You are on page 1of 1

SEMIEMPERICAL ESTIMATE OF PILE CAPACITY CONFORMING AASHTO LRFD-2007

PROJECT: DHAKA MAWA BHANGA HIGHWAY PROJECT


GWT:
γw:
0
9.8
m
kN/m3
CLIENT:
OWNER:
HPCP & DICL
BANGLADESH ARMY
DMB BH- 31
CATEGORY OF PILE: B O R E D P I L E Pile Capacity (kN)

Rel. Density/

Resistance, qp
Consistency

Diameter of

Diameter of

Diameter of
Thickness

Resistance;fs
Noncohesive

(Corrected)
Stress, σz0'
Cohesive/

Unit Skin
Effective

Unit Tip
Graphical

Pile(m)

Pile(m)

Pile(m)
Layer
Layer

Liquefaction

SPT
Depth (m) γt SPT SPT Representation of
Analysis
N-Value

N-VALUE
# Start End (m) Type kN/m3 (kPa) N N60 N160 (kPa) (kPa)
0 10 20 30 40 50 60
1 1.2 1.5
1 0 1.45 1.45 C 17 5.2 19 25 50 0.0 0 1 0.00 0.00 0.00
2 1.45 2.45 1 C 17 14.0 19 25 42 0.0 0 0.00 0.00 0.00
3 2.45 3.45 1 C 17 21.2 5 7 10 0.0 0 0.00 0.00 0.00
4 3.45 4.45 1 C 17 28.4 7 9 13 0.0 0 0.00 0.00 0.00
5 4.45 5.45 1 C 17 35.6 6 8 11 0.0 0 0.00 0.00 0.00
6 5.45 6.45 1 C 17 42.8 4 5 7 0.0 0 0.00 0.00 0.00
7 6.45 7.45 1 C 17 50.0 13 17 21 0.0 0 0.00 0.00 0.00
8 7.45 8.45 1 S 17 57.2 16 21 MEDIUM 25 0.0 0 11 0.00 0.00 0.00
9 8.45 9.45 1 S 17 64.4 10 13 LOOSE 15 0.0 0 0.00 0.00 0.00
10 9.45 10.95 1.5 S 17 73.4 11 15 MEDIUM 16 0.0 0 0.00 0.00 0.00
11 10.95 12.45 1.5 S 17 84.2 13 17 MEDIUM 18 0.0 0 0.00 0.00 0.00
12 12.45 13.95 1.5 S 17 95.0 16 21 MEDIUM 21 0.0 0 0.00 0.00 0.00
13 13.95 15.45 1.5 S 17 105.8 19 25 MEDIUM 25 0.0 0 0.00 0.00 0.00
14 15.45 16.95 1.5 S 17 116.6 22 29 MEDIUM 27 60.6 1686.67 536.83 750.18 1136.42
15 16.95 18.45 1.5 S 17 127.4 23 31 MEDIUM 28 60.6 1763.33 652.11 893.32 1324.39
21
16 18.45 19.95 1.5 S 17 138.2 29 39 MEDIUM 34 59.9 2223.33 866.57 1179.58 1736.41
17 19.95 21.45 1.5 S 17 149.0 21 28 MEDIUM 24 58.4 1610 797.81 1058.53 1512.84
18 21.45 22.95 1.5 S 17 159.8 22 29 MEDIUM 24 56.4 1686.67 906.44 1193.71 1690.84
19 22.95 24.45 1.5 S 17 170.6 25 33 MEDIUM 27 53.7 1916.67 1050.98 1381.61 1952.81
20 24.45 25.95 1.5 S 17 181.4 26 35 MEDIUM 27 50.4 1993.33 1150.19 1505.47 2116.67
21 25.95 27.45 1.5 S 17 192.2 28 37 MEDIUM 29 48.1 2146.67 1265.82 1653.87 2320.23
22 27.45 28.95 1.5 S 17 203.0 29 39 MEDIUM 29 50.8 2223.33 1365.63 1778.45 2484.99
23 28.95 30.45 1.5 S 17 213.8 26 35 MEDIUM 25 53.5 1993.33 31 1389.39 1792.51 2475.48
24 30.45 31.95 1.5 S 17 224.6 24 32 MEDIUM 23 56.2 1840 1437.46 1840.57 2517.48
25 31.95 33.45 1.5 S 17 235.4 27 36 MEDIUM 25 58.9 2070 1590.13 2038.22 2791.65
26 33.45 34.95 1.5 S 17 246.2 30 40 MEDIUM 27 61.6 2300 1747.05 2240.97 3072.17
27 34.95 36.45 1.5 S 17 257.0 32 43 DENSE 29 64.3 2453.33 1888.13 2419.90 3313.90
28 36.45 37.95 1.5 S 17 267.8 19 25 MEDIUM 17 67.0 1456.67 1732.38 2170.38 2884.59
29 37.95 39.45 1.5 S 17 278.6 21 28 MEDIUM 18 69.7 1610 1881.95 2359.50 3139.04
30 39.45 40.45 1 S 17 287.6 23 31 MEDIUM 19 71.9 1763.33 41 1510.58 1923.49 2612.09
31 40.45 42.45 2 S 17 298.4 24 32 MEDIUM 20 74.6 1840 2735.85 3398.63 4465.05
32 42.45 43.95 1.5 S 17 311.0 27 36 MEDIUM 22 77.8 2070 2354.67 2955.67 3938.45
. 33 43.95 45.45 1.5 S 17 321.8 29 39 MEDIUM 23 80.5 2223.33 2521.20 3165.14 4218.35
0
Note:
Notes:
Analysed By: Priodeep Chowdhury
»Sub soil up to depth (10 x diameter of pile) below tip, consistency and composition shall be compatible and
confirmed by test.
»Pile length is evaluated from existing river bed level or ground level.
Checked By: Md. Roknuz Zaman
»Where Factor of Safety against Liquefaction is less than one, skin resistance is ineffective.
»Factor of Safety against Skin Resistance and Tip Resistance has been considered as 3.0.
DEVELOPMENT CONSTRUCTIONS LTD.
»Structural Capacity of 1.0m, 1.2m & 1.5 m diameter piles are 6500 kN, 9500 kN & 14500 kN respectively. HOUSE 11, ROAD 19/A, SECTOR 4, UTTARA, DHAKA 1230