fc' 24 MPa B1 0.

85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 20.5
cover 40 mm beam wt. 9.0825 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 116.2723485 kN/m

As 6 16mm 1206.372
As' 2 16mm 402.1239

TRIAL SECTION
b 850 mm
h 400 mm d 321.5 mm
bw 300 mm d' 58 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 10841.5746
C2 110584.0614 a 36.1385822
T 331752.1842 c 42.515979

CHECK
fs 3937.117679 fs>fy TENSION STEEL YIELDS
;\ fs' -218.5157865 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTION
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 80.914754
T - a 68.7775409

CHECK
fs 1783.99044 fs>fy TENSION STEEL YIELDS
fs' 169.9177434 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CORR

Mu=phi(Mn)
Mn 138854864.9 kN.m
Mu 124.9693784 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Concrete Topping
Tiles on Mortar Bed

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 32.03095
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

1.211 m
6.6 m

13.77513 kN/m
3.633 kN/m
0.3633 kN/m
0.3633 kN/m
3.3908 kN/m SRP-1600 1 UNIT
- kN/m D 1.90 M
0 kN/m L 2.44
1.3321 kN/m H 2.2
9.0825 kN/m CAPACITY 5.951 CU.M./DAY
4.692625 kN/m

9.688 kN/m
8.3559 kN/m
1.3321 kN/m
9.688 kN/m

kN/m

116.2723 kN.m.
58.13617 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 20.5
cover 40 mm beam wt. 35.2621 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 293.7162430729 kN/m

As 10 20 mm 3141.593
As' 5 20 mm 1570.796

TRIAL SECTION
b 1287.5 mm
h 550 mm d 469.5 mm
bw 400 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 21174.9505
C2 431968.9899 a 52.9373762
T 863937.9797 c 62.2792661

CHECK
fs 3923.174686 fs>fy TENSION STEEL YIELDS
;\ fs' 21.95850661 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTION
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 83.2944932
T - a 70.8003192

CHECK
fs 2781.976276 fs>fy TENSION STEEL YIELDS
fs' 167.798559 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CORR

Mu=phi(Mn)
Mn 358727692.4 kN.m
Mu 322.8549232 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Tiles on Mortar Bed
Concrete Topping

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 132.89075
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

5.263 m
5.15 m

54.60363 kN/m
15.789 kN/m
1.5789 kN/m
1.5789 kN/m
0 kN/m 1 UNIT
10.526 kN/m 1.90 M
5.7893 kN/m 2.44
0 kN/m 2.2
35.2621 kN/m 5.951 CU.M./DAY
19.34153 kN/m

42.104 kN/m
36.3147 kN/m
5.7893 kN/m
42.104 kN/m

kN/m

293.7162 kN.m.
146.8581 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 20.5
cover 40 mm beam wt. 38.1425 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 272.3112330705 kN/m

As 10 20 mm 3141.593
As' 4 20 mm 1256.637

TRIAL SECTION
b 750 mm
h 500 mm d 419.5 mm
bw 400 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 25409.9406
C2 345575.1919 a 63.5248515
T 863937.9797 c 74.7351194

CHECK
fs 2767.894534 fs>fy TENSION STEEL YIELDS
;\ fs' 118.2987555 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTION
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 87.7246668
T - a 74.5659668

CHECK
fs 2269.204401 fs>fy TENSION STEEL YIELDS
fs' 189.6251155 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CORR

Mu=phi(Mn)
Mn 318228348.2 kN.m
Mu 286.4055134 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Tiles on Mortar Bed
Concrete Topping

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 118.24175
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

4.015 m
5.257 m

55.70813 kN/m
12.045 kN/m
1.2045 kN/m
1.2045 kN/m
11.242 kN/m 1 UNIT
8.03 kN/m 1.90 M
4.4165 kN/m 2.44
0 kN/m 2.2
38.1425 kN/m 5.951 CU.M./DAY
17.56563 kN/m

