Providing RCC M35 grade for Pile Cap all complete
(D) (ii) as per Drawing and Technical Specification as per
calus 1100, 1500 & 1700 Using Batching Plant, cum 459.00 6,582.00 30,21,138.00
Transit Mixer and Concrete Pump
41
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
C. Super-Structure Work
1.15 14.1C Furnishing and Placing Reinforced/ Prestressed
(ii) (p) cement concrete M30 in T-Beam + Slab Super-
Case-II structure as per drawing and Technical Specification cum 318.39 7,660.00 24,38,841.00
1500 & 1600 1700 of MORTH Using Batching Plant,
Transit Mixer and Concrete Pump.
1.17 14.4 Providing RCC M30 grade in wearing coat over deck
slab and approach slab as per drawing and cum 36.04 9,983.00 3,59,747.00
Technical Specification & MORTH clouse 2702
1.18 14.9 Providing Drainage Spot as per drawing and
Technical Specification & Section 2705 of MORTH no 18.00 922.00 16,596.00
42
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
43
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
E. Construction of Diversion
1.29 2.3 (ii) Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees
cut earlier and disposal of unserviceable materials
as per Technical Specification Clause 201 of
MORTH
A In the area of light Jungle. Sqm. 3800.00 3.96 15,038.00
1.30 3.2 Earthwork in excavation necessary for
construction of roadway in all types of soil including
conglomerates/soil mixed with boulders all leads and Cum. 465.00 97.74 45,447.00
lifts all complete job as per drawings and Technical
Specifications Clause 301.
1.31 3.16 Construction of embankment with approved material
obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required
slope and compacting to meet requirement of table Cum. 11,000.00 267.00 29,37,000.00
300-2 and as per Technical specifiaction Clause 305
1.32 12.39 Providing & Laying Plain Cement Concrete M-15 for
H.P bed. all complete job complete as per drawings
and Technical Specifications Sections 1100 & 1700 Cum. 152.95 5,181.00 7,92,413.00
44
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
45
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
46
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
47
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
17 Type-3 152.800 153.025 225.000 Built-Up 7 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM, 40
mm. BC + RCC Drain with Cover
18 Type-1 153.025 153.250 225.000 Open 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM,
40 mm. BC
19 Type-3 153.250 153.525 275.000 Built-Up 7 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM, 40
mm. BC + RCC Drain with Cover
20 Type-1 153.525 155.050 1525.000 Open 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM,
40 mm. BC
21 Type-3 155.050 155.500 450.000 Built-Up 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM, 40
mm. BC + RCC Drain with Cover
22 Type-1 155.500 155.700 200.000 Open 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM,
40 mm. BC
23 Type-3 155.700 156.100 400.000 Built-Up 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM, 40
mm. BC + RCC Drain with Cover
24 Type-1 156.100 156.500 400.000 Open 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM,
40 mm. BC
25 Type-3 156.500 156.950 450.000 Built-Up 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM, 40
mm. BC + RCC Drain with Cover
26 Type-1 156.950 158.500 1550.000 Open 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM,
40 mm. BC
27 Type-3 158.500 160.300 1800.000 Built-Up 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM, 40
mm. BC + RCC Drain with Cover
28 Type-1 160.300 161.400 1100.000 Open 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM,
40 mm. BC
29 Type-3 161.400 162.375 975.000 Built-Up 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM, 40
mm. BC + RCC Drain with Cover
30 Type-1 162.375 165.270 2895.000 Open 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM,
40 mm. BC
31 Type-3 165.270 166.000 730.000 Built-Up 7.0 Bituminous GSB 20% Profile Correction, 200
Overlay mm. WMM, 120 mm. DBM, 40
mm. BC + RCC Drain with Cover
Length of Type -1 C/S - 7 m. Carriageway open Area in m. 8920
Length of Type -2 C/S - 5.50m. Carriageway open Area in m. 7675
Length of Type -4 C/S - 7.00 m. Carriageway Built-up Area in m. 8080
Length of Type -3 C/S - 5.50m. Carriageway Built-up Area in m. 6325
48
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
TCS ‐ TYPE ‐ 2 (Open area with 5.50 m. Carriageway ‐ Total Length = 7.675 Km.)
Sl. Item of Work Length in Width in m. Thickness in m. Total Total Length Total
No. m. Quantity in Km. Quantity
1 20 % GSB (150 1000 7.000 0.030 210.000 7.675 1611.750
mm. thick) for
Levelling work
and Pot Filling
49
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
TCS ‐ TYPE ‐ 3 (Built‐up Area with 7.00 m. Carriageway ‐ Total Length = 8.080 Km.)
Sl. Item of Work Length in Width in m. Thickness in m. Total Total Length Total
No. m. Quantity in Km. Quantity
TCS ‐ TYPE ‐ 4 (Built‐up Area with 5.50 m. Carriageway ‐ Total Length = 6.325 Km.)
Sl. Item of Work Length in Width in m. Thickness in m. Total Total Length Total
No. m. Quantity in Km. Quantity
1 20 % GSB (150 1000 7.000 0.030 210.000 6.325 1328.250
mm. thick) for
Levelling work
and Pot Filling
2 WMM 200 mm. 1000 5.500 0.200 1100.000 6.325 6957.500
Layer
50
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
51
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
52
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
53
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
1 Earthwork in excavation necessary for construction of roadway in all types of soil all
complete as per Technical Specifications Clause 301 = 31000 x 6.0 x 0.60 = 111600.00
54
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Detailed Quantity Computation for Strengthening work of existing Intermediate /Two Lane NH-80 Stretch Km. 136 to Km. 166 (Sabour -
Ramjanipur Section) in the State of Bihar
1.00 SITE CLEARANCE AND DISMANTLING
Measurement Estimated
Item Description Unit
length Bredth Depth Quantity
1.01 Dismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of masonry, cement concrete, wood work, steel work, including
T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of
unserviceable material with all lifts and leads, excavation and backfilling to required
compaction complete as per MoRT&H Technical Specifications Clause 202.
(i) Brick /Stone Masonry (Widening & Reconstruction of Culverts, Bridges, Drains cum
etc.) As per Site Condition 785.00
(iii) Plain Concrete/reinforced cement concrete structures including cleaning, As per Site Condition 80.00
a) PCC (Drains, Culverts/Bridges Abutments/Piers & Wing Wall) cum As per Site Condition 40.00
(iv) Removing Hume Pipe (600 to 900 mm. dia.) Lm Existing Damaged HP Culvert 65.00
1.02 Dismantling of flexible pavements and disposal of dismantled materials up to a lead
of 1000 metres, stacking serviceable and unserviceable materials separately as per
MoRTH Technical Specifications Clause 202.
(a) Bituminous courses cum 31,000.00 7.00 0.080 17,360.00
(b) Granular courses cum 12,600.00 7.00 0.150 13,230.00
55
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Detailed Quantity Computation for Strengthening work of existing Intermediate /Two Lane NH-80 Stretch Km. 136 to Km. 166
(Sabour - Ramjanipur Section) in the State of Bihar
5.00 DRAINAGE AND PROTECTION WORKS
Item Measurement Estimated
Description Unit
No. length Bredth Depth Quantity
5.01 Earthwork in excavation for foundation in all types of soil for construction
of drains, vertical fall, outfall and escape including disposal of surplus
excavated earth with all leads as per MoRTH Technical Specifications cum 28810.00 2.00 1.60 92192.00
Sections 300.
5.02 Providing cement concrete M-15 grade PCC (Levelling Course below
drains, in vertical fall, outfall, escape for drainage arrangement as per
drawing and MoRTH Technical Specifications sections 1500, 1700 and cum 28810.00 1.70 0.075 3673.28
2500.
5.03 Construction of RCC M-20 grade Road side covered drain as per
drawing - 1.25 m. avg. Height, 1.25 m. inner width and 125 mm side wall 28810 x {(1.25 x
thickness) including cost of centering, shuttering with all leads and lifts all cum 0.125)+(1.50x2x0.125)+ 19806.88
complete job as per drawing and Technical Specifications Clause 309 and (1.25x0.125)}
Sections 1500 & 1700.
5.04 Providing and fixing in position uncoated Fe-500 grade HSD reinforcement
in reinforced cement concrete structures complete as per drawing and tonne 19806 x 40 /1000 792.24
Technical Specifications Section 1600.
56
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Detailed Quantity Computation for Strengthening work of existing Intermediate /Two Lane NH-80
Stretch Km. 136 to Km. 166 (Sabour - Ramjanipur Section) in the State of Bihar
7.00 TRAFFIC SIGNS, MARKING AND OTHER ROAD APPURTENANCES
Estimated
Item Description Unit
Quantity
7.01 Providing with hot applied thermoplastic paints conforming to ASTM D36/BS-
3262 (Part - I) as per drawing & Technical Specifications Clause 803.
a. Lane/centre line/edge line/ transverse marking and any other markings sqm 7,900.00
b. Directional Arrows, lettering etc. as per Drg. No.61 of MoRTH "Type
Design for Inter-sections on National Highways”. Nr. 80.00
7.02 Supplying and fixing at site traffic signs having retro-reflectorive sheeting of
high intensity grade (Type III) fixed over aluminum sheeting 2.0 mm thick
complete including vertical pipes/ angles/ posts etc. all complete Job as per
drawing and MoRTH Technical specifications Clause 801
A) Informatory Sign
i) Direction / advance Direction Sign (0.90 Sqm. Size) Nr. 32
ii) Route Marker signs (600 x 450) Nr. 32
B) Cautionary Signs Nr. 92
C) Mandatory signs
i) Stop sign (900 octagonal) Nr. 60
ii) Speed Limit sign, Overtaking prohibited (600 Dia) Nr. 90
7.03 Providing and fixing retro-reflectorised road delineators complete as per
drawing and MoRTH Technical Specifications Clause 805
a) Road Delineators Nr. 460.00
b) Cluster of Red Reflectors Junctions Nr. 300.00
c) Hazard markers Nr. 165.00
d) Object markers Nr. 145.00
57
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
7 Providing M30 in Approach Slab Cum. 100.800 50.40 25.200 25.200 201.600
Providing RCC M30 Wearing
8 Cum. 18.000 9.18 6.696 6.750 40.626
Coat
9 Providing RCC M-30 in Railing m. 60.000 30.00 19.000 19.000 128.000
10 Providing Drainage Spout Nos. 16.000 8.00 4.000 4.000 32.000
11 Providing Weep Holes Nos. 96.000 72.00 60.000 80.000 308.000
12 Filter Media Behined Box Cell Cum. 115.200 100.80 57.600 72.000 345.600
17 Filter Media Behined Wing Wall Cum. 96.000 134.40 76.800 115.200 422.400
20 Providing M15 in Curtain wall Cum. 185.600 120.60 69.700 83.200 459.100
58
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
59
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
61
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
62
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
63
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
64
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
200 200
100 300 Haunch 150
Haunch
Construction 300X150 2.166 Haunch
150X87 Drainage
300 Joint 1350
#N/A 300 550 0.300
550 Spout
Neoprene Bearing 400 Pedustal
0.5x0.36x0.096
Cap
Details of Superstructure
Input :
Conc in s/s = 106.129 cum / span
Steel = 26.080 M.T./span
Drainage spout/span = 6 nos.
Length of approach slab = 3.600 m
Thick of approach slab = 0.300 m
Width of bridge = 16.000 m
Carriageway 11.000
Railing Type RCC Railing/crash barrier
Thick of lean conc below appr. Slab = 0.150 m
Effective Span= 14.000 m
Overall Span 14.560
No. of spans = 3.000
Thick of wearing coat = 0.075 m
Neoprene Bearing 50.0 36.0 9.6 cm
No. of Longitudinal girders = 5.000
Detailed Quantity Computation of Superstructure :
1. M30 in Deck Slab as per MOST = 3 x 106.13 = 318.39 cum
2. Approach Slab = 2 x 3.6 x 0.3 x 16 = 34.56 cum
3. Lvl course M15 in appr. = 2 x 3.75 x 0.15 x 16 = 18.00 cum
4a. RCC Railing = 2 x (14.56 x 3 + 2 x 3.6) = 101.76 m
4b. Crash Bariar = 2 x (14.56 x 3 + 2 x 3.6) = 101.76 m
5. RCC Wearing Coat = 11 x 3 x 14.56 x 0.075 = 36.04 cum
6. Neoprene Bearing = 15 x 50 x 36 x 9.6 x 2 5,18,400.00 cucm
7. Tar paper bearing = 2 x 16 x 0.20 = 6.40 sqm
8. Drainage Spout = 3x6= 18.00 nos.
9. Expansion joint = (3 + 1) x 16 = 64.00 m
10. Asphaltic Plug joint = 2 x 16 = 32.00 m
11. (i) Steel in s/s - (Deck & Girder) = 26.08 x 3 = 78.24 M.T.
(ii) Steel in approach slab = 0.80 M.T.
Total steel in superstructure and approach slab= 79.04 M.T.
65
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
66
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
26.56 3.250
deg 0.800
10.815 RL-94.000 Bed Level
1.800
RL-93.198 Bottom of Pile cap
0.15 Lvl. Course
22.0
3.60 0.80
7.40 Seismic
0.80 Reaction
16.00 3.60 Block
0.80
16.3 Neoprene Pad=40cmx20cmx3cm= 2400.0
67
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
68
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
69
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
b14
Cover in substructure= 0.05 m
Cover in foundation= 0.075 m
Bend in link and stirrups= 0.1 m
b15 b7 Bend in main bar= 0.3 m
b16 500 b8
b11
b15 b10
b16
0.5 b8
b2
b7
b3(BF)
b13 b1
b1
b12 b4
b6 b5
e2 e4
e6
300 e5
allaround
d
e3 e8 e1 e8
e7 e7
e6
Details of Pile
70
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
72
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
73
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
74
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
2.166
3.75
2.750
26.555 deg 1.000
RL-93.593 Bed Level
1.800
RL-93.198 Bottom of Pile cap
0.15 Lvl. Course
22.000
13.200
0.500
0.500
2.256
0.1 m Typ.
1.20
RL-71.198 Founding Level
75
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
5.100
##
Tr. Seismic
0.75 0.80 Reaction
Block
1.10
7.200 Neoprene Pad=80cmx20cmx3cm= 4800.0
8.600 3.6 0.70
8.700
1.00 Long. Seis.
1 Reaction
3.6 Block
7.2 0.35
Neoprene Pad=40cmx20cmx3cm= 2400.0
76
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
77
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
d19
d15, d17
d16, d18
d12 d8, d9
d13
Cover in substructure= 0.05 m
Cover in foundation= 0.075 m
Bend in link and stirrups= 0.1 m
Bend in main bar= 0.3 m
d1
d2 d3
(d4+d5+d6)
b6 b5
e9 e11
e12 e14
allaround
Details of Pile
78
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Sl. LOCATION BAR SHAPE DIA SPACING LENGTH NOS TOTAL WEIGHT
No. MARKED of Bar of Bar LENGTH
sub-structure, continued………
80
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
82
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
83
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Protection Work :
Boulder Pitching
in slope
Slope 2:1
Earthen Shoulder
8450
7000
3600 300
Earthen Shoulder
Slope 2:1
hl
sl cl
Boulder Pitching
in slope
84
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Proposed Diversion
Formation width
Embankment (varies) 9.00 Embankment (varies)
#REF!
2.5 m. Varies 500.00 mm. Sub-grade 2
1
GL #REF!
85
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Earth work :
1 Clearing and grubbing of original ground along the approach :
Area = 200 x 19 3800.00 sqm.
2 Earth work filling in embankment… all complete job
86
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
5. Analysis of Rates
87
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
capacity in
P&M-005 Bitumen Boiler oil fired Bitumen Spraying 1500 hour 258.00
litre
Paving of concrete
P&M-006 Concrete Paver Finisher with 40 HP Motor cum / hour 20 hour 1273.00
surface
P&M-007 Concrete Pump of 45 & 30 cum capacity Pumping of concrete cum / hour 33 / 22 hour 333.00
capacity in
P&M-008 Concrete Bucket For Pouring concrete 1 hour 21.00
cum
P&M-009 Concrete Mixer (a) 0.4/0.28 cum Concrete Mixing cum/hour 2.5 hour 66.00
P&M-010 Concrete Mixer (b) 1 cum Concrete Mixing cum/hour 7.5 hour 215.00
P&M-027 Integrated Stone Crusher 100THP Crushing of Spalls TPH 100 hour 11287.00
P&M-028 Integrated Stone Crusher 200 HP Crushing of Spalls TPH 200 hour 23744.00
P&M-029 Kerb Casting Machine Kerb Making Rm/hour 80 hour 404.00
capacity in
P&M-030 Mastic Cooker Mastic Wearing coat 1 hour 80.00
tonne
P&M-031 Mechanical Broom Hydraulic Surface Cleaning sqm/hour 1250 hour 477.00
88
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Rolling of Asphalt
P&M-037 Pneumatic Road Roller cum/hour 25 hour 1621.00
Surface
Pneumatic Sinking of
P&M-038 Pneumatic Sinking Plant cum/hour 1.5 to 2.00 hour 5432.00
wells
P&M-039 Pot Hole Repair Machine Repair of potholes cum/hour 4 hour 1180.00
Stressing of steel
P&M-040 Prestressing Jack with Pump & access hour 168.00
wires/stands
P&M-041 Ripper Scarifying cum/hour 60 hour 37.00
P&M-042 Rotavator Scarifying cum/hour 25 hour 23.00
P&M-043 Road marking machine Road marking Sqm/hour 100 hour 122.00
Soil Compaction /BM
P&M-044 Smooth Wheeled Roller 8 tonne cum/hour 70/25 hour 675.00
Compaction
P&M-045 Tandem Road Roller Rolling of Aspalt Surface cum/hour 30 hour 1491.00
P&M-062 Wet Mix Plant 60 TPH Wet Mix cum/hour 25 hour 1569.00
89
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
P&M-063 Air compressor with pneumatic chisel attachment for cutting hard clay. hour 808.00
Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne
P&M-064 hour 3230.00
per hour
P&M-067 Cement concrete batch mix plant @ 175 cum per hour (effective output) hour 6782.00
P&M-068 Cement concrete batch mix plant @ 75 cum per hour hour 2906.00
P&M-076 Compressor with guniting equipment along with accessories hour 202.00
P&M-077 Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes/hour. hour 1569.00
Induction, deinduction and erection of plant and equipment including all components and
P&M-082 hour input
accessories for pneumatic method of well sinking.
