You are on page 1of 6

HYUNDAI E&C CO.

, LTD
RAS LAFFAN C IWPP PROJECT SITE INSPECTION & TEST PLAN

PIPING – PULMBING WORKS


ITP NUMBER RLC-AH-QP-91-3001 REVISION NO. A

DATE JUNE 21, 2009

ITEM/COMPONET PLUMBING WORKS

PREPARED BY QCE H. S. KIM APPROVED BY QC MGR B. H. LEE

- LEGEND -
H-HOLD(MANATORY HOLD POINT UNTIL INSPECTION COMPLETE)
W-WITNESS INSPECTION POINT(PROCEED IF INSPECTION AUTHORITY NOT AVAILABLE)
R-REVIEW(RECORD/REPORT REVIEW)
S-SURVEILLANCE INSPECTION(RANDOM CHECK)

- NOTE -
1. ALL INTERNAL CONTROL DOCCUMENTS SHALL BE THE LATEST REVISION
2. CONSTRUCTION MATERIALS MUST BE APPROVED PRIOR TO START ANY WORKS
3. WHERE AN ACTIVITY IS NOT APPLICABLE THEN “N/A” SHALL BE INSERTED AGAINST THE APPROPRIATE OPERATION

REMARK
DISCIPLINE : HVAC ITP No. RLC-AH-QP-91-3001
RAS LAFFAN C IWPP / QATAR
WORK DESCRIPTION : Rev. No. A
Page 1 OF 2
SITE INSPECTION & TEST PLAN PLUMBING WORKS
Date JUNE 21, 2009
APPLICABLE REPORT PARTICIPATION BY
No DESCRIPTION OF INSPECTION TEST REMARKS
DOCUMENT FORM S/C HDEC Owner
1 Material Receiving Inspection
- Verify material type/size/quantity Material Spec. PQM-06-06 H W R
- Physical Damage Packing List
2 Excavation of Trench As per Design DWG. RLC-AH-QP-91- H W R
- Excavation Depth 3001-01
3 Bedding(Material & Thickness) As per Design DWG. RLC-AH-QP-91- H W R
3001-01
4 Plumbing Installation
1) Elevation of Pipe As per Design DWG. RLC-AH-QP-91- H W S
2) Hanger and Support of Pipe in Accessible Area 3001-01/03
3) Pipe Connection
5 Plumbing Fixture Installation
- Install proper fixture As per Design DWG RLC-AH-QP-91- H W S
- Check the location & elevation 3001-01
6 Pressure Test Method Statement
- Hydrostatic Test RLC-AH-QS-94-001 RLC-AH-QP-91- H H W
- Water Pressure Test Para. 9, 10 3001-02
Legend; H : Hold W : Witness S : Surveillance R : Review S/C : HDEC Subcontractor
DISCIPLINE : PIPING ITP No. RLC-AH-QP-91-3001
RAS LAFFAN C IWPP / QATAR
WORK DESCRIPTION : Rev. No. A
Page 2 OF 2
SITE INSPECTION & TEST PLAN UNDERGROUND PIPING(HDPE)
Date JUNE 17, 2009

APPLICABLE REPORT PARTICIPATION BY REMARKS


No DESCRIPTION OF INSPECTION TEST
DOCUMENT FORM S/C HDEC Owner

7 Pipe Insulation (If applicable) As per Design DWG. RLC-AH-QP-91- H W S


3001-01
8 Backfilling
- Backfilling Material As per Design DWG. RLC-AH-QP-91- H W R
- Backfilling 3001-01
Legend; H : Hold W : Witness S : Surveillance R : Review S/C : HDEC Subcontractor
RAS LAFFAN C IWPP PROJECT

INSPECTION REPORT FOR PLUMBING WORKS

BUILDING : UNIT NO.:

SYSTEM: DWG. NO.:

NO. CHECK ITEM RESULT REMARK

1 Material Verification

2 Excavation of Trench

3 Bedding(Material & Thickness)

Plumbing Installation

1) Elevation of Pipe
4
2) Hanger and Support of Pipe in Accessible Area

3) Pipe Connection

5 Piping Fixture Installation

Pressure Test
6
(Hydrostatic Test or Water Pressure Test)

7 Insulation(if applicable)

8 Backfilling

REMARKS :

SIGNATURE DATE

CHECKED BY SUBCON :

VERIFIED BY HDEC QC :

REVIEWED BY OWNER :
FORM NO. RLC-AH-QP-91-3001-01
RAS LAFFAN C IWPP PROJECT
PRESSURE TEST REPORT
PACKAGE NO. : P & ID NO. :

SYSTEM : DATE OF TEST :

TYPE OF TEST : DESIGN PRESSURE / TEMP :


□ HYDROSTATIC □ PNEUMATIC □ OTHERS REQUIRED TEST PRESSURE :

TEST MEDIUM / TEMP : ACTUAL TEST PRESSURE :

PRESSURE GAUGE SERIAL NO.:

PRESSURE HOLDING TIME : MIN., START : FINISH :

SKETCH OF TEST BOUNDARIES :

RESULT : ACCEPT REJECT

REMARK :

SIGNATURE DATE

CHECKED BY SUBCON :

VERIFIED BY HDEC QC :

REVIEWED BY OWNER :
FORM NO. RLC-AH-QP-91-3001-02
RAS LAFFAN C IWPP PROJECT

GENERAL CHECK REPORT

Description

EQP’T Name Unit No.

TAG No. DWG. No.

SKETCH :

REMARK :

SIGNATURE DATE

CHECKED BY SUBCON :

VERIFIED BY HDEC QC :

REVIEWED BY OWNER :
FORM NO. RLC-AH-QP-91-3001-03