You are on page 1of 5

ANNEXURE - I-VRV System

[ Part “A” ]- Schedule of Equipment and Price

S.No Description Unit Qty Rate Amount


1 Supply of "LG" make Variable Refrigerant Flow type multi unit air-conditioning system with
R410A Refrigerant ,complete with indoor and outdoor units with individual controller for
cooling type operations.

1.1 Supply of Outdoor Unit:


Supply of Modular type outdoor units equipped with highly efficient inverter scroll
compressor(s), special heat exchanger, low noise condenser fan, auto check function for
connection error, auto address setting, with capacities as mentioned below :

a) 8 HP Nos 5 0 0
b) 4 HP Nos 2 0 0
1.2 Supply of Indoor Unit
Supply of Indoor unit address setting and capacity as mentioned below, multiple speed
motor, coil section with DX coil, outer cabinet, drain pan, drain water lift-up mechanism
insulation, pipe connection, etc. of various capacity as per specification and drawings.

1.2.1 Hiwall Unit


a) 1.5 TR Nos 21 0 0
b) 2.0 TR Nos 5 0 0
2 Supply of Imported Y-Joints for Indoor and Outdoor units Nos 19 0 0
3 Installatation,Testing,Commissioning of the following VRF Indoor Units.
a) Hiwall Unit Nos 24 2,000 48,000
4 Top Up Supply & Charging of Gas for the entire piping network of the VRF and Ductable
system.

a) For VRF System Lot 1 25,000 25,000


Supply and installation of hard/Soft drawn drawn VRV compatible refrigerant piping between 266,250
indoor and outdoor units insulated with 19/13mm thickness insulation for both suction line
5 and liquid line. Rmt 213 1,250

Supply & Installation of “Hard-PVC+braided flexible 25 mm/32mm/40mm Dia drain piping 15,500
6 along with necessary saddles and insulation over the pipes. Rmt 100 155

Supply & Installation of Shielded Copper Conductor Control Communication cable to be laid 34,080
in PVC pipe with adeqate support at regular intervals as per standard laying procedures.
7 Rmt 240 142

8 Installation of imported Y-Joints for Indoor units. Nos 24 575 13,800


9 Installation, Pressure Testing, Vacummisation & Commissioning of VRF Outdoor Units
a) 8 HP Nos 5 8800 44,000
b) 4 HP Nos 2 4400 8,800
10 MS Stand for VRF and Ductable ODU Units with Vibration Isolator set up
a) 8 HP Nos 5 6000 30,000
b) 4 HP Nos 2 5500 11,000
11 Lifting/Shifting/Positioning of all the Indoor and Outdoor Units to the respective floor and 15,500
then positioning of these units at their respective location. Lot 1 15500

Sub Total amount (Without Taxes) 511,930


Grand Total (Including Taxes)-Part B 604,077
TOTAL SYSTEM PRICE SUMMARY
Total approx. price for the project as per above BOQ shall be as under

1 SITC of Air conditioning unit (Without tax) 511,930


2 SITC of Air conditioning unit (With tax) 604,077
ANNEXURE II - PAYMENT TERMS

High Side
1 100% Advance
Low Side Works
1 Advance = 50% of the Contract Value inclusive of taxes
2 Against Progressive Intsallation(Before commissioning of system) = 40% of the Contract Value inclusive of taxes
3 Against completion of work 10% of Contract Value inclusive of taxes
ANNEXURE III -Excluded Works and Services

1 Any kind of Electrical ,civil work like making and dressing of openings for running the ducts, pipes, cables etc. as per our
2 requirement,
Any Carpentry work like false ceiling, drop ceiling, boxing for return air, making slits for return air (including fixing of
3 slit/ full tone
Providing Draintiles fixing) and concealing the ducts (wherever
traps
required), opening for fixing of grilles/ diffusers/ dampers and fixing of G.I./ Wooden frames for grilles/ diffusers.
5 Any Mathadi or Varai Charges or Issue

1
ANNEXURE - I-VRV System

[ Part “A” ]- Schedule of Equipment and Price

S.No Description Unit Qty


1 LG Make Hiwall Unit
a) 1.5 TR Nos 8
b) 2.0 TR Nos 2
Total (excluding tax)
Grand Total (Including Taxes)-Part A
1 Installation Of Indoor Unit
a) Hiwall Unit Nos 10
2 Top Up Supply & Charging of Gas for the entire piping network of the VRF and Ductable Lot 1
system.

Supply and installation of Soft refrigerant piping between indoor and outdoor units insulated
with 9mm thickness insulation for both suction line .
3 Rmt 92

Supply & Installation of “Hard-PVC+braided flexible 25 mm/32mm/40mm Dia drain piping


4 along with necessary saddles and insulation over the pipes. Rmt 50

Supply & Installation of Shielded Copper Conductor Control Communication cable to be laid
in PVC pipe with adeqate support at regular intervals as per standard laying procedures.
5 Rmt 105

6 ODU stand with Vibration Isolator. Nos 10


7 Lifting/Shifting/Positioning of all the Indoor and Outdoor Units to the respective floor and
then positioning of these units at their respective location. Lot 1

Sub Total amount (Without Taxes)


Grand Total (Including Taxes)-Part B
TOTAL SYSTEM PRICE SUMMARY
Total approx. price for the project as per above BOQ shall be as under

ANNEXURE II - PAYMENT TERMS

High Side
1 100% Advance
Low Side Works
1 Advance = 50% of the Contract Value inclusive of taxes
2 Against Progressive Intsallation(Before commissioning of system) = 40% of the Contract Value inclusive of taxes
3 Against completion of work 10% of Contract Value inclusive of taxes
ANNEXURE III -Excluded Works and Services

1 Any kind of Electrical ,civil work like making and dressing of openings for running the ducts, pipes, cables etc. as per
2 requirement,
Any Carpentry work like false ceiling, drop ceiling, boxing for return air, making slits for return air (including fixing of
3 slit/ full tone
Providing Draintiles fixing) and concealing the ducts (wherever
traps
required), opening for fixing of grilles/ diffusers/ dampers and fixing of G.I./ Wooden frames for grilles/ diffusers.
5 Any Mathadi or Varai Charges or Issue
Rate Amount

0 0
0 0
0

2,000 20,000
5,000
5,000

880 80,960

155 7,750

140 14,700

950 9500
10,000
10000

147,910
174,534

Value inclusive of taxes

ucts, pipes, cables etc. as per our


r return air (including fixing of

ames for grilles/ diffusers.