Professional Documents
Culture Documents
酒店开业检查表
Name of Property:
酒店名称:_____________________________________________
Address:
地址:_____________________________________________ _______
______________________________________
General Manager:
总经理 ____________________________________________
_______
第 1 页 共 24 页
Risk mangaemet:
风险管理........................ ….......................... …........................
..... ............ ......5
Brand standards & hallmarks
品牌标准及特点:...................... …..........................
…........................ ..... ...... 6
Legal:
法律:… .......................... …..........................
…........................ ..... .............. ...7
Operations:
运营:… .......................... …..........................
…........................ ..... .............. ...8
第 2 页 共 24 页
Date Hotel to be Opened:
酒店开业日期___________________________________________________
__________
PROPERTY 酒店
Pre Opening Inspection Conducted. Project Approved for Opening
已实施开业前检查。批准此项目开业( 须达到开业前检查报告所提出的条件 ) :
___________________________
Director – Design
总监 - 设计
_____________________________
(Date) 日期 :
_____________________________
Director – Engineering
总监 - 工程
_____________________________
(Date) 日期
第 3 页 共 24 页
Finance & Business Support 财务及业务支持
_____________________________
Deputy General Manager – Finance
& Business Support
副总经理 – 财务及业务支持
_____________________________
(Date) 日期
第 4 页 共 24 页
RISK MANAGEMENT 风险管理
procedures checklist:
开业前风险管理检查表
_____________________________
General Manager
总经理
_____________________________
(Date) 日期
第 5 页 共 24 页
BRAND STANDARDS & HALLMARKS 品牌标准及特点
提供并具备“品牌特色“
Position:
职位
____________________________
(Date) 日期
LEGAL 法律
第 6 页 共 24 页
Global Reservation System Licence Agreement Executed
酒店预订系统许可协议已签署
____________________________
Associate General Counsel
法律顾问
_____________________________
(Date) 日期
OPERATIONS 运营
Authorisation to open
核准开业
________________________
General Manager
总经理
第 7 页 共 24 页
__________________________
(Date) 日期
第 8 页 共 24 页
Appendix I 附件一
Announcement
开业通告
行政办公室隆重宣布酒店集团旗下新开一家酒店。
This communication is for internal notification only and serves to alert you
to activate your CHECKLIST for the support of this hotel.
此信函是内部通告和提请注意启动核实开业所需的文件。
NAME:
名称
ADDRESS:
地址
TEL / FAX:
电话/传真
BRAND TYPE:
品牌
DESCRIPTION:
描述
第 9 页 共 24 页
Appendix II 附件二
第 10 页 共 24 页
游泳池(面积、深度)
Health Club/Spa (size 如果有的话
& description of
facilities/equipment)
健康俱乐部/水疗(面积、
设施/设备详述)
Other facilities
其他设施
Architect
建筑师
Interior Designer
室内设计师
Main Contractor
总承包单位
M&E Engineer
机电设计工程师
Fire Systems
consultant
消防系统顾问
Kitchen/Laundry
consultant
厨房/洗衣房顾问
Reviewed by
检查人
Date
日期
第 11 页 共 24 页
Risk Management Pre-Opening / Operational procedures
Checklist
酒店开业前风险管理检查表
By:
General Manager
总经理
第 12 页 共 24 页
Appendix IV 附件四
酒店管理有限公司
CONTRACTOR’S CERTIFICATE
总承包单位证明书
Location:________________________________________________
酒店名称和所在地
I certify that this building has been built in compliance with the plans and
specifications prepared by the various design consultants’ offices and reviewed by
Shaanxi Regional Electric Hotel Management Co;
and is in compliance with all applicable codes and standards, subject to the
attached list of qualifications (if any).
兹证明该建筑之建造达到各项设计标准,并已由酒店管理公司检查,达到了所有相关
的标准。附清单(若有)所列各项合格证书。
_______________________________________
Printed Name of Certifying Person
证明人的打印名字
_______________________________________
Signature of Certifying Person
证明人签字
_______________________________________
Title of Certifying Person
证明人职务
第 13 页 共 24 页
_______________________________________
Certifying Company/Authority Name/Company Seal
证明公司/正式名称/ 公章
_______________________________________
Date
日期
_______________________________________
List of qualifications attached (state Yes or No)
附:清单(注明是或不是)
Note:
This form must be endorsed by the Contractor.
该文件必须由总承包单位签字
第 14 页 共 24 页
Appendix V 附件五
( )区域酒店
ARCHITECT’S CERTIFICATE
建筑设计师证明
I certify that this building has been designed in compliance with the plans and
specifications prepared and coordinated by this office and reviewed by Shaanxi
Regional Electric Power Hotel Management Co group, and is in compliance with all
applicable codes and standards, subject to the attached list of qualifications (if any).
