Professional Documents
Culture Documents
1
(4) tools
a. Numerical and graphical description
b. The t-tools (for inferences on differences in means)
c. Z-distribution tools for Binomial proportions
d. Nonparametric methods for inferences on medians (and differences in
medians)
(1) Concepts
a. Purposes for exploring relationships between a response and a predictor
(prediction and (apparent) effect of one variable on the other)
b. Observational and experimental data: correlation is not causation
c. Validity conditions
d. Detecting and understanding influence (or lack thereof) of outliers
(2) Tools
a. Simple linear regression, scatterplots, fitted line plots
b. Residual analysis for tool validation
c. The role of transformations
d. Extensions: quadratic regression
e. Making predictions
Multiple Regression
(1) Concepts
a. Working analogy: building groups of people to work on a project vis-à-vis
building multiple regression models
b. Model selection: historical (forward, backward, stepwise) and
contemporary (best subsets) methods.
c. Interactions between predictors
d. The role of transformations
(2) Tools
a. Fitting, and interpreting models
b. Testing for lack of fit
c. Incorporating categorical predictors
d. Testing for and interpreting interactions
e. Residual analyses for examining model validity
ANOVA for one Factor
(1) Concepts
a. Multiple groups (extension of two-samples)
b. Strengths and limitations
(2) Tools
a. One-way ANOVA; data organization;
2
b. Residual plots for assessing validity;
c. Post-hoc methods (Duncan’s Multiple Range, Tukey’s “all pairs”,
contrasts; Bonferroni (and other) multiple test adjustments
d. Contrasts (independent and non-independent)
(2) Tools
a. Pearson’s statistic; g-statistic
b. Inference for One-way, two-way, multi-way tables
Grading
3
5050 Schedule
Discussion Questions (DQ) are expected to have a first draft by Friday and are due the next Monday.
Homework assignments (HW) will be due on Fridays by class time on the day indicated.
8 10 12
HW 1
15 17 19
DQ 1
22 24 26
DQ 2 HW 2
29 October 1 2
DQ 3
6 8 10
DQ 4 HW 3
13 15 17
DQ 5
20 22 24
DQ 6 HW 4
27 29 31
DQ 7
November 3 5 7
Mid-Term Project
Due
10 12 14
DQ 8 HW 5
17 19 21
DQ 9
24 26 28
DQ 10 Thanksgiving
December 1 3 5
HW 6
8 10 12
Final Project Due