32.12 kN/m
27.7035 kN/m
4.4165 kN/m
32.12 kN/m

kN/m

272.3112 kN.m.
136.1556 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa
cover 40 mm beam wt. 35.47935 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 70.4457332629 kN/m

rho MAX. 0.0270233766


w MAX. 0.3096428571
bd^2 12887025.40068
say
b 178.9191070954 250 mm dim. Ratio
d 268.3786606431 270 mm 1.08

rho 0.0177383003
rho MAX. > rho SINGLY REINFORCED

As 1197.335267826 say
n 5.9550570754 6 BARS
bars 5 4 3 0 #DIV/0!
spacing S 10.8 17.5 28.66667 #DIV/0! #DIV/0! #DIV/0!
;\
; beam wt. 1.62 kN/m ass.b.wt. > act.b.wt. RECOMPUTE FOR (d) & eff. dep
OK d
Eff. Dept
CHECK FOR ADEQUACY

As 4-16mmø 6 1206.372 mm2


As' 2-16mmø 2 402.1239 mm2 NEGLECT
fc' 24 MPa
fy 275 MPa
b 250 mm
d 271.5 mm

assume tension steel yields CHECK


tension steel yields fs 1528.61145636
C=T
a 65.049448 mm C 331,752.18
c 76.528762 mm T 331,752.18

TENSION CONTROLLED
Phi 0.9

Mu 71,352,512.83 N.m
71.35 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width= 5.482 m
Length= 3.849 m

DEAD LOAD 160.5166 kN


Slab (100mm thk) 50.64052 kN
ME/EE Fixtures 6.330065 kN
Ceiling 6.330065 kN
Ext Wall (150mm thk) 59.08061 kN
Truss 0.85438 kN
Purlins 1.801577 kN
Roofing 0.738508 kN
125.0372 kN
Beam Weight 35.47935 kN

LIVE LOAD 16.88017 kN


Commercial 0 kN
Movable Partition 0 kN
0 kN

#DIV/0! #DIV/0! FACTORED LOAD


#DIV/0! Wu 219.628163 kN

MPUTE FOR (d) & eff. dept MANNUALLY


271.5 ȳ 20.5 FACTORED MOMENT
new dept> 350 348.5 Support 70.44573 kN.m.
Midspan 35.22287 kN.m.

fs>fy TENSION STEEL YIELDS

N
N
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 11.25
cover 40 mm beam wt. 33.8485 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 264.5119239583 kN/m

As 8 20 mm 2513.274
As' 2 20 mm 628.3185

TRIAL SECTION
b 1062.5 mm
h 400 mm d 328.75 mm
bw 300 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 25409.9406
C2 172787.5959 a 84.6998019
T 691150.3838 c 99.6468258

CHECK
fs 1379.491052 fs>fy TENSION STEEL YIELDS
;\ fs' 238.7240666 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTION
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 102.722031
T - a 87.3137262

CHECK
fs 1320.230728 fs>fy TENSION STEEL YIELDS
fs' 249.539639 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CORR

Mu=phi(Mn)
Mn 194479784.3 kN.m
Mu 175.0318059 kN.m

FAILED!!! :(
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Tiles on Mortar Bed
Concrete Topping

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 104.93035
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

3.563 m
5.5 m

49.43663 kN/m
10.689 kN/m
1.0689 kN/m
1.0689 kN/m
9.9764 kN/m 1 UNIT
7.126 kN/m 1.90 M
3.9193 kN/m 2.44
0 kN/m 2.2
33.8485 kN/m 5.951 CU.M./DAY
15.58813 kN/m

28.504 kN/m
24.5847 kN/m
3.9193 kN/m
28.504 kN/m

kN/m

264.5119 kN.m.
132.256 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 16.875
cover 40 mm beam wt. 30.5922 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 173.5377265625 kN/m

As 8 20 mm 2513.274
As' 3 20 mm 942.4778

TRIAL SECTION
b 1062.5 mm
h 450 mm d 373.125 mm
bw 300 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 21174.9505
C2 259181.3939 a 70.5831683
T 691150.3838 c 83.0390215

CHECK
fs 2096.021653 fs>fy TENSION STEEL YIELDS
;\ fs' 166.46888 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTION
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 93.7376066
T - a 79.6769656

CHECK
fs 1788.315726 fs>fy TENSION STEEL YIELDS
fs' 215.9492299 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CORR

Mu=phi(Mn)
Mn 226247684 kN.m
Mu 203.6229156 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Tiles on Mortar Bed
Concrete Topping