P&M-083 Joint Cutting Machine with 2-3 blades (for rigid pavement) hour 303.00
P&M-085 Piling rig Including double acting pile driving hammer (Hydraulic rig) hrs 7117.00
P&M-087 Snow blower equipment 140 HP @ 600 cum per hour hour input
P&M-092 Vibrating Pile driving hammer complete with power unit and accessories. hour input
90
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
(B) Labour
91
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
(C) Materials
M-001 Stone Boulder of size 150 mm and below at Cruser Plant cum 338.58
M-002 Supply of quarried stone 150 - 200 mm size for Hand Broken at site cum 338.58
M-003 Boulder with minimum size of 300 mm for Pitching at Site cum 338.58
M-009 Granular Material or hard murrum for GSB works at Site Cum 134.96
M-010 Granular Material or hard murrum for GSB works at Mixing Plant Cum 134.96
M-011 Fly ash conforming to IS: 3812 ( Part II & I) atHMP Plant / Batching Plant / Crushing Plant Cum 0
M-012 Filter media/Filter Material as per Table 300-3 (MoRT&H Specification) Cum 422.28
92
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Rate at Plant
Sl. No. Description Unit (HMP/Batchi Rate at Site
ng)
M-013 Close graded Granular sub-base Material 53 mm to 9.5 mm cum 494.46 578.9
M-014 Close graded Granular sub-base Material 37.5 mm to 9.5 mm cum 471.86 552.26
M-015 Close graded Granular sub-base Material 26.5 mm to 9.5 mm cum 529.62 620.37
M-016 Close graded Granular sub-base Material 9.5 mm to 4.75 mm cum 508.74 595.75
M-017 Close graded Granular sub-base Material 9.5 mm to 2.36 mm cum 394.31 460.8
M-018 Close graded Granular sub-base Material 4.75mm to 2.36 mm cum 195.72 226.59
M-019 Close graded Granular sub-base Material 4.75mm to 75 micron mm 181.88 210.27
M-020 Close graded Granular sub-base Material 2.36 mm cum 181.88 210.27
M-021 Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve. cum 92.57 109.16
M-022 Coarse graded Granular sub-base Material 2.36 mm & below cum 181.88 206.07
M-023 Coarse graded Granular sub-base Material 4.75mm to 75 micron mm 181.88 206.07
M-024 Coarse graded Granular sub-base Material 4.75 mm to 2.36 mm cum 195.72 222.38
M-025 Coarse graded Granular sub-base Material 9.5 mm to 4.75 mm cum 508.74 591.53
M-026 Coarse graded Granular sub-base Material 26.5 mm to 4.75 mm cum 480.94 558.75
M-027 Coarse graded Granular sub-base Material 26.5 mm to 9.5 mm cum 529.62 616.16
M-028 Coarse graded Granular sub-base Material 37.5 mm to 9.5 mm cum 471.86 548.04
M-029 Coarse graded Granular sub-base Material 53 mm to 26 .5mm cum 441.36 512.05
M-030 Aggregates below 5.6 mm cum 195.72 222.38
M-031 Aggregates 22.4 mm to 2.36 mm cum 507.98 590.63
M-032 Aggregates 22.4 mm to 5.6 mm cum 507.98 590.63
M-033 Aggregates 45 mm to 2.8 mm cum 453.47 526.34
M-034 Aggregates 45 mm to 22.4 mm cum 461.26 535.53
M-035 Aggregates 53 mm to 2.8 mm cum 453.47 526.34
M-036 Aggregates 53 mm to 22.4 mm cum 441.36 512.05
M-037 Aggregates 63 mm to 2.8 mm cum 412.37 477.88
M-038 Aggregates 63 mm to 45 mm cum 412.26 477.75
M-039 Aggregates 90 mm to 45 mm cum 382.30 442.41
M-040 Aggregates 10 mm to 5 mm cum 508.74 591.53
M-041 Aggregates 11.2 mm to 0.09 mm cum 333.95 385.41
M-042 Aggregates 13.2 mm to 0.09 mm cum 452.61 525.34
M-043 Aggregates 13.2 mm to 5.6 mm cum 589.97 687.32
M-044 Aggregates 13.2 mm to 10 mm cum 617.12 719.34
M-045 Aggregates 20 mm to 10 mm cum 617.12 719.34
M-046 Aggregates 25 mm to 10 mm cum 588.46 685.54
M-047 Aggregates 19 mm to 6 mm cum 507.98 590.63
M-048 Aggregates 37.5 mm to 19 mm cum 461.26 535.53
M-049 Aggregates 37.5 mm to 25 mm cum 461.26 535.53
M-050 Aggregates 6 mm nominal size cum 394.20 456.45
M-051 Aggregates 10 mm nominal size cum 589.97 687.32
M-052 Aggregates 13.2/12.5 mm nominal size cum 617.12 719.34
M-053 Aggregates 20 mm nominal size cum 529.62 616.16
M-054 Aggregates 25 mm nominal size cum 505.28 587.46
M-055 Aggregates 40 mm nominal size cum 425.02 492.79
93
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Aluminium sheeting fixed with encapsulated lens type reflective sheeting including 2% towards
M-061 sqm 8740.21
lettering, cost of angle iron, cost of drilling holes, nuts, bolts etc.and signs as applicable
M-062 Aluminium studs 100 x 100 mm fitted with lense reflectors nos 169.12
M-065 Bearing (Cast steel rocker bearing assembly of 250 tonne ) nos 77649.64
M-067 Bearing (Forged steel roller bearing of 250 tonne nos 46589.77
Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE
M-068 pads providing sliding surfaces against stainless steel mating together with cast steel nos input
assemblies/fabricated structural steel assemblies duly painted with all components
M-069 Bearing (PTFE sliding plate bearing assembly of 80 tonnes ) nos input
M-089 Credit for excavated rock found suitable for use cum 145.40
94
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
M-091 Delineators from ISI certified firm as per the standard drawing given in IRC - 79 each 793.71
M-092 Earth Cost or compensation for earth taken from private land cum 23.65
Elastomeric slab seal expansion joint assembly manufactured by using chloroprene, elastomer
M-093 metre 26366.47
for elastomeric slab unit conforming to clause 915.1 of IRC: 83 (part II),
M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick of 125 gms each 100 nos 614.96
M-095 Epoxy compound with accessories for preparing epoxy mortar kg 538.10
Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in
M-102 sqm 99.02
rolls of required size.
M-103 Galvanised structural steel plate 200 mm wide, 6 mm thick, 24 m long kg 45.02
M-121 Jute netting, open weave, 2.5 cm square opening for seeding and Mulching sqm 38.43
Modular strip/box seal expansion joint including anchorage catering to a horizontal movement
beyond 70 mm and upto 140mm assembly comprising of edge beams, central beam,2
M-127 metre 29056.91
modules chloroprene seal, anchorage elements, support and control system, all steel sections
protected against corrosion and installed by the manufacturer or his authorised representative
Modular strip/box seal expansion joint catering to a horizontal movement beyond 140mm and
upto 210mm box/box seal joint assembly containing 3 modules/cells and comprising of edge
M-128 beams, two central beams, chloroprene seal, anchorage elements, support and control system, metre input
all steel sections protected against corrosion and installed by the manufacturer or his
authorised representative
M-135 Perforated pipe of cement concrete, internal dia 100 mm metre 117.57
M-137 Pipes 200 mm dia, 2.5 m long for drainage metre 179.62
M-138 Plastic sheath, 1.25 mm thick for dowel bars sqm 15.37
M-141 Pre moulded Joint filler,25 mm thick for expansion joint. sqm 960.88
Preformed continuous chloroprene elastomer or closed cell foam sealing element with high tear
M-143 metre input
strength, vulcanised in a single operation for the full length of a joint to ensure water tightness.
M-145 Pre-packed cement based polymer concrete of strength 45 Mpa at 28 days kg input
M-149 RCC Pipe NP 4 heavy duty non presure pipe 1000 mm dia metre 2881.74
M-150 RCC Pipe NP 4 heavy duty non presure pipe 1200 mm dia metre 4096.92
M-151 RCC Pipe NP 4 heavy duty non presure pipe 300 mm dia metre 527.74
M-153 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Copper Strips) metre input
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Galvanised carbon steel
M-154 metre input
strips)
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Glass reinforced
M-155 metre input
polymer/fibre reinforced polymer/polymeric strips)
M-156 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Stainless steel strips) metre input
M-157 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. Aluminium strips) metre input
96
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
M-159 Sand bags (Cost of sand and Empty cement bag) nos 6.90
M-164 Separation Membrane of impermeable plastic sheeting 125 micron thick sqm 15.37
M-167 Sludge / Farm yard manure @ 0.18 cum per 100 sqm at site of work for turfing cum 691.83
M-173 Steel helmet and cushion block on top of pile head during driving. kg 41.10
M-181 Synthetic Geogrids as per clause 3102.8 and approved design and specifications. sqm input
M-187 Tube anchorage set complete with bearing plate, permanent wedges etc nos 46.12
M-196 Wooden staff for fastening of flag 25 mm dia, one m long each 30.75
97
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
98
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Items No. Summary of Rates calculated and used for analysis of rates of other items Unit Rate
per cm
Item 8.3 Printing new letter and figures of any shade (ii) English Roman height per 0.40
letter
Item 8.8 Painting Two Coats on New Concrete Surfaces sqm 67.00
Item 8.9 Painting angle iron post two coats sqm 58.00
Item 12.6 (B) Cement mortor 1:2 (Excluding OH & CP) cum 4832.00
Item 12.6 (A) Cement mortor 1:3 (Excluding OH & CP) cum 3927.00
Item 12.6 (D) Cement mortor 1:6 (Excluding OH & CP) cum 2680.00
Item 12.7 (A ) Course Rubble masonary in cement mortor 1:3 (including OH & CP) cum 3341.00
Item 12.7 (Addl) B) Random Rubble masonary in cement mortor 1:6 (including OH & CP) cum 3620.00
Item 12.8 (A) PCC Grade M15 including OH & CP for Open Foundation by Mixer cum 5181.00
PCC Grade M15 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (A) cum 3624.00
by Mixer
PCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (B) PCC cum 3892.00
by Mixer
RCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (C) cum 3970.00
by Mixer
Item 12.8 (C) RCC RCC Grade M20 including OH & CP for Open Foundation by Batching Plant cum 5854.00
RCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (C) cum 4094.00
by Batching Plant
PCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (D) cum 4227.00
by Mixer
Item 12.8 (D) PCC Grade M25 including OH & CP for Open Foundation by Batching Plant cum 6210.00
PCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (D) cum 4354.00
by Batching Plant
RCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (E) cum 4308.00
by Mixer
RCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (E) cum 4680.00
by Batching Plant
PCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (F) cum 4263.00
by Mixer
PCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (F) cum 4386.00
by Batching Plant
RCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (G) cum 4328.00
by Mixer
RCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (G) cum 4454.00
by Batching Plant
RCC Grade M35 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (H) cum 4421.00
by Mixer
Item 12.8 (H) RCC Grade M35 including OH & CP for Open Foundation by Batching Plant cum 4949.00
Item 12.8 (H) RCC Grade M35 excluding OH & CP for Open Foundation by Batching Plant cum 4949.00
RCC Grade M35 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery
Item 12.8 (H) cum 4806.00
by Batching Plant
PCC Grade M20 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material
Item 12.11 (C) i cum 4427.00
& Mechinery by Mixer
PCC Grade M20 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material
Item 12.11 (C) i cum 4423.00
& Mechinery by Batching Plant
99
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
PCC Grade M25 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material
Item 12.11 (C) ii cum 4635.00
& Mechinery by Mixer
PCC Grade M25 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material
Item 12.11 (C) ii cum 4629.00
& Mechinery by Batching Plant
PCC Grade M30 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material
Item 12.11 (C) iii cum 4671.00
& Mechinery by Mixer
PCC Grade M30 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material
Item 12.11 (C) iii cum 4667.00
& Mechinery by Batching Plant
PCC Grade M35 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material
Item 12.11 (C) iv cum 4755.00
& Mechinery by Mixer
Item 12.11 (C) iv PCC Grade M35 including OH & CP for Well Foundation (Bottom Plug) by Batching Plant cum 6809.00
PCC Grade M35 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material
Item 12.11 (C) iv cum 4749.00
& Mechinery by Batching Plant
Item 12.11 (F) iv PCC Grade M35 including OH & CP for Well Foundation (Well Cap) by Batching Plant cum 6438.00
Item No. 3.13 Excavation for Structures (Manual Means) cum 208.00
Item No. 3.13 Excavation for Structures (Mechenical Meanse) cum 48.00
Item 14.1(A) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 6693.00
Item 14.1(B) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 7278.00
Item 14.1(E) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 9817.76
RCC Grade M30 for super-structure including formwork and excluding OH & CP by Batching
Item 14.1(C) cum
Plant 5348.00
RCC Grade M30 for super-structure excluding formwork and excluding OH & CP by Batching
Item 14.1(C) cum
Plant 4457.00
Supplying ,fitting and placing HYSD bar reinforcement in super-structure exncluding OH &
Item 14.2 A tonne 36608.00
CP
Item 13.6 Supplying, fitting and placing HYSD including OH & CP for sub-structure tonne 49336.00
Crack Prevention courses. Case-I Stress Absorbing Membrane (SAM) crack width less than 6
Item 5.21 Case-I sqm 56.00
mm
Crack Prevention courses. Case-II Stress Absorbing Membrane (SAM) with crack width 6 mm
Item 5.21 Case-II sqm 68.00
to 9 mm
Crack Prevention courses. Case-III Stress Absorbing Membrane (SAM) crack width above 9
Item 5.21 Case-III sqm 88.00
mm and cracked area above 50 %
Item 5.21 Case-IV Crack Prevention courses. Case-IV Bitumen Impregnated Geotextile sqm 156.00
Item 5.15 Case-III Slurry Seal Case III 1.5 mm thickness sqm 22.00
Item 5.9 Case-I Surface Dressing Case-I 19 mm nominal chipping size sqm 77.00
Item 5.9 Case-II Surface Dressing Case-II 13 mm nominal size chipping sqm 64.00
100
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Name of Quarry
Track Km.
Road Km.
S. No.
Unit
1 2 3
1 Stone Boulders cum Mirzachowki 42 0 0
2 Stone Metal cum Mirzachowki 42 0 0
3 Stone Chips cum Mirzachowki 42 0 0
4 Sand cum Sanhaula 23 0 0
5 Local Sand cum Local 2 0 1
6 Steel (TMT Bars) MT Bhagalpur 25 0 0
7 Cement MT Bhagalpur 25 0 0
8 Bitumen (Packed) MT Barauni 153 0 0
9 Bitumen (Emulsion) MT Patna 253 0 0
10 Bitumen (CRMB) MT Patna 253 0 0
Stone Aggregate as a
11 cum Mirzachowki 42 0 0
GSB
12 Brick No Local 7 0 1
13 Hume Pipe m. Godda 95 0 0
101
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Carriage Cost for different Construction Material (Without C.P & O.H) Effective from 22.09.2016
Cost in Rs.
Calculation
S. No.
Carriage Lead
Carriage Lead
Carriage Lead
Unit
Type of material
Cost in Rs.
1 2 3 4 5 6 7 8 9 10 (1x5 + 2x7 + 3x9 + 10)
1 Stone Boulders Road cum Mirzachowki 42 0 0 8 / 4.8 x 6.04 = 10.07 8 / 4.8 x 7.27 = 12.12 8 / 4.8 x14.63 = 24.38 152.00 = 42 x 10.07 + 0 x 12.12 + 0 x 24.38 + 152 = 574.94 574.94
2 Stone Metal Road cum Mirzachowki 42 0 0 8 / 4.59 x 6.04 = 10.53 8 / 4.59 x 7.27 = 12.67 8/4.59 x14.63 = 25.50 124.00 = 42 x 10.53 + 0 x 12.67 + 0 x 25.5 + 124 = 566.26 566.26
3 Stone Chips Road cum Mirzachowki 42 0 0 8 / 5 x 6.04 = 9.66 8 / 5 x 7.27 = 11.63 8 / 5 x 14.63 = 23.41 124.00 = 42 x 9.66 + 0 x 11.63 + 0 x 23.41 + 124 = 529.72 529.72
Stone Aggregate
4 Road cum Mirzachowki 42 0 0 8 / 6 x 6.04 = 8.05 8 / 6 x 7.27 = 9.69 8 / 6 x 14.63 = 19.51 152.00 = 42 x 8.05 + 0 x 9.69 + 0 x 19.51 + 152 = 490.10 490.10
as a GSB
5 Sand Road cum Sanhaula 23 0 0 8 / 5 x 6.04 = 9.66 8 / 5 x 7.27 = 11.63 8 / 5 x 14.63 = 23.41 124.00 = 23 x 9.66 + 0 x 11.63 + 0 x 23.41 + 124 = 346.18 346.18
6 Local Sand Road cum Local 2 0 1 8 / 5 x 6.04 = 9.66 8 / 5 x 7.27 = 11.63 8 / 5 x 14.63 = 23.41 124.00 = 2 x 9.66 + 0 x 11.63 + 1 x 23.41 + 124 = 166.73 166.73
7 Steel (TMT Bars) Road MT Bhagalpur 25 0 0 8 / 8 x 6.04 = 6.04 8 / 8 x 7.27 = 7.27 8 / 8 x 14.63 = 14.63 203.98 = 25 x 6.04 + 0 x 7.27 + 0 x 14.63 + 203.98 = 354.98 354.98
8 Cement Road MT Bhagalpur 25 0 0 8 / 8 x 6.04 = 6.04 8 / 8 x7.27 = 7.27 8 / 8 x 14.63 = 14.63 203.98 = 25 x 6.04 + 0 x 7.27 + 0 x 14.63 + 203.98 = 354.98 354.98
9 Bitumen (Packed) Road MT Barauni 153 0 0 8 / 8 x 6.04 = 6.04 8 / 8 x 7.27 = 7.27 8 / 8 x 14.63 = 14.63 203.98 = 153 x 6.04 + 0 x 7.27 + 0 x 14.63 + 203.98 = 1128.10 1,128.10
10 Bitumen (Emulsion) Road MT Patna 253 0 0 8 / 8 x 6.04 = 6.04 8 / 8 x 7.27 = 7.27 8 / 8 x 14.63 = 14.63 203.98 = 253 x 6.04 + 0 x 7.27 + 0 x 14.63 + 203.98 = 1732.10 1,732.10
11 Brick Road No Local 7 0 1 (2x2) x 6.04 = 24.16 (2x2) x 7.27 = 29.08 (2x2) x 14.63 = 58.52 152.00 = 7 x 24.16 + 0 x 29.08 + 1 x 58.52 + 152 = 379.64 379.64
12 Hume Pipe Road m. Godda 95 0 0 8 / 10 x 6.04 = 4.83 8 / 10 x 7.27 = 5.82 8 / 10 x 14.63 = 11.70 152.00 = 95 x 4.83 + 0 x 5.82 + 0 x 11.7 + 152 = 610.85 610.85
102
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees,
2.1 including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable
material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of
2.3 stumps of trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned up to a lead of 1000 metres including removal
and disposal of top organic soil not exceeding 150 mm in thickness.)
