You are on page 1of 9

TREATMENT ROOM DATA SHEETS

Description of features, facilities, specifications, design and construction


For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

SPECIALTY: EXPERIENCE ROOM


A. Basics

 An Experience Room is a specialty feature that does not require a therapist.


 It is usually for two people and includes a seating area, steam/shower or rasul or mud bar, and
double tub
 All rooms must have sinks and counters equipped with locked cupboards, wall mounted towel
warmers (or warming drawers). Hot towel cabinets are be built in to the millwork.
 Each room is individually adjustable for lighting (all dimmable); temperature and music.

The illustrations below depict a standard layout for this treatment room including the following data:
standard layout, typical equipment to brand specifications, typical locations for electrical outlets and
control switches and minimum space requirements. For details on equipment, refer to Equipment
Specifications Book or www.willowstreamspastandards.com.

SPECIALTY ROOMS
EXPERIENCE

Fairmont Raffles Hotels International Inc. Page 1 of 9


June 2011
TREATMENT ROOM DATA SHEETS
Description of features, facilities, specifications, design and construction
For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

EXPERIENCE ROOM

Total Room Area: 18.2 m² / 196 ft²

SPECIALTY ROOMS
EXPERIENCE

Fairmont Raffles Hotels International Inc. Page 2 of 9


June 2011
TREATMENT ROOM DATA SHEETS
Description of features, facilities, specifications, design and construction
For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

B. EQUIPMENT SPECIFICATIONS

Plumbin
Equip. # Image Description Electrical Outlet Item # Installed By
g
FIX-20 Wall mount, high quality 110V or Hard None MYTEO13 Client's
chrome complete with all 220V as wired, 0 Contractor
hardware. Includes Wire kit. appropriate, Built-in
220V. 100 Rated GFCI
Watts
FIX-6 Hydrotherapy tub for two, with 220V or 5-20R 3/4" MTIEH Client's
automatic. This fill and drain 110V as receptacle Hot/Cold Contractor
tub is designed for two people appropriate, s under in floor,
facing each other. Drop-in, Uses two (2) tub, GFCI waste
model features: 16 water jets 20 amp required direct to
powered by 2 water pumps, circuits with one 1.5"
Turbo-Fill, Hydro-Massage, accessible drain.
Self-Cleaning Disinfection reset
System, Kohler Stillness switch
chrome faucet set with high-

SPECIALTY ROOMS
flow valves and hand shower
in chrome. Also includes in-

EXPERIENCE
line water heater to maintain
desired water temperature.
FIX-16 Steam Generator with Warm 208V AC, 3 Hard Water AC3K14- Client's
Start. Include 2 Comfort Flo Phase, 14kW wired, inlet 3/8" 208-3-WS Contractor
steam heads in polished add NPT,
chrome. dedicated Drain
GFCI outlet
1/2" NPT
FIX-16b Digital Control & Steamhead See wiring Connect None ACK60-CP Client's
Trim Kit – Chrome. Locate in instructions to Steam Contractor
the treatment room but not Generator
visible to clients.

FIX-16a Warm Start Control Switch N/A None None ACWS-CP Client's
Activates Warm Start. Locate Contractor
in the treatment room but not
visible to clients.

Fairmont Raffles Hotels International Inc. Page 3 of 9


June 2011
TREATMENT ROOM DATA SHEETS
Description of features, facilities, specifications, design and construction
For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

Plumbin
Equip. # Image Description Electrical Outlet Item # Installed By
g
FIX-16d Automatic Drain System to Connects to Connect Connect ACADK Client's
flush system after each use. TB2 to Steam 1/2" Contractor
Terminal Generator copper
Block piping to
tank
drain,
direct to
floor
drain
VFIX- Mystifier Inline Aromatherapy 110V or Adjacent Connect ESMIST Client's
16e System to fit on Steam 220V as to unit into Contractor
Generator Steam Line. This appropriate, w/6' cord. steam line
inline system adds eucalyptus Startup .74 between
and other oils directly into the Amps generator
steam line. and in
room
nozzle
FIX-22 South Pacific Overhead Rain None None Custom, SESPRAD Client's
Custom Shower with 1/2" A Contractor
Handheld Overhead Shower- hot/cold,
ADA Overhead 9.25" shower 3" waste

SPECIALTY ROOMS
head with 107 no-clog spray
heads, thermostatic control,

EXPERIENCE
volume control & ADA-
compliant hand shower with
36" wall bar with 60" flexible
hose.