兹证明该建筑设计之各项细节均达到计划要求,并已由陕西省地方电力酒店管理有限
公司检查,达到了所有相关的标准。附清单(若有)所列各项合格证书。
_______________________________________
Printed Name of Certifying Person
证明人的打印姓名
_______________________________________
Signature of Certifying Person
证明人的签字
_______________________________________
Title of Certifying Person
证明人的职务
第 15 页 共 24 页
_______________________________________
Certifying Company/Authority Name/Company Seal
证明公司/正式名称 / 公章
_______________________________________
Date
日期
______________________________________
List of qualifications attached (state Yes or No)
附:清单(注明是或不是)
Note:
This form must be endorsed by Architect.
该文件须由建筑设计师签字。
第 16 页 共 24 页
Appendix VI 附件六
( )区域酒店
I certify that I have reviewed the requirements of the Fire Safety Systems described
in the Shaanxi Regional Electric Power Hotel Management Co ; Standards
Manual, and the above-mentioned Hotel has an installed system which meets or
exceeds these standards.
兹证实已查阅酒店管理公司标准手册中消防系统的要求,以上提及酒店安装的消防系
统符合甚至超过此标准。
In addition, the entire fire safety system has been tested and is fully operational of
this date.
此外,全部消防系统已被检测并且在此期间全面运转。
Date :
日期
第 17 页 共 24 页
Name of Company :
公司名称
Note:
This form must be endorsed by the authorized fire service contractor/consultant or the
local authority. The signature of the Owner, General Manager or Chief Engineer is not
valid.
文件必须由经认可的消防安装合同单位或当地消防权威部门签字。业主、总经理和总工程师
的签字均为无效。
第 18 页 共 24 页
Appendix VII 附件七
酒店管理有限公司
I certify that I have reviewed the requirements of the Fire Safety Systems described
in the [] Standards Manual, and the above-mentioned Hotel has an installed system
which meets or exceeds these standards.
兹证实已查阅[]酒店标准手册中消防系统的要求,以上提及酒店的安装系统符合甚至
超过此标准。
In addition, the entire fire safety system has been tested and is fully operational of
this date.
此外,全部消防系统已检测并且在此期间全面运转。
____________________________
Printed Name of Certifying Person
证明人的打印姓名
_________________________________
Signature of Certifying Person
证明人的签字
_________________________________
Title of Certifying Person
证明人职务
_________________________________
Certifying Company/Authority Name/Company Seal
证明公司/正式名称 / 公章
_________________________________
Printed name of Hotel General Manager
第 19 页 共 24 页
酒店总经理的打印姓名
_________________________________
Signature of Hotel General Manager
酒店总经理的签字
_________________________________
Date
日期
Note:
This form must be endorsed by the Fire Testing Company.
该文件必须由消防测试单位签字
Note:
注意
The hotel is obliged to update the "Certification of Testing for the Hotel" Form and
undertake a full system test every 6 months.
酒店被要求每六个月保证对系统进行全面检测并更新酒店检测证书。
The first test must be carried out by an authorized contractor/consultant or the local
authority before the 'official' opening date of the property.
酒店在开业前的首次检测必须由经认可的合同单位/顾问或当地权威机构执行。
The second test, (after a further 6 months) may be carried out by the hotel Engineering
or Security personnel. It is however strongly recommended that the services of an
authorized consultant/contract or are engaged under a 'term contract' to undertake
these tests, maintain the system and ensure full compliance.
六个月后的第二次检测可由酒店工程部或安全部执行,但强力推荐聘用有资质的专家提供
检测服务,维护系统并确保正常运行。
From this point every alternate testing, (or each 12 months) the test should be carried
out and the form should be completed by the authorized independent fire services
contractor/consultant or by the local authority and countersigned on the bottom 2 lines
基于此点,隔次检测(或每 12 个月),应由经认可的合同单位,顾问或当地权威机构执
行,总经理在倒数第 2 行签字。
第 20 页 共 24 页
Appendix VIII 附件八
1、
2、
3、
4、
5、
6、
7、
8、
9、
10、
第 21 页 共 24 页
Appendix IX 附件九
By:
第 22 页 共 24 页
Associate General Counsel,
Hotel Management Co;
法律顾问
Date
日期
Note:
This form must be filled by Legal Department.
该文件必须由法律部门签字。
第 23 页 共 24 页
Appendix X 附件十
Insurance Policy
酒店管理有限公司酒店保险条款
1、
2、
3、
4、
5、
6、
7、
8、
9、
10、
第 24 页 共 24 页