103
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000
metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity
3.6 including cutting and loading in tippers, trimming bottom and side slopes, in accordance cum 97.74
with requirements of lines, grades and cross sections, and transporting to the embankment
location within all lifts and lead upto 1000m)
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable
3.11 soil including excavation, loading and disposal upto 1000 metres lead but excluding cum 84.00
replacement by suitable soil which shall be paid separately as per clause 305.)
104
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
CHAPTER-4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS)
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface
5.1 of granular Base including clearing of road surface and spraying primer at the rate of 0.75 sqm 29.10
kg/sqm using mechanical means.)
5.2 Tack coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor
at the rate of 0.275 kg per sqm on the prepared bituminous/granular surface cleaned with sqm 11.50
mechanical broom.
Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix
plant producing an average output of 75 tonnes per hour using crushed aggregates of
5.3 specified grading premixed with bituminous binder, transported to site, laid over a previously
prepared surface with paver finisher to the required grade, level and alignment and rolled as
per clauses 501.6 and 501.7 to achieve the desired compaction)
(i) for Grading I ( 40 mm nominal size ) cum 6,784.00
105
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam
with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by
5.6 weight of total mix of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction
as per MoRTH specification clause No. 507 complete in all respects.)
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete
with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of
5.7 mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher
with sensor control to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification
clause No. 508 complete in all respects)
CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective
sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild
8.4 steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below
ground level as per approved drawing)
Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing
and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of
encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting,
8.6 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x sqm 12,828.00
75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation
with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per
approved drawing)
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines,
dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint
8.11 conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust
and other foreign matter, demarcation at site and traffic control )
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design
8.14 as per IRC:8-1980, fixing in position including painting and printing etc)
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design
8.16 as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting) each 442.00
CHAPTER-9
PIPE CULVERTS
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40
9.1 mm nominal size mechanically mixed, placed in foundation and compacted by vibration cum 4,015.00
including curing for 14 days.)
107
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
I Ordinary soil
A Manual Means
(i) upto 3 m depth cum 103.00
(ii) 3 m to 6 m depth cum 133.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 5,854.00
108
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical
12.38
Specification
A RCC Grade M20
(i) Using Concrete Mixer cum 5,640.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 5,843.00
B RCC Grade M25
(i) Using concrete mixer. cum 6,141.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 6,386.00
C RCC Grade M30
(i) Using concrete mixer. cum 6,205.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 6,407.00
D RCC Grade M35
(i) Using concrete mixer. cum 6,337.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 6,582.00
12.39 Levelling course for Pile cap cum 4,738.00
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as
12.40 tonne 49,214.00
per drawing and technical specifications
CHAPTER-13
SUB-STRUCTURE
109
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Back filling behind abutment, wing wall and return wall complete as per drawing and
13.9
Technical specification
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming
cubic
13.14 to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including 0.61
centimetre
all accessories as per drawing and Technical Specifications.
CHAPTER-14
SUPER-STRUCTURE
C RCC Grade M 30
110
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
14.4 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement cum 9,983.00
complete as per drawing and Technical Specifications
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to
line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre
14.7 spacing between vertical post not to exceed 2000 mm, leaving adequate space between metre 1,492.00
vertical post for expansion, complete as per approved drawings and technical
specifications.
14.9 Drainage Spouts complete as per drawing and Technical specification each 922.00
PCC M15 Grade leveling course below approach slab complete as per drawing and
14.10 cum 5,181.00
Technical specification
Reinforced cement concrete approach slab including reinforcement and formwork complete
14.11 cum 8,764.00
as per drawing and Technical specification
Providing anti-corrosive treatment to HYSD reinforcement with Fusion Bonded Epoxy
14.12 Coating (FBEC) (To be taken as per the prevailing market rates.) tonne
14.14 Providing and fixing Helical pipes in voided concrete slabs metre #VALUE!
Crash Barriers (The rate analysis for rigid crash barrier in reinforced cement concrete, semi-
rigid crash barrier with metal beam and flexible crash barrier with wire ropes have been
14.15
made and included in chapter-8 on Traffic and Transportation.)
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to
14.16 unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, metre 102.00
efflorescence and applying paint @ of 1 litre for 2 Sq.m. )
Burried Joint (Providing and laying a burried expansion joint, expansion gap being 20 mm,
covered with 12 mm thick, 200 mm wide galvanised wieldable structural steel plate as per
14.17 IS: 2062, placed symmetrical to centre line of the joint, resting freely over the top surface of metre 1,046.00
the deck concrete, welding of 8 mm dia. 100 mm long galvanised nails spaced 300 mm c/c
along the centre line of the plate, all as specified in clause 2604.)
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed
(iii) ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto metre 404.00
20 mm, covered with sealant complete as per drawing and technical specifications.
Providing and filling joint sealing compound as per drawings and technical specifications
(iv) metre 20.00
with coarse sand and 6% bitumen by weight
Asphaltic Plug joint (Providing and laying of asphaltic plug joint to provide for horizontal
movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to
100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure
14.19 plate of 200mm x 6mm of wieldable structural steel conforming to IS: 2062, asphaltic plug to metre 1,099.00
consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5
mm nominal size and a heat resistant foam caulking/backer rod, all as per approved
drawings and specifications.)
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel
expansion joint, catering to right or skew (less than 20 deg., moderately curved with
maximum horizontal movement upto 50 mm, complete as per approved drawings and
14.20 metre 38,107.00
standard specifications to be installed by the manufacturer/supplier or their authorised
representative ensuring compliance to the manufacturer's instructions for installation and
clause 2606 of MoRTH specifications for road & bridge works.)
111
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to
maximum horizontal movement upto 70 mm, complete as per approved drawings and
14.22 metre 11,844.00
standard specifications to be installed by the manufacturer/supplier or their authorised
representative ensuring compliance to the manufacturer's instructions for installation.)
CHAPTER-15
RIVER TRAINING AND PROTECTION WORKS
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates
made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh
15.2 cum 2,277.00
(weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing
not less than 40 kg each.)
Providing and laying Pitching on slopes laid over prepared filter media including boulder
15.4 apron laid dry in front of toe of embankment complete as per drawing and Technical
specifications
A Stone/Boulder cum 1,847.00
B Cement Concrete blocks of size 0.3x0.3 x0.3 m cast in cement concrete of Grade M15 cum 5,285.00
Providing and laying Filter material underneath pitching in slopes complete as per drawing
15.5 cum 1,959.00
and Technical specification
112
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
113
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
The existing narrow arch Bridge (7 x 4.60 = 33 m.) at Ch. 142.700 of NH-80 is found
in damaged condition. Replacement of the existing Arch Bridge by New RCC High-
level Bridge is essential. Considering the available ROW in the project section, it has
been proposed to construct the New RCC High-level Bridge on existing Alignment
after it’s dismantling. Suitable Diversion Shall be constructed on right side of existing
bridge for smooth movement of Traffic during construction of New Bridge.
114
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
17. Location Plan of Boring taken in the Attached in Drawing No.-1 enclosed.
bed of the river of the location
18. Test results of sample of bores giving the following characteristics at founding level
(A) Lacy’s Silt Factor 2.74
(B) Cohesion 5.50 T / sqm. (Avg. at Founding Level)
(C) Angle of internal friction 12o (Avg. at Founding Level)
19. Location of Proposed Bridge Proposed bridge shall be Constructed on
Existing Bridge Location after dismantling
of Existing Bridge. A diversion of length
300 m. shall be constructed adjacent to
existing Bridge for smooth movement of
Traffic during construction of proposed
Bridge.
20. Does the stream carry drifting materials Yes.
during flood
21. Details of Training work Training work not required.
22. Whether Bridge proposed is straight or Proposed Bridge shall be constructed
skew Straight
23. Will the Approaches be straight Immediate 30 m. length Straight (Ref. Plan
Profile Drawing –No.-1)
24. Proposed clear Roadway Over Bridge 11.00 m. (Designed) Superstructure Dwg.
with 1.50 m. wide Footpath as per latest
Guidelines of IRC SP-73-2015.
25. Width of footpath if any 1.50 m.
26. Overall Formation Width of Bridge 16.00 m.
25. No. & Size of Span recommended 3 x 14.00 m. (Effective)
26. Type of Foundation recommended Pile Foundation
27. Details of existing bridge Attached in Report on next pages.
28. Name of the Town nearest to bridge site Bhagalpur
29. Labour & Materials detail Given in Report
The over-all formation width of Proposed Bridge has been kept 16.00 m. as per
Guidelines of IRC SP-73-2015. Based on Hydraulic Particular, the proposed Span
arrangement of New Bridge has been kept 3 x 14.00 m. RCC T-Beam Girder + Slab
Bridge resting on Pile Foundation of 1.2 m. dia.
115
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
The bridge has been designed for three lane as the carriageway width is 11.00m
which is more than 9.6m as per table no.-2 of IRC-6
Design Loading
Design loading is in according to the IRC-6 having most critical combination of
various load, forces and stresses. Dead load in the various member of the bridge shall
be as per the IRC codes.
• One Lane of 70R with one lane of Class-A Load
• Three Lane of Class-A
• Footpath Live Load shall be as per IRC-6
Apart from the dead load & Live Load Wind Load and Earthquake Forces has also be
taken into account. Impact, tractive and breaking forces has also considered as per the
provision of IRC-6.
Code \ Specification
Standard Specification and code of practice for road bridges of IRC wherever
applicable are followed. Following codes have been generally followed:
Sub-structures
Abutment & Pier : RCC M-30
Foundations
Pile & Pile Cap : RCC M-35
116
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
The Hydrological study for existing river has been carried out in the month of July
2016. Accordingly all the hydraulic calculation done based on the data collected in
field for determining the Discharge, Waterway, Scour depth, Afflux etc. Summary of
Hydraulic particulars is presented below.
2 Design Data
3 H.F.L.
(A) At Bridge site 99.038
4 Discharge
117
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Introduction
The objective of sub surface exploration is to determine the characteristics of the existing
Geo-materials in the zone of influences of the proposed bridge site in such a way as to
establish the design parameters which influence the choice and design details of foundation
types. Sub surface exploration for the proposed Bridge in Km. 143 of NH-80 is essential for
design of foundations for proposed spans of the bridge. The bore hole were sunk upto the
depth as mentioned in the following table.
i. Boring work
Boring was done by Auger operated manually upto the depth of water table and thereafter by
rotary method collecting mud slurry as per IS. 1892-1972. In this method boring is advanced
by a cutter fixed to drill rods, which are operated by means of pipe wrench. Bentonite slurry
is continuously pushed by a double piston pump through the GI pipe upto the cutting level to
prevent the collapse of the Bore holes. The slurry flowing to the bottom of the cutter mixes
with cut soil and flows to the surface and the soil is settled in the settling pit and the same
mud slurry is reused. The drilling rod attached with diamond bit is lowered slowly with the
help of manually operated winch fixed with the tripod. Seamless flush jointed steel casings of
150mm. internal diameter were used to prevent any caving of the bore hole and were inserted
simultaneously with the advancement of boring
During sinking of bore holes, Standard Penetration Tests were conducted as per IS. 2131-
1981 at regular intervals of 1.5m. The split spoon sampler was of standard design as per IS.
9640-1980, the outer and inner diameter being 50.8mm. and 38mm. respectively. The SPT
were conducted by driving a hammer of weight 63.5 kg. falling freely on jarring block
connected to the drill rod from a height of 750 mm. Nos. of blows required for the penetration
of 0 to 150mm., 150mm to 300mm. and 300mm. to 450mm. were noted. The No. of blows
required for the penetration from 150mm.to 450mm. was taken as N value. Since soft and
hard rock was found, diamond bits were connected with drill rods.
Representative disturbed samples were collected through split spoon sampler and sealed in
polithene bags with proper identification marks. Undisturbed samples could not be collected
due to cohesion less soil. Rock drilling information and observations were recorded as per IS
4464-1985 & 5313-1980 in field log bore data sheet. Rock coring samples were obtained in a
core barrel sampler of 1.50m. length and 100 to 150mm dia with a diamond bit at its cutting
end by rotary drilling. Samples so obtained were sent to laboratory for determination of
Engineering Properties, general identification and classification. Water table was observed
after 24 hours of completion of bore holes. Rate of penetration, water loss and color of water
were also observed during drilling.
The no. & location of Bore holes with the termination depth are shown in the following table.
118
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Location in m.
1 30.00 04.09.2016 05.09.2016
2 30.00 02.09.2016 03.09.2016
Field Bore log data sheet showing different strata and Standard Penetration Test N value are
enclosed.
Laboratory Test
The following laboratory tests were carried out on disturbed and undisturbed soil samples for
identification and classification properties and for determination of shear strength parameters
and to obtain other properties of sub surface formation as per relevant IS Codes as indicated
below and tabulated.
The details of different layers of soil encountered in different boreholes are furnished in the
following table on the basis of visual observation, soil classification and Standard Penetration
Values.
Location-B.H.No. 1
Depth Soil Nature of Soil
(In m.) Classification
0.00 – 7.00 CI Stiff brownish grey sandy silty clay
7.00 – 19.00 CI Very stiff brownish grey sandy silty clay
19.00 – 30.00 CI Hard brownish grey sandy silty clay
Location-B.H.No. 2
Depth Soil Nature of Soil
(In m.) Classification
0.00 – 6.80 CI Hard brownish grey sandy silty clay
6.80 – 20.00 CI Very stiff yellowish brown sandy silty clay
Hard brownish yellow sandy silty clay with
20.00 – 30.00 CI
kankar
On close scrutiny of field and laboratory test results it reveals that soil is mainly sandy silty
clay upto entire depth.
Recommendation
Pile Foundation is suggested.
The Detailed Sub-Soil Investigation Data /Report is Presented at the end of this
Chapter
119
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
120
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
121
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
DESIGN ELEMENTS
Bridge - in Replacement of Existing Narrow & Damaged Bridge in Km. 143 of NH-80 ( 3 x 14 ) on Pile Foundation
N.H.-Bhagalpur, (Bihar)
122
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
123
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
124
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
125
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
RL-99.064 HFL
20.700
16.299
5.1
126
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Forces on Bearing for different Load Cases (Seismic Force in Long. Direction)
Overall Span 14.00 m
Seismic Coefficient Ah= 0.14
Total Live Load per span LL= 1432000 N
Total Dead Load per Span DL= 3000000 N
No of Longitudinal girder NG= 5 Nos
Notation Details per bearing Calculation With LL No. LL Limits Unit
N Reaction 1250000 560000 N
Hb Horizontal force in "b" direction =(LL+DL)*Ah/NG/2 62048 42000 N
Hl Horizontal force in "l" direction =Hb x 0.3 18614.4 12600 N
Δbd Translation in direction "b" =Span in mm*0.0005/2 3.5 3.5 mm
Δld Translation in direction "l" 0 0 mm
σm = N/A =Reaction/Area of Bearing 7.360562 3.297532 2-10 Mpa Safe
αbd = 0.5*σm*hi/(b*S*S) 0.001756 0.000787 radian
αld Angle of rotation in "l" direction 0 0 radian
γdb = Hb/A+Δbd/h 0.413978 0.295926
γdl = Hl/A+Δld/h 0.10961 0.074194
2 2
γd = sqrt(γdb +γdl ) 0.4 0.305085 <=0.7 Safe
γd,all = 0.1*σm+0.2, but<=0.7 0.936056 0.529753
αd = (αbd*b+αld*l)/b 0.001756 0.000787 radian
αall = 0.5*n*σm*hi/(b*S*S) 0.008782 0.003935 radian
τc = 1.5*σm/S 1.298923 0.581917 MPa
τγ =γd 0.4 0.305085 MPa
α bi = 0.5*s m *h i /(b*S 2 ) 0.001756 0.000787 radian
α li = 0.5*σ m *h i /(l*S 2 ) 0.001253 0.000561 radian
τα =0.5*(b2*αbi+l2*αli)/hi2 1.774345 0.794907 MPa
τ = tc+τγ+τα 5.000 1.681909 <=5 Mpa Safe
Shear Rating per bearing=(lo*bo*G/ho)*10-1 =(500*360*1/96)/10 188 t/m
127
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
14.00
0.28
0.28
A1 P2/A2
for 17T for 17T for 17T for 17T for 12T for 12T for 8T
RA1= 17.34 + 15.68 + 11.97 + 10.31 + 5.45 + 4.15 + 0.50 = 65.401 T
RA2= 100 -65.401 = 34.599 T
C= 1.630 Spacing of Wheel= 1.93 as per IRC:6
Maximum load on Abutment due to Class -A Wheel Loading
14.28
13.08
8.78
5.78
2.78
0.00
14.00
0.28
0.28
A1 for 11.4T for 11.4T for 6.8T for 6.8T for 6.8T for 6.8T P2/A2
RA1= 11.628 + 10.65 + 4.26 + 2.81 + 1.35 + 0.00 = 30.701 T
RA2= 43.2 -30.701 = 12.499 T
128
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
70 T
4.57
14.00
0.28
0.28
A1
129
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
65.401 T 30.701 T
8.390
4.645
130
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Impact factor= 1.225 Wheel load from edge of the footpath/kerb= 1.63
2.75 2.625
R1 R2
Note: It is assumed that the left wheel load is directly over outer girder if it comes beyond towards inner girder
131
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
(Z/2) x (Sa/g)
Ah=
(R/I)
Where Ah= Horizontal Seismic Coefficient
Z= Seismic Zone Factor
Sa/g= Avg. Response Acceleration Coefficient
R= Response Reduction Factor
I= Importance of bridge
2 D
T=
1000*F
INPUT DATA
Z= 0.24
R= 2.5 F
I= 1.2
D= 150+96.101 246.10 2461.01 KN
Grade of Concrete 30 L
Length of Structure= 16000
Thickness of Structure= 800.00
Moment of Inertia of Substructure= 6.827E+11
Modulus of Elasticity of Concrete= 27386
Type of Soil Site= Medium
L= 3000
Deflection of Abutment cap tip= 1 mm
(L^3/3E*MI)= 4.814E-07
Hence F= 2077 KN
T= 0.07 sec
Sa/g= 2.5
Z/2= 0.12
R/I= 2.083
Ah= 0.14
132
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Apprroach Slab
Normal Factored
Coeff. Of horizontal earth pressure Kah= 0.279 0.4185
Coeff. Of vertical earth pressure Kav= 0.102 0.153 H2 H1 1.487 1.79
H3
Earth pressure has been considered below approach slab
H1= Active earth Pressure due to LL surcharge (0.4185*1.8*1.2)
H2=Active earth Pressure due to Approach Slab(0.4185*2.5*0.3)
H3= Active EarthPressure due to Traingular par (0.4185*1.8*1.787)
133
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Sl. No. Active Earth Pressre Forces due to Active ELever Arm Moment in Tm
1 H1 0.904 1.615 0.7435 1.201
2 H2 0.314 0.561 0.7435 0.417
3 H3 1.346 1.203 0.625 0.751
Total 3.379 2.369
180
120
10 mm dia.Bar @ 200 mm c/c
134
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
A B
0.6
C D
H1
H2 Y 1.6
1.00 F F
1.6 - Y
E
Fig:- Showing the Cantilver Return with Earth Pressure
Consider the bending of the pannel in BE plane due to Activ Normal Factored
Coeff. Of horizontal earth pressure Kah= 0.279 0.4185
Coeff. Of vertical earth pressure Kav= 0.102 0.153
Consider the very thin strip at "FF" depth "y" below "CD"
H2=0.4185*1.8*0.6+ 0.4185*1.8* Y
Or H2= 0.45198 +0.754Y Where Y/X= 0.667
H2=0.4185*1.8*0.6+ 0.4185*1.8*((1.6-0.6)/1.5) *X
Or H2= 0.45198+ 0.502 *X
135
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Shear Force:
1.5
Shear= 1.695 '+ 0.5* ∫ (1.356 +0.502X)Ydx
0
1.5
= 1.695 '+ 0.5* ∫ (1.356 +0.502X)* 0.667Xdx
0
1.5
= 1.695 '+ 0.5* ∫ (0.453X +0.168X^2)dx
0
136
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Distribution Steel
Distribution steel required = 20% X 0.000508 = (Refer IRC:112-16.6.1.1.(3)) 0.0001016 sqm
Providing 10 mmdia.Bar, C/Area of bar= 0.0000785 sqm
Spacing= 0.00007854 X 1000/0.0001016 = 773 mm c/c
Maximum spacing shall be lesser of 3h 400mm (Refer IRC:112-16.6.1.1(4)) 400 mm c/c
Say 200 mm c/c Safe
Provide 10 mm dia.Bar @ 200 mm c/c on both face of wall
Returnwall Edge
137
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Wall is designed as cantilever fixed at two side at abutment wall and foundation slab and free at other two edge.