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 115.2915
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

4.566 m
4.25 m

47.37225 kN/m
13.698 kN/m
1.3698 kN/m
1.3698 kN/m
0 kN/m 1 UNIT
9.132 kN/m 1.90 M
5.0226 kN/m 2.44
0 kN/m 2.2
30.5922 kN/m 5.951 CU.M./DAY
16.78005 kN/m

36.528 kN/m
31.5054 kN/m
5.0226 kN/m
36.528 kN/m

kN/m

173.5377 kN.m.
86.76886 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa
cover 40 mm beam wt. 5.453438 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 92.6393206383 kN/m

rho MAX. 0.0270233766


w MAX. 0.3096428571
bd^2 16947020.39245
say
b 196.0214562734 250 mm dim. Ratio
d 294.0321844102 300 mm 1.2

rho 0.0190925384
rho MAX. > rho SINGLY REINFORCED

As 1431.940376753 say
n 7.1218871617 8 BARS
bars 7 6 5 4 3
spacing S 3.1428571429 6.3333333 10.8 17.5 28.6666667 #DIV/0!
;\
; beam wt. 1.8 kN/m ass.b.wt. > act.b.wt. RECOMPUTE FOR (d) & eff. dep
OK d
Eff. Dept
CHECK FOR ADEQUACY

As 4-16mmø 8 1608.495 mm2


As' 2-16mmø 2 402.1239 mm2 NEGLECT
fc' 24 MPa
fy 275 MPa
b 250 mm
d 321.5 mm

assume tension steel yields CHECK


tension steel yields fs 1290.4656995
C=T
a 86.732597 mm C 442,336.25
c 102.03835 mm T 442,336.25

TENSION CONTROLLED
Phi 0.9

Mu 110,725,755.54 N.m
110.73 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width= 1.2465 m
Length= 5.503 m

DEAD LOAD 17.295188 kN/m


Slab (125mm thk) 3.7395 kN/m
ME/EE Fixtures 0.37395 kN/m
Ceiling 0.37395 kN/m
Ext Wall (150mm thk) 3.4902 kN/m
Int Wall (100mm thk) 2.493 kN/m
Tiles on Mortar Bed 1.37115 kN/m
Concrete Topping 0 kN/m
11.84175 kN/m
Beam Weight 5.4534375 kN/m

LIVE LOAD 9.972 kN/m


Commercial 8.60085 kN/m
Movable Partition 1.37115 kN/m
9.972 kN/m

0 #DIV/0! FACTORED LOAD


#DIV/0! Wu 36.709425 kN/m

MPUTE FOR (d) & eff. dept MANNUALLY


321.5 ȳ 20.5 FACTORED MOMENT
new dept> 400 378.5 Support 92.639321 kN.m.
Midspan 46.31966 kN.m.

fs>fy TENSION STEEL YIELDS

N
N
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa
cover 40 mm beam wt. 21.03938 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 711.0597682444 kN/m

rho MAX. 0.0270233766


w MAX. 0.3096428571
bd^2 130078073.863842
say
b 386.6700427739 500 mm dim. Ratio
d 580.0050641609 500 mm 1

rho 0.028432617
rho MAX. < rho DOUBLY REINFORCED

As 7108.1542495853 say
n 22.6259577016 8 BARS
bars 7 0 #DIV/0! #DIV/0!
spacing S 34.2857142857 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
;\
; beam wt. 6 kN/m ass.b.wt. > act.b.wt.
OK

CHECK FOR ADEQUACY

As 4-16mmø 8 2513.274 mm2


As' 2-16mmø 2 628.3185 mm2 NEGLECT
fc' 24 MPa
fy 275 MPa
b 500 mm
d 500 mm

assume tension steel yields CHECK


tension steel yields fs
C=T
a 67.759842 mm C
c 79.717461 mm T

TENSION CONTROLLED
Phi

Mu 289,943,164.48 N.m
289.94 kN.m

FAILED!!! :(
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Tiles on Mortar Bed
Concrete Topping

