You are on page 1of 2

Coarse Screen

01.1 Abbreviation Unit Phase


Parameters

Design Data
Daily Wastewater Amount Q m3/d
1.
Peak Flow Qh m3/h

Re-check Dimension of the Existing Coarse Screen


Design Flow m3/h
Width of Spacings b mm
Width of Bars S mm
Depth of Water h m
Flow through velocity at the screen face v m/s
Slope to the vertical 𝛼

𝑛=
-

𝐵 = 𝑆 𝑛 − 1 + 𝑏𝑛
mm

2.
Number of Screens -

Number of Stand-By Screens -


Number of Operating Screens -
Required Width of Each Screen mm
Actual Width of Each Screen m
By pass

Make:
Model:
Bar spacing: mm
Quantity: 2 nos.
(1D/1S)
By pass: 1
01.2 Pump Station Abbreviation Unit Phase

Design Data
Design ave . flow Qd m3/d
1.
Design peak . flow Qh m3/h

Hydraulic Calculation of Pumping station


Water level of pumping station h1 m

Water level of fine screen h2 m


Single pump flow Q1 m3/h
2.
Number of Pumps N ‐
Max.flow of pipeline Q2 m3/h
Diameter of pump outlet pipe D1 m
Flow rate of the pump outlet pipe V1 m/s
Q1 .67Q 909 1..79
3 /425
3600
10 454 .65 / 3600
1.852
 1.852
1 
vh Qhh 10 .67 ( .31 / 3600)
Pumpv 1  1.2852
2 2Cycle 1 4.87 L
Calculation 2  .871.06  62  0.19
C
D11 D2  3 .14 1
0.3 2
100 1.852
 0. 55 4
4
Length of Wet  2 4 2
D  3.14  0.55 2
4 Well 4 L m
Width of Wet Well B m
Heigth of Wet Well H m
Volume of Wet Well V m3
𝑉 = 𝐿 × 𝐵 × 𝐻=4.6 × 4.0 × 0.9
𝑉𝑜𝑙𝑢𝑚𝑒
Filling Time = t1 min
𝐼𝑛𝑓𝑙𝑜𝑤
4
𝑉 16.56
𝑡 = × 24 × 60 = × 24 × 60
𝑄 6750

𝑉𝑜𝑙𝑢𝑚𝑒
Emptying Time = t2 min
𝐷𝑖𝑠𝑐ℎ𝑎𝑟𝑔𝑒 − 𝐼𝑛𝑓𝑙𝑜𝑤
𝑉 16.56
𝑡 = × 60 = × 60
𝑄 −𝑄 /24 909.3 − 6750/24

Pumping Cycle Time=t1+t2 t3 min


Cycies pre Hour

You might also like