To Open New Project

Te Prepare Main DataBase

Design Mode
To Import Data Reserve
From Data Hirarci
Data SR yg masih Additive di rubah ke Weight Average
To Import Polygon
To Prepare Polygon Graphic
Menghitung secara
keseluruhan
To Set Up Calender by Fleet
To Scheduling Set Up
To Scheduling Running Video
Set Up by Legend
To Scheduling report
Shedule Report by ALL Volume

M (Kode Mine
DataBase) dan
didalamnya code dari
data base
Shedule Report by Seam
Shedule Report by Seam

Memunculkan Code
Shedule Report by Resource
Membuat Gantt Chart (Sequence)
Save As to Excel
To Prepare DataBase Report & Bus Graphic (Graphic Reserve LOM)
Excample Graphic LOM
To Prepare Range
To Prepare Preshedule Path / Mine Out Quantities
To Prepare Out Put Path
To Mine Status Plot
To Periode Plot Progress
Periode Status untuk Sequence Stripping
To Prepare Disposal
Kemudian ke Mincom untuk membuat Batter Block Disposal dan seterusnya hingga
sama dengan mengeluarkan Reserve Disposal dan Polygon Graphical Output

Import Data Reserv. Disposal


Harus Di Nol kan
Setiap Unit Diganti seperti contoh di bawah
Dimulai dari Elevasi terendah (Dumping kearah Elevasi yang terendah, contrengan
pertama di artikan awal dari Dumpingan Activity)
Continue to Run Scenario

Note : Vol. Pit Harus Lebih Kecil Dari Disposal


Edit Legend -- > Shading (input seperti contoh di bawah)
To Run Video

Note : Program Run Disposal Harus di Plot Type “Mine Status Plot”
1. Xpac Calender, Schedule Set Up, Running Scenario, Gantt Chart, Schedule Report