Beam Weight

LIVE LOAD
Commercial
Movable Partition

#DIV/0! #DIV/0! #DIV/0! FACTORED LOAD


#DIV/0! #DIV/0! Wu 141.62505

NO NEED TO RECOMPUTE FOR (d) & eff. dept


d 319.5 ȳ 20.5 FACTORED MOMENT
Eff. Dept 560 400 580.5 Support
Midspan

3163.29097256 fs>fy TENSION STEEL YIELDS

691,150.38 N
691,150.38 N

ENSION CONTROLLED
0.9
ION OF LOADS

4.809 m
7.762 m

66.724875 kN/m
14.427 kN/m
1.4427 kN/m
1.4427 kN/m
13.4652 kN/m
9.618 kN/m
5.2899 kN/m
0 kN/m
45.6855 kN/m
21.039375 kN/m

38.472 kN/m
33.1821 kN/m
5.2899 kN/m
38.472 kN/m

kN/m

711.05977 kN.m.
355.52988 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.66666667
cover 40 mm beam wt. 34.103 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 77.0973168752 kN/m

As 6 16 mm 1206.371579
As' 2 16 mm 402.12385966

TRIAL SECTION
b 675 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 24.09238811 mm ok
c 28.34398601 mm
CHECK
fs 5291.902429 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 88341340.085 kN.m
Mu 79.5072060761 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Tiles on Mortar Bed
Concrete Topping

Beam Weight

LIVE LOAD
Commercial
Movable Partition

FACTORED LOAD
Wu 128.5225

FACTORED MOMENT
Support
Midspan
ION OF LOADS

5.09 m
2.683 m

52.80875 kN/m
15.27 kN/m
1.527 kN/m
1.527 kN/m
0 kN/m 1 UNIT
10.18 kN/m 1.90 M
5.599 kN/m 2.44
0 kN/m 2.2
34.103 kN/m 5.951 CU.M./DAY
18.70575 kN/m

40.72 kN/m
35.121 kN/m
5.599 kN/m
40.72 kN/m

kN/m

77.09732 kN.m.
38.54866 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.66666667
cover 40 mm beam wt. 118.769225777 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 62.0256505813 kN/m

As 6 16 mm 1206.37157898
As' 2 16 mm 402.123859659

TRIAL SECTION
b 675 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 24.09238811 mm ok
c 28.34398601 mm
CHECK
fs 5291.902429 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 88341340.0846 kN.m
Mu 79.5072060761 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Concrete Topping
Int Wall (100mm thk)
Tiles on Mortar Bed
Tank

Beam Weight

LIVE LOAD
Commercial
Movable Partition

FACTORED LOAD
Wu 277.416253

FACTORED MOMENT
Support
Midspan
ION OF LOADS

2.434 m
2.683 m

161.5224 kN
19.59127 kN
1.959127 kN
1.959127 kN
0.230725 kN 1 UNIT
13.06084 kN 1.90 M
7.183464 kN 2.44
74.78467 kN 2.2
118.7692 kN 5.951 CU.M./DAY
42.75315 kN

52.24338 kN
45.05991 kN
7.183464 kN
52.24338 kN

kN

62.02565 kN.m.
31.01283 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.66666667
cover 40 mm beam wt. 98.6808661123 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 51.5860926398 kN/m

As 5 16 mm 1005.30964915
As' 2 16 mm 402.123859659

TRIAL SECTION
b 625 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 21.6831493 mm ok
c 25.50958741 mm
CHECK
fs 5946.558254 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 73950812.6696 kN.m
Mu 66.5557314026 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Concrete Topping
Int Wall (100mm thk)
Concrete Topping
Tank

Beam Weight

LIVE LOAD
Commercial
Movable Partition

FACTORED LOAD
Wu 248.010061

FACTORED MOMENT
Support
Midspan
ION OF LOADS

2.6355 m
2.496 m

136.5075 kN
19.73462 kN
1.973462 kN
1.973462 kN
0.214644 kN 1 UNIT
0 kN 1.90 M
- kN 2.44
74.78467 kN 2.2
98.68087 kN 5.951 CU.M./DAY
37.82663 kN

52.62566 kN
45.38964 kN
7.236029 kN
52.62566 kN

kN

51.58609 kN.m.
25.79305 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.66666667
cover 40 mm beam wt. 99.73588963 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 44.6504927166 kN/m