Fairmont Raffles Hotels International Inc. Page 4 of 9


June 2011
TREATMENT ROOM DATA SHEETS
Description of features, facilities, specifications, design and construction
For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

C. GENERAL

Dimensions:

 Minimum 11’ (3.4) X 20’ (6.1m)


Sound Separation:
 Sound proofing between rooms, water pipes, drains and doors.
 Sound separation STC 54 minimum for all walls.
Doors:
 Solid core
 Silent closing devices
 Doors to steam / shower need to be frosted, 3/8” (8 mm) tempered glass doors with aluminum
frame

SPECIALTY ROOMS
EXPERIENCE
Window:
 Locate on wall opposite from entry door where possible
 Sound proof
Window Treatment:
Obscure/covered (black-out)

Wall:
 Standard dry wall construction
 Where possible, all finishes should be rated “Green”; made from environmentally friendly
materials.
 Semi-gloss or satin finish preferred for upper wall and tile/mosaic for lower walls
 Steam shower finishes are tiles using continuous slip resistant stone surfaces to floor and seating
(or reconstituted agglomerates or Avonite. Marble is not permitted

Flooring:

Fairmont Raffles Hotels International Inc. Page 5 of 9


June 2011
TREATMENT ROOM DATA SHEETS
Description of features, facilities, specifications, design and construction
For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

 Tile required with floor sloped minimum of ¼ “ per ft from all walls to central floor drain under
table position
 No marble
Ceiling:
 Fully enclosed (no drop ceilings)
 Steam / Shower ceiling slopes (see variety of shapes in Wet Area Standards)
Steam Shower/rasul:
 Steam Shower wall construction is prefabricate polystyrene panels (80mm) waterproof
construction system reinforced with fiber glass and cement mortar coating to both sides created
thermal insulation and moisture and mold resistance
 One double steam shower at 7 X 7 minimum
 The floor for the entire shower area shall be sloped towards the shower floor drain with the size of
the drain varying from a 2” to 4” (4 cm x 10 cm) waste line, depending on the selected shower
feature.

SPECIALTY ROOMS
Built in seating and mud table

EXPERIENCE
Consider built in amenity shelves in shower to accommodate four products.
 Maximize exhaust and adequate negative pressure to reduce humidity transfer to dry areas.
 Mud bar / Rasul optional (see specialty equipment specifications)

Steam Generator Steam Generator and steam inlet


Generator located in the technical space provided providing steam to a steam inlet. Inlet should make
steam inlet position obvious and could be decorative and complimentary to the overall theme. Drain
required in the technical closet for steam generator. Local controls within the closet area. Etheric oil
infusion system should be included and integrated into the generator system.

Fairmont Raffles Hotels International Inc. Page 6 of 9


June 2011
TREATMENT ROOM DATA SHEETS
Description of features, facilities, specifications, design and construction
For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

D. MILLWORK: (refer to Spa & Fitness Typical Millwork/Joinery Drawings)


 Cabinets are lockable mastered (see room layouts) to store clean linen and supplies.
 Countertops are standard 35-36” [89-90 cm] high and have at least 5 linear feet [152 cm] of
surface space. The surface is to be stain resistant, have a smooth surface and be easily cleaned.
Hot towel cabinets should be placed on an open shelf in the upper cabinet. This space needs to be
minimum of 2’6” wide (762), 1’3” high (381) and 1’2” deep (356) to fit the specified equipment.
Must have electrical at shelf height.