Earth pressure is acting over the wall shall create wrapping of the wall at cantilever edge. Bending moment due
to Earth Pressure at upper end of the cantilever return shall be more than that of lower edge.
Consider the design of wall fixed by the two side as per "Roark Formulas for Stress and Strain"
Normal Factored
Live Load surcharge, q= 0.603 0.9045 t/m3
Traingular earth pressure, q= 2.404 3.606 t/m3
138
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Since actual depth provided is more than required, section shall be designed for this depth.
For this condition area of steel shall be obtained by the equation as below
Ast=Mu/0.87*fy*z, where z=d(1-0.416*x/d) and x/d=1.2-(1.22-6.68Mu/fckbd2)1/2
x/d= 0.0958652 z= 0.234269 m
Since actual depth provided is more than required, section shall be designed for this depth.
For this condition area of steel shall be obtained by the equation as below
Ast=Mu/0.87*fy*z, where z=d(1-0.416*x/d) and x/d=1.2-(1.22-6.68Mu/fckbd2)1/2
x/d= 0.1002508 z= 0.2223246 m
139
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
0.3
Return Wall
Foundation Slab
Levelling Course
Fig.:- Reinforcement details in return wall
140
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
141
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
142
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Service Condition
Maximum Reaction Rb (T)= 96.101 t
Min. Reaction 47.099 t
Lever arm value, = 0.020 m
Maximum longitudinal moment about the base =96.101 X 0.02 = 1.92 t
Min Longitudinal moment about base =47.099 X 0.02 = 0.94 t
Maximum transeverse eccentricity of Live Load = 2.159 m
Maximum transverse moment =96.101 X 2.159 = 219.42 tm
Minimum Transverse moment =47.099 X 2.159 = 116.08 tm
143
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic Case
Horizontal force at bearing level in Longitudinal direction= Fh/2+Vr*ltc
Change in length due to Temparature and Shrinkage ltc= (0.0000117*34+0.0002)x14.56/2 = 0.0040 m
Fh/2+Vr*ltc= 5.728*0.5+940*0.004 = 6.624 t
F F*Cos(Nos) F*Sin(Nos)
Max Long. horizontal Force on abutment 6.624 6.624 0t
Minimum Longitudinal force on abutment 6.624 6.624 0t
M M*Cos(Nos) M*Sin(Nos)
Max. Long. moment at base of abutment= 6.624 X (3 + 0.282 + 0.09) 22.336 22.336 0 tm
Min. Long. moment at base of abutment= 6.624 X (3 + 0.282 + 0.09) 22.336 22.336 0 tm
Max. Vertical Reaction on Abutment due to braking =5.728 X 0.5 X (1.2 + 0.065 + 1.416)/14= 0.548 t
Min. Vertical Reaction on Abutment due to braking -0.548 t
144
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
0.931529886 1 '2
Ca=
0.866226369
x 0.277300402
1 0.876492006
Or, Ca= 0.44
Horizontal component = Cah= 0.440 *1*COS(90-90+20) = 0.413
Vertical component = Cav 0.440 *1*SIN(90-90+20) = 0.150
Dynamic Increament:
Cah-Kah= 0.134 = 0.130
145
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
f) Wind Load
Top Bed/LWL Element Ht Mean Ht. Pressure Load/m Toal Load Moment
Elements RL RL In m In m Kg/m2 Kg/m T Tm
(70R-W-15.12m) 101.511 96.700 --- 6.311 --- 300.000 2.184 13.783224
Railing 102.556 96.700 0.860 5.426 70.130 60.312 0.439 2.382014
Deck& Kerb 101.696 96.700 1.600 4.196 63.980 102.368 0.745 3.12602
Abutment Cap 99.724 96.700 0.500 2.774 56.257 28.129 0.034 0.0951947
Abutment Shaft 99.224 96.700 2.524 1.262 47.572 120.072 0.096 0.1212244
Total 3.498 19.508
Top Bed/LWL Element Ht Mean Ht. Pressure Load/m Toal Load Moment
Elements RL RL In m In m Kg/m2 Kg/m T Tm
Railing 102.556 96.700 0.860 5.426 --- 240.000 1.747 9.479222
Deck& Kerb 101.696 96.700 1.600 4.196 --- 240.000 1.747 7.330412
Abutment Cap 99.724 96.700 0.500 2.774 --- 240.000 0.293 0.8122272
Abutment Shaft 99.224 96.700 2.524 1.262 --- 240.000 0.192 0.242304
Total 3.979 17.864
Top Bed/LWL Element Ht Mean Ht. Pressure Load/m Toal Load Moment
Elements RL RL In m In m Kg/m2 Kg/m T Tm
(70R-W-15.2m) 101.696 96.700 --- 4.196 --- 450.000 3.276 13.746096
146
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Top HFL Element Ht Mean Ht. Pressure Load/m Toal Load Moment
Elements RL RL In m In m Kg/m2 Kg/m T Tm
Railing 102.556 99.064 0.860 3.062 --- 120.000 0.874 2.674657
Deck& Kerb 101.696 99.064 1.600 1.832 --- 240.000 1.747 3.200504
Abutment Cap 99.724 99.064 0.500 0.410 --- 240.000 0.293 0.120048
Abutment Shaft 99.224 99.064 0.160 0.080 --- 240.000 0.192 0.01536
Total 3.105 6.011
Top HFL Element Ht Mean Ht. Pressure Load/m Toal Load Moment
Elements RL RL In m In m Kg/m2 Kg/m T Tm
(70R-W-15.2m) 101.696 99.064 --- 1.832 --- 450.000 3.276 6.001632
147
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
ure
148
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r2 23.870 96.341
0.3 r1 7.161 28.902
DL Substructure Normal 1 176.815 -54.797
Substruct 0.3 r3 5.118 -1.586
Seismic
ure
149
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
ure
150
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
151
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
152
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
153
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
154
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
155
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Service Condition
Maximum Reaction Rb (T)= 96.101 t
Min. Reaction 47.099 t
Lever arm value, = 0.00 m
Maximum longitudinal moment about the base =96.101 X 0 = 0.00 t
Min Longitudinal moment about base =47.099 X 0 = 0.00 t
Maximum transeverse eccentricity of Live Load = 2.159 m
Maximum transverse moment =96.101 X 2.159 = 207.48 tm
Minimum Transverse moment =47.099 X 2.159 = 101.69 tm
Seismic Condition (Vertical)
Considering 20% of Live Load , Refer IRC 6:2014, Table-1
Maximum Reaction =96.101 X 0.12 X 0.2 = 2.306 t
Minimum Reaction =47.099 X 0.12 X 0.2 = 1.130 t
Lever arm value, = 0.000 m
Maximum longitudinal moment about the base =2.307 X 0 = 0.000 tm
Minimum longitudinal moment about base =1.131 X 0 = 0.000 tm
Maximum transeverse eccentricity = 2.159 m
Maximum transverse moment =2.307 X 2.159 X 0.2 = 0.996 tm
Minimum Transverse moment =1.131 X 2.159 X 0.2 = 0.488 tm
156
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic Case
Horizontal force at bearing level in Longitudinal direction= Fh/2+Vr*ltc
Change in length due to Temparature and Shrinkage ltc= =(0.0000117*34+0.0002)x14.56/2 0.0040
Fh/2+Vr*ltc= 5.728*0.5+940*0.004 6.624
F F*Cos(0) F*Sin(0)
Max Longitudinal horizontal Force on abutment= 6.624 6.624 0t
Minimum Longitudinal force on abutment= 6.624 6.624 0t
M M*Cos(0) M*Sin(0)
Max. Long. moment at base of abutment= 6.624 X (1.8+3 + 0.282 + 0.09)= 34.259 34.259 0 tm
Min. Long. moment at base of abutment= 6.624 X (1.8+3 + 0.282 + 0.09)= 34.259 34.259 0 tm
Max. Vertical Reaction on Abutment due to braking =6.624 X 0.5 X(1.2+ 0.065 + 1.416)/14= 0.634 t
Min. Vertical Reaction on Abutment due to braking -0.634 t
157
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
158
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
159
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
--------------- ** **
--------------- ** **
b) Basic combination (HFL Case) :
Partial Safety Vertical Horizontal Transverse Longitudinal Transverse
Particulars of Loads
Factor Load (T) Load (HL) Load (HT) Moment (TM) Moment
DL+SIDL Superstructure 1.35 202.50 0 6.885
SIDL Wearing Coat (WC) 1.75 27.590 0.552 0.938
DL Substructure 1.35 992.308 -512.208 0
Live Loads
CWLL Max 1.5 144.1515 0.00 311.22
Min 70.6485 0.00 152.53
FPLL Max 1.5 15.43 0.00 0.00
Min 7.72 0.00 51.71
Breaking & Bearing Max. 1.5 4.112 27.120 0.000 140.265 0.000
Min. -4.112 27.120 0.000 140.265 0.000
Earth Pressure 1.5 209.85 0 444.495 0
Wind Forces Span Intact 1.5 0.000 4.914 0.000 36.586
Span Dislodged 0.000 0.727 0.000 3.214
-- 1.5 0.000 0.000 0.000 0.000
Max. 1386.095 236.967 0.000 73.104 319.046
Service Condition Total
Min. 1296.652 236.967 0.000 73.104 212.060
Max. 1386.09 236.97 4.91 73.10 355.63
Wind-Span Intact Total
Min. 1296.65 236.97 4.91 73.10 248.65
Span Dislodged Total 992.308 209.847 0.000 -67.713 0.000
Scour All Not Max. -- -- -- -- --
Around Nor Applicable Min. -- -- -- -- --
Scour All Not Max. -- -- -- -- --
Around windApplicable Min. -- -- -- -- --
--------------- ** **
--------------- ** **
--------------- ** **
--------------- ** **
160
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r1 29.838 169.026
0.3 r2 8.951 50.708
DL Substructure Normal 1 846.214 -504.589
Substruct 0.3 r3 16.997 -18.165
Seismic
--------------- ** **
--------------- ** **
161
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r2 29.838 169.026
0.3 r1 8.951 50.708
DL Substructure Normal 1 846.214 -504.589
Substruct 0.3 r3 16.997 -18.165
Seismic
--------------- ** **
--------------- ** **
162
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r1 29.838 169.026
0.3 r2 8.951 50.708
DL Substructure Normal 1 735.043 -379.413 0.000
Substruct 0.3 r3 13.803 -18.165
Seismic
--------------- ** **
--------------- ** **
163
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r2 29.838 169.026
0.3 r1 8.951 50.708
DL Substructure Normal 1 735.043 -379.413 0.000
Substruct 0.3 r3 13.803 -18.165
Seismic
--------------- ** **
--------------- ** **
164
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
--------------- ** **
--------------- ** **
b) Basic combination (HFL Case) :
Partial Safety Vertical Horizontal Transverse Longitudinal Transverse
Particulars of Loads
Factor Load (T) Load (HL) Load (HT) Moment (TM) Moment
DL+SIDL Superstructure 1 150.00 0 5.1
SIDL Wearing Coat (WC) 1 15.766 0.315 0.536
DL Substructure 1 735.043 -379.413 0
Live Loads
CWLL Max 1 96.101 0.00 207.48
Min 47.099 0.00 101.69
FPLL Max 1 10.29 0.00 0.00
Min 5.15 0.00 34.47
Breaking & Bearing Max. 1 2.741 18.080 0.000 93.510 0.000
Min. -2.741 18.080 0.000 93.510 0.000
Earth Pressure 1 139.90 0 296.330 0
Wind Forces Span Intact 1 0.000 3.276 0.000 24.391
Span Dislodged 0.000 0.485 0.000 2.142
-- 1 0.000 0.000 0.000 0.000
Max. 1009.940 157.978 0.000 10.742 213.118
Service Condition Total
Min. 950.311 157.978 0.000 10.742 141.794
Max. 1009.94 157.98 3.28 10.74 237.51
Wind-Span Intact Total
Min. 950.31 157.98 3.28 10.74 166.18
Span Dislodged Total 735.043 139.898 0.000 -83.083 0.000
Scour All Not Max. -- -- -- -- --
Around Nor Applicable Min. -- -- -- -- --
Scour All Not Max. -- -- -- -- --
Around windApplicable Min. -- -- -- -- --
--------------- ** **
--------------- ** **
--------------- ** **
--------------- ** **
165
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
DATA ( Pile )
Type of Pile Head(Free-R, Fixed-X) R/X X
Horizontal Subgrade Reaction K2= 97.73 Kg/cm2
Length of Pile above Ground Level L2 0 cm
Depth of pile below GL L= 2247.6 cm
Diameter of Pile under Consideration Dia.= 120 cm
Grade of Concrete used for pile M= 35 Mpa
Thickness of pile Cap Tpc= 180 cm
Depth of Pile Cap (Below GL) d= -2.4 cm
Length of pile under scour L1= 0.0 cm
Allowable Deflection of pile head Y= 1.2 cm
Calculation
Moment of Inertia of pile I= 10178760 cm4
Youngs Modulus of Pile Material E= 295804 Kg/cm2
Effective length of pile below scour Le= 2070.000 cm
Calcuation of Depth of Fixity (Lf) R 418.96 cm
4R 1675.8 cm
SinceLe=2070>4R=1675.8, Take value of Lf/R corresponding to L1/R from Fig 2 of IS2911-Par1/Sec2
L1/R 0
Lf/R 2.2
Depth of fixity "Lf" Lf= 921.70 Ref. graph
Start of Rock below maximum scour= Lf= NA Ref. bore log
Equivalent Cantilever Length (L1+min(Lf))= 921.70 9.2170 m
Lateral capacity Q= 12EIy/(L1+Lf)^3= 55.373 T
Deflection at scour/bed level Q(L1+Lf)^3/12EI= 1.2 cm
Fixed End Moment, Q(L1+Lf)/2 Mf= 255.19 Tm
Reduction factor for Max. Mom. m= 0.69
Actual Maximum Moment allowed M=m*Mf 176.00 Tm
2.5
Ground Level
Determination of Depth of Fixity
2.3 d=-2.4cm
Lf/R or Lf/T and "m"
Le
1.2cm<1.2cm
Lf=9.217
Le=20.7 RL-85.707 Fixing Level of pile
166
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
PILE
Depth of Pile below G.L. = 22.476 m
Length of pile below Scour Level/Pile Cap = 20.700 m Fig is indicative only
Layer-……
Factor of safety for evaluating pile capacity = 2.500 in soil
Layer at Which pile rest = 10 TH Layer- 10
Layer at Which pile rest (Soil / Rock) = soil
RL of the Layers = 93.700 90.700 87.700 84.700 81.700 80.700 78.700 75.700 74.700 72.700
Depth of layers from G.L./Bed = 3.000 6.000 9.000 12.000 15.000 16.000 18.000 21.000 22.000 24.000
Depth from Scour/Cutoff Level Layer - 1 Layer - 2 Layer - 3 Layer - 4 Layer - 5 Layer - 6 Layer - 7 Layer - 8 Layer - 9 Layer-10
Effective Depth of layer below scour h 1.224 3.000 3.000 3.000 3.000 1.000 2.000 3.000 1.000 0.476
Bulk Density of soil in g/cm3 or t/m3 γ 1.952 1.984 2.012 2.020 2.032 2.048 2.038 2.033 2.042 2.048
Effective Unit weight of soil (Yeff.) Yeff. 0.952 0.984 1.012 1.02 1.032 1.048 1.038 1.033 1.042 1.048
For Cohesionless soils
Bearing capacity factor (Ny) 0.393 0.449 0.449 0.637 0.707 0.781 1.224 1.33 1.689 1.689
Bearing capacity factor (Nq) 1.499 1.568 1.568 1.796 1.879 1.966 2.471 2.588 2.974 2.974
Coeff. Of earth pressure K 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Angle of wall friction between soil & pile δ 4.5 5 5 6.5 7 7.5 10 10.5 12 12
Angle of internal friction φ 4.5 5.0 5.0 6.5 7.0 7.5 10.0 10.5 12.0 12.0
For Cohesive soils
Bearing capacity factor Nc 6.34 6.49 6.49 6.99 7.16 7.34 8.34 8.57 9.29 9.29
Average Cohesion at pile tip Cp 3.8 3.9 3.95 4.5 4.8 4.75 5.2 5 5.5 6.5
Avg. Cohesion throughout length of pile C 3.80 3.90 3.95 4.50 4.80 4.75 5.20 5.00 5.50 6.50
Reduction factor α 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Calculation
Surface area of pile stem Asi 4.614 11.310 11.310 11.310 11.310 3.770 7.540 11.310 3.770 1.794
Effective overburden pressure PDi 0.582624 2.641 5.635 8.683 11.761 13.833 15.395 17.983 20.053 20.824
K.PDi.tan(δ).Asi = 0.317 3.920 8.364 16.784 24.499 10.299 30.701 56.541 24.104 11.914
α.C.ASi = 8.767 22.054 22.337 25.447 27.143 8.954 19.604 28.274 10.367 5.832
KPDi tand Asi + α C As = 9.085 25.974 30.701 42.230 51.642 19.252 50.305 84.816 34.471 17.746
2
Cross sectional area of pile tip Ap 1.131 m
Eff. Overburden pressure=20.823672+0.5*1.048*0.476 PD 21.073 t/m2
End Bearing resistance {Ref. Appendix B of IS:2911 (Part I/Sec2) - 1979} Frictional resistance {Ref. Appendix B of IS:2911(Part I/Sec 2) - 1979}
Qu1 ={Ap(1/2* DYNY + PD Nq)} + {Ap Nc Cp} Qu2 = Sum1n ( KPDi tand Asi ) + ( a C As )
Point resistance = 140.35557 Frictional Resistance = 366.2213 t
Total Ultimate resistence, Qu=(Qu1+Qu2) = 506.57687 t (Frictional Resistance due to soil layer above weathered rock is ignored)
Safe load on pile (Normal Case) = 203 t Uplift Load Capacity of Pile (Normal Case)= 146
167
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
2 7
168
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
169
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
δ = 1.067 % of Steel(IS:456-Table-19) Tc
Tc= 0.67 1 0.67
δTc= 0.71489 1.25 0.73
170
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
2 7
171
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
172
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
δ = 1.046 % of Steel(IS:456-Table-19) Tc
Tc= 0.67 1 0.67
δTc= 0.70082 1.25 0.73
173
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
DESIGN DATA
1.38
H1 1.5 1.8
3.6
0.15
0.75
Grade of Concrete fck= M 35 N/mm2
Grade of Steel fy= 500 N/mm2
Es= 200000 N/mm2
Diameter of main bar at bottom(Long.) = 0.025 m
Diameter of bar at top (Long.) = 0.016 m
Diameter of main bar at top (Trans.) = 0.016 m
Diameter of main bar at bottom(Trans.) 0.016 m
Diameter of shear reinforcement = 0.01 m
No. of Leg used for stirrups = 10
Cover to the main steel = 75 mm
E/F - Earth Face R/F - River Face E/F R/F
Area of pile cap projected beyond the face of abutment 34.719 35.371 sqm
C.g. of pile cap projection from face of abutment(E/F) 1.065 1.085 sqm
Height of abutment = 4.787 m
Width of pile cap = 16.300 m
Thk. Of Pile cap = 1.800 m
Diameter of pile = 1.200 m
Depth of pile = 22.476 m
No. of pile in Transverse direction = 4 Nos.