As 5 16 mm 1005.309649
As' 2 16 mm 402.1238597

TRIAL SECTION
b 475 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 28.53046 mm ok
c 33.565247 mm
CHECK
fs 4375.3843 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 73004308.44 kN.m
Mu 65.7038776 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Concrete Topping
Tiles on Mortar Bed
Tank

Beam Weight

LIVE LOAD
Commercial
Movable Partition

FACTORED LOAD
Wu 199.70403

FACTORED MOMENT
Support
Midspan

a is within the flange; CASE1


ION OF LOADS

1.2285 m
2.683 m

131.26199 kN
9.8881965 kN
0.9888197 kN
0.9888197 kN
9.2289834 kN
0.2307246 kN
3.6256721 kN
74.784674 kN
99.73589 kN
31.526103 kN

26.368524 kN
22.742852 kN
3.6256721 kN
26.368524 kN

kN

44.650493 kN.m.
22.325246 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.66666667
cover 40 mm beam wt. 23.96765 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 54.9630451441 kN/m

As 5 16 mm 1005.3096491
As' 2 16 mm 402.12385966

TRIAL SECTION
b 610 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 22.216341 mm ok
c 26.136872 mm
CHECK
fs 5789.4409 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 73877109.471 kN.m
Mu 66.489398524 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Tiles on Mortar Bed
Concrete Topping

Beam Weight

LIVE LOAD
Commercial
Movable Partition

FACTORED LOAD
Wu 113.463875

FACTORED MOMENT
Support
Midspan

a is within the flange; CASE1


ION OF LOADS

5.0995 m
2.411 m

40.158563 kN/m
15.2985 kN/m
1.52985 kN/m
1.52985 kN/m
0 kN/m
0 kN/m
5.60945 kN/m
0 kN/m
23.96765 kN/m
16.190913 kN/m

40.796 kN/m
35.18655 kN/m
5.60945 kN/m
40.796 kN/m

kN/m

54.963045 kN.m.
27.481523 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.66667
cover 40 mm beam wt. 99.73589 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 40.8894001509 kN/m

As 5 16 mm 1005.31
As' 2 16 mm 402.1239

TRIAL SECTION
b 460 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 29.460801 mm ok
c 34.659765 mm
CHECK
fs 4218.2669 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 72875707 kN.m
Mu 65.58814 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width= 1.3415 m
Length= 2.457 m

DEAD LOAD 131.26199 kN/m


Slab (125mm thk) 9.8881965 kN/m
ME/EE Fixtures 0.9888197 kN/m
Ceiling 0.9888197 kN/m
Ext Wall (150mm thk) 9.2289834 kN/m
Concrete Topping 0.2307246 kN/m
Tiles on Mortar Bed 3.6256721 kN/m
Tank 74.784674 kN
99.73589 kN/m
Beam Weight 31.526103 kN/m

LIVE LOAD 26.368524 kN/m


Commercial 22.742852 kN/m
Movable Partition 3.6256721 kN/m
26.368524 kN/m

FACTORED LOAD
Wu 199.70403 kN/m

FACTORED MOMENT
Support 40.8894 kN.m.
Midspan 20.4447 kN.m.

a is within the flange; CASE1


fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 22.5
cover 40 mm beam wt. 37.9555 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 184.7612450601 kN/m

As 8 20 mm 2513.274
As' 3 20 mm 942.4778

TRIAL SECTION
b 985 mm
h 450 mm d 367.5 mm
bw 300 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 21174.9505
C2 259181.393921 a 70.5831683
T 691150.38379 c 83.0390215

CHECK
fs 2055.37811024 fs>fy TENSION STEEL YIELDS
;\ fs' 166.468879961 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTIO
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 93.7376066
T - a 79.6769656

CHECK
fs 1752.31096673 fs>fy TENSION STEEL YIELDS
fs' 215.949229922 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CO

Mu=phi(Mn)
Mn 222359963.118 N.mm
Mu 200.123966806 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Concrete Topping
Tiles on Mortar Bed

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 143.04125
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

5.665 m
3.937 m

58.774375 kN/m
16.995 kN/m
1.6995 kN/m
1.6995 kN/m
0 kN/m
11.33 kN/m
0 kN/m
6.2315 kN/m
37.9555 kN/m
20.818875 kN/m

