Professional Documents
Culture Documents
Design Data
Daily Wastewater Amount Q m3/d
1.
Peak Flow Qh m3/h
𝑛=
-
𝐵 = 𝑆 𝑛 − 1 + 𝑏𝑛
mm
2.
Number of Screens -
Make:
Model:
Bar spacing: mm
Quantity: 2 nos.
(1D/1S)
By pass: 1
01.2 Pump Station Abbreviation Unit Phase
Design Data
Design ave . flow Qd m3/d
1.
Design peak . flow Qh m3/h
𝑉𝑜𝑙𝑢𝑚𝑒
Emptying Time = t2 min
𝐷𝑖𝑠𝑐ℎ𝑎𝑟𝑔𝑒 − 𝐼𝑛𝑓𝑙𝑜𝑤
𝑉 16.56
𝑡 = × 60 = × 60
𝑄 −𝑄 /24 909.3 − 6750/24