No. of pile in longitudinal direction = 2 Nos.
Spacing of pile in Transverse direction = 4.933 m
Spacing of pile in Longitudinal direction = 3.600 m
Vertical capacity of pile = 253.750 T
Lateral capacity of pile = 55.373 T
Area of pile cap = 83.130 m2
Depth of pile cap = 1.800 m
Density of concrete = 2.500 t/m3
E/F R/F
Dist of Outer pile from face of the abutment= 1.380 1.42 m
Dist of inner 1st pile from face of the abutment= 0.000 0 m
Dist of inner 2nd pile from face of the abutment= 0 0
Note:- E/F - Earth Face Non Seis. Seis. Non Seis.
DESIGN LOAD R/F - River Face E/F R/F R/F
Average load on Outer pile = 217.508 135.02 185.94
Max. load on inner 1st pile (Non Seis.) = 0.000 0.00 0.00
Max. load on inner 2nd pile (Non Seis.) = 0.000 0.00 0
174
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Designing as Beam
Effective cover considering 25mm dia. Bar = 87.5 mm
Effective depth available = 1.713 m
Width of beam considered b= 1m
175
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
k= 1 % of Steel(IS:456-Table-19) Tc
Tc= 0.33 0.15 0.29
kTc= 0.33 0.25 0.37
p1= 0.02
K=1+sqrt(200/d)<=2 K= 1.34
vRd=0.12K(80p1fck)^1/3 Punching shear stress at control perimeter = 61.5 t/sqm
176
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Reaction Block
Pedastal
Abutment cap
0.80
Transverse
0.80 Seismic Reaction
Block
0.80
DESIGN DATA
177
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
d'
h(S)
0 2 legged 12 φ 8Nos
178
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
c1 c2 c3 c4 c5 d
1500 300 600 2287 300 1200
H1 H2 h1 h2 h3 h4 h5 h6 No Of Piles
4787 22500 1787 3024 -24 1800 20700 -- 8
Notes in GAD
w1 w2 w3 w4 c φ γdry
750 3600 4933 2130 0 30 1.80
WB WL CR GS CL DWL SLA P
5100 16300 2750 2625 2750 16000 16000 150
Formation Cap Lev. HFL Bed Top of Cap Scour Level Fnd. Lev.
101.511 99.724 99.064 96.700 96.724 96.332 74.224
e1 e2 e3 e4 e5 e6 e7 e8
T-25 T-16 T-16 T-16 4Nos. 23Nos. T-10 T-10
150mm c/c 150mm c/c 150mm c/c 150mm c/c T-16 T-25 200mm c/c 300mm c/c
-- 10 legged
Perimeter of Well Cap= 36.92 m
a1 a2 a3 a4 c1 c2 c3 c4 c5
-- -- -- -- -- -- -- -- --
-- -- -- -- -- -- -- -- --
179
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Input Data
Seismic coefficient
Design of Pier Cap
Analysis of Forces at top of Cap
Design of Pier Shaft
Analysis of Forces at bottom of Cap
Lateral and Axial Capacity of Pile
Axial Capacity of Pile
Design of Pile
Design of Pile Cap
Design summary used for Drawing
180
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
8.600 0.300
##### 6.7 0.150
0.250
' Maximum Transverse Eccentricity of Live Load= 2.225m 0.55 0.3
181
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
182
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
RL-99.064 HFL
1.80
RL-93.524 Cut-off Level
26.000
8.7
5.1
183
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
(Z/2) x (Sa/g)
Ah=
(R/I)
Where Ah= Horizontal Seismic Coefficient
Z= Seismic Zone Factor
Sa/g= Avg. Response Acceleration Coefficient
R= Response Reduction Factor
I= Importance of bridge
2 D
T=
1000*F
INPUT DATA
Z= 0.24
R= 2.4996
I= 1.2
D= 150+705+96.102 951.10 9511.02 KN
Grade of Concrete= M 30
Length of Shaft= 8600 mm
Thickness of Shaft= 1000.00 mm
Moment of Inertia of Substructure(MI)= 7.17E+11 mm4
Modulus of Elasticity of Concrete(E)= 27386
Type of Soil Site= Medium
L= 4400 mm
Deflection of Abutment cap tip= 1 mm
(L^3/3E*MI)= 1.45E-06
Hence F= 691 KN
T= 0.23 sec
Pile Cap
Sa/g= 2.5
Z/2= 0.12
R/I= 2.083
Ah= 0.144
184
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
9.44
7.92
5.79
4.42
1.37 9.1762
Cumulative dist. From first load 9.1762
Live load on span 8 12 12 17 17 17 17
Spacing of Live Load 3.96 1.52 2.13 1.37 3.05 1.37
R1 R2
0.28 14.00 14.00
0.28
0.28
0.28
A1 P1R1 P1R2 P2
28.60 0.04 m Expansion Joint
C.G of Load from first 17T Wheel load= 5.1238 0
70 R Wheel Load on Pier Right Span 70 R Wheel Load on Pier Left Span
Spacing Distance from P2/A2 Load Moment Spacing Distance Load Moment
from A1
0 9.18 17 155.9954 0 0 0 0
1.37 10.55 17 179.2854 1.37 0 0 0
3.05 13.5962 17 231.1354 3.05 0.0000 0 0
1.37 0 0 0 1.37 13.6338 17 231.7746
2.13 0 0 0 2.13 11.5038 12 138.0456
1.52 0 0 0 1.52 9.9838 12 119.8056
3.96 0 0 0 3.96 6.0238 8 48.1904
Sum= 51 566.4162 Sum= 49 537.8162
Reaction on Pier due to Right Span P1R2 40.458 Reaction on Pier due to Left Span P1R1 38.415
P2R1 10.542 A1 10.585
Total load on the pier due to 70R Wheel Load= 78.873
185
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
18.8
15.8
12.8
9.8
5.5
4.3 5.2088448
Cumulative dist. From first load 1.1 5.2088448
Live load on span 6.8 6.8 6.8 6.8 11.4 11.4 2.7 2.7
Spacing of Live Load 3 3 3 4.3 1.2 3.2 1.1
R1 R2
14.00 14.00
0.28
0.28
0.28
0.28
A1 P1R1 P1R2 P2
28.60
Place CG of Load at centre of pier 0.04 m Expansion Joint
Class-A Wheel Loading Right Span Class-A Wheel Loading Left Span
Spacing Distance from P2/A2 Load Moment Spacing Distance Load Moment
from A2
0 5.2088 2.7 14.0638809 0 0 0 0
1.1 6.31 2.7 17.0338809 1.1 0 0 0
3.2 9.51 11.4 108.40083 3.2 0 0 0
1.2 10.71 11.4 122.08083 1.2 0.00 0 0
4.3 0.000 0 0 4.3 13.59 6.8 92.4198556
3 0.000 0 0 3 10.59 6.8 72.0198556
3 0.000 0 0 3 7.59 6.8 51.6198556
3 0.000 0 0 3 4.59 6.8 31.2198556
Sum= 28.2 261.579422 Sum= 27.2 247.279422
Reaction on Pier due to Right Span P1R2 18.684 Reaction on Pier due to Left Span P1R1 17.663
P2R1 9.516 A1 9.537
Total load on the pier due to Class-A Load= 36.347
186
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
14.00 14.00
0.28
0.28
0.28
0.3
A1 P1R1 P1R2 P2
0.04 m Expansion Joint
Reaction due to 70 Track Load= P1R1 32.89375
Reaction due to 70 Track Load= P1R2 32.8938
A1 2.1063
P2R1 2.1063
70R-Track Class-A
78.880 T 36.347 T
8.390
4.645
187
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Impact factor= 1.225 Wheel load from edge of the footpath/kerb= 1.63
2.75 2.625
R1 R2
Note: It is assumed that the left wheel load is directly over outer girder if it comes beyond towards inner girder
Location G1 G2
Maximum of above including Impact 61.1 35.52
188
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Impact factor= 1.225 Wheel load from edge of the footpath/kerb= 1.63
2.75 2.625
R1 R2
189
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
2.625 2.625
0.125
0.05 0.50
Pile Cap
8.70 1.8
190
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
k= 1 % of Steel(IS:456-Table-19) Tc
Tc= 0.5612 0.5 0.5
kTc= 0.5612 0.75 0.59
191
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
192
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
193
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
194
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Sl. No. Particulars Load (T) Long. L.A. Long. Mom Trans. L.A Trans. Mom.
1 Longitudinal Seismic Reaction Block 6.720 0.000 0.000 0.000 0.000
2 Transverse Seismic reaction Block 3.960 0.000 0.000 0.000 0.000
3 Pier Cap Dry/LWL 48.950 0.000 0.000 0.000 0.000
4 Pier Shaft Dry/LWL cond. 71.273 0.000 0.000 0.000 0.000
5 Pier Cap HFL Condition 48.580 0.000 0.000 0.000 0.000
6 Pier Shaft HFL condition. 73.696 0.00 0.000 0.00 0.000
Total Dry/LWL condition 130.903 0.000 0.000
Total HFL condition 132.956 0.000 0.000
195
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Service Condition
Maximum Reaction for longitudinal moment Rb (T)= 96.102 t
Minimum Reaction for longitudinal moment 47.098 t
Lever arm value, = 0.300 m
Maximum longitudinal moment about the base =96.102 X 0.3 = 28.83 t
Min Longitudinal moment about base =47.098 X 0.3 = 14.13 t
Maximum reaction for transverse moment 78.873 t
Maximum transeverse eccentricity of Live Load = 3.355 m
Maximum transverse moment =78.873 X 3.355 = 264.62 tm
Minimum Transverse moment Min. reaction for transverse momenet= 47.098 = 158.01 tm
196
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
M M*Cos(0) M*Sin(0)
Max. Long. Moment (Span Dislodged) 18.08 X (4.4 + 0.282 + 0.09) = 86.278 86.278 0 tm
Min. Long. Moment (Span Dislodged) 18.08 X (4.4 + 0.282 + 0.09) = 86.278 86.278 0 tm
Max. Long. Moment (Span Intact) 14.32 X (4.4 + 0.282 + 0.09) = 68.335 68.335 0 tm
Min. Long. Moment (Span Intact) 14.32 X (4.4 + 0.282 + 0.09) = 68.335 68.335 0 tm
Max. Vertical Reactiondue to braking 28.64 X 0.5 X (1.2 + 0.065 + 1.416)/14= 2.741 t
Min. Vertical Reactiondue to braking -2.741 t
Seismic Case
Longitudinal Force at bearinng level (Span Dislodged)= Fh/2+Vr*ltc
Change in length due to Temparature and Shrinkage ltc= (0.0000117*34+0.0002)x14.56/2 = 0.0040 m
Fh/2+Vr*ltc= 5.728*0.5+940*0.004 = 6.624 t
F F*Cos(0) F*Sin(0)
Max Longitudinal horizontal Force on pier (Span Dislodged)= 6.624 6.624 0
Minimum Longitudinal force on pier (Span Dislodged)= 6.624 6.624 0
Max Longitudinal horizontal Force on pier (Span Intact)= 2.864 2.864 0
Minimum Longitudinal force on pier (Span Intact)= 2.864 2.864 0
M M*Cos(0) M*Sin(0)
Max. Long. Moment (Span Dislodged) 6.624 X (4.4 + 0.282 + 0.09)= 31.610 31.61 0 tm
Min. Long. Moment (Span Dislodged) 6.624 X (4.4 + 0.282 + 0.09)= 31.610 31.61 0 tm
Max. Long. Moment (Span Intact) 2.864 X (4.4 + 0.282 + 0.09)= 13.667 13.667 0 tm
Min. Long. Moment (Span Intact) 2.864 X (4.4 + 0.282 + 0.09)= 13.667 13.667 0 tm
Max. Vertical Reactiondue to braking 5.728 X 0.5 X(1.2+ 0.065 + 1.416)/14= 0.548 t
Min. Vertical Reactiondue to braking -0.548 t
Wind Forces due to Top Bed/LWL Element Ht. Mean Ht. Pressure Load/m Toal Load Moment
LWL/Dry Condition RL RL In m In m Kg/m2 Kg/m T Tm
Railing 102.556 96.366 0.860 5.760 120.000 1.747 10.063
Deck/Girder including Kerb 101.696 96.366 1.600 4.530 240.000 3.495 15.83
Pier Cap(Top width considered) 99.724 96.366 1.000 2.858 240.000 0.432 1.2347
Pier Shaft 98.724 96.366 2.358 1.179 240.000 0.240 0.283
Total 5.914 27.410
Wind Forces due to Top Bed/LWL Element Ht. Mean Ht. Pressure Load/m Toal Load Moment
LWL/Dry Condition RL RL In m In m Kg/m2 Kg/m T Tm
Wind force on deck 101.696 96.366 4.530 450.000 6.552 29.681
197
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
For Span Dislodged Case At Bed/Lwl Level At top of Cap At bottom of Cap
Design force & Moment Force Moment Force Moment Force Moment
3.293 14.840 3.293 18.271 3.293 24.198
Wind Forces due to Top HFL Element Ht. Mean Ht. Pressure Load/m Toal Load Moment
LWL/Dry Condition RL RL In m In m Kg/m2 Kg/m T Tm
Railing 102.556 99.064 0.860 3.062 120.000 1.747 5.349
Deck/Girder including Kerb 101.696 99.064 1.650 1.807 240.000 3.495 6.315
Pier Cap(Top width considered 99.724 99.064 0.660 0.330 240.000 0.432 0.143
Pier Shaft 99.064 99.064 0.000 0.000 240.000 0.240 0.000
Total 5.914 11.806
Wind Forces due to Top HFL Element Ht. Mean Ht. Pressure Load/m Toal Load Moment
LWL/Dry Condition RL RL In m In m Kg/m2 Kg/m T Tm
Wind force on deck 101.696 99.064 1.807 450.000 6.552 11.839
198
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
199
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r1 128.329 761.763
0.3 r2 38.499 228.529
DL+SIDL of Superstructure Normal 1 150.000 45.000 10.328
SIDL Wearing Coat (WC) 1 15.015 4.505 0.766
(Span Disldg) 0.3 r3 5.018 1.746 0.256
Seismic
icl. WC
1.0 r1 23.927 142.034
0.3 r2 7.178 42.610
DL Substructure Normal 1 130.903 0.000 0.000
0.3 r3 3.809 0.000 0.000
Substruct
Seismic
ure
200
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r2 128.329 761.763
0.3 r1 38.499 228.529
DL+SIDL SuperstructureNormal 1 150.000 45.000 10.328
SIDL Wearing Coat (WC) 1 15.015 4.505 0.766
(Span Disldg) 0.3 r3 4.802 1.310 0.245
Seismic
icl. WC
1.0 r2 23.927 142.034
0.3 r1 7.178 42.610
DL Substructure Normal 1 130.903 0.000 0.000
0.3 r3 3.809 0.000 0.000
Substruct
Seismic
ure
201
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r1 128.329 761.763
0.3 r2 38.499 228.529
DL+SIDL SuperstructureNormal 1 150.000 45.000 10.328
SIDL Wearing Coat (WC) 1 15.015 4.505 0.766
(Span Disldg) 0.3 r3 5.018 1.746 0.256
Seismic
icl. WC
1.0 r1 23.927 142.034
0.3 r2 7.178 42.610
DL Substructure Normal 1 132.956 0.000 0.000
0.3 r3 3.869 0.000 0.000
Substruct
Seismic
ure
202
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r2 128.329 761.763
0.3 r1 38.499 228.529
DL+SIDL SuperstructureNormal 1 150.000 45.000 10.328
SIDL Wearing Coat (WC) 1 15.015 4.505 0.766
(Span Disldg) 0.3 r3 4.802 1.310 0.245
Seismic
icl. WC
1.0 r2 23.927 142.034
0.3 r1 7.178 42.610
DL Substructure Normal 1 132.956 0.000 0.000
0.3 r3 3.869 0.000 0.000
Substruct
Seismic
ure
203
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Min steel, Cl. 16.5.1.1 of IRC 112:2011 = 0.13% of c/s area = 0.011037 Sqm
Horizontal Reinforcement
2
Distribution steel required = 20%/2 X (0.01473) = (Refer IRC:112-16.6) 0.001473 m
2
Providing 12 mmdia.Bar, C/Area of bar= 0.0001131 m
Spacing= 0.0001131 X4.4 X 1000/0.001473 = 337.84 mm c/c
'maximum spacing, Cl.-16.6.1.1(4)= 400 mm c/c
Say 200 mm c/c Safe
Provide 12 mm dia.Bar @ 200 mm c/c on both face of wall
204
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Min steel, Cl. 16.5.1.1 of IRC 112:2011 = 0.13% of c/s area = 0.011037 Sqm
Horizontal Reinforcement
2
Distribution steel required = 20%/2 X (0.01473) = (Refer IRC:112-16.6) 0.001473 m
2
Providing 12 mmdia.Bar, C/Area of bar= 0.0001131 m
Spacing= 0.0001131 X4.4 X 1000/0.001473 = 337.84 mm c/c
'maximum spacing, Cl.-16.6.1.1(4)= 400 mm c/c
Say 200 mm c/c Safe
Provide 12 mm dia.Bar @ 200 mm c/c on both face of wall
205
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Service Condition
Dead Load reaction at pier due to longer span 150.00 t
Long. Moment about centre line of pier 45.00 tm
Dead Load reaction at pier due to shorter span 705.00 t
Long. Moment about centre line of pier 211.5 tm
Net Dead Load reaction at pier due to longer & shorter span 855.00 t
Resultant Long. Moment about centre line of pier -166.50 tm
Service Condition
Dead Load reaction at pier 150.00 t
Longitudinal Moment about centre line of pier =150x 0.3 45 tm
Service Condition
Weight of Transverse =(2*0.9*1.1*0.8)*2.4 3.96 t
Long. Reaction Block =(8*0.8*0.35*1.2)*2.4 6.72 m3
206
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Sl. No. Particulars Load (T) Long. L.A. Long. Mom Trans. L.A Trans. Mom.