45.32 kN/m
39.0885 kN/m
6.2315 kN/m
45.32 kN/m

kN/m

184.76125 kN.m.
92.380623 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa
cover 40 mm beam wt. 12.03125 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 342.6150878906 kN/m

rho MAX. 0.0270233766


w MAX. 0.3096428571
bd^2 62676462.23262
say
b 303.1381893407 500 mm dim. Ratio
d 454.7072840111 500 mm 1

rho 0.0120537257
rho MAX. > rho SINGLY REINFORCED

As 3013.431423785 say
n 9.5920501353 10 BARS
bars 9 8 0 #DIV/0! #DIV/0!
spacing S 22.2222222222 27.5 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
;\
; beam wt. 6 kN/m ass.b.wt. > act.b.wt. RECOMPUTE FOR (d) & eff. dep
OK d
Eff. Dept
CHECK FOR ADEQUACY

As 4-16mmø 10 3141.593 mm2


As' 2-16mmø 2 628.3185 mm2 NEGLECT
fc' 24 MPa
fy 275 MPa
b 500 mm
d 419.5 mm

assume tension steel yields CHECK


tension steel yields fs 1925.92090078
C=T
a 84.699802 mm C 863,937.98
c 99.646826 mm T 863,937.98

TENSION CONTROLLED
Phi 0.9

Mu 293,250,865.15 N.m
293.25 kN.m

FAILED!!! :(
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width= 2.75 m
Length= 7.125 m

DEAD LOAD 38.15625 kN/m


Slab (125mm thk) 8.25 kN/m
ME/EE Fixtures 0.825 kN/m
Ceiling 0.825 kN/m
Ext Wall (150mm thk) 7.7 kN/m
Int Wall (100mm thk) 5.5 kN/m
Concrete Topping 0 kN/m
Tiles on Mortar Bed 3.025 kN/m
26.125 kN/m
Beam Weight 12.03125 kN/m

LIVE LOAD 22 kN/m


Commercial 18.975 kN/m
Movable Partition 3.025 kN/m
22 kN/m

#DIV/0! #DIV/0! FACTORED LOAD


#DIV/0! Wu 80.9875 kN/m

MPUTE FOR (d) & eff. dept MANNUALLY


419.5 ȳ 20.5 FACTORED MOMENT
new dept> 500 580.5 Support 342.61509 kN.m.
Midspan 171.30754 kN.m.

fs>fy TENSION STEEL YIELDS

N
N
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.6666667
cover 40 mm beam wt. 25.24605 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 61.8997516169 kN/m

As 5 16 mm 1005.30965
As' 2 16 mm 402.12386

TRIAL SECTION
b 625 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 21.683149 mm ok
c 25.509587 mm
CHECK
fs 5946.5583 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 73950812.7 kN.m
Mu 66.5557314 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Concrete Topping
Tiles on Mortar Bed

Beam Weight

LIVE LOAD
Commercial
Movable Partition

FACTORED LOAD
Wu 119.515875

FACTORED MOMENT
Support
Midspan

a is within the flange; CASE1


ION OF LOADS

5.3715 m
2.493 m

42.300563 kN/m
16.1145 kN/m
1.61145 kN/m
1.61145 kN/m
0 kN/m
0 kN/m
0 kN/m
5.90865 kN/m
25.24605 kN/m
17.054513 kN/m

42.972 kN/m
37.06335 kN/m
5.90865 kN/m
42.972 kN/m

kN/m

61.899752 kN.m.
30.949876 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 15
cover 40 mm beam wt. 36.40965 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 274.0621640625 kN/m

As 10 20 mm 3141.593
As' 4 20 mm 1256.637

TRIAL SECTION
b 860 mm
h 500 mm d 425 mm
bw 400 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 25409.9406
C2 345575.1918949 a 63.5248515
T 863937.9797372 c 74.7351194

CHECK
fs 2812.050481791 fs>fy TENSION STEEL YIELDS
;\ fs' 118.2987555118 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTI
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 87.7246668
T - a 74.5659668

CHECK
fs 2306.822098401 fs>fy TENSION STEEL YIELDS
fs' 189.6251155199 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CO

