Calculated Target
Strand Elastic Jack Adjusted Pressure (Bars)
Start Finish Strand Force to be Jack Gauge Pressure (Bars)
Date Diameter Modulus Piston Area
Time Time Grade applied (KN) Type / No. No.
(mm) (Kg/Cm2) 2
(Cm ) 15% 100% 15% 100%
End-1 Extention (mm) End-2 Extention (mm) Gross Wedge Draw-In (mm) Jack Length Net Net Avg
Tendon Theoretical Strand Total %
Elongation Draw-In Elongation Elongation
No. Ext No. Extension Total Variation
Measur-1 Factor Total-1 Measur-2 Factor Total-2 Measur-1 Measur-2
Draw-In
x 2 (mm) (mm) (mm) (mm)
Total 1+2
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
Date: Approved :