1 Longitudinal Seismic Reaction Block 3.960 0.000 0.000 0.000 0.000
2 Transverse Seismic reaction Block 6.720 0.000 0.000 0.000 0.000
3 Pier Cap Dry/LWL 48.950 0.000 0.000 0.000 0.000
4 Pier Shaft Dry/LWL cond. 71.273 0.000 0.000 0.000 0.000
5 Soil above Fnd. Slab / Pile / Well Cap DRY 0.000 0.000 0.000 0.000 0.000
6 Fnd. Slab / Pile / Well Cap in Dry Cond. 199.665 0.000 0.000 0.000 0.000
7 Pier Cap HFL Condition 48.580 0.000 0.000 0.000 0.000
8 Pier Shaft HFL condition. 73.696 0.000 0.000 0.000 0.000
9 Soil above Fnd. Slab / Pile / Well Cap HFL 0.000 0.000 0.000 0.000 0.000
10 Fnd. Slab / Pile / Well Cap in HFL Cond. 187.685 0.000 0.000 0.000 0.000
Total Dry/LWL condition 330.568 0.000 0.000
Total HFL condition 320.641 0.000 0.000
207
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Service Condition
Maximum Reaction for longitudinal moment Rb (T)= 96.102 t
Minimum Reaction for longitudinal moment 47.098 t
Lever arm value, = 0.30 m
Maximum longitudinal moment about the base =96.102 X 0.3 = 28.83 t
Min Longitudinal moment about base =47.098 X 0.3 = 14.13 t
Maximum reaction for transverse moment 78.87 t
Maximum transeverse eccentricity of Live Load = 3.355 m
Maximum transverse moment =78.873 X 3.355 = 264.62 tm
Minimum Transverse moment Min. reaction for transverse momenet= 47.098 = 158.01 tm
Seismic Condition (Vertical) Considering 20% of Live Load , Refer IRC 6:2014, Table-1
Maximum Reaction for longitudinal moment =96.102 X 0.121X0.2= 2.326 t
Minimum Reaction for longitudinal moment =47.098 X 0.121X0.2= 1.140 t
Lever arm value, = 0.300 m
Maximum longitudinal moment about the base =2.326 X 0.3= 0.698 tm
Minimum longitudinal moment about base =1.14 X 0.3= 0.342 tm
Maximum reaction for transverse moment =78.873 X 0.121X0.2= 1.909 t
Maximum transeverse eccentricity = 3.355 m
Maximum transverse moment =1.909 X 3.355= 6.404 tm
Minimum Transverse moment Min. reaction for transverse momenet= 1.1397716 3.824 tm
Seismic Condition (Horizontal)
Maximum horizontal force in Transverse direction =96.102 X 0.181X0.2= 3.4788924 t
Minimum horizontal force in transverse direction =47.098 X 0.181X0.2= 1.7049476 t
Lever arm value, =1.8+6.187 + 1.2= 9.187 m
Maximum Transverse moment about the base =3.479 X 9.187= 31.961 tm
Minimum Transverse moment about base =1.705 X 9.187= 15.663 tm
208
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
209
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
210
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r1 160.190 1239.233
0.3 r2 48.057 371.770
DL+SIDL of Superstructure Normal 1 150.000 45.000 7.650
SIDL Wearing Coat (WC) 1 15.015 4.505 0.766
(Span Disldg) 0.3 r3 5.990 1.797 0.305
Seismic
icl. WC
211
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r2 160.190 1239.233
0.3 r1 48.057 371.770
DL+SIDL SuperstructureNormal 1 150.000 45.000 7.650
SIDL Wearing Coat (WC) 1 15.015 4.505 0.766
(Span Disldg) 0.3 r3 5.990 1.797 0.305
Seismic
icl. WC
ure
212
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r1 160.190 1239.233
0.3 r2 48.057 371.770
DL+SIDL SuperstructureNormal 1 150.000 45.000 7.650
SIDL Wearing Coat (WC) 1 15.015 4.505 0.766
(Span Disldg) 0.3 r3 5.990 1.797 0.305
Seismic
icl. WC
ure
213
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Seismic
icl. WC
1.0 r2 154.755 1197.185
0.3 r1 46.427 359.155
DL+SIDL SuperstructureNormal 1 150.000 45.000 7.650
SIDL Wearing Coat (WC) 1 15.015 4.505 0.766
(Span Disldg) 0.3 r3 5.445 1.797 0.278
Seismic
icl. WC
ure
214
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
215
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
L=2884.2cm
Le
1.2cm
L2+L1=0 L2+L1=0
Scour Level RL-94.762 Scour Level
1.2cm<1.2cm
Le==26 Lf=9.217
RL-85.545 Fixing Level of pile
216
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
PILE
Depth of Pile below G.L. 28.842 m
Effective length of Pile below scour level = 26.000 m Fig is indicative only
Factor of safety for evaluating pile capacity = 2.500 in soil Layer-….
Layers at which pile tip rest = 10 th
Layer- 10
Layer at Which pile rest (Soil / Rock) = SOIL
RL of the Layers = 93.366 90.366 87.366 84.366 81.366 78.366 75.366 72.366 69.366 66.366
Depth of layers from G.L. = 3.000 6.000 9.000 12.000 15.000 18.000 21.000 24.000 27.000 30.000
Depth from Scour/Cutoff Level Layer - 1 Layer - 2 Layer - 3 Layer - 4 Layer - 5 Layer - 6 Layer - 7 Layer - 8 Layer - 9 Layer-10
EffectiveDepth of layers h 0.158 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 1.842
Density of soil in g/cm3 or t/m3 γ 2.000 2.036 2.033 2.039 2.043 2.062 2.045 2.056 2.047 2.062
Effective Unit weight of soil (Yeff.) Yeff. 1 1.036 1.033 1.039 1.043 1.062 1.045 1.056 1.047 1.062
For Cohesionless soils
Bearing capacity factor (Ny) 0.571 0.508 0.449 0.449 0.781 1.442 1.562 1.689 1.969 2.123
Bearing capacity factor (Nq) 1.716 1.64 1.568 1.568 1.966 2.71 2.839 2.974 3.264 3.421
Coeff. Of earth pressure K 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Angle of wall friction between soil & pile δ 6 5.5 5 5 7.5 11 11.5 12 13 13.5
Angle of internal friction φ 6.0 5.5 5.0 5.0 7.5 11.0 11.5 12.0 13.0 13.5
For Cohesive soils
Bearing capacity factor Nc 6.81 6.65 6.49 6.49 7.34 8.80 9.04 9.29 9.81 10.08
Average Cohesion at pile tip Cp 3.6 3.85 4.8 5.1 5.5 5.8 5.9 5.8 5.6 5.4
Avg. Cohesion throughout length of pile C 3.60 3.85 4.80 5.10 5.50 5.80 5.90 5.80 5.60 5.40
Reduction factor α 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Calculation
Surface area of pile stem Asi 0.596 11.310 11.310 11.310 11.310 11.310 11.310 11.310 11.310 6.944
Effective overburden pressure PDi 0.079 1.712 4.816 7.924 11.047 14.204 17.365 20.516 23.671 26.219
K.PDi.tan(δ).Asi = 0.007 2.797 7.147 11.760 24.672 46.839 59.933 73.979 92.707 65.567
α.C.ASi = 1.072 21.771 27.143 28.840 31.102 32.798 33.364 32.798 31.667 18.749
KPDi tand Asi + α C As = 1.080 24.568 34.291 40.600 55.773 79.637 93.297 106.778 124.375 84.316
2
Cross sectional area of pile tip Ap 1.131 m
Eff. Overburden pressure PD 27.197 t/m2
End Bearing resistance {Ref. Appendix B of IS:2911 (Part I/Sec2) - 1979} Frictional resistance {Ref. Appendix B of IS:2911(Part I/Sec 2) - 1979}
Qu1 ={Ap(1/2* DYNY + PD Nq)} + {Ap Nc Cp} Qu2 = Sum1n ( KPDi tand Asi ) + ( a C As )
Point resistance = 168.3422 t Frictional Resistance = 644.71338 t
Total Ultimate resistence, Qu=(Qu1+Qu2) = 813.05558 t (Frictional Resistance due to sand is ignored as the pile is resting on wethrd. rock)
Safe load on pile (Normal Case) = 325.0 t Uplift Load Capacity of Pile (Normal Case)= 258.00 t
217
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition (Dry/LWL Case) :
1832.201 21.480 -31.103 458.475 305.367 15.636 292.04 286.285 323.88 318.123 355.72 349.962 355.721 286.285 3.580 11.384
Service Condition
1735.039 21.480 -57.784 401.982 289.173 15.636 282.24 271.544 310.16 299.459 338.08 327.374 338.075 271.544 3.580 11.384
675.042 27.120 246.866 11.668 112.507 15.636 104.48 150.191 105.29 151.001 106.10 151.812 151.812 104.475 4.520 14.373
One Span Dislodged
675.042 27.120 246.866 11.668 112.507 15.636 104.48 150.191 105.29 151.001 106.10 151.812 151.812 104.475 4.520 14.373
1832.201 23.622 -31.103 530.927 305.367 15.636 287.01 281.253 323.88 318.123 360.75 354.993 360.753 281.253 3.937 12.519
Wind-Span Intact
1735.039 23.622 -57.784 474.434 289.173 15.636 277.21 266.512 310.16 299.459 343.11 332.406 343.107 266.512 3.937 12.519
675.042 27.566 246.866 47.965 112.507 15.636 101.96 147.670 105.29 151.001 108.62 154.332 154.332 101.955 4.594 14.609
Wind-Span Dislodged
675.042 27.566 246.866 47.965 112.507 15.636 101.96 147.670 105.29 151.001 108.62 154.332 154.332 101.955 4.594 14.609
Maximum and MinimumValue= 360.753 101.955 4.594 14.609
218
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lateral Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition and Seismic in longitudinal Direction (Dry/LWL)
1299.764 289.938 1659.75 101.564 216.627 15.636 71.53 378.891 78.58 385.944 85.64 392.997 392.997 71.530 48.32 153.66
DN - Seis.-Span Intact
1278.051 289.406 1648.72 148.412 213.009 15.636 65.68 370.998 75.99 381.304 86.29 391.611 391.611 65.679 48.23 153.38
1212.296 289.938 1671.41 94.556 202.049 15.636 56.36 365.880 62.93 372.446 69.49 379.013 379.013 56.359 48.32 153.66
UP - Seis.-Span Intact
1191.295 289.406 1660.61 142.952 198.549 15.636 50.50 358.018 60.43 367.945 70.35 377.872 377.872 50.498 48.23 153.38
513.572 134.691 651.22 8.721 85.595 15.636 40.33 160.925 40.93 161.530 41.54 162.136 162.136 40.327 22.45 71.38
DN- Seis.- Span Dislodged
513.572 134.691 651.22 8.721 85.595 15.636 40.33 160.925 40.93 161.530 41.54 162.136 162.136 40.327 22.45 71.38
477.593 134.691 647.63 8.110 79.599 15.636 34.71 154.638 35.27 155.201 35.83 155.764 155.764 34.706 22.45 71.38
UP- Seis.- Span Dislodged
477.593 134.691 647.63 8.110 79.599 15.636 34.71 154.638 35.27 155.201 35.83 155.764 155.764 34.706 22.45 71.38
Maximum and MinimumValue= 392.997 34.706 48.32 153.66
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition and Seismic in Transverse Direction (Dry/LWL)
1299.764 289.523 -141.573 1925.25 216.627 15.636 111.67 85.457 245.37 219.155 379.07 352.853 379.070 85.457 48.25 153.44
DN - Seis.-Span Intact
1278.051 287.749 -147.706 1955.81 213.009 15.636 106.50 79.148 242.32 214.968 378.14 350.788 378.141 79.148 47.96 152.50
1212.296 289.523 -129.904 1918.25 202.049 15.636 96.50 72.446 229.71 205.658 362.93 338.869 362.925 72.446 48.25 153.44
UP - Seis.-Span Intact
1191.295 287.749 -135.824 1950.35 198.549 15.636 91.32 66.169 226.76 201.609 362.20 337.050 362.202 66.169 47.96 152.50
513.572 118.004 170.124 489.82 85.595 15.636 51.46 82.968 85.48 116.984 119.50 150.999 150.999 51.464 19.67 62.54
DN- Seis.- Span Dislodged
513.572 118.004 170.124 489.822 85.595 15.636 51.46 82.968 85.48 116.984 119.50 150.999 150.999 51.464 19.67 62.54
477.593 118.004 166.529 489.211 79.599 15.636 45.84 76.682 79.82 110.655 113.79 144.627 144.627 45.843 19.67 62.54
UP- Seis.- Span Dislodged
477.593 118.004 166.529 489.211 79.599 15.636 45.84 76.682 79.82 110.655 113.79 144.627 144.627 45.843 19.67 62.54
Maximum and MinimumValue= 379.070 45.843 48.25 153.44
219
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition (Dry/LWL Case) :
1335.019 14.320 -95.660 308.275 222.503 15.636 225.59 207.874 247.00 229.282 268.41 250.690 268.405 207.874 2.39 7.59
Service Condition
1270.244 14.320 -113.448 270.613 211.707 15.636 219.06 198.047 237.85 216.839 256.64 235.632 256.641 198.047 2.39 7.59
495.583 18.080 168.327 8.416 82.597 15.636 82.06 113.235 82.65 113.819 83.23 114.404 114.404 82.063 3.01 9.58
One Span Dislodged
495.583 18.080 168.327 8.416 82.597 15.636 82.06 113.235 82.65 113.819 83.23 114.404 114.404 82.063 3.01 9.58
1335.019 15.748 -95.660 356.576 222.503 15.636 222.24 204.520 247.00 229.282 271.76 254.044 271.759 204.520 2.62 8.35
Wind-Span Intact
1270.244 15.748 -113.448 318.914 211.707 15.636 215.70 194.692 237.85 216.839 260.00 238.986 259.995 194.692 2.62 8.35
495.583 18.377 168.327 32.614 82.597 15.636 80.38 111.554 82.65 113.819 84.91 116.084 116.084 80.383 3.06 9.74
Wind-Span Dislodged
495.583 18.377 168.327 32.614 82.597 15.636 80.38 111.554 82.65 113.819 84.91 116.084 116.084 80.383 3.06 9.74
Maximum and MinimumValue= 271.759 80.383 3.063 9.740
Safe Safe Safe Safe
Safe
220
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lateral Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition and Seismic in longitudinal Direction (Dry/LWL)
1299.764 289.938 1659.75 101.564 216.627 15.636 71.53 378.891 78.58 385.944 85.64 392.997 392.997 71.530 48.32 153.66
DN - Seis.-Span Intact
1278.051 289.406 1648.72 148.412 213.009 15.636 65.68 370.998 75.99 381.304 86.29 391.611 391.611 65.679 48.23 153.38
1212.296 289.938 1671.41 94.556 202.049 15.636 56.36 365.880 62.93 372.446 69.49 379.013 379.013 56.359 48.32 153.66
UP - Seis.-Span Intact
1191.295 289.406 1660.61 142.952 198.549 15.636 50.50 358.018 60.43 367.945 70.35 377.872 377.872 50.498 48.23 153.38
513.572 134.691 651.22 8.721 85.595 15.636 40.33 160.925 40.93 161.530 41.54 162.136 162.136 40.327 22.45 71.38
DN- Seis.- Span Dislodged
513.572 134.691 651.22 8.721 85.595 15.636 40.33 160.925 40.93 161.530 41.54 162.136 162.136 40.327 22.45 71.38
477.593 134.691 647.63 8.110 79.599 15.636 34.71 154.638 35.27 155.201 35.83 155.764 155.764 34.706 22.45 71.38
UP- Seis.- Span Dislodged
477.593 134.691 647.63 8.110 79.599 15.636 34.71 154.638 35.27 155.201 35.83 155.764 155.764 34.706 22.45 71.38
Maximum and MinimumValue= 392.997 34.706 48.32 153.66
Safe Safe Safe Safe
Safe
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition and Seismic in Transverse Direction (Dry/LWL)
1299.764 289.523 -141.573 1925.25 216.627 15.636 111.67 85.457 245.37 219.155 379.07 352.853 379.070 85.457 48.25 153.44