Mu=phi(Mn)
Mn 322885463.4879 kN.m
Mu 290.5969171391 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Concrete Topping
Tiles on Mortar Bed

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 108.718875
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

3.5595 m
5.5 m

52.631063 kN/m
10.6785 kN/m
1.06785 kN/m
1.06785 kN/m
11.48 kN/m
8.2 kN/m
0 kN/m
3.91545 kN/m
36.40965 kN/m
16.221413 kN/m

28.476 kN/m
24.56055 kN/m
3.91545 kN/m
28.476 kN/m

kN/m

274.06216 kN.m.
137.03108 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.66667
cover 40 mm beam wt. 8.84925 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 41.2918910156 kN/m

As 4 16 mm 804.2477
As' 2 16 mm 402.1239

TRIAL SECTION
b 605 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 17.919958 mm ok
c 21.082304 mm
CHECK
fs 7321.3355 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 59576799 kN.m
Mu 53.61912 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width= 0.9315 m
Length= 4.25 m

DEAD LOAD 12.924563 kN/m


Slab (125mm thk) 2.7945 kN/m
ME/EE Fixtures 0.27945 kN/m
Ceiling 0.27945 kN/m
Ext Wall (150mm thk) 2.6082 kN/m
Int Wall (100mm thk) 1.863 kN/m
Concrete Topping 0 kN/m
Tiles on Mortar Bed 1.02465 kN/m
8.84925 kN/m
Beam Weight 4.0753125 kN/m

LIVE LOAD 7.452 kN/m


Commercial 6.42735 kN/m
Movable Partition 1.02465 kN/m
7.452 kN/m

FACTORED LOAD
Wu 27.432675 kN/m

FACTORED MOMENT
Support 41.291891 kN.m.
Midspan 20.645946 kN.m.

a is within the flange; CASE1


fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 13.66667
cover 40 mm beam wt. 20.1875 kN/m
main rebar. 16 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 18.1004218734 kN/m

As 4 16 mm 804.2477
As' 2 16 mm 402.1239

TRIAL SECTION
b 410 mm
h 350 mm d 278.3333 mm
bw 250 mm d' 58 mm
ASSUME ALL STEEL YIELDS
depth of comp block a 26.442865 mm ok
c 31.109253 mm
CHECK
fs 4768.1778 fs>fy TENSION STEEL YIELDS
phi=0.90

Mu=phi(Mn)
Mn 58634301 kN.m
Mu 52.77087 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width= 2.125 m
Length= 1.863 m

DEAD LOAD 29.484375 kN/m


Slab (125mm thk) 6.375 kN/m
ME/EE Fixtures 0.6375 kN/m
Ceiling 0.6375 kN/m
Ext Wall (150mm thk) 5.95 kN/m
Int Wall (100mm thk) 4.25 kN/m
Concrete Topping 0 kN/m
Tiles on Mortar Bed 2.3375 kN/m
20.1875 kN/m
Beam Weight 9.296875 kN/m

LIVE LOAD 17 kN/m


Commercial 14.6625 kN/m
Movable Partition 2.3375 kN/m
17 kN/m

FACTORED LOAD
Wu 62.58125 kN/m

FACTORED MOMENT
Support 18.100422 kN.m.
Midspan 9.0502109 kN.m.

a is within the flange; CASE1


fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 20.5
cover 40 mm beam wt. 32.2002 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 277.6684122 kN/m

As 10 20 mm 3141.593
As' 4 20 mm 1256.637

TRIAL SECTION
b 1310 mm
h 500 mm d 419.5 mm
bw 400 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 25409.9406
C2 345575.1918949 a 63.5248515
T 863937.9797372 c 74.7351194

CHECK
fs 2767.89453438 fs>fy TENSION STEEL YIELDS
;\ fs' 118.2987555118 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTI
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 87.7246668
T - a 74.5659668

CHECK
fs 2269.204400657 fs>fy TENSION STEEL YIELDS
fs' 189.6251155199 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CO

Mu=phi(Mn)
Mn 318228348.1855 kN.m
Mu 286.4055133669 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Concrete Topping
Tiles on Mortar Bed

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 121.3515
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

