BAC/101/2014

MS Material Submittal
Project Name: Bahrain International Airport Modernization Project
Reference No.: 1-M-C-CI09-ATC-AD-MS-0064 Date: 14-09-2016
Contract Title: Airport Modernization Project Contract Date: 16-04-2016
Contractor: Arabtec-TAV JV Sub-Package: Ahmed Mansoor Al A-Ali (AMA)
TO: ADPI FRO Arabtec-TAV JV
M:
Description of Material (One item only per form): As per Specifications LEED Compliant Alternative
Title: Form-Facing Materials SAMPLE
Description: Forms for Cylindrical Columns, Pedestal, Beam & Supports YES NO
 Attach all relevant technical literature marked to identify relevant descriptions, current test certificate, samples, etc.
 Attach a certificate stating compliance with Contract requirements.
 Highlight any element of contractual non-compliance in this submittal.
References: Planned Dates for Applicable Submittal Date
Drawing Ref. No.:       for:O & M Manual
1.      
Specification No.:       Vol. 3 Book 2 – 033000 2.2 Page 6/37 2. BAC FM Training      
BOQ Ref. No.:       3. Specified/recommended spare parts      
International Standards:       EN 4. Warranties and Guarantees      
Ref:
Manufacturer / Supplier:
Company Name: CNBM International Locally
Manufactured:
CAGSG
Manufactured:
Address: Bahrain Production Period:
Delivery Ex-Works:
Total Delivery Time:
Local Agent: Ahmed Mansoor Al A-Ali Overland:
Sea Freight:
Total Freight:
PROGRAMME CONTRACTOR’S AUTHORIZED SIGNATURE
Date Required on Site:
Expected Date of Arrival on Site: Hassan Hammadeh
ENGINEER’S COMMENTS

Signed by: Signed by:


Discipline Engineer Assistant Resident Engineer
DOCUMENT STATUS
Code 1 – Work may proceed. Acknowledgment
Code 2 – Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Receipt
Code 3 – Revise & resubmit. Work may not proceed. Code 4 – Review not required. Work may proceed.
Consultant
IMPORTANT: Permission to proceed on behalf of BAC does not constitute acceptance or approval by BAC of design, calculations, analysis, tests, Stamp
methods of materials developed or selected by the Contractor and does not relieve him from compliance with his contractual obligations.

Contractor
Stamp
Resident Engineer Signature Date
CC: BAC, HILL

BAC Form 007 – Material Submittal