Professional Documents
Culture Documents
PILING PACKAGE
A. GENERAL REQUIREMENTS
1 Site Survey (Stacking Out) & Site Clearing Area (± 5700m2) ls
2 Temporary Facilities & Controls: ls
- Contractor's Office & storage and barracks
- Water, power and lighting for the works
- Security, safety, health & welfare of work people
- Temporary fencing high = 2m, L = 354m & signed board project
3 Project Documentation & Administration ls
4 Shop drawings & as built drawings ls
5 Mobilization and Demobilization ls
6 Insurance (CAR & Insurance of Contractor's personnel) ls
B. EARTH WORK
1 Excavation for Safety Ditch m3
2 Removed Disposal soil m3
C. FOUNDATION WORK
C.1 Supply & Install Spun Pile
Indicator pile shall be driven located as shown at plan piling silo until reach final set
criteria, and final pile length (main piling) will be order based on indicator pile data
1 Indicator Pile
1.1 Spun Pile dia. 600 mm, 19 meter depth
2 Main Piling
2.1 Spun Pile dia. 600 mm, 19 meter depth
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-