SEMIEMPERICAL ESTIMATE OF PILE CAPACITY CONFORMING AASHTO LRFD-2007

PROJECT: DHAKA MAWA BHANGA HIGHWAY PROJECT


GWT:
γw:
0
9.8
m
kN/m 3
CLIENT:
OWNER:
HPCP & DICL
BANGLADESH ARMY
DMB BH- 21
CATEGORY OF PILE: B O R E D P I L E Pile Capacity (kN)

Rel. Density/

Resistance, qp
Consistency
Thickness

Diameter of

Diameter of

Diameter of
Resistance;fs
Noncohesive

(Corrected)
Stress, σz0'
Cohesive/

Unit Skin
Effective

Unit Tip
Graphical

Pile(m)

Pile(m)

Pile(m)
Layer
Layer

Liquefaction

SPT
Depth (m) γt SPT SPT Representation of
Analysis
N-Value

N-VALUE
# Start End (m) Type kN/m3 (kPa) N N60 N160 (kPa) (kPa) 0 10 20 30 40 50 60 1 1.2 1.5
1
1 0 1.45 1.45 C 17 5.2 0 0 0 0.0 0 0.00 0.00 0.00
2 1.45 2.45 1 C 17 14.0 1 1 2 0.0 0 0.00 0.00 0.00
3 2.45 3.45 1 C 17 21.2 2 3 4 0.0 0 0.00 0.00 0.00
4 3.45 4.45 1 C 17 28.4 4 5 8 0.0 0 0.00 0.00 0.00
5 4.45 5.45 1 C 17 35.6 0 0 0.0 0 0.00 0.00 0.00
6 5.45 6.45 1 C 17 42.8 2 3 3 0.0 0 0.00 0.00 0.00
7 6.45 7.45 1 C 17 50.0 2 3 3 0.0 0 0.00 0.00 0.00
8 7.45 8.45 1 C 17 57.2 3 4 5 0.0 0 11 0.00 0.00 0.00
9 8.45 9.45 1 C 17 64.4 5 7 8 0.0 0 0.00 0.00 0.00
10 9.45 10.95 1.5 C 17 73.4 12 16 17 0.0 0 0.00 0.00 0.00
11 10.95 12.45 1.5 S 17 84.2 12 16 MEDIUM 17 0.0 0 0.00 0.00 0.00
12 12.45 13.95 1.5 S 17 95.0 15 20 MEDIUM 20 0.0 0 0.00 0.00 0.00
13 13.95 15.45 1.5 S 17 105.8 14 19 MEDIUM 18 0.0 0 0.00 0.00 0.00
14 15.45 16.95 1.5 S 17 116.6 12 16 MEDIUM 15 0.0 0 0.00 0.00 0.00
15 16.95 18.45 1.5 S 17 127.4 11 15 MEDIUM 13 0.0 0 0.00 0.00 0.00
16 18.45 19.95 1.5 S 17 138.2 13 17 MEDIUM 15 0.0 0 21 0.00 0.00 0.00
17 19.95 21.45 1.5 S 17 149.0 17 23 MEDIUM 19 0.0 0 0.00 0.00 0.00
18 21.45 22.95 1.5 S 17 159.8 16 21 MEDIUM 18 56.4 1226.67 409.70 568.72 855.41
19 22.95 24.45 1.5 S 17 170.6 18 24 MEDIUM 19 53.7 1380 534.17 727.71 1072.22
20 24.45 25.95 1.5 S 17 181.4 21 28 MEDIUM 22 50.4 1610 673.52 909.38 1326.40
21 25.95 27.45 1.5 S 17 192.2 26 35 MEDIUM 27 48.1 1993.33 849.37 1144.49 1665.44
22 27.45 28.95 1.5 S 17 203.0 35 47 DENSE 35 50.8 2683.33 1109.74 1500.29 2191.49
23 28.95 30.45 1.5 S 17 213.8 26 35 MEDIUM 25 53.5 1993.33 1013.08 1340.94 1911.00
31
24 30.45 31.95 1.5 S 17 224.6 22 29 MEDIUM 21 56.2 1686.67 1021.01 1331.18 1862.69
25 31.95 33.45 1.5 S 17 235.4 31 41 DENSE 29 58.9 2376.67 1294.11 1702.26 2407.82
26 33.45 34.95 1.5 S 17 246.2 34 45 DENSE 31 61.6 2606.67 1451.02 1905.00 2688.34
27 34.95 36.45 1.5 S 17 257.0 27 36 MEDIUM 24 64.3 2070 1411.46 1823.81 2523.63
28 36.45 37.95 1.5 S 17 267.8 29 39 MEDIUM 25 67.0 2223.33 1556.78 2007.83 2771.72
29 37.95 39.45 1.5 S 17 278.6 28 37 MEDIUM 24 69.7 2146.67 1646.13 2110.24 2890.69
. 30 39.45 40.45 1 S 17 287.6 34 45 DENSE 29 71.9 2606.67 1480.48 1940.36 2732.55
0
Note:
Notes:
Analysed By: Priodeep Chowdhury
»Sub soil up to depth (10 x diameter of pile) below tip, consistency and composition shall be compatible and
confirmed by test.
»Pile length is evaluated from existing river bed level or ground level.
Checked By: Md. Roknuz Zaman
»Where Factor of Safety against Liquefaction is less than one, skin resistance is ineffective.
»Factor of Safety against Skin Resistance and Tip Resistance has been considered as 3.0.
DEVELOPMENT CONSTRUCTIONS LTD.
»Structural Capacity of 1.0m, 1.2m & 1.5 m diameter piles are 6500 kN, 9500 kN & 14500 kN respectively. HOUSE 11, ROAD 19/A, SECTOR 4, UTTARA, DHAKA 1230