E. EQUIPMENT (FIXED ONLY)


 Hand sink at counter is flush to countertop, with either lever handles or one handle temperature
controls.
 Faucet is goose neck style at least 8” [20.32cm] height above sink top and should not splash or
make noise when water is on. E.g. Stillness deck mount faucet K-956 from Kohler
 Towel warmer is hard wired hot towel warmer is required positioned on wall near door side or as
positioned in drawings. Option to provide heated drawers in millwork for towels.
 Steam generator is selected from specifications and located within 10 ft of the steam room

SPECIALTY ROOMS
 Shower equipment is minimum hand held and overhead rain for one or two.

EXPERIENCE
 Tub - double jetted hydrotherapy tub per specifications with drain and fill capability of 10
minutes. Pipeless system or with disinfectant system required. Cable drain essential.

F. MECHANICAL ELECTRICAL PLUMPING (MEP)

HVAC:
 Each room must have independently controlled HVAC unit with full temperature range.
 Supply grills and airflow are directed away from the tables.
 Slot vents are preferred and all intakes are hidden.
 Access panels are discretely placed - above the door or out the line of sight when guests enter.
 All heating and air conditioning vents must be silent and placed to avoid blowing on clients.
 Maximize exhaust and adequate negative pressure to reduce humidity transfer to dry areas (due to
shower)

Humidity Level:
 High

Fairmont Raffles Hotels International Inc. Page 7 of 9


June 2011
TREATMENT ROOM DATA SHEETS
Description of features, facilities, specifications, design and construction
For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

PLUMBING
Drain:
 Sink waste at working counter and at hand sink in WC
 2” [50.8mm] floor drain in shower stall
 Add two 2” [50.8mm] drains in shower stall if Swiss Shower or body jets are specified.
 Central floor drain outside the steam area
 Tub drains per the specifications of the tub selected - drain and fill must be under 10 minutes.
Fire Suppression:
 Per Code
Water Supply:
 Hot and Cold Supply at counter
 Hot and cold supply at Tub

SPECIALTY ROOMS
ELECTRICAL

EXPERIENCE
Power – Electrical Outlets:
 Two 110v/220v 15 amps GFCI outlet at counter
 Two wall locations of 110v/220v 15 amps 12” AFF on wall opposite wall of counter and side
wall away from door
 110v/220v 15 amps GFCI outlet located behind the Hot Cabinet (either to far right or left side to
allow or plug).
 See locations on sample layout.
Lighting:
 All lights are dimmable and indirect.
 Two wall sconces minimum are provided
 One attractive ceiling mounted light or cove lighting around the room
 Steam shower lighting with separate control
 One task light under cabinet over countertop. Place control for this light at countertop location.
 All controls are to be “low tech” and simple to operate adjacent to other controls at the door entry.

Fairmont Raffles Hotels International Inc. Page 8 of 9


June 2011
TREATMENT ROOM DATA SHEETS
Description of features, facilities, specifications, design and construction
For additional details on treatment rooms and other areas of spas refer also to: Brand
Standards, Spa& Fitness Typical Millwork, Wet Area Standards & Willow Steam Concepts

Music:
 Control for selection of music of minimum of 8 channels from a central system with a volume
control
 Speakers are of high quality, recessed in the ceiling. For sound system requirements refer to
Section P of Design Standards

Telephone:
Not required

G. OTHER

Furniture:

 Two chairs that are comfortable with ottoman and side tables for the interior with oil resistant
fabric choices

Fixtures:
 Robe hook (two )located behind arrival door

SPECIALTY ROOMS
 Robe hooks (two) by stream shower

EXPERIENCE
Signage:
 Small number beside each door outside room (names are optional to add)
 Small dowel/hook under the number for hanging in use/not in use symbol
Local Code:
 Take into consideration all spa licensing requirements as well as zoning, building codes and
permits, labor unions, fire safety codes, water, sewage, electrical code and ADA requirements as
they relate to your area.
 Check all Local Department of Health, State Board and health and safety regulations.

Fairmont Raffles Hotels International Inc. Page 9 of 9


June 2011

You might also like