DN - Seis.-Span Intact
1278.051 287.749 -147.706 1955.81 213.009 15.636 106.50 79.148 242.32 214.968 378.14 350.788 378.141 79.148 47.96 152.50
1212.296 289.523 -129.904 1918.25 202.049 15.636 96.50 72.446 229.71 205.658 362.93 338.869 362.925 72.446 48.25 153.44
UP - Seis.-Span Intact
1191.295 287.749 -135.824 1950.35 198.549 15.636 91.32 66.169 226.76 201.609 362.20 337.050 362.202 66.169 47.96 152.50
513.572 118.004 170.124 489.82 85.595 15.636 51.46 82.968 85.48 116.984 119.50 150.999 150.999 51.464 19.67 62.54
DN- Seis.- Span Dislodged
513.572 118.004 170.124 489.822 85.595 15.636 51.46 82.968 85.48 116.984 119.50 150.999 150.999 51.464 19.67 62.54
477.593 118.004 166.529 489.211 79.599 15.636 45.84 76.682 79.82 110.655 113.79 144.627 144.627 45.843 19.67 62.54
UP- Seis.- Span Dislodged
477.593 118.004 166.529 489.211 79.599 15.636 45.84 76.682 79.82 110.655 113.79 144.627 144.627 45.843 19.67 62.54
Maximum and MinimumValue= 379.070 45.843 48.25 153.44
Safe Safe Safe Safe
Safe
221
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
δ = 1.026 % of Steel(IS:456-Table-19) Tc
Tc= 0.6284 0.75 0.59
δTc= 0.6447384 1 0.67
222
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition (HFL Case) :
1818.800 21.872 -29.933 458.961 303.133 15.636 289.67 284.126 321.54 315.998 353.41 347.870 353.413 284.126 3.65 11.59
Service Condition
1721.638 21.872 -56.614 402.468 286.940 15.636 279.87 269.385 307.82 297.334 335.77 325.283 335.767 269.385 3.65 11.59
661.641 27.512 248.036 12.154 110.274 15.636 102.10 148.032 102.94 148.876 103.79 149.720 149.720 102.100 4.59 14.58
One Span Dislodged
661.641 27.512 248.036 12.154 110.274 15.636 102.10 148.032 102.94 148.876 103.79 149.720 149.720 102.100 4.59 14.58
1818.800 24.054 -29.933 533.499 303.133 15.636 284.49 278.949 321.54 315.998 358.59 353.047 358.590 278.949 4.01 12.75
Wind-Span Intact
1721.638 24.054 -56.614 477.006 286.940 15.636 274.69 264.208 307.82 297.334 340.94 330.459 340.943 264.208 4.01 12.75
661.641 27.985 248.036 49.574 110.274 15.636 99.50 145.433 102.94 148.876 106.39 152.319 152.319 99.501 4.66 14.83
Wind-Span Dislodged
661.641 27.985 248.036 49.574 110.274 15.636 99.50 145.433 102.94 148.876 106.39 152.319 152.319 99.501 4.66 14.83
Maximum and MinimumValue= 358.590 99.501 4.664 14.831
223
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition and Seismic in longitudinal Direction(HFL)
1289.477 287.602 1658.73 101.564 214.913 15.636 69.91 377.082 76.96 384.135 84.02 391.188 391.188 69.910 47.93 152.42
DN - Seis.-Span Intact
1267.764 287.070 1647.71 148.412 211.294 15.636 64.06 369.189 74.37 379.496 84.67 389.802 389.802 64.059 47.84 152.14
1202.730 287.602 1670.40 94.556 200.455 15.636 54.86 364.191 61.43 370.758 67.99 377.324 377.324 54.858 47.93 152.42
UP - Seis.-Span Intact
1181.729 287.070 1659.59 142.952 196.955 15.636 49.00 356.329 58.93 366.257 68.85 376.184 376.184 48.998 47.84 152.14
503.285 132.355 650.21 8.721 83.881 15.636 38.71 159.116 39.31 159.721 39.92 160.327 160.327 38.707 22.06 70.15
DN - Span Dislodged
503.285 132.355 650.21 8.721 83.881 15.636 38.71 159.116 39.31 159.721 39.92 160.327 160.327 38.707 22.06 70.15
483.042 132.355 651.12 8.876 80.507 15.636 35.24 155.815 35.86 156.432 36.47 157.048 157.048 35.238 22.06 70.15
UP - Span Dislodged
468.027 132.355 646.61 8.110 78.004 15.636 33.21 152.949 33.77 153.512 34.33 154.075 154.075 33.206 22.06 70.15
Maximum and MinimumValue= 391.188 33.206 47.93 152.42
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition and Seismic in Transverse Direction (HFL)
1289.477 280.122 -141.573 1869.575 214.913 15.636 113.83 87.609 243.66 217.440 373.49 347.272 373.489 87.609 46.69 148.46
DN - Seis.-Span Intact
1267.764 278.348 -147.706 1900.125 211.294 15.636 108.65 81.301 240.61 213.254 372.56 345.207 372.560 81.301 46.39 147.52
1202.730 280.122 -129.904 1862.567 200.455 15.636 98.77 74.718 228.12 204.063 357.46 333.408 357.464 74.718 46.69 148.46
UP - Seis.-Span Intact
1181.729 278.348 -135.824 1894.665 196.955 15.636 93.59 68.441 225.17 200.015 356.74 331.589 356.741 68.441 46.39 147.52
502.740 112.208 170.124 461.445 83.790 15.636 51.63 83.134 83.67 115.179 115.72 147.223 147.223 51.629 18.70 59.47
DN - Span Dislodged
502.740 112.208 170.124 461.445 83.790 15.636 51.63 83.134 83.67 115.179 115.72 147.223 147.223 51.629 18.70 59.47
468.572 112.208 166.529 460.890 78.095 15.636 46.31 77.145 78.31 109.151 110.32 141.157 141.157 46.306 18.70 59.47
UP - Span Dislodged
468.572 112.208 166.529 460.890 78.095 15.636 46.31 77.145 78.31 109.151 110.32 141.157 141.157 46.306 18.70 59.47
Maximum and MinimumValue= 373.489 46.306 46.687 148.46
224
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition (HFL Case) :
1325.092 14.582 -36.605 310.080 220.849 15.636 218.34 211.562 239.87 233.096 261.41 254.629 261.408 211.562 2.43 7.73
Service Condition
1260.318 14.582 -54.393 272.417 210.053 15.636 211.81 201.735 230.73 220.653 249.64 239.571 249.643 201.735 2.43 7.73
485.656 18.341 169.107 8.740 80.943 15.636 80.31 111.630 80.92 112.237 81.53 112.844 112.844 80.314 3.06 9.72
One Span Dislodged
485.656 18.341 169.107 8.740 80.943 15.636 80.31 111.630 80.92 112.237 81.53 112.844 112.844 80.314 3.06 9.72
1325.092 16.036 -36.605 359.772 220.849 15.636 214.89 208.112 239.87 233.096 264.86 258.080 264.858 208.112 2.67 8.50
Wind-Span Intact
1260.318 16.036 -54.393 322.109 210.053 15.636 208.36 198.284 230.73 220.653 253.09 243.022 253.094 198.284 2.67 8.50
485.656 18.656 169.107 33.687 80.943 15.636 78.58 109.898 80.92 112.237 83.26 114.576 114.576 78.582 3.11 9.89
Wind-Span Dislodged
485.656 18.656 169.107 33.687 80.943 15.636 78.58 109.898 80.92 112.237 83.26 114.576 114.576 78.582 3.11 9.89
Maximum and MinimumValue= 264.858 78.582 3.109 9.887
Safe Safe Safe Safe
Safe
225
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition and Seismic in longitudinal Direction(HFL)
1289.477 287.602 1658.73 101.564 214.913 15.636 69.91 377.082 76.96 384.135 84.02 391.188 391.188 69.910 47.93 152.42
DN - Seis.-Span Intact
1267.764 287.070 1647.71 148.412 211.294 15.636 64.06 369.189 74.37 379.496 84.67 389.802 389.802 64.059 47.84 152.14
1202.730 287.602 1670.40 94.556 200.455 15.636 54.86 364.191 61.43 370.758 67.99 377.324 377.324 54.858 47.93 152.42
UP - Seis.-Span Intact
1181.729 287.070 1659.59 142.952 196.955 15.636 49.00 356.329 58.93 366.257 68.85 376.184 376.184 48.998 47.84 152.14
503.285 132.355 650.21 8.721 83.881 15.636 38.71 159.116 39.31 159.721 39.92 160.327 160.327 38.707 22.06 70.15
DN - Span Dislodged
503.285 132.355 650.21 8.721 83.881 15.636 38.71 159.116 39.31 159.721 39.92 160.327 160.327 38.707 22.06 70.15
483.042 132.355 651.12 8.876 80.507 15.636 35.24 155.815 35.86 156.432 36.47 157.048 157.048 35.238 22.06 70.15
UP - Span Dislodged
468.027 132.355 646.61 8.110 78.004 15.636 33.21 152.949 33.77 153.512 34.33 154.075 154.075 33.206 22.06 70.15
Maximum and MinimumValue= 391.188 33.206 47.93 152.42
Safe Safe Safe Safe
Safe
Load and Moment on Group of Pile Vertical Self Wt. Load on individual Pile due to axial load and moment Load and Moment on each Pile
Vert. Lat. Long. Trans. Load Upto Pile-1 Pile-2 Pile-5 Pile-6 Pile-3 Pile-4 Max Min Lat. Long.
Load Load Moment Moment on Each Fixity Load Load Load Mom.
Service Condition and Seismic in Transverse Direction (HFL)
1289.477 280.122 -141.573 1869.575 214.913 15.636 113.83 87.609 243.66 217.440 373.49 347.272 373.489 87.609 46.69 148.46
DN - Seis.-Span Intact
1267.764 278.348 -147.706 1900.125 211.294 15.636 108.65 81.301 240.61 213.254 372.56 345.207 372.560 81.301 46.39 147.52
1202.730 280.122 -129.904 1862.567 200.455 15.636 98.77 74.718 228.12 204.063 357.46 333.408 357.464 74.718 46.69 148.46
UP - Seis.-Span Intact
1181.729 278.348 -135.824 1894.665 196.955 15.636 93.59 68.441 225.17 200.015 356.74 331.589 356.741 68.441 46.39 147.52
502.740 112.208 170.124 461.445 83.790 15.636 51.63 83.134 83.67 115.179 115.72 147.223 147.223 51.629 18.70 59.47
DN - Span Dislodged
502.740 112.208 170.124 461.445 83.790 15.636 51.63 83.134 83.67 115.179 115.72 147.223 147.223 51.629 18.70 59.47
468.572 112.208 166.529 460.890 78.095 15.636 46.31 77.145 78.31 109.151 110.32 141.157 141.157 46.306 18.70 59.47
UP - Span Dislodged
468.572 112.208 166.529 460.890 78.095 15.636 46.31 77.145 78.31 109.151 110.32 141.157 141.157 46.306 18.70 59.47
Maximum and MinimumValue= 373.489 46.306 46.687 148.46
Safe Safe Safe Safe
Safe
226
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
δ = 1.025 % of Steel(IS:456-Table-19) Tc
Tc= 0.6284 0.75 0.59
δTc= 0.64411 1 0.67
227
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
INPUT DATA
PIER
2.175 0.175 0.05
H1 1.8
228
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Designing as Beam
Effective cover considering 25mm dia. Bar = 87.5 mm
Effective depth available for Long. Bottom Bar = 1.713 m
Effective depth available for Trans. Bottom Bar = 1.705 m
Width of beam considered b= 1m
Effective Depth Required
2
Mu= k*fck*bd where k= 0.1336
Effective depth required def.=Sqrt(Mu/k*fck*b)
def.= 0.611 Safe
Designed as under reinforced section
Steel - Longitudial - Bottom
Since actual depth provided is more than required, section shall be designed for this depth.
For this condition area of steel shall be obtained by the equation as below
229
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
k= 1 % of Steel(IS:456-Table-19) Tc
Tc= 0.33 0.15 0.29
kTc= 0.33 0.25 0.37
p1= 0.02
K=1+sqrt(200/d)<=2 K= 1.34
vRd=0.12K(80p1fck)^1/3 Punching shear stress at control perimeter = 61.5 t/sqm
230
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Pier Shaft
0.90
1.100
DESIGN DATA
231
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
0.90
d'
h(S)
0 2 legged 12 φ 14
0
Transverse Direction
232
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
X-Girder
Pier cap
Long. Girder
0.8
0.35
DESIGN DATA
Ht. of Contact of Reaction Block with Girder (Neoprene Pad)= 0.2 m
Height of Reaction Block= 1.20 m
Transverse width of Reaction Block= 0.80 m
Length of Reaction Block= 0.3500 m
No. of Reaction Block= 4 Nos. on either side
Live Load Reaction at Pier including impact= 0 Not considered (As per IRC-6)
Total load of superstructure (Left Span) 300 t
Total Reaction at Pier including impact= 300 t
Horizontal Seismic Coeff.(Refer IRC 6)= 0.36 Conidering R=1, as per IRC6: 2014
Total Horizontal Load on one Reaction Block= 27 t
Height of Reaction force from Pier cap= 1.025 m
Diameter of main bar at Girder face= 0.020 m
Diameter of bar at outer face= 0.016 m
Diameter of shear reinforcement= 0.016 m
No. of Leg used for shear reinforcement= 2 Nos.
a= 1.025 m S= 0.8 d= 0.23 m b= 0.35 m
h= 0.8 Vu= 27.000 t d'= 0.29 m
233
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
680 2 legged 16 φ 4
0
Long. Direction
234
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Bridge - in Replacement of Existing Narrow & Damaged Bridge in Km. 143 of NH-80 ( 3 x 14 ) on Pile Foundation
The following data are used to generate the drawings for the structure concerned
(Limit State Design)
Dimensions ara in mm and Levels are in Meter Load on Pile Horizontal Vertical
Formation Cap Lev. HFL Bed Top of Cap Scour Level Fnd. Lev. Non Seismic 4 269
101.511 99.724 99.064 96.366 95.324 94.762 67.524 Seismic/wind 49 393
H1 H2 h1 h2 h3 h4 h5 h6 No Of Piles
6187 27800 1787 3358 1042 1800 26000 0 6
p1 p2 p3 p4 p5 p6 p7(a) p d
1000 1000 1800 500 500 500 2300 50 1200
p7(b) 2300
GS CL CR w1 w2 w3 CLP SLP WL WB
2625 1350 1350 750 3600 3600 13200 8600 8700 5100
d1 d2 d3 d4 d5 d6 d7 d8 d9
30-T25 30-T25 4-T25 15-T12-200 2-T12-200 2L-T12-200 T12-300 T12-300 T12-300
30Nos 30Nos 4Nos 15Nos 2Nos 2 legged
T-25 T-25 T-25 T-12 T-12 T-12 T-12 T-12 T-12
200 mm c/c 200 mm c/c 200 mm c/c 300 mm c/c 300 mm c/c 300 mm c/c
Y Y Y Y Y
d10 d11 d12 d13 d14 d15 d16 d17 d18 d19
22-T25 11-T25 4-T16 11-T16 8-2L-T12 2L- T16-100 2L- T16-100 2L- T12-100 2L- T12-100 4-T16
22Nos 11Nos 4Nos 11Nos 8Nos 2 legged 2 legged 2 legged 2 legged 4
T-25 T-25 T-16 T-16 2 legged T-16 T-16 T-12 T-12 T-16
2-Layer Each of 11bar T-12 100 mm c/c 100 mm c/c 100 mm c/c 100 mm c/c
Pile/Raft Reinforcement
e8 e9 e10 e11 e12 e13 e14 e15
T-25 T-16 T-16 T-16 4Nos 10Nos 20Nos T-10
150 mm c/c 150 mm c/c 150 mm c/c 150 mm c/c T-16 T-10 T-25 200 mm c/c
300 mm c/c -
a1 a2 a3 a4 c1 c2 c3 c4 c5
0Nos 0Nos T-0 T-0 0Nos 0Nos 0Nos 0Nos 0Nos
T-0 T-0 0 mm c/c 0 mm c/c T-0 T-0 T-0 T-0 T-0
235
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Hydraulic Calculation for Proposed HL RCC Bridge in Replacement of Existing Narrow & Damaged Bridge in Km. 143 of
NH-80 in the State of Bihar
1. DESIGN DISCHARGE BY AREA VELOCITY METHOD :
Calculation based on H.F.L. Condition at Bridge Site :
River Bed Slope = 0.0003946
n = 0.040 H.F.L. at Bridge Site = 99.038 m.
