Water
Q = mCpdT 20 70
∆T2 = 55
T1 = 20 °C
****-PIPE
T2 = 70 °C PIPE DIA (IN) = 27 mm
= 0.0334 m
CROSS SEC AREA = П/4d2
K = 0.158 W/M°C
CROSS SEC AREA = 0.0009 m2
Cp = 2.68 KJ/KG°C
FLUID VELOCITY = ?
V = 2.49 m/s
NRE = ρvd/µ
NRE0.8 = 7870
NPR0.33 = 2.25
.,Nu = 406
Nu = hD/k
406 = hD/k
hi = 2411 w/m°c
1/u0 = 1/hi+1/h0+d0ln(do/di)/2kw+do/di
1/hi = 0.0002
doln(do/di) = 0.00755314
Jh = hf
doln(do/di)/2kw = 0.000008
JH = jhNRe
do/di = 1.25375375
JH = NuPr-1/3(µ/µ)-0.14
1/u0 = 0.0006
JH = 179.5357
1/u0 = 0.0006
JH = jhNRe
u0 = 1601 w/m °C2
179.535697 = jhNRe
(∆T)ln = (∆T1-∆T2)/ln(∆T1/∆T2)
jh = 0.0024221
(∆T)ln = 77.32 °C
Area HE = ?
Q = UOA(∆T)ln
A = Q/UO(∆T)ln
A = 6.50 m2
= 0.42
A = ПdoL
L = 94.01
No of tubes = 15
No of tubes ~ 15
Cross sectional
area one tube = 0.00056 m2
Tube side velocity = volumetric flow /cross sectional area per pass
Number of passes = total cross sectional area /cross sectional area per pass
= 3.9491
= 4
Pressure drop
∆pt = No of passes(8hf(l/do+2.5)(ρv2/2)
= 23434.2373 N/m2
BLOW DOWN
COC = 56.16653