4.806 m
5.24 m

49.86225 kN/m
14.418 kN/m
1.4418 kN/m
1.4418 kN/m
0 kN/m
9.612 kN/m
0 kN/m
5.2866 kN/m
32.2002 kN/m
17.66205 kN/m

38.448 kN/m
33.1614 kN/m
5.2866 kN/m
38.448 kN/m

kN/m

277.66841 kN.m.
138.83421 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 22.5
cover 40 mm beam wt. 34.56684 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 189.7987656899 kN/m

As 8 20 mm 2513.274
As' 4 20 mm 1256.637

TRIAL SECTION
b 685 mm
h 450 mm d 367.5 mm
bw 300 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 16939.9604
C2 345575.1918949 a 56.4665346
T 691150.3837898 c 66.4312172

CHECK
fs 2719.222637801 fs>fy TENSION STEEL YIELDS
;\ fs' 58.0860999508 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTI
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 87.4109039
T - a 74.2992683

CHECK
fs 1922.568583694 fs>fy TENSION STEEL YIELDS
fs' 188.1520679683 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CO

Mu=phi(Mn)
Mn 222919067.6459 N.mm
Mu 200.6271608813 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Concrete Topping
Tiles on Mortar Bed

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 106.75266
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

3.612 m
4.619 m

50.43255 kN/m
10.836 kN/m
1.0836 kN/m
1.0836 kN/m
10.1136 kN/m
7.224 kN/m
0.25284 kN/m
3.9732 kN/m
34.56684 kN/m
15.86571 kN/m

28.896 kN/m
24.9228 kN/m
3.9732 kN/m
28.896 kN/m

kN/m

189.79877 kN.m.
94.899383 kN.m.
fc' 24 MPa B1 0.85
fy 275 MPa phi 0.9
fyt 275 MPa barred y 22.5
cover 40 mm beam wt. 17.554 kN/m
main rebar. 20 mm ȣc 24 kN/m3
shear reinfo. 10 mm

BEAM 1 Along GRID 3 (1 unit)


max.MOMENT 115.8937745729 kN/m

As 6 20 mm 1884.956
As' 2 20 mm 628.3185

TRIAL SECTION
b 685 mm
h 400 mm d 317.5 mm
bw 300 mm d' 60 mm
ASSUME ALL STEEL YIELDS
C1 20.4 Ac 16939.9604
C2 172787.595947 a 56.4665346
T 518362.787842 c 66.4312172

CHECK
fs 2267.62772109 fs>fy TENSION STEEL YIELDS
;\ fs' 58.0860999508 fs<fy COMP STEEL DOES NOT YIELD;REPEAT ASSUMPTIO
;
ASSUME COMP STEEL DOES NOT YIELD (manual computation)
C1 - Ac -
C2 - c 76.3585038
T - a 64.9047282

CHECK
fs 1894.81054001 fs>fy TENSION STEEL YIELDS
fs' 128.53974047 fs<fy COMP STEEL DOES NOT YIELD;ASSUMPTION IS CO

Mu=phi(Mn)
Mn 134022453.181 N.mm
Mu 120.620207863 kN.m

SAFE!!! :)
COMPUTATION OF LOADS
ALONG GRID 3
Tributary Width=
Length=

DEAD LOAD
Slab (125mm thk)
ME/EE Fixtures
Ceiling
Ext Wall (150mm thk)
Int Wall (100mm thk)
Concrete Topping
Tiles on Mortar Bed

Beam Weight

LIVE LOAD
Commercial
mm2 Movable Partition
mm
mm

FACTORED LOAD
Wu 66.155
DOES NOT YIELD;REPEAT ASSUMPTION!!!!!!!!

FACTORED MOMENT
mm2 Support
mm Midspan
mm a is within the flange; CASE1

DOES NOT YIELD;ASSUMPTION IS CORRECT


ION OF LOADS

2.62 m
4.585 m

27.1825 kN/m
7.86 kN/m
0.786 kN/m
0.786 kN/m
0 kN/m
5.24 kN/m
0 kN/m
2.882 kN/m
17.554 kN/m
9.6285 kN/m

20.96 kN/m
18.078 kN/m
2.882 kN/m
20.96 kN/m

kN/m

115.89377 kN.m.
57.946887 kN.m.