Chainage H.F.L. Bed Level Bed Level Difference Average of Length Area Difference of Perimeter
2
(m) (R.L. in m) Existing Modified (2-3) (m) (4) (m) (in m) (in m ) Bed Level(m) (in m)
1 2 3 4 5 6 7 8 9 10
8.000 99.038 96.697 96.697 2.341 2.352 8.000 18.816 0.022 8.000
11.000 99.038 96.722 96.722 2.316 2.329 3.000 6.985 0.025 3.000
20.000 99.038 96.374 96.374 2.664 2.490 9.000 22.410 0.348 9.007
25.000 99.038 96.366 96.366 2.672 2.668 5.000 13.340 0.008 5.000
30.000 99.038 96.492 96.492 2.546 2.609 5.000 13.045 0.126 5.002
34.000 99.038 96.764 96.764 2.274 2.410 4.000 9.640 0.272 4.009
37.000 99.038 97.054 97.054 1.984 2.129 3.000 6.387 0.290 3.014
49.000 99.038 97.373 97.373 1.665 1.824 12.000 21.894 0.319 12.004
55.000 99.038 97.349 97.349 1.689 1.677 6.000 10.062 0.024 6.000
R = A/P
Hence, R = 2.227 m. Therefore,Q (at Bridge Site Under H.F.L.Condition) :
2/3 1/2
V = 1/n x R x S Q=AxV
Hence, V = 0.847 m/sec Therefore, Q = 103.765 cumec
Calculation based on H.F.L. Condition at 135 m Up-Stream :
River Bed Slope = 0.0003946
n = 0.040 H.F.L. at Up-Stream = 99.091 m.
Chainage H.F.L. Bed Level Bed Level Difference Average of Length Area Difference of Perimeter
(m) (R.L. in m) Existing Modified (2-3) (m) (4) (m) (m) (in m2) Bed Level(m) (m)
1 2 3 4 5 6 7 8 9 10
12.000 99.091 96.841 96.841 2.250 2.205 12.000 26.463 0.090 12.000
20.000 99.091 96.916 96.916 2.175 2.213 8.000 17.702 0.075 8.000
27.000 99.091 96.996 96.996 2.095 2.135 7.000 14.947 0.080 7.000
33.000 99.091 96.977 96.977 2.114 2.105 6.000 12.629 0.019 6.000
40.000 99.091 96.965 96.965 2.126 2.120 7.000 14.842 0.012 7.000
49.000 99.091 97.063 97.063 2.028 2.077 9.000 18.695 0.098 9.001
55.000 99.091 97.169 97.169 1.922 1.975 6.000 11.852 0.106 6.001
R = A/P
Hence, R = 2.130 m. Therefore,Q (at 135 m U/S Under H.F.L.Condition) :
V = 1/n x R2/3 x S1/2 Q=AxV
Hence, V = 0.822 m/sec Add 10 % for overtoping Therefore, Q = 105.855 cumec
236
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
7.000 99.018 97.590 97.590 1.428 1.407 7.000 9.847 0.043 7.000
15.000 99.018 97.539 97.539 1.479 1.454 8.000 11.630 0.051 8.000
21.000 99.018 97.581 97.581 1.437 1.458 6.000 8.750 0.042 6.000
30.000 99.018 96.768 96.768 2.250 1.844 9.000 16.594 0.813 9.037
36.000 99.018 97.147 97.147 1.871 2.061 6.000 12.365 0.379 6.012
43.000 99.018 97.658 97.658 1.360 1.616 7.000 11.310 0.511 7.019
50.000 99.018 97.542 97.542 1.476 1.418 7.000 9.928 0.116 7.001
55.000 99.018 97.552 97.552 1.466 1.471 5.000 7.356 0.010 5.000
R = A/P
Hence, R = 1.594 m. Therefore,Q (at 50 m D/S Under H.F.L.Condition) :
2/3 1/2
V = 1/n x R x S Q=AxV
Hence, V = 0.677 m/sec Add 10 % for overtoping Therefore, Q = 65.413 cumec
SUMMARY OF DISCHARGE BY DIFFERENT METHODS
1. By Area Velocity Method :
a. At Bridge Site 103.765 cumec
b. At 135 m Up-Stream 105.855 cumec
c. At 50 m Down-Stream 65.413 cumec
Hence, Qmax = 105.855 cumec
DESIGN DISCHARGE
Max. Discharge out of the above three methods found to be :
Qmax = 105.855 cumec
Hence, the Design Discharge through the Bridge :
QDesign = 106 cumec
CALCULATION OF WATERWAY REQUIRED
Effective linear waterway or the Regime width as per IRC-5: 1970 Clause No. 104.3 and Article 8.3 of SP-13
Waterway required or Regime width or Effective linear waterway :
Regime Width, W = C x Q0.5
Where, W = Regime Width in m
Q = Design Discharge in cumec = 106.000
C = A Constant = 4.800
Therefore, W= 49.419 m.
CALCULATION OF SCOUR DEPTH
Restricting Regime width by 19% waterway required = 40.03
Span arragement proosed=3 x 14 Overall Span = 43.870 m.
Restriction in waterway due to pier shaft and foundation cap
Element Height Width Weighted width
Pier shaft 3.064 1 3.064
Foundation Cap 0 5.1 0
Obstruction due to each pier = 1.000 m.
Obstruction due of both abutment = 1.000 m.
Providing Waterway =3 x (14 + 0.60) + 0.04 - (3 - 1) x 1 - 1 = 40.840 m.
237
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
238
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Hydraulic Calculation for Proposed HL RCC Bridge in Replacement of Existing Narrow & Damaged Bridge in Km. 143 of NH-80 in the State of Bihar
102.000
101.000
Reduced Level (in m)
100.000
99.000
98.000
97.000
97.373
97.349
97.054
96.675
96.722
96.764
96.697
96.000
96.374
96.492
96.366
95.000
94.000
93.000
92.000
91.000
90.000
0
11
20
25
30
34
37
49
55
Chainage (in m)
239
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Hydraulic Calculation for Proposed HL RCC Bridge in Replacement of Existing Narrow & Damaged Bridge in Km. 143 of NH-80 in the State of Bihar
102.000
101.000
100.000
Reduced Level (in m)
99.000
98.000
97.000
96.000
95.000
94.000
93.000
92.000
91.000
90.000
0
12
20
27
33
40
49
55
Chainage (in m)
240
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Hydraulic Calculation for Proposed HL RCC Bridge in Replacement of Existing Narrow & Damaged Bridge in Km. 143 of NH-80 in the State of Bihar
102.000
101.000
100.000
Reduced Level (in m)
99.000
98.000
97.000
96.000
95.000
94.000
93.000
92.000
91.000
90.000
0
15
21
30
36
43
50
55
Chainage (in m)
241
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Hydraulic Calculation for Proposed HL RCC Bridge in Replacement of Existing Narrow & Damaged Bridge in Km. 143 of NH-80 in the State of Bihar
102.000
101.000
100.000
Reduced Level (in m)
99.000
98.000
97.000
96.000
95.000
94.000
93.000
92.000
91.000
90.000
Bridge Site
U/S Site
D/S Site
Chainage (in m)
242
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
1.1 Introduction
The objective of sub surface exploration is to determine the characteristics of the existing
Geo-materials in the zone of influences of the proposed bridge site in such a way as to
establish the design parameters which influence the choice and design details of foundation
types. Sub surface exploration for the proposed Bridge in Km. 143 of NH-80 is essential for
design of foundations for proposed spans of the bridge. The bore hole were sunk upto the
depth as mentioned in the following table.
1.2 Methodology
1.2.1.1 Boring
Boring was done by Auger operated manually upto the depth of water table and thereafter by
rotary method collecting mud slurry as per IS. 1892-1972. In this method boring is advanced
by a cutter fixed to drill rods, which are operated by means of pipe wrench. Bentonite slurry
is continuously pushed by a double piston pump through the GI pipe upto the cutting level to
prevent the collapse of the Bore holes. The slurry flowing to the bottom of the cutter mixes
with cut soil and flows to the surface and the soil is settled in the settling pit and the same
mud slurry is reused. The drilling rod attached with diamond bit is lowered slowly with the
help of manually operated winch fixed with the tripod. Seamless flush jointed steel casings of
150mm. internal diameter were used to prevent any caving of the bore hole and were inserted
simultaneously with the advancement of boring
During sinking of bore holes, Standard Penetration Tests were conducted as per IS. 2131-
1981 at regular intervals of 1.5m. The split spoon sampler was of standard design as per IS.
9640-1980, the outer and inner diameter being 50.8mm. and 38mm. respectively. The SPT
were conducted by driving a hammer of weight 63.5 kg. falling freely on jarring block
connected to the drill rod from a height of 750 mm. Nos. of blows required for the penetration
of 0 to 150mm., 150mm to 300mm. and 300mm. to 450mm. were noted. The No. of blows
required for the penetration from 150mm.to 450mm. was taken as N value. Since soft and
hard rock was found, diamond bits were connected with drill rods.
Representative disturbed samples were collected through split spoon sampler and sealed in
polithene bags with proper identification marks. Undisturbed samples could not be collected
due to cohesion less soil. Rock drilling information and observations were recorded as per IS
4464-1985 & 5313-1980 in field log bore data sheet. Rock coring samples were obtained in a
core barrel sampler of 1.50m. length and 100 to 150mm dia with a diamond bit at its cutting
end by rotary drilling. Samples so obtained were sent to laboratory for determination of
Engineering Properties, general identification and classification. Water table was observed
after 24 hours of completion of bore holes. Rate of penetration, water loss and color of water
were also observed during drilling.
The no. & location of Bore holes with the termination depth are shown in the following table.
243
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Field Bore log data sheet showing different strata and Standard Penetration Test N value are
enclosed.
The following laboratory tests were carried out on disturbed and undisturbed soil
samples for identification and classification properties and for determination of shear
strength parameters and to obtain other properties of sub surface formation as per
relevant IS Codes as indicated below and tabulated.
Location-B.H.No. 1
Depth Soil Nature of Soil
(In m.) Classification
0.00 – 7.00 CI Stiff brownish grey sandy silty clay
7.00 – 19.00 CI Very stiff brownish grey sandy silty clay
19.00 – 30.00 CI Hard brownish grey sandy silty clay
Location-B.H.No. 2
Depth Soil Nature of Soil
(In m.) Classification
0.00 – 6.80 CI Hard brownish grey sandy silty clay
6.80 – 20.00 CI Very stiff yellowish brown sandy silty clay
Hard brownish yellow sandy silty clay with
20.00 – 30.00 CI
kankar
On close scrutiny of field and laboratory test results it reveals that soil is mainly sandy silty
clay upto entire depth.
1.4 Recommendation
The Detailed Sub-Soil Investigation Data and Result is presented on next pages
244
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
3.00 3 4 6 10 SPT
7.00m.
4.00 - - - - UDS
6.00 4 7 8 15 SPT
10.00 - - - - UDS
12.00 7 10 12 22 SPT
19.00m.
15.00 9 12 15 27 SPT
16.00 - - - - UDS
18.00 10 13 16 29 SPT
22.00 - - - - UDS
27.00 15 20 26 46 SPT
30.00 18 24 28 52 SPT
245
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
1.50 2 3 5 8 SPT
3.00 3 3 6 9 SPT
6.80m.
4.00 - - - - UDS
6.00 6 7 10 17 SPT
7.00 - - - - UDS
10.00 - - - - UDS
12.00 7 10 11 21 SPT
20.00m.
15.00 8 13 15 28 SPT
16.00 - - - - UDS
18.00 9 13 17 30 SPT
21.00 11 15 20 35 SPT
Hard brownish yellow sandy silty
clay with kankar
22.00 - - - - UDS
24.00 12 17 22 39 SPT
30.00m.
27.00 13 18 23 41 SPT
30.00 16 20 25 45 SPT
Specific Gravity
Characteristics
IS:1498-1970
Bulk Density
Depth (in m)
Dry Density
Silt Factor
Void ratio
C
(gm/c3)
(gm/c3)
Medium Sand
Coarse Sand
N NII
Fine Sand
F
Gravel
Kg./cm2
Clay
Silt
LL PL PI (degree) Cc
1.50 SPT 9 9 CI - 1.00 2.35 5.30 32.84 58.51 3.22 40.0 20.0 20.0 25.5 1.97 1.57 2.72 0.73 0.375 5.00 0.279
3.00 SPT 10 10 CI - 1.55 3.32 7.77 23.85 63.51 3.23 42.0 20.0 22.0 24.9 1.95 1.56 2.72 0.74 0.380 4.50 0.293
4.00 UDS - - CI - 2.13 3.45 6.27 22.70 65.45 3.24 43.0 20.0 23.0 25.4 1.96 1.57 2.71 0.73 0.385 4.00 0.300
6.00 SPT 15 15 CI 1.40 2.15 3.07 6.38 23.65 63.35 3.25 42.5 21.0 21.5 25.2 1.98 1.58 2.71 0.71 0.390 5.00 0.296
9.00 SPT 18 17 CI 2.00 2.37 2.67 7.56 26.23 59.17 3.26 42.0 21.0 21.0 24.7 2.01 1.61 2.71 0.68 0.395 5.00 0.293
10.00 UDS - - CI 2.28 2.42 3.08 6.92 25.60 59.70 - 41.5 21.0 20.5 24.3 2.02 1.62 2.71 0.67 0.400 5.50 0.289
12.00 SPT 22 19 CI 1.65 2.15 3.36 7.85 26.58 58.41 - 43.0 20.0 23.0 24.5 2.02 1.62 2.71 0.67 0.450 6.50 0.300
15.00 SPT 27 21 CI 3.70 2.40 4.55 10.32 24.80 54.23 - 42.0 21.0 21.0 24.2 2.03 1.64 2.70 0.65 0.480 7.00 0.293
16.00 UDS - - CI 2.20 2.35 4.60 9.12 25.70 56.03 - 42.5 20.0 22.5 24.4 2.05 1.65 2.70 0.64 0.475 7.50 0.296
18.00 SPT 29 22 CI 3.05 2.60 3.75 9.25 26.55 54.80 - 43.0 20.0 23.0 23.8 2.04 1.65 2.70 0.64 0.520 10.00 0.300
21.00 SPT 38 27 CI 1.88 2.12 3.45 11.30 27.20 54.05 - 41.5 21.0 20.5 23.5 2.03 1.65 2.70 0.64 0.500 10.50 0.289
22.00 UDS - - CI 3.28 2.42 4.75 12.28 26.30 50.97 - 40.0 20.0 20.0 23.3 2.04 1.66 2.70 0.63 0.550 12.00 0.279
24.00 SPT 41 28 CI 2.30 2.15 4.60 11.26 24.68 55.01 - 43.0 20.0 23.0 22.9 2.05 1.67 2.70 0.62 0.650 12.00 0.300
27.00 SPT 46 31 CI 3.25 2.70 4.56 12.08 26.23 51.18 - 42.0 20.0 22.0 22.5 2.04 1.67 2.70 0.62 0.640 13.50 0.293
30.00 SPT 52 34 CI 2.80 2.65 4.46 11.55 25.80 52.74 - 41.5 20.0 21.5 22.2 2.05 1.68 2.70 0.61 0.700 13.00 0.289
247
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
Specific Gravity
Characteristics
IS:1498-1970
Bulk Density
Depth (in m)
Dry Density
Silt Factor
Void ratio
C
(gm/c3)
(gm/c3)
Medium Sand
Coarse Sand
N NII
Fine Sand
F
Gravel
Kg./cm2
Clay
Silt
LL PL PI (degree) Cc
1.00 UDS - - CI 2.89 1.03 3.32 4.20 32.55 56.01 2.74 43.5 20.0 23.5 26.7 1.98 1.56 2.72 0.74 0.320 6.00 0.303
1.50 SPT 8 8 CI 2.45 1.29 2.58 3.86 30.70 59.12 2.79 43.0 20.0 23.0 26.9 2.01 1.58 2.72 0.72 0.350 5.50 0.300
3.00 SPT 9 9 CI 3.16 1.14 2.12 4.63 31.85 57.10 2.80 44.0 20.0 24.0 27.2 2.00 1.57 2.72 0.73 0.360 6.00 0.307
4.00 UDS - - CI 2.44 0.68 1.62 5.45 30.65 59.16 2.82 43.5 20.0 23.5 26.5 2.02 1.60 2.72 0.70 0.375 6.50 0.303
6.00 SPT 17 16 CI 1.96 1.05 1.84 4.93 32.75 57.47 2.94 43.0 20.0 23.0 26.2 2.04 1.61 2.71 0.68 0.385 5.50 0.300
7.00 UDS - - CI 2.55 2.07 2.26 4.60 34.80 53.72 2.88 42.5 21.0 21.5 25.5 2.02 1.61 2.71 0.68 0.420 5.00 0.296
9.00 SPT 20 18 CI 2.17 1.48 2.52 5.78 36.50 51.55 2.96 42.0 21.0 21.0 25.3 2.03 1.62 2.71 0.67 0.480 5.00 0.293
10.00 UDS - - CI 1.70 1.67 2.60 4.96 35.45 53.62 - 42.0 21.0 21.0 24.9 2.04 1.64 2.70 0.65 0.500 5.00 0.293
12.00 SPT 21 18 CI 1.95 2.02 2.32 6.05 34.30 53.36 - 41.5 21.0 20.5 24.6 2.04 1.64 2.70 0.65 0.510 5.00 0.289
15.00 SPT 28 22 CI 2.29 1.65 2.54 10.70 38.15 44.67 - 41.0 21.0 20.0 24.1 2.04 1.65 2.70 0.64 0.550 7.50 0.286
16.00 UDS - - CI 2.65 1.53 2.77 11.32 36.20 45.53 - 42.0 20.0 22.0 23.9 2.04 1.65 2.70 0.64 0.560 9.00 0.293
18.00 SPT 30 23 CI 3.25 1.64 2.84 13.29 35.40 43.58 - 42.0 20.0 22.0 23.7 2.06 1.67 2.70 0.62 0.580 11.00 0.293
21.00 SPT 35 25 CI 3.38 2.62 3.55 9.78 48.17 32.50 - 41.0 21.0 20.0 22.7 2.05 1.67 2.70 0.62 0.590 11.50 0.286
22.00 UDS - - CI 4.06 2.18 2.92 10.33 50.03 30.48 - 40.5 21.0 19.5 22.9 2.06 1.68 2.70 0.61 0.600 12.00 0.282
24.00 SPT 39 27 CI 3.63 2.67 3.28 12.65 44.22 33.55 - 40.0 21.0 19.0 22.6 2.06 1.68 2.70 0.61 0.580 12.00 0.279
27.00 SPT 41 28 CI 2.98 2.72 3.42 13.70 39.48 37.70 - 40.0 21.0 19.0 22.8 2.05 1.67 2.70 0.62 0.560 13.00 0.279
30.00 SPT 45 30 CI 4.15 2.46 2.92 12.68 41.49 36.30 - 39.0 21.0 18.0 22.2 2.06 1.69 2.70 0.60 0.540 13.50 0.272
248
Strengthening work of National Highway 80 from Km. 136 to Km. 166 Sabour – Ramjanipur Section including
Replacement of one Minor Damaged Arch Bridge in Km. 143 Bridge in